603
Grant No -
49 - Ministry of Disaster Management and Relief
Medium Terms Expenditure
(Taka in Thousand)
Projection
Budget
Description
2014-15
2015-16
2016-17
Non-Development
Development
Total:
Revenue
Capital
Total:
1.0
Mission Statement and Major Functions
1.1
Mission Statement
To reduce risks for people, especially the poor and vulnerable, by strengthening the overall capacity of
disaster management and to establish an efficient and capable emergency disaster response system to
face large scale disasters.
1.2
2.0
Major Functions
a.
Formulation and implementation of laws, policies and an action plan for disaster risk reduction,
emergency response and disaster management;
b.
Preparation of policies and plans for urgent humanitarian assistance and rehabilitation programmes
and preparation and preservation of all social safety net programmes;
c.
Preparation of disaster risk reduction plan, taking up activities for training and research, and
coordination, monitoring and evaluation among local, regional and international development partners;
d.
Humanitarian assistance to ensure food security through the preparation and implementation of Food
for Work (Rural Infrastructure Development); Rural Infrastructure Maintenance (Test Relief), VGF,
GR, and other related programmes;
e.
Ensure employment for the ultra-poor during lean period of the year to reduce risk;
f.
Coordination of the use and distribution of emergency food aid and other humanitarian assistance
received from abroad;
g.
Implementation of programmes related to refugee affairs and co-ordination with national and
international agencies.
Medium Term Strategic Objectives and Activities
Medium-Term Strategic
Objectives
Activities
Implementing
Departments/Agencies
1
2
3
1. Institutionalising disaster
management system,
creation of
professionalism and
increasing the capability

Imparting training on disaster
management to all concerned people in
disaster prone areas
 Secretariat

Prepare agency-wise national and local
 Directorate rate of Disaster
604
Medium-Term Strategic
Objectives
Activities
Implementing
Departments/Agencies
1
2
3
level contingency plans for disaster risk
reduction and identification of disaster
prone and ultra-poor population areas
2. Construction, extension
and up-gradation of
infrastructure to reduce
disaster risks
3. Reducing the sufferings
and disaster risks for
vulnerable people and
people in danger

Procurement, maintenance and
distribution of rescue vehicles and
equipment to respond to disasters

Construction of small and medium
bridges/culverts for rapid discharge of
water

Construction and maintenance of multipurpose cyclone shelters in coastal
areas

Construction and maintenance of multipurpose flood shelters in flood prone
areas

Construction of cyclone resistant
houses, raising the grounds of social
institutions and raising high grounds
(matir killa)

Creation of employment for the ultrapoor, especially poor destitute women,
in identified disaster prone areas

Implementation of risk reduction and
climate change adaptation programmes

Identification ofinternal risks and
reducing loss of lives and properties
through early warning

