Sewerage Infrastructure Drawing Request Form

advertisement
Sewerage Infrastructure Drawing
Request Form
Council of the City of Gold Coast
ABN 84 858 548 460
PO Box 5042 GCMC Qld 9729
P 1300 GOLDCOAST
E: mail@goldcoast.qld.gov.au
W: cityofgoldcoast.com.au
Please use BLOCK LETTERS and complete all details in full
Privacy statement
Council of the City of Gold Coast is collecting your personal information in accordance with the Local Government Act 2009 in order to process the
required documentation. This information will only be used by authorised officers to ensure records are accurate. Your information will not be given
to any other person or agency unless you have given us permission or we are required or allowed to by law.
Requests can be emailed to mail@goldcoast.qld.gov.au or by mail to PO Box 5042 Gold Coast Mail Centre QLD 9729
Allow 10 working days from the date Council has received the request for it to be processed.
Contact details
Name
Postal address
Postcode
Primary phone
Alternative phone
Facsimile
Email
Property details
Lot number
Registered plan number
Property address
GTP/BUP/WD
Reasons for Request
Property Sewer connection point
Property settlement
Building activity
Development
Access for CCTV activities
Underground drilling or excavating
Identification of easements and GCW sewer infrastructure
Information
Sewerage infrastructure (location, material, size, manhole surface levels, invert levels, ties) and sewer house connection (location, and invert
levels). Drawings for sewerage infrastructure are provided to Council by developers and contractors post construction and the information
supplied is specific to the requested parcel of land and generally includes the above. Easements over internal infrastructure may not be included
on mapping.
If the drawing requested is not available, Council may undertake an on-site investigation to confirm the infrastructure and connection locations.
All service locations and material type must be confirmed by the applicant on site prior to new design or construction activities.
Fees
Fee name
[√ ] please tick applicable fee(s)
Sewerage Infrastructure Drawing
Account number
Amount
97727
$66.00
A Council officer will contact you via email when the search is available. Payment will then need to be made
These fees are in accordance with Councils regulatory fees and non-regulatory charges. A copy of the Councils regulatory fees and nonregulatory charges can be found on the website cityofgoldcoast.com.au
Payment options
 Payment online, by request of City officer via email.
 Cash, cheque or credit card at any of Councils branch offices. For branch office locations and operating hours, please refer to the
City’s website cityofgoldcoast.com.au
 Cheque or money order by post to Council of the City of Gold Coast PO Box 5042 Gold Coast MC QLD 9729. Please ensure that
you provide adequate reference details or attachments to allow the cheque to be appropriately receipted.
Please be advised that payments by credit card will incur a surcharge of 0.60%
Office use only
Document supplied:
 Dekho Map
 PDF Drawing
Date received
Fee paid
Received by (name)
Receipt number
Online payment request date
Method of payment
PN Number
iSpot #
#51884257 v1
Last Updated 21/10/2015
 Other _________________
Page 1 of 1
Download