Resolution No. 2231a WHEREAS, the City of McLoud is amending fees for those services offered to the citizens of the City of McLoud in order to perform such duties in the best interest of the City. AND WHEREAS, these fees are established to effectively operate the City of McLoud as a sound financial agency; BE IT THEREFORE RESOLVED that the following fees are hereby set: BUILDING PERMITS NEW STRUCTURE, REMODELS AND MOVE IN (Plus $4.50 state fee)* BUILDING PERMITS CANNOT BE ISSUED WITH A ZONING CLEARANCE PERMIT FIRST, ALLOW UP TO 3 DAYS FOR APPROVAL BY THE CITYCLERK; ALL BUILDING PERMITS MUST ADD $25.00 INSPECTION FEE & $4.50 STATE FEE. THE PERMIT FEE WILL TRIPLE if any person commences construction prior to obtaining a permit. (State law reference – 59 O.S.§1696 and all city ordinances may be referenced at the McLoud Library, the City Hall or online at www.mcloudok.us. Zoning Clearance Permit New Structure New Commercial Additions/Alterations/Repairs Inspection Fee – all permits Re-Inspection Plan Check Fee Setback fee (if not included in plat) $ 10.00…(Must be approved before building permit can be issued.) $ .15 per square ft up to 5,000 square ft $ .10 per square ft over 5,000 square ft $ .10 per square ft (no min. or max square ft requirement) $ .05 per square ft $ 25.00 per inspection $100.00 re-inspection fee $ 20.00 $ 25.00 Buildings that are 150 square feet (10x15) or less do not require a building permit. MISC BUILDING PERMITS: (Add $25.00 inspection fee plus State Fee $4.50) Barn (no slab floor) $ 25.00 Carport $ 25.00 Demolition permit $ 50.00 Development permit – SEE PUD FEES Garage (no slab floor) $ 35.00 Garage/yard sale $ 10.00 (city signs only – 3) Patio $ 35.00 Porch $ 35.00 Portable building $ 35.00 (more than 150 square feet WITHOUT slab) Roofing (goes by remodel SF) Storm cellar $ 35.00 MOBILE HOME PARK PERMITS ONLY (Plus $4.50 State fee)* BUILDING: Base Foundation Final $150.00 $75.00 $50.00 ELECTRICAL: Base Pole Well $50.00 $45.00 $55.00 PLUMBING: Base Final $50.00 $45.00 SINGLE WIDE MOBILE HOMES ONLY ALLOWED IN MOBILE HOME PARKS. DOUBLE WIDE MOBILE HOMES ONLY ALLOWED ON 5 AC OR MORE (zoned Agriculture), must be 24 feet wide and no more than 3 years old with other requirements. SEE CODE ENFORCEMENT or CITY ORD. Resolution No. 2231 Permit Fees Adopted July 26, 2012 MOVING PERMIT MOVING PERMIT MUST ADD $25.00 INSPECTION and STATE FEE of $4.50 THE PERMIT FEE WILL TRIPLE if any person commences construction prior to obtaining a permit. (State law reference – 59 O.S.§1696. State Department of Transportation handles mobile homes. No permit required for buildings less than 13 ½ feet high or 14 feet long. No permit sold for building over 22 feet high or 50 feet long. Permit fees based on width: 14 feet to 24 feet = $ 50.00 25 feet to 30 feet = $100.00 31 feet to 50 feet = $150.00 ALL MOVING PERMITS MUST BE SUBMITTED WITH PROOF OF LIABILITY POLICY FROM THE HOUSE MOVER AND ALL UTILTIIES SIGNED OFF BY ENGINEERS PRIOR TO MOVING STRUCTURE. Permit cannot be issued to owner. LICENSE FEES Plumbing Contractor Electrical Contractor Mechanical Contractor $100.00 per year $100.00 per year $100.00 per year License Fees are to be renewed annually. ELECTRICAL PERMITS (Plus $4.50 State fee)* ALL ELECTRICAL PERMITS MUST ADD $25.00 INSPEC FEE & $4.50 STATE FEE, unless otherwise noted. THE PERMIT FEE WILL TRIPLE if any person commences construction prior to obtaining a permit. (State law reference – 59 O.S.§1696. Any electrical contractor who proceeds to do work requiring a permit, without following the requirements of the City Ordinance and NEC shall be assessed double the amount of the fee that should have been paid. The office of the inspector may require plans and specs on all elecrtrical work being performed prior to inspection. Electric service will not be turned on without inspection approval and call from the inspector to the Electric Company. It shall be unlawful for any person to alter any electric work after its final inspection without obtaining a permit for installation, repair or alteration. New Construction: Residential First 100 amps of service $100.00 Each additional 100 amps of service or fraction thereof $ 50.00 Commercial or Multiple Occupancy First 100 amps of service $200.00 Each additional 100 amps of service or fraction thereof $100.00 Temporary/Construction Pole $ 50.00 2 Resolution No. 2231 Permit Fees Adopted July 26, 2012 Change in Existing Service (Plus $4.50 State fee)* Additions/Alterations/Major Repairs $ 35.00 Residential First 100 amps of service $ 35.00 Each additional 100 amps of service or fraction thereof $ 25.00 Commercial or Multiple Occupancy First 100 amps of service $ 75.00 Each additional 100 amps of service or fraction thereof $ 25.00 Elevators Base $ 20.00 plus $ 5.00 for each passenger elevator $ 10.00 for each freight elevator Sign Service (electric only) First 100 amps of service Each additional 100 amps of service or fraction thereof Inspection Fee - All Permits Re-Inspection $ 75.00 $ 25.00 $ 25.00 $100.00 MECHANICAL PERMITS (Plus $4.50 State fee)* ALL MECHANICL PERMITS MUST ADD $25.00 INSPEC FEE and STATE FEE of $4.50 unless otherwise noted. THE PERMIT FEE WILL TRIPLE if any person commences construction prior to obtaining a permit. (State law reference – 59 O.S.§1696. Air Conditioning Residential Commercial $ 45.00 per installation unit $ 60.00 per installation unit $ 10.00 per ton over 3 tons (Three (3) tons of Heat & Air for each 1500 sq. ft. of building.) Boilers Chilled Water Cooling System Cooling Towers Forced Air Heating Heat Exchanger Miscellaneous Fee $100.00 per unit $ 45.00 for each single unit installation $100.00 $ 45.00 per unit $ 45.00 $ 45.00 floor furnace, wall heaters, Propeller type heater, unit heater, gravity flow units, and squirrel cage blower. Heating & Air Package Up to and including three tons Per ton over 3 tons $ 75.00 $ 10.00 Refrigeration All Commercial refrigeration units All Pressure Test $ 35.00 $ 35.00 Inspection Fee Re-Inspections $ 25.00 (unless otherwise noted) $ 100.00 3 Resolution No. 2231 Permit Fees Adopted July 26, 2012 PLUMBING PERMITS (Plus $4.50 State fee)* ALL PLUMBING PERMITS ABOVE MUST ADD $25.00 INSPECTION and $4.50 STATE FEES unless otherwise noted. THE PERMIT FEE WILL TRIPLE if any person commences construction prior to obtaining a permit. (State law reference – 59 O.S.§1696. New Construction Plumbing Water Tap $100.00 $150.00 Additions/Alterations/Repairs Permit Water faucets/handles/replace $ 35.00 