C - State of New Jersey

advertisement
Section 2
Prequalification Discipline List Response Format
INSTRUCTIONS: In column A, indicate with an “X” all of the disciplines that your firm is requesting prequalification.
Certificate of authorization is not required for disciplines marked “E” under Exempt.
To view/apply for discipline(s) requirements (Section 3) click on the link below.

A
PRIMARY DISCIPLINES:
CODE
DESCRIPTION
TYPES OF TECHNICAL/
PROFESSIONAL STAFF
B-1
B-4
C-6
E-3
E-4
E-5
E-7
H-1
H-3
I-1
I-3
I-5
L-1
S-1
T-1
T-7
Bridge Design – Non Movable Structures
Bridge Design – Movable Structures
Construction Inspection – Roadway / Bridge
Environmental Assessments/EIS/CE
Environmental Permitting
Environmental Physical Site Investigation
Environmental Remedial Support
Highway Design
Hydrology & Hydraulics
Bridge Inspection – Simple Bridges
Bridge Inspection – Movable Bridges
Bridge Inspection – Complex Bridges
Landscape Architecture
Surveying
Traffic Engineering
Transportation Planning
Structural Engineers
Structural, Mechanical, and Electrical Engineers
Construction Managers or Civil Engineers
Environmental Specialists or Engineers or Planners
Environmental Specialists, Engineers, or Planners
Environmental or Civil Engineers and Specialists
Environmental or Civil Engineers and Specialists
Engineers
Hydrologists or Civil Engineers
Structural Engineers w/ NBIS
Structural Engineers w/ NBIS
Structural Engineers w/ NBIS
Landscape Architects
Surveyors
Civil and Traffic Engineers
Engineers or Planners
Discipline
NEW JERSEY DEPARTMENT OF TRANSPORTATION – DIVISION OF PROCUREMENT
PS10 – Jan. 2012
Exempt
from
Cert. of
Auth
E
E
E
E
Technical
Review
Group
B
B
C
C
C
C
C
B
C
B
B
B
A
B
C
A
PAGE 1 of 3
SECTION 2 FORM

A
PROJECT SPECIFIC DISCIPLINES: (to be submitted ONLY if NJDOT has a posting using those below and ONLY if NJDOT is notified
in writing of your intent to submit a Technical Proposal.
Discipline
CODE
DESCRIPTION
A-1
A-3
A-5
A-6
A-7
C-1
C-7
Aerial Photography Surveys
Archaeology Services
Asbestos Remediation
Aviation Services
Air Quality Analyses Requirements
Claim/Litigation Support/Scheduling
Construction Inspection - Intelligent
Transportation System (ITS)
Contamination Screenings
D-2
Dredge Material Management
C-5
E-2
E-8
G-1
G-2
G-3
G-4
H-2
I-6
M-1
M-6
Intelligent Transportation System (ITS)
Facilities
Electrical Requirements
Geographical Information Systems
Geotechnical Design
Global Positioning Surveys
Goods Movement
Historic Architectural Survey / Mitigation
Inspection of Dams
Market & Customer Research –
Transportation
Prestressed/Precast Concrete Inspection
NEW JERSEY DEPARTMENT OF TRANSPORTATION – DIVISION OF PROCUREMENT
PS10 – Jan. 2012
TYPES OF TECHNICAL/
PROFESSIONAL STAFF
Surveys or Photogrameterists
Archaeologists
Environmental or Asbestos Safety Control Monitor
Planner Aviation Economist
Engineers or Planners
Engineers or Designers, and Schedulers
Exempt
from
Cert. of
Auth
E
E
E
E
Electrical and Traffic Engineers or Planners
Engineers or Environmental Specialists
Environmental Engineers,
Civil/Chemical, Geologist
Technical
Review
Group
C
A
A
B
C
C
B
E
C
B
Electrical and Traffic Engineers or Planners
A
Electrical Engineers
Surveyor, Systems Analyst, or Programmer
Civil and Geotechnical Engineers
Surveyors or Civil Engineers
Planners
Architectural Historians
Engineers
A
B
B
C
A
A
C
Planners
Prestressed Concrete Institute (PCI) Levels I, II, and III
E
E
E
A
C
PAGE 2 of 3
SECTION 2 FORM

A
PROJECT SPECIFIC DISCIPLINES: (to be submitted ONLY if NJDOT has a posting using those below and ONLY if NJDOT is notified
in writing of your intent to submit a Technical Proposal.
Exempt
from
Cert. of
Auth
Technical
Review
Group
CODE
DESCRIPTION
TYPES OF TECHNICAL/
PROFESSIONAL STAFF
M-7
Inspection of Structural Steel and Welding
AWS/CWI with ASNT Level II or III
B
M-8
Materials Inspection and Engineering
Project Manager
A
M-9
Maritime Transportation
Engineers
A
M-10
Marine Transportation System Planning
Engineers or Planners
A
N-1
Noise Measurement and Analysis
Engineers or Planners
P-2
Pavement Management Systems
Civil Engineers, System Analysts, or Programmers
C
P-3
Pedestrian and Bicycle Facilities
Engineers or Planners
A
P-4
Public Involvement – Transportation Issues
Planners
P-6
Pavement Design
Engineers
R-2
Right of Way-Services
Relocation and Acquisition Specialists
S-2
Subsurface Utility Engineering (SUE)
Engineers or Technicians
A
T-3
Transportation Access Management
Engineers or Planners
B
T-4
Traffic Data Collection
Planners or Technicians
T-5
Transportation Demand Modeling
Engineers or Planners
A
T-12
Transportation Security
Engineers and Planners
A
U-2
Utility Engineering
Civil, Structural, or Mechanical Engineers
A
Discipline
E
B
E
C
C
E
B
E
A
For additional Resume sheets click here and Project Description sheets click here
Criteria for certain disciplines are unchanged from the PS-09, which may allow the firm to choose expedited renewal, ER, from the previously approved service level by
proposing the same personnel and projects submitted successfully from the PS-09. Check Boxes are provided where expedited renewal is applicable, at which case
Sections 4 and 5 need not be submitted with the PS-10 packet.
Disciplines with changes in staff and/or project(s) are not eligible for expedited renewal and require full resumes or project descriptions in Sections 4 and 5,
respectively. New personnel or new project(s) must be accompanied by full resume(s) or project descriptions and submitted with the PS-10 packet
NEW JERSEY DEPARTMENT OF TRANSPORTATION – DIVISION OF PROCUREMENT
PS10 – Jan. 2012
PAGE 3 of 3
SECTION 2 FORM
Download