2013-14 HIGHWAY INFRASTRUCTURE CAPITAL PROJECT LIST
Trans-Canada Highway (PTH 1)

Micro-surface seven kilometres in Headingley from Goal Road to the CPR Crossing

Structure rehabilitation at Birch River located 4.8 km east of PR 506, east of Prawda

Commence grade widening of 32 km from Brokenhead River to Greater Winnipeg Water
District Railway crossing

Commence intersection improvements in Headingley

Micro-surface 0.9 km from four km east of PTH 26 to 4.9 km, east of PTH 26

Micro-surface 8.5 km from Portage la Prairie to west junction of PTH 1A

Micro-surface eight km from PR 248 from 0.5 km, west of PR 332

Continue the culvert replacements from PTH 16 to the Portage Diversion

Structure rehabilitation at Assiniboine River located 6.6 km west of PR 430, east of Portage
la Prairie

Pave 10 km of westbound lanes and shoulders from west of Portage la Prairie to PTH 16

Micro-surface 13.3 km from PTH 21 to west junction of PR 250

Continue paving the new service road in Brandon from Deer Ridge to one km east of east
junction PTH 10

Minor structure rehabilitation at Assiniboine River located 0.7 km south of PR 459, west of
Brandon

Pave 13.1 km on the westbound lanes from PTH 5 to 13.1 km east of PTH 5 including the
shoulders.
PTH 1A
 Pave 0.9 km in Portage la Prairie from Eighth Street to 18th Street on Saskatchewan
Avenue

Pave 1.6 km in Brandon from 34th Street to 18th Street on Victoria Avenue
PTH 2
 Complete structure replacement at Codner Drain in the vicinity of Starbuck

Micro-surface 15.3 km from PR 244 to PR 240

Commence structure rehabilitation at Souris River in the vicinity of Wawanesa as part of
flood restoration
...2
-2
Micro-surface 11.9 km from east junction of PR 256 to 11.9 km east, near the Reston
access

Micro-surface 21.5 km from PTH 22 to PTH 10
PTH 3
 Intersection improvements at PTH 23

Continue grade widening, base and paving of 21.4 km from east junction PR 254 to south
junction of PTH 21, west of Deloraine
PTH 5
 Pave 21.6 km from south junction PR 265 to PR 261

Structure rehabilitation at Shell River located 0.4 km east of PR 583, east of Roblin

Micro-surface 10.2 km from PTH 19 to PTH 50

Grade west of PTH 10, southwest of Ashville

Replace structure at drain located in the vicinity of Kelwood

Replace structure at Turtle River located in the vicinity of Laurier
PTH 6
 Grade including base a 1.5 km new location in the vicinity of Woodlands

Micro-surface 24.7 km from 42.3 km north of PR 513 to 67 km north of PR 513

Micro-surface 25.6 km from Grand Rapids Drive to 25.6 km north of Grand Rapids

Micro-surface 29.8 km from PTH 39 to PR 373

Commence grading and culvert replacements of 25 km from Sasagiu Rapids to 25 km
north
PTH 7
 Pavement rehabilitation of 20.6 km from 1.6 km south of PTH 101 to 2.3 km north of
PTH 67
PTH 9
 Commence paving of 13 km from PTH 4 to three km north of Clandeboye
PTH 10
 Micro-surface 22.2 km from south junction PTH 23 to south junction of PTH 2
...3
-3
Culvert jacking from 6.7 km north of PTH 3 to 0.8 km north of south junction PTH 23

Minor structure rehabilitation at Souris River located south of south junction of PTH 2 as
part of flood restoration

Commence grade widening, base and paving including the passing lanes of 15.6 km from
0.4 km north of PTH 25 to 4.5 km north of PTH 24

Structure rehabilitation at Bowsman River located 0.9 km north of PR 266, north of
Bowsman

Grade north of Ashville

Pave 15 km from Overflowing River to 10 km south of PTH 60

Pave 19.8 km from 19.8 km south to Overflowing River

Various culvert replacements located south of The Pas from PTH 60 to PR 289
PTH 11
 Commence structure rehabilitation at Powerview Creek, near Pine Falls

Micro-surface 14.2 km from 5.8 km west of the south junction of PTH 44 to the north
junction of PTH 44
PTH 12
 Commence structure replacement at West Pine Creek located 2.7k m east PTH 89, east of
Piney

Commence structure replacement at East Pine Creek located 3.5 km east PTH 89, east of
Piney

Commence structure replacement at Sprague Creek located 0.5 km west of PR 308, south
of Sprague

Commence structure replacement at Mud Creek located 1.1 km west of PR 308, south of
Sprague

Commence structure replacement at Seine River Diversion located 1.5 km south of
PR 210, south of Ste. Anne

