Section Cover Page Section 13905 Sprinkler Equipment 1999-08-27 This Master Specification Section contains: .1 This Cover Sheet .2 Data Sheet - Shop Drawing Review Process .3 Specification Section Text: 1. 1.1 1.2 1.3 1.4 General Related Requirements General Requirements Quality Assurance Submittals 2. 2.1 2.2 2.3 2.4 2.5 Products Sprinkler Head Sprinkler Valve Excess Pressure Pump Air Compressor Siamese Fire Department Connection 3. 3.1 Execution Installation BMS Basic Master Specification Alberta Infrastructure Master Specification System Page 0 Data Sheet - Reference Standards Section 13905 Sprinkler Equipment 1999-08-27 Applicable Standards .1 NFPA13-1996 Installation of Sprinkler Systems These reference documents may be available for reference purposes in the Technical Resources and Standards Division Library, Alberta Infrastructure, 3rd Floor, 6950 - 113 Street, Edmonton; Telephone: (780) 427-7924. BMS Basic Master Specification Alberta Infrastructure Master Specification System Page 01 Data Sheet - Shop Drawing Review Process 1999-08-27 Section 13905 Sprinkler Equipment Risk Management and Insurance Division of Alberta Treasury is responsible for approval of fire protection system shop drawings for insurance underwriting purposes. The following is an outline of the shop drawing review process required to ensure that Risk Management is provided with a reviewed set of shop drawings: .1 Contractor submits sprinkler system shop drawing through Alberta Infrastructure to Prime Consultant. .2 Prime Consultant distributes shop drawings to appropriate subconsultants for review. .3 Prime Consultant returns reviewed shop drawings to Alberta Infrastructure. .4 Alberta Infrastructure sends one set of reviewed shop drawings to Risk Management and Insurance, Alberta Treasury. .5 Alberta Infrastructure retains one set of the reviewed shop drawings and returns the remaining sets to the Contractor. .6 Risk Management communicates any concerns or required changes to Prime Consultant. .7 Prime Consultant communicates instructions to Contractor by change order if necessary. BMS Basic Master Specification Alberta Infrastructure Master Specification System Page 02 Section 13905 Sprinkler Equipment Page 1 Plan No: Project ID: 1. General 1.1 RELATED REQUIREMENTS .1 1.2 Spare Parts and Maintenance Materials: Section 15030. GENERAL REQUIREMENTS .1 Provide complete sprinkler system as required by local Codes and as indicated on drawings. Size of sprinkler system is based on [light hazard occupancy] [ordinary hazard occupancy] [extra hazard occupancy]. .2 Provide sprinklers for areas as indicated and required, including specialized rooms. Run piping concealed above furred ceilings and in joists to minimize obstructions. Expose only heads. 1.3 QUALITY ASSURANCE .1 Sprinkler equipment and installation shall be reviewed and approved by local Fire Commissioner. .2 Sprinkler equipment shall be installed by qualified Contractors licensed and regularly engaged in installation of automatic fire sprinkler equipment. .3 Equipment and installation shall meet the requirements of NFPA 13-1996 - Installation of Sprinkler Systems. 1.4 SUBMITTALS .1 Submit preliminary layout showing only head locations for review by the Minister. Furnish additional heads which may be required for coordinated ceiling pattern without added cost, even though number of heads may exceed minimum code requirements. .2 Submit detailed pipe layout, component and hydraulic design calculations, approved by local Fire Commissioner. 2. Products 2.1 SPRINKLER HEAD .1 Temperature rating on fusible links shall suit specific hazard area with minimum margin of safety 10°C. .2 For suspended ceilings, provide [standard] [recessed] pendant type with [brass] [chrome plated] finish and escutcheon. Section 13905 Sprinkler Equipment Page 2 Plan No: Project ID: .3 2.2 For exposed areas, provide standard upright type with [brass] [chrome plated] finish. For sidewall application, provide sidewall type with [brass] [chrome plated] finish and escutcheon. SPRINKLER VALVE .1 2.3 Provide approved automatic sprinkler valve with one or two pole [as required] flow detectors, pressure switch, outside water motor gong [, outside electric gongs], inside electric gong and circuit breaker, [excess pressure pump], [ air compressor]. EXCESS PRESSURE PUMP .1 2.4 Provide pump capable of pumping sprinkler system to 280 kPa in excess of normal pressure with supports, gauge, starter and connection to sprinkler system. AIR COMPRESSOR .1 2.5 Provide electric drive, horizontal tank mounted, single stage compressor, capable of restoring normal system air pressure within 30 minutes, two pole air pressure operated electric pressure switch with 2-way release or breather valve, safety valve, check valve, tank drain, belt guard and controls. SIAMESE FIRE DEPARTMENT CONNECTION .1 Provide two-way [standard] [flush mounted] Siamese fire department connection with [brass] [chrome plated] finish, local fire department thread, dust caps and chains, 20 mm automatic drip [connected to drain], marked "Sprinkler - Fire Department Connection." .2 Siamese fire department connection for sprinkler system shall match connection for standpipe and hose system. 3. Execution 3.1 INSTALLATION .1 Protect sprinkler heads against mechanical injury with standard guards where necessary. .2 Locate outside alarms on wall of building adjacent to Siamese fire department connection. .3 Provide 25 mm diameter nipple and 25 x 15 mm reducing fitting for each upright head. Section 13905 Sprinkler Equipment Page 3 Plan No: Project ID: .4 Provide on sprinkler system take-off from water supply approved double check valve assembly with gate valves on either side. END OF SECTION