AT&T INSTALLATION REQUIREMENT CHANGE NOTIFICATION - ATT-TP-76300-172
Date: 03-06-2013
TO: ALL AT&T INSTALLATION SUPPLIERS
EFFECTIVE DATE: 5 days from posted date or as per Supplier’s Contract
Submitter’s Name: Larry Payne
TP: TP76300
Subject: Equipment aisle Lighting
Section: B
Subsection: 2
Subsection: 2.2
Action: Add
Modification:
Delete:
Section Title: General Installation Requirements
Section Title: Building Facilities and Care of Premises
Subsection Title: AC Power, Heat and Light
Prior to Change:
2.2.1
AT&T will provide electric power for all necessary purposes, with suitable outlets in
areas in which work is to be performed. AC outlets located in equipment bays are for
test equipment only and shall not be used for power tools, powering
telecommunication, or information services equipment or any building maintenance
apparatus (buffers, vacuums, etc,). Heat and general illumination (of a permanent or
temporary nature) in rooms in which work is to be performed or material stored, will
also be provided by AT&T.
2.2.2
The Installation Supplier shall provide temporary lighting for specific work operations.
Use of fluorescent lights or other lights requiring ballast shall be approved by the AT&T
Representative prior to their use. However, in no case shall fluorescent lights requiring
ballast be used without an Alternating Current Equipment Ground (ACEG).
2.2.3
The Installation Supplier’s personnel shall make no adjustments to controls,
thermostats or venting of the heating or cooling plant. Any adjustments needed shall
be directed to the AT&T Representative.
Post Change:
2.2.1 AT&T will provide electric power for all necessary purposes, with suitable outlets in
areas in which work is to be performed. AC outlets located in equipment bays are for
test equipment only and shall not be used for power tools, powering
telecommunication, or information services equipment or any building maintenance
apparatus (buffers, vacuums, etc,). Heat and general illumination (of a permanent or
temporary nature) in rooms in which work is to be performed or material stored, will
also be provided by AT&T.
2.2.2
The Installation Supplier shall provide temporary lighting for specific work operations.
Use of fluorescent lights or other lights requiring ballast shall be approved by the AT&T
Representative prior to their use. However, in no case shall fluorescent lights requiring
ballast be used without an Alternating Current Equipment Ground (ACEG).
2.2.3
The Installation Supplier’s personnel shall make no adjustments to controls,
thermostats or venting of the heating or cooling plant. Any adjustments needed shall
be directed to the AT&T Representative.
Equipment aisle lighting that is controlled by switches rather than motion sensors shall
be turned off when no work is being performed in the aisle.
2.2.4
Questions relative to this IRCN should be addressed to Lawrence E. Lyles at 404-927-7722
Lawrence E. Lyles
Page 1 of 2
AT&T INSTALLATION REQUIREMENT CHANGE NOTIFICATION - ATT-TP-76300-172
Lead Network Engineering Manager
Lawrence.Lyles@att.com
Access the TP's on the Extranet Site https://ebiznet.sbc.com/sbcnebs
Concurred
Area Mgr Eng Network Quality
Implementation Eng & Common Systems
(Jimmy Davis)
Principal-Network Design Engineer
(Larry Payne)
Date: 03-06-13
Date: 03-05-13
Release Approved
Principal-Network Design Engineer, GES
Date: 03-06-13
(Lawrence E. Lyles)
Page 2 of 2