Implementation of Food for Works
(FFW) Programme

Implementation of Test Relief (TR)
Programme

Implementation of Vulnerable Group
Feeding (VGF) Programme

Distribution of GR Food, GR Cash,
Sarees, Lungis, Blankets, CI Sheets,
House Building Grants etc.
Management
 Directorate rate of Disaster
Management
 Secretariat
 Directorate rate of Disaster
Management
3.0
Poverty and Gender Reporting
3.1
Impact of Strategic Objectives on Poverty Reduction and Women's Advancement
3.1.1
Institutionalising disaster management system, creation of professionalism and increasing the
capability
Impact on Poverty Reduction: Disaster risks have been mitigated through early warning signals,
necessary training and increasing public awareness activities, strengthening of volunteer forces and
implementation of disaster risk reduction programmes. The capacity of the poor and at risk community to
face disaster is also improved through partnerships and coordination of efforts among various ministries,
agencies and development partners. Community empowerment, capacity building, response management
605
are strengthened to reduce the loss of lives and properties caused by natural disasters. Socio-economic
security of the poor people is strengthening, creating positive impact on reduction of poverty.
Impact on Women’s Advancement: In disaster prone areas, the capability of women to face natural
disasters has been enhanced due to their involvement in disaster awareness activities and livelihood
training. As a result, poverty and disaster risks are reduced.
3.1.2
Construction, extension and up-gradation of infrastructure to reduce disaster risks
Impact on Poverty Reduction:with the construction of flood/cyclone centres in disaster prone areas, poor
people take shelter in these centres with their belongings. Through the construction of disaster resistant
houses and raised grounds (matir killa) people are protecting their assets by transferring their livestock to
these places. Their crops are saved because of the fast discharge of water through bridges /culverts. This
will have an impact on the reduction of poverty.
Impact on Women’s Advancement:An effective transport system plays a positive role in rescuing people,
especially women and children during disasters. The lives of women and children are also saved by taking
shelters during floods and cyclones. The overall benefits of communications and transport accelerate
women’s advancement.
3.1.3
Reducing the sufferings and disaster risks for vulnerable people and people in danger
Impact on Poverty Reduction: The poverty of a minimum of 65-70 lakh peopleis being reduced every
year through implementation of Employment Generation Programme for the Poorest (EGPP), Test Relief
(TR) Programme and Food for Work (FFW) Programme and other programmes during agricultural slack
seasons and in disaster affected areas. Similarly, by getting instant food relief under VGF programme to
face disaster shocks the sufferings of 25 lakh poor people are eased every year. In addition, distributions of
disaster reliefs immediately after the shocks such as GR Food, GR Cash, Sarees, Lungis, Blankets, CI
Sheets, and House Building Grants etc. help the affected people to overcome losses and pain.
Impact on Women’s Advancement: At least 30% of the beneficiaries are women under targeted and
women friendly programmes. The poor and destitute women are getting preferential employment, their
income is increasing and their access to food improved. Women, children and handicapped people are
shifted to safe shelters on a priority basis at the beginning of any great disaster and they are given food
and medicines. As a result, their social security and capacity to face disaster have been strengthened.
Poverty Reduction and Women’s Advancement Related Spending
3.2
(Taka in Thousand)
Particulars
Budget
2014-15
Projection
2015-16
2016-17
Poverty Reduction
Gender
4.1
Priority Spending Areas/Programmes
Priority Spending Areas/Programmes
1.
2.
Expansion of social safety net programmes
Related Strategic Objectives
 Reducing the sufferings and
Employment Generation Programme for the Poorest, FFW (in
exchange for food/taka, TR and VGF programmes play an important
role in reducing unemployment, disaster risks and easing food
shortages during periods of crises. These efforts thus ensure food
security for the poor. In consideration of this, this area has been given
the first priority.
disaster risk of vulnerable
people and people in danger
Construction of small bridges, culverts and Flood and Cyclone
Shelters
 Construction, extension and
During disasters, the protection of human lives and properties is one of
the prime responsibilities of this Division Therefore, construction and
maintenance of cyclone/flood shelters, keeping the communication
up-gradation of infrastructure to
reduce disaster risks
606
Priority Spending Areas/Programmes
Related Strategic Objectives
system operating uninterrupted in rural areas, and constructing and
maintaining small bridges/culverts are considered to be the second
area in the list of priorities.
3.
Procurement and maintenance of search and rescue vehicles and
equipment
Search and rescue vehicles and equipment play an important role in
saving lives and properties of disaster affected people. Therefore,
procurement and maintenance of search and rescue vehicles and
equipment have been given the third position on the priority list.
4.
 Institutionalising disaster
management system, creation
of professionalism and
increasing the capability
 Institutionalising disaster
Risk reduction training, research and awareness programme
In order to reduce the impact of global climate change there is no
alternative to update the overall disaster management programmes
and to undertake training, research and public awareness activities to
conduct, monitor and evaluate adaptation initiatives.
management system, creation
of professionalism and
increasing the capability
4.2
Medium Term Expenditure Estimates and Projection (2014-15 to 2016-17)
4.2.a
Expenditure by Department/Agencies/Operational Units
(Taka in thousand)
Description
Budget
Revised
Budget
2014-15
2013-14
Projection
2015-16
2016-17
Grand Total :
4.2.b
Expenditure by Economic Group Wise
(Taka in thousand)
Description
Economic
Group
Code
Budget
Revised
Budget
2014-15
2013-14
Projection
2015-16
2016-17
Revenue Expenditure
4600
5.0
Pay of Establishment
Key Performance Indicator (KPIs)
Indicator
1
Related
Unit of
Revised Actual
Strategic Measurement Target