Micro-surface 40.2 km from PR 308 to PR 210

Replace structure at Rat River Diversion, southwest of Zhoda
PTH 13
 Continue culvert jacking from Carman to Elm Creek
...4
-4PTH 16
 Complete grade widening, base and paving of 18.2 km Binscarth to east of Foxwarren
PTH 20A
 Intersection improvements in Dauphin at Mountain Road
PTH 21
 Replace structure at Souris River located in the vicinity of Hartney as part of flood
restoration
PTH 23
 Continue the structure rehabilitation at Red River location 1.2 km east of PTH 75, east of
Morris
PTH 34
 Complete structure replacement at Gillespie Drain, south of Gladstone
PTH 44
 Micro-surface four km from PTH 9 to PTH 59
PTH 59
 Micro-surface eight km from two km north of PTH 101 to PR 213

Commence paving 28 km from north of the Brokenhead Ojibway First Nation to PTH 11
PTH 75
 Commence intersection improvements at U.S. border
PTH 83
 Grade reconstruction from 1.1 km north of PR 366 in the vicinity of Inglis

Commence grading, base and paving of 1.8 km from PR 366 to 1.8 km north PR 366 in the
vicinity of Inglis

Complete grading, base and paving of 20.4 km from north of PR 367 to south of PTH 57,
north of San Clara

Commence grading, base and paving of 8.5 km from PR 264 to north of PR 482
...5
-5PTH 100 (South Perimeter Highway)

Pavement rehabilitation at PTH 1 west junction, south Perimeter

Structure rehabilitation at east interchange of PTH 1, south Perimeter

Commence intersection improvements from Brady Road to PR 330, south Perimeter

Structure rehabilitation at PTH 75, south Perimeter

Continue intersection improvements at various median openings on the south Perimeter
PTH 101
 Pavement rehabilitation of eight km from 0.9 km south of PTH 59 to 0.7 km north of PTH 15
PTH 110
 Complete grading, base and paving of 4.1 km from Assiniboine River to PTH 1
PR 204
 Minor structure rehabilitation at the Red River in Selkirk
PR 205
 Micro-surface 13.1 km from 22 km east of PTH 3 to PTH 75
PR 207
 Structure rehabilitation at Cordite Drain located north of PTH 15
PR 211
 Structure rehabilitation at Winnipeg River, east of Pinawa
PR 213
 Micro-surface 8.8 km from PTH 59 to PR 206
PR 221
 Continue with the structures at CentrePort Canada Way

Continue paving at CentrePort Canada Way
PR 222
 Replace structure at the Fish Creek drain located 1.7 km south of PR 324, south of Camp
Morton
...6
-6PR 227
 Continue replacing the structure at the Assiniboine River Diversion, north of Portage la
Prairie as part of flood restoration
PR 243
 Grade, base and pave one km in Reinland
PR 245
 Grade 2.8 km from east junction of PR 242 to 2.8 km east
PR 246
 Structure rehabilitation at St. Jean Baptiste as part of flood restoration
PR 251
 Replace structure at Souris River located in the vicinity of Coulter as part of flood
restoration
PR 253
 Commence structure replacement at Pembina River located west of Pilot Mound
PR 255
 Commence road improvements of various locations between PR 256 to PTH 83
PR 269
 Micro-surface 14.6 km from south junction PTH 20 to north junction PR 364
PR 280
 Continue grading from PR 391 to 174 km east of PR 391, cost-shared with Manitoba Hydro
PR 287
 Replace structure at Cormorant Lake Narrows located 38.7 km north of PR 384, at
Cormorant
PR 304
 Continue grading improvements from Manigotagan to east of Wallace Lake
...7
-7PR 315
 Continue grading improvements from PR 313 to Ontario boundary
PR 325
 Road improvements of 10 km between 12.9 km east of PTH 6 to 38.7 km east of PTH 6
PR 334
 Micro-surface 0.8 km from PTH 3 to PR 247
PR 340
 Surface 10.4 km from PR 453 to 10.4 km north of PR 453
PR 348
 Minor structure rehabilitation at Little Souris River located southwest of Brandon as part of
flood restoration
PR 373
 Continue surfacing 28.8 km from six km north of Rossville junction to Sea Falls, north of
Norway House

Continue grading 21.8 km from Minago River to 21.8 km north of Minago River, north of
Jenpeg
PR 384
 Continue grading of the new location in the vicinity of Lobstick Creek
PR 391
 Grade improvements of various locations from Thompson to Suwannee River
PR 392
 Continue grading, base and paving of Hudson Bay
PR 481
 Road improvement from Cayer to Crane River as part of flood restoration
PR 483
 Surface various locations from PTH 10 to Sapotaweyak Cree Nation
...8
-8PR 513
 Micro-surface from PTH 6 to 10.1 km east of PTH 6

Road improvements from east of PTH 6 to Dauphin River First Nation
PR 610
 Intersection improvements in Brandon at 17th Street East (Richmond Avenue)
Winter Roads
 Continue installing the structure at Panko Narrows