General Inspection Checklist FOR Preliminary Inspection Grading Inspection R/W & Engineering Inspection Final Plan Inspection Filled out ( * items ) prior to the field inspection and cross off items not applicable. Date & Time of Inspection: ______________________________________________________ Location of Inspection: ______________________________________________________ Project Number: ______________________________________________________ Inspection Personnel: ______________________________________________________ ______________________________________________________ ______________________________________________________ ______________________________________________________ ______________________________________________________ ______________________________________________________ ______________________________________________________ ______________________________________________________ ______________________________________________________ ______________________________________________________ ______________________________________________________ 1 Issued Apr_ 2008 General Inspection Checklist PROPOSED CONSTRUCTION *A. This project is scheduled for the in ____________ (Month, Year) *B. This project is due in the Check Squad ______________ (Month, Day, Year) C. Are there special conditions affecting working time of scheduling. D. Estimated Construction Cost $________________ E. Are City and/or County agreements needed? F. Work to be done by City and/or County forces prior to, or during construction. G. Maintenance responsibilities upon completion of project (City, County, or WYDOT) Yes No EARTHWORK *A. Soils Profile received: *B. Clearing and Grubbing: 1. ACRE 2. Clearing trees (a.) *C. Yes No LS (Explanation required) Diameter Removal of Structures and Obstructions: *1. Removal of ________________________________ (a.) Method of Payment (List Quantity) EA SY TON Subsidiary (b.) FT CY LS Salvage Value (Approval required) Disposition 2 Issued Apr_ 2008 General Inspection Checklist D. Excavation & Embankment: *1. *2. 3. Borrow Special Excavation CY TON None *(a.) Location *(b.) Ownership *(c.) Agreement *(d.) Samples submitted (e.) Stripping overburden (May be used in fill where large quantity) (f.) Haul roads (g.) Haul type (h.) Dead haul Yes No CYMI TMI Muck Excavation (a.) Limits (b.) Quantity (c.) Waste area(s) (d.) Haul distance Rock Excavation (a.) Blasting required Yes No (b.) Special precautions Yes No (c.) Use to construct embankment Yes No (d.) Suitable for riprap Yes No (e.) Waste area(s) (f.) Dead haul 3 Issued Apr_ 2008 General Inspection Checklist 4. 5. (g.) Seismic velocities (h.) Special techniques Pre-splitting Cushion blasting Unclassified Excavation: (a.) Excavation below grade (b.) Limits & location (c.) Type backfill required (d.) Quantity (CY) Unclassified Excavation (Excess) (a.) Quantity (CY) 6. (b.) Waste area(s) (c.) Dead haul Embankment Construction (a.) Shrink factor Limits (b.) Swell factor Limits (c.) Additional embankments Approaches Dikes 7. Ditch berms Over-exc. backfill Water (MG) Yes No *(a.) Prewetting *(b.) Estimated Quantity/CY __________ Gal. *(c.) Water source(s) _______________________________________ (d.) Dust control Yes No Gal._______ 4 Issued Apr_ 2008 General Inspection Checklist 8. Grade Line (a.) Vertical control changes (List locations and reasons) (1.) (2.) (3.) (b.) E. F. Excavation below grade (1.) Location (2.) Reason (3.) Type of material (4.) Depth (5.) Waste area(s) (6.) Source of backfill Old Road Obliteration: 1. Location 2. Method of measurement CY Turnouts: 1. Mailboxes Single Double Multiple Cluster Location(s) 2. Scenic 3. Schoolbus 5 Issued Apr_ 2008 General Inspection Checklist Box beam G. Guardrail: H. Topsoil and Seeding: W-beam *1. Topsoil storing CY __________ *2. Topsoil placing CY __________ a. Limits Slope stake - slope stake b. Depth 3. Topsoil borrow 4. Seeding 5. Cor-Tan R/W - R/W CY __________ a. Limits b. Seeding recommendations from Environmental Services Prior to the Grading Inspection, a form ARequest for Seeding Recommendations@ should be obtained from the WYDOT agronomist. This form is to be filled out with the required information and returned to the agronomist for his/hers use in recommending seeding and erosion protection items for the project. This information should be conveyed to the Resident Engineer. Landscaping SUB-BASE DESIGN A. A. Overburden (all pits): 1. Removal 2. Placing ______________CY ______________CY Sub-base: *1. Pit name and/or location *2. Agreement *3. Samples submitted: Yes No 6 Issued Apr_ 2008 General Inspection Checklist 4. Special provisions 5. Air quality permit required Yes No 6. Crusher Run Crushed Pit Run Yes Yes Yes No No No 7. Haul Yes No CYMI TMI BASE COURSE DESIGN Crushed Cement Treated Emulsion Stabilized *A. Pit name and/or location: *B. Agreement: *C. Samples submitted: *D. Mineral filler location if required: A. Lime: A. Winter protection: A. Special provisions: A. A. Yes No Yes No Air quality permit required: Yes No Haul: Yes No CYMI TMI Plant Mix Bit SURFACING Plant Mix Concrete *A. Wearing Couse Commercial Mix Pit name and/or location 7 Issued Apr_ 2008 General Inspection Checklist *B. Agreement *C. Samples submitted: D. Lime E. Concrete Yes No Source 2. Fly Ash required 3. Placing of concrete and reinforcing 4. Finishing and finishing equipment 5. Joints and placement Mineral filler location if required G. Seal coat I. No 1. F. H. Yes Yes No Fog 1. Type 2. Shoulder widths < 4 feet Yes Blotter Haul Chip Chip (Overshoot) Ton CY Yes No CYMI J. Rumble strips required K. Special provisions L. Air quality permit required > 4 feet No Source: Yes No Yes No TMI 8 Issued Apr_ 2008 General Inspection Checklist APPROACHES AND CATTLEGUARDS *A. *B. Approaches 1. Show locations on plans and list in summary form on R/W & Utility Plans 2. Included approaches requested by entities B BLM, USFS, etc. ? Cattleguards Station on plans Width Cattleguard & Type Description 1. 