Brief summation of the transboundary water projects which I have

advertisement
Composite Natural Resource Management Brief
Ousmane Dione, World Bank Lead Water Resources Specialist:
1.
Senegal River Basin Regional Hydropower Project: The first power pool in West Africa connecting
three of the riparian countries of the Senegal River Basin (Mali, Mauritania and Senegal) through 1,500 km
of transmission lines jointly financed owned and operated in conjunction with the Manantali multipurpose
hydropower dam. The project also pioneered the development of the water charter of the Senegal River that
governs the overall water allocation among all users in the Senegal River Basin.
2. Inclusive framework of the Senegal River Basin: This technical assistance project promoted and
facilitated the overall institutional, legal and technical dialogue among the four riparian countries of the
Senegal River Basin (Guinea, Mali, Mauritania and Senegal) leading to the return of Guinea into the
Senegal River Basin Organization (OMVS) Guinea left 34 years ago. The inclusive framework also
embedded the preparation and adoption of a priority development program to be implemented by OMVS
on behalf of the four countries;
3. Senegal River Basin Water and Environmental Management Project: The first basin-wide water and
environment project to build linkages between regional, national and local levels across the four riparian
countries of the Senegal Basin. An important aspect of the project was the establishment of local level
coordination committees (LCCs) across the basin with a specific focus on transboundary natural resource
management activities and active stakeholder participation through regional involvement and coordination
of NGOs within the Basin;
4. Senegal River Basin Multipurpose Water Resources Management Program: A 10 year program to
implement a Basin wide multi-sector program, including hydropower development, innovative benefitssharing at the local level (through associated income generation activities and reduction of waterborne
diseases resulting from regional infrastructure-Malaria and Bilharzia) and institutional capacity building at
regional, national and local levels (2006 to date). An important feature of the project is the operational
decision making process at three levels in implementing the program activities across the basin and within
the four countries.
5. Niger Basin Authority (NBA) Institutional Reform. This technical assistance project led to the overall
revamping of one of the oldest basin organizations in Africa (NBA) and the preparation of a basin master
plan with a priority regional development program worth USD 8 billion.
6. Niger Basin Water Resources and Environmental Management Project. The first regional water
resources management operation implemented across the nine countries of the Niger Basin. The project
built and strengthened the linkages between the NBA, riparian countries and grassroots organizations in
addressing water and environmental hotspot issues within the Basin.
7. Niger Basin Water resources development and sustainable ecosystem management program: This
ambitious program spanning over 12 years aims at implementing priority actions within the Niger Basin
master plan. It includes the rehabilitation of multipurpose hydropower dams in Nigeria in support of the
West Africa Power Pool Program (WAPP) with the supply of electricity to riparian countries (Benin and
Niger); the feasibility studies for additional dams (Mali, Guinea and Nigeria); the development of planning
tools for cooperative management and sharing of the Niger River water resources, and the development of
income generation activities across the five countries participating in the first phase of the program. The
program also includes an important feature on conflict resolution through the active involvement of
stakeholders know as Fada Ngourma forum on decision making for basin water resources management.
8. Volta River Basin Institutional program: This initiative included support to the six riparian countries of
the Volta River Basin in establishing the Volta River Basin Authority in 2006.
9. Congo Basin: Started initial discussions with the International Commission of Congo Ubangui-Shari
(CISCOS) on developing a regional initiative for water resources management in the Congo Basin.
10. Indus and Ganges River Basins: Coordinates water resource initiatives and related regional activities in
the context of an emerging regional priority on the great rivers of the Himalayas in the South Asia Region.
Mekuria Tafesse, Water Resources Management Consultant
Experience supporting transboundary water projects:
1
1.
NEPAD’s1 Short Term Action Plan for Transboundary Water Resources, 2003/2004 - consultant to
AfDB: Identification of projects that enhanced the formation, or strengthening, of river basin organizations.
Necessitated assessments of the status of the cooperative development and management of selected River
basin Organizations, consultations with Regional Economic Commissions (ECOWAS and the SADC), the
development of coherent approaches and recommendations for a set of initial projects for the immediate to
medium term. The transboundary river/lake basins assessed were: Senegal, Niger, Lake Chad and Congo.
For the Congo River Basin recommendations were provided on approaches to initiating riparian
cooperation.
2.
Eastern Nile Subsidiary Action Program, 2005/2009 - ENTRO ED: Identification and preparation of
cooperative investment projects, consensus building through extensive stakeholder engagements, resource
mobilization and initiation of implementation that included a power interconnection. Investments worth
US$ 500m were acquired by the countries (with much more in the pipeline) as a result of cooperation.
Some of the major achievements were: a shared understanding of river basin resources (socio-economics,
environment and water resources), the strengthening of regional and country institutions that drive
cooperation, trust building and development of partnerships, various stakeholders were included:
development partners, parliamentarian groupings, multi-sectoral experts, academicians, researchers, civil
society, media, etc. Planning for larger joint investments is underway, encouraged by the experiences
garnered from the Senegal River Basin and Lesotho Highlands Development Project.
3.
Zambezi Basin Multi-Sector Investment Opportunity Analysis, 2009 - Consultant to World Bank:
Contributed to a technical workshop on the preliminary findings of a study investigating the opportunities
for multi-sector investment in the Zambezi River Basin, delivered a session on experiences and lessons
learnt in cooperative transboundary river basins in Africa and participated in the planning of future steps.
New Partnership for Africa’s Development - now part of the African Union