Objectives
2012-13
Target
Revised
Target
2014-15
2015-16
2016-17
8
9
10
21.81
23.44
25.07
26.69
0.32
0.40
0.50
0.55
0.60
2.50
2.0
1.00
1.00
1.00
2
3
4
1. Beneficiaries of social safety net
programme (Employment
generation programme for the
poorest)
3
Lakh person
month
20.40
2. Shelter provided to disaster prone
people in Cyclone/Flood prone
areas
2
Lakh person
3. Coverage of training to Disaster
Management Committee members
1
Number in
thousand
5
2013-14
Medium Term Targets
6
7
6.0
Recent Achievements, Activities, Output Indicators
Expenditure Estimates of the Departments/Agencies
and
Targets
and
6.1
Secretariat
6.1.1
Recent Achievements: The Disaster Management Act - 2012has been promulgated. Construction and
maintenance management policy for cyclone shelters has been approved earlier. New warning signals and
public disaster messages on cyclone and weather have been published. A program for sending emergency
607
disaster messages in a short time to disaster prone people through cell phones has been undertaken and
under this program pilot projects have been implemented in the district of Cox's Bazar and Sirajgonj. New
chapters on disaster risk reduction program and emergency humanitarian assistance, fire, earthquake and
tsunami have been included in the Standing Order on Disaster (SOD). The National Work Plan-2010-2015
on disaster management has been prepared. In addition, arrangements have been made to send disaster
warnings and risk reduction messages through IVR and SMS. In the last three years, under the ultra-poor
employment program a total 1987 lakh unemployed ultra-poor rural workers were given 80 days of
employment; one third of them were women.
6.1.2
Activities, Output Indicators and Targets
Activities
Output
Indicator
1
2
3
4
5
Trained Disaster
Manager
1
Number in
thousand
0.15
2. Implementation of risk reduction
and climate change adaptation
programmes
Adaptation
programme
3
Programme
number in
thousand
3. Creation of employment for the
ultra-poor especially poor
destitute women in identified
disaster prone areas
Employment of
ultra-poor
3
3
1. Imparting training on disaster
management to all related
persons
Related
Unit of
Revised Actual
Strategic Measurement Target
Objectives
2012-13
4. Identification of internal risk and
Training of
reducing loss of lives and
volunteers and
properties through early
supply of
warning
machineries and
equipments
6.1.3
Target
Revised
Target
2013-14
7
Medium Term Targets
2014-15 2015-16
2016-17
9
10
11
0.145
1.5
-
-
1.00
1.20
1.00
-
-
Lakh man
month
20.40
21.81
23.44
25.00
26.69
Person
(thousand)
2.50
6
6
6
6
6
8
Medium Term Expenditure Estimates by Operational Unit, Programmes and Projects
(Taka in Thousand)
Actual
Name of the Operational Unit/
Programme/Project
Related
Activity
2012-13
1
2
3
Budget
Revised
2013-14
4
5
Medium Term Expenditure Estimates
2014-15
2015-16
2016-17
6
7
8
Operational Units
6.2
Directorate of Disaster Management
6.2.1
Recent Achievement: During the financial years from 2009-10 to 2011-12, 99,773 projects were
completed under the Rural Development Infrastructure (FFW) Program of the directorate involving 7.31
lakhs MT of food grains and taka 274.60 crore. As a result, employment was generated for 46.58 lakh poor
people. Under Rural Infrastructure Maintenance (TR) Program, 6, 16,978 schemes were implemented with
10.07 lakh MT of food grains, generating employment for 83.79 lakh of poor people. As a result, there has
been significant institutional development in educational, religious and public welfare institutions, including
rural infrastructure development. Under VGF program, a total 5.23 lakh MT of food grains were distributed
to 2.38 crore ultra-poor/helpless/destitute families. Under the GR program, a total of 1.27 lakh MT of rice,
Taka 15.91 crore and house building grants of taka 117.80 crore were distributed among affected 70.75
lakh destitute people. Taka 4.70 crore were spent for transportation of relief items, taka 66.00 crore for
purchase of CI sheets, taka 29.99 crore for purchase of blankets, taka 34.85 lakh for purchase of fuel for
watercrafts and taka 26.60 lakh for repair of watercrafts. Under the 12 meter long bridges/culverts
construction program, taka 366.705 crore for construction of 1847 bridges in plain/hilly areas. As a result,
transportation was facilitated for 2.15 crore people. 74 flood shelters were built at a cost of 31.04 crore in
cyclones prone and river erosion areas.
608
6.2.2
Activities, Output Indicators and Targets
Activities
Output
Indicator
Related
Unit of
Revised Actual
Strategic Measurement Target
Objectives
2012-13
1
2
3
4
5
1. Implementation of Food for
Work (FFW) Programme
Beneficiary
3
Person in lakh
-
2. Implementation of Test Relief
(TR) Programme
Beneficiary
3
Person in lakh
3. Implementation of Vulnerable
Group Feeding (VGF)
Programme
Beneficiary
3
4. Construction of small and
medium bridges/culverts for
rapid discharge of water
Bridge/ Culvert
5. Construction and maintenance
of multi-purpose cyclone
shelters in coastal areas
Target
Revised
Target
2013-14
2014-15 2015-16
2016-17
9
10
11
19.79
20.41
21.75
21.87
-
19.68
19.20
20.80
21.87
Person in lakh
-
189.00
208
229
252
2
Thousand
metre
-
13.17
13.17
13.17
13.17
cyclone shelters
2
Thousand
square metre
-
8.35
8.35
8.35
8.35
6. Construction and maintenance
of multi-purpose flood shelters
in flood prone areas
flood shelters
2
Thousand
square metre
-
2.00
2.00
2.00
2.00
7. Construction of cyclone
resistant houses, raising the
ground of social institutions
and raising high ground (matir
killa)
cyclone resistant
houses
2
Thousand sq.
Metre
-
3.00
3.00
3.00
3.00
Beneficiary
3
Person in lakh
-
30.00
35.00
40.00
40.00
9. Procurement, maintenance and
Rescue vehicles
distribution of rescue vehicles
and machineries
and equipments to respond to
disasters
1
Taka (crore)
-
40
40
40
40
10. Prepare agency-wise national
and local level contingency
plans for disaster risk reduction
and Identification of disaster
prone and ultra-poor population
areas
1
Number
-
12
12
12
12
8. Distribution of GR Food, GR
Cash, Sarees, Lungis,
Blankets, CI Sheets, House
Building Grants etc.
6.2.3
Contingency
plan prepared
7
Medium Term Targets
6
8
Medium Term Expenditure Estimates by Operational Unit, Programmes and Projects
(Taka in Thousand)
Actual
Name of the Operational Unit/
Programme/Project
Related
Activity
2012-13
1
2
3
Operational Units
Budget
Revised
2013-14
4
5
Medium Term Expenditure Estimates
2014-15
2015-16
2016-17
6
7
8
Download