2. 3. FENCING A. Types Station to Station __________________________________________________________________ __________________________________________________________________ __________________________________________________________________ __________________________________________________________________ 1. 2. Replace in kind a. Type b. Location: Station____________to Station________________ Reset existing fence 9 Issued Apr_ 2008 General Inspection Checklist *B. Special gates (> 16 feet wide B two gates will be required unless recommended otherwise) 1. Location Type Width Type Width Type Width Type Width a. b. 2. Replace in kind Location a. b. 3. Remove and reset gates Location a. b. 4. Remove existing gates Location a. b. C. Snow fence 10 Issued Apr_ 2008 General Inspection Checklist Reset Snow Fence Snow Fence Repair Snow Fence (Wood) (Panel lengths and height required for quantity computation) Pay unit = EA DRAINAGE A Minor drainage 1. Drainage surveys completed? Yes No 2. Alkali samples submitted? Yes No 3. Culvert Design System (CDS) runs complete Yes No 4. Erosion Control Type: B. Source: Major Drainage 1. Drainage surveys competed? Yes No 2. Alkali samples submitted? Yes No 3. Structure selection complete? Yes No 4. Applications for required water quality certificates and permits submitted by Environmental Services Yes No 5. Erosion control Type: C. D. Source: Storm Sewer *1. Manholes *2. Drop Inlets Detention Ponds 11 Issued Apr_ 2008 General Inspection Checklist E. Irrigation structures 1. Landowner contacted? Yes No 2. Private irrigation easement required? Yes No 3. Separate contract with irrigation district to adjust ditches? Yes 4 5. No Structure a. Location b. Type (concrete, wood, other) c. Drawing number (WYDOT) Contract items (list) Force account F. Lump sum Subsidiary Channel Changes 1. Do proposed channel changes conflict with recent changes, additions or corrections to the plans? Yes No If yes, explain:________________________________________________ G. Yes No 2. Is material usable for balancing? 3. Waste area. if required 4. Irrigation structures affected by channel changes? Yes No 5. Should Ch.Ch. be fenced inside right-of-way? Yes No Subsurface pipe (Underdrain) *1. Recommended Not recommended 12 Issued Apr_ 2008 General Inspection Checklist *a. H. Location *b. 2. Waste area (Location) 3. Backfill material (Location) Size *c. Type Edge drain *1. Recommended 2. Location Not recommended ENVIRONMENTAL CONSIDERATIONS A. A. Wetlands 1. Wetland encroachments 2. Mitigation measures required 3. Have wetland permit applications been made and approved by the Corps of Engineers? Yes No Any stipulations or changes required? b. Have agreements been obtained from the landowner? Additional Corp of Engineer Permits required 1. A. a. Rivers Streams Drainages Additional permit requirements 1. DEQ - Air quality permits 2. DEQ - NPDES permit a. Has plan been completed for: Roadway Pit and plan sites 13 Issued Apr_ 2008 General Inspection Checklist b. Responsibility Contractor A. WYDOT Archeological clearances obtained Yes No Yes No Yes No TRAFFIC A. Detours *1. Typical section *2. Design speed 3. Type of surfacing 4. Special structures 5. Method of payment 6. Detour obliteration: a. 7. B. Waste location Pipe Salvage a. Location b. Disposition c. Estimated quantity Traffic will be carried through construction 1. Temporary guardrail required 2. C. Temporary connections *1. Yes Was survey made? No 14 Issued Apr_ 2008 General Inspection Checklist D. *2. Typical section *3. Design speed 4. Type of surfacing 5. Method of payment Traffic control: 1. E. F. Yes No Quantities obtained from Traffic design and field engineer Temporary median cross-overs *1. Location *2. Drainage culvert size Intersections or interchanges *1. Location *2. Special design required? 3. Special recommendation by field G. Traffic signals required? H. Lighting I. Service roads Yes Yes *1. Locations (show on plans) 2. Inside of outside right-of-way *3. Fence location *4. Design a. Typical section b. Sub-base: Yes No No No Depth________ 15 Issued Apr_ 2008 General Inspection Checklist 5. c. Base: Yes No Depth________ d. Plant mix Yes No Depth________ e. To be set up by Materials and Project Development Method of payment Excavation (include with balance?) Yes No Equipment hours Bulldozer Roller Type ___________ Truck Motor Grader Scraper Loader Compaction RIGHT-OF-WAY Yes No A. Section ties complete A. LUCO and LUFJ complete A. Recommended changes since previous inspection (show on plans) A. Additional topography (show on plans) A. Recent ownership changes that would affect design (show on plans) A. Construction permits Yes No UTILITIES A. Recent utility changes (show on plans) *B. Private utilities to be set up in contract 1. Location a. 16 Issued Apr_ 2008 General Inspection Checklist b. 2. Contract item FA LS Unit SPECIAL PROVISIONS Sequence of work, etc MISCELLANEOUS ITEMS *A. *B. Historical signs, markers & monuments 1. Location 2. Disposition Turnouts and rest areas -- show on plans and explain Median cross-overs -- show location on plans and explain Special design items *1. Retaining walls *2. Wells *3. Sewage systems *4. Crops involved Special precautions *6. Yes Yes No No Picnic Facilities 17 Issued Apr_ 2008 General Inspection Checklist *7. Curb & Gutter Type A *8 Double gutter *9 Sidewalks *10 Median paving 11. Climbing lanes B C 18 Issued Apr_ 2008