IEEE POWER & ENERGY SOCIETY WIND POWER COORDINATING COMMITTEE WIND PLANT COLLECTOR SYSTEM DESING WG CHAIR VICE CHAIR SECRETARY Mitch Bradt Univ. of Wisconsin-Madison Wayne Dilliing Senior Electrical Manager Michael Starke 432 North Lake Street, Rm 717 Madison, Wisconsin 53706 Tel: (608) 263-1085 bradt@wisc.edu Mortenson Construction Tel: (763) 287-5280 Wayne.Dilling@mortenson.com Oak Ridge National Laboratory Energy & Transportation Science Division One Bethel Valley Rd Oak Ridge, Tennessee 37831 Phone (865) 241-2573 Email: starkemr@ornl.gov Minutes of WG meeting #12 of the Wind Plant Collector System Design Working Group AWEA WINDPOWER 2011 January 24, 2011, 1:30 – 3:00 p.m. Anaheim, CA NEXT MEETING— July 26, IEEE PES General Meeting Detroit, MI Room: TBD Chair Mitch Bradt called the meeting to order at 1:30 pm. Mitch introduced the working group scope to the new attendees. The working group members and guests were introduced. A list of those in attendance is attached to these minutes. Meeting minutes were reviewed and accepted. The minutes from the eleventh meeting were accepted as is. Mitch presented on the past accomplishments of the working group and discussed the presentations for Wedensday. MEETING #12 AGENDA 1. 2. 3. Welcome and Introductions (reminder of website username and p-word) Review and acceptance of previous meeting minutes Reminder of NEC/NESC panel session “How to Apply Electrical Code Requirements for Large Wind Power Plants” May 25th 1:30 - 3:00 pm, Ballroom C a. b. c. 4. Mitch Bradt: Intro and Moderator Wayne Dilling: NEC and NESC Considerations from a Construction Perspective Chris Brooks: National Electrical Safety Code (NESC) (ANSI/IEEE C2) Applicability in Wind Farms d. Abdou Sana: NEC’s Applicability to Wind Power Plant (WPP) Collection Systems and Grounding Design Discussion/Finalization of presentations at PES GM 2011 “Wind Plant Collector System Design 3.0” Tues, July 26th 8:00 -10:00 am @ GM Renaissance Center • Harmonics, Resonance, and Flicker Issues with Wind Plants THE INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS, Inc Wind Plant Collector System Design Working Group Meeting #12 Minutes • Testing and Commissioning • SCADA and Control 5. 6. 7. OLD BUSINESS: a. Open discussion for volunteers for further paper drafts i. Application of Grounding Transformers ii. Terms, Definitions, Abbreviations for Wind Plant Collector Systems iii. Potential Impacts on Existing Infrastructure iv. Lists of Components and Material Standards that are Applicable to WPP v. Protection for WPP, 2.0 NEW BUSINESS: Article for Nov 2011 “Wind” Issue of Power & Energy Magazine Next meetings o Firm: PES GM in Detroit— Wed July 27th 8:00 - 10:00 Wed July 27th 10:00- noon Grounding for Personal Safety WandSPCSD wg Discussion of Presenters for IEEE PES General Meeting: Mitch discussed the presenters for the papers in July PES General Meeting in Detroit, MI. Reigh Walling and Dave Mueller would present the topic “Harmonics and Resonance Issues in Wind Plants.” Wayne Dilling and Ben Lanz will present “Wind Power Plant Testing and Commissioning.” Nestor Castillo will present on “Wind Power Plant SCADA and Control.” New Draft Topics Mitch introduced the original paper topics that had been discussed in previous meetings, but had not been addressed with a paper: “Application of Grounding Transformers for Wind Plants,” “Terms, Definitions, Abbreviations for Wind Plant Collector Systems,” “Potential Impacts on Existing Infrastructure in Wind Plants,” “Lists of Components and Material Standards that are Applicable in a Wind Power Plant,” and “Protection 2.0.” Mitch requested volunteers for “Application of grounding transformers.” Gary Zahalka volunteered to take the lead with Dewan Jamir, Ernst Camm, and Nestor Castillo providing support. A question was raised concerning whether grounding switches should be included in this draft paper. Gary Engmann and Steve Williams both commented that the paper should focus on how to size and the application of grounding transformer, but not include discussion on groundings switches. This could be saved for a future paper with a possible name of “Alternative Grounding Approaches for Collector System Design” Mitch moved to “Terms, Definitions, Abbreviations for Wind Plant Collector Systems” and requested volunteers. Chris Brooks volunteered to take the lead with support from Gary Engmann, Michael Starke, and Wayne Dilling. Chris suggested that we approach this paper topic through a review of the previous publications and the NEC 2011. Steve and others mentioned that a list was already circulating of terms within AWEA. Mitch moved to “Potential impacts on existing infrastructure.” Mitch asked the working group what this paper would cover. No one was exactly sure and Mitch striked the paper from the draft list until a more reasonable version could be created. Mitch requested volunteers for “Lists of components and material standards that are applicable to WPP.” Steve and Ernst both noted that a document was being developed by the PSRC and had relevant information. Michael Starke volunteered to lead this paper since he has been involved in the development of the draft. Ben Lanz and Dewan Jamir volunteered to provide support. Standards from IEEE, IEC, and ANSI should be incorporated in the draft. THE INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS, Inc PAGE 2 Wind Plant Collector System Design Working Group Meeting #12 Minutes Mitch moved to “Protection for WPP 2.0.” Ernst mentioned that in upcoming IEEE PES General Meeting J. Nimera and others have a publication discussing protection. We should incorporate this information into the paper. At this point, all of the previous paper topics were covered and Mitch requested other topic titles/areas. Steve noted that the working group had discussed this type of paper in the past and thought that paper topics should focus on collector system design and not modeling approaches. A number of working group members agreed and Ernst also noted that other working groups are possibility already involved in this area. This topic would not be initiated. An attendee mentioned the topic of “voltage regulation and var compensation,” by wind turbines. The working group believed that this topic had already been addressed. Steve suggested that since the working has recently incorporated solar into the title, a paper looking at design similarities between wind and solar collector systems should possibly be initiated. Some areas of interest would include, characterizing the different solar types of generation and examining the varying configurations of collector systems. No specific decisions were made regarding whether to move forward on this paper or not at the meeting. “Operation and Maintenance considerations for design of WPP” was suggested as a topic. Kyle Louis suggested that he would take lead. Chris Brooks, David Tillman, Samuel Moser, and Wayne Dilling would provide support. This paper would discuss topics such as the “Do’s and Don’ts” of designing. Chris Brooks also suggested “Asset management” (data needs) as a topic. Discussion on IEEE Magazine Article Mitch noted that the working group has been asked to provide an article to the PES magazine for November 2011. Ernst Camm, Mitch Bradt, Michael Starke, and Wayne Dilling would develop the article. Web Site Mitch reminded the working group on the username and password. Mitch also discussed how to access the website and information that was contained on the site. Adjourn The meeting was adjourned at 3:00 p.m. Attendees: # At Meeting Name Organization email 1 J. Barrett CG Power Solutions jbarrett@cgpowersolutions.com 2 C. Brooks S & C Electric CBrooks@sandc.com 3 E. Camm S & C Electric Ecamm@sandc.com 4 N. Castillo Garrad Hassan America Nestor.castillo@garradhassan.com THE INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS, Inc PAGE 3 Wind Plant Collector System Design Working Group Meeting #12 Minutes 5 W. Dilling Mortenson Wayne.dilling@mortenson.com 6 M. Ebert Ulteig Engineers Inc. Michael.ebert@ulteig.com 7 G. Engmann Burns &McDonnell g.engmann@ieee.org 8 L. Gray Commenwealth Associates Inc. hgray@cai-engr.com 9 D. Jamir Burns & McDonnell djamir@burnsmcd.com 10 V. Kadchhud Square D/Schneider Electric Vashi.kadchhud@schnieder-electric.com 11 B. Lanz IMCORP Ben.lanz@imcorptech.com 12 R. O’Hara Sargent & Lundy Robert.e.ohara@sargentlundy.com S. Miller Commonwealth Associates Incorporated s.miller@ieee.org 14 S. Moser Stantec Samuel.moser@stantec.com 15 S. Pell Schneider Electric sjpell@gmail.com 16 G. Porter Enernex gene@enernex.com 17 D. Price Garrad Hassan Doug.price@gl-garradhassan.com 18 D. Schafer Commonwealth Associates dashafer@ca-eng.com 19 J. Schoene Enernex jens@enernex.com 20 M. Shah Horizon Wind Energy Milap.shah@edpr.com 21 M. Starke Oak Ridge National Lab starkmr@ornl.gov 22 G. Todeschini Enernex Grazia@enernex.com 23 D. Wilkie Commenwealth Associates dwilkie@cai-engr.com 24 S. Williams S & C Electric swilliams@sandc.com 25 G. Zahalka Ulteig Gary.zahalka@ulteig.com 26 V. Zheglov Enernex vzheglov@enernex.com 13 THE INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS, Inc PAGE 4