Risk Areas Commercial-off-the-Shelf (COTS) Adherence to Government-off-the-shelf (GOTS) Computer Obsolescence/Migration COTS Evaluation Government Furnished Equipment (GFE) Modifications Adherence to Standards (Nat'l and Int'l) COTS Availability COTS Integration Integration with Existing non-COTS Environmental Aspects Operations/Support Compliance Site Environmental Impact Production Compliance System Design Considerations External Interfaces Interface Specifications Interfaces to Other Systems Funding & Schedule (Program or Project Level) Cost and Schedule Funding (Stability/Profile) Hardware Memory Microelectronics Analog (MMIC, other) Nonstandard Parts Microelectronics Digital (e.g., VLSI/VHSIC/ASIC) Packaging (Size/Weight/Power) Logistics Planning Logistics Support Analysis Spares Technical Manuals Networking Interface Standards/Protocols Network Planning Operational Site Activation Installation and Checkout Personnel Support & Test Equipment Training, Material, Equipment Communications Protocols Multiple Access Network Security Equipment Integration Site Activation Programmatic Acquisition Reform Acquisition/Decision Strategy Contract Issues Contract Issues -- Changing Contractors Contract Issues -- Incentives Contract Issues -- Contract Administration Data Requirements Funding PRIME or Government as System Integrator Legal/Regulatory Issues Multiservice or Multiagency Program Program Management (Plans/Resources) Risk Management Source Selection (Best Value Type) Total Cost of a System Acquisition/Decision Strategy - Spiral Development Contract Issues - Subcontracting by a PRIME Contract Issues -- Claims Contract Issues -- Measuring Contractor Compliance Cost as an Independent Variable (CAIV) Earned Value Funding of Spiral Evolutionary Acquisition International Program Management Structure Outsourcing IT Products and Services Requirements Management Source Selection Staffing User Support Security COTS and Security Cryptography Information Warfare Security Concept of Operations Security Test and Evaluation Software Achieving Responsiveness Achieving System Throughput (at full load) Code and Unit test Design Development Process Integration and Test Large-scale Development and Integration Management Process Mixed Programming Languages Object Oriented Migration Parallel/Multi-Processing Porting Real-time Processing Requirements Requirements Stability Software Architecture Software Metrics Timing & Sizing Support Obsolescent Parts Certification/Accreditation COTS/GOTS Interoperability External Interfaces Projected Security Requirements Security Standards System Vulnerabilities Achieving Processing Reserve Goals Achieving System Response Beyond state-of-the-art Contractor Capability Development of Algorithms Development System Lack of Disciplined Practices Management Methods Memory Utilization Multiple Development Locations Operating System Performance Constraints Prototype Code Requirements Reverse Engineering/Code Reuse Software Estimation (Size and Schedule) Software Standards Year 2000 Compliance Declining Maintenance Budgets Software Maintenance Systems Engineering Balanced Scorecard Benchmarking Configuration Control Engineering Processes Growth/Expandability Information Engineering Parallel Development of Interfacing Systems Requirements Stability System Integration System Migration System Releasability Systems Interoperability Testing External Agency Certification Regression Testing Issues System Testing (In-Plant) Test Design Test Plan Common Data Environment (CDE) Standard Operating Environment Fault Tolerant Design Human Factors Operational Concept Reliability/Maintainability/Availability Safety System Maturity System Performance System Specifications Technology Insertion Availability of Test Resources Integration and Test System Testing System Testing (On-site) Test Design – Usability Test Plan – Usability