STORM WATER MANAGEMENT

advertisement
GWINNETT COUNTY
STORM WATER MANAGEMENT
REVIEW CHECKLIST – CONCEPT PLAN
DEVELOPMENT NAME:
DISTRICT/LANDLOT/PARCEL:
ENGINEER:
FAX NUMBER/EMAIL:
REVIEWER:
DATE:
COUNTY CASE #:
...
Walk Through
...
Drop-Off, include a copy of these comments and one set of plans, do not drop off money or easement documents.
Bring to Suite 275- 2nd floor One Justice any day of the week. Allow up to 5 business days for re-review.
...
Section Re-Review, include a copy of these comments and one set of plans, do not drop off money or easement
documents. Bring to Suite 275- 2nd floor One Justice any day of the week. Allow up to 10 business days for re-review.
FYI if all comments are not addressed after the third review, a meeting will be required with County Staff, Designer and
Owner/Developer.
Abbreviations: DR - Development Regulations | FPMO - Floodplain Management Ordinance | RDNR - Rules of the
Department of Natural Resources | ESCO - Erosion and Sediment Control Ordinance | SSFISS – Stormwater Systems
and Facilities Installation Standards and Specifications
CONCEPT PLAN REVIEW
1)
Show Floodplain limits per FPMO 1.4.2.b .
2)
Provide Topo at minimum 10-foot contours (DR 10.1.3).
3)
Indicate on the plan the approximate 100-year water elevation of the existing lake.
4)
Discuss lot number(s)
5)
Label the 50-foot undisturbed buffer and 75-foot impervious setback adjacent to streams.
6)
Provide standard storm water notes indicated below in storm water notes section.
1.
with this office.
Select appropriate Floodplain Note(s). Select either note a or b and select notes c and d as applicable.
a.
There is no water course with a drainage area exceeding 100 acres or floodplain per FIRM Panel ________
dated _______ on this property.
b.
Floodplain for any water course with a drainage area exceeding 100 acres will be treated in accordance with
the Floodplain regulations
c.
Floodplain shown is from FIRM panel _______ dated ________.
d.
Floodplain shown is from Floodplain study titled ____________ by _______________ dated _______.
Study was done as a part of project number XXX xxxx-xxxxx.
GWINNETT COUNTY SWM – REVIEW CHECKLIST – CONCEPT PLAN
REV 05/02 05/01 10/06
Page 1 of 2
2.
3.
4.
Select appropriate wetlands note(s). Select either a or b and if wetlands are on the site select note c.
a.
There are no wetlands being disturbed on this site.
b.
All wetlands to be disturbed are delineated on this site.
c.
Prior to the wetlands being disturbed, an appropriate permit shall be obtained.
Select appropriate storm water management note.
a.
The Storm Water Management study for this concept plan is addressed in project named ___________ with
case number XXX xxxx-xxxxx.
b.
A Storm Water Management study shall be required for this project.
Select note a if appropriate. Always add note b.
a.
There are no stream buffers on site.
b.
A 50-foot undisturbed buffer and a 75-foot impervious setback adjacent to all streams shall be maintained
unless an appropriate stream buffer variance is obtained.
ADDITIONAL COMMENTS
7)
8)
9)
GWINNETT COUNTY SWM – REVIEW CHECKLIST – CONCEPT PLAN
REV 05/02 05/01 10/06
Page 2 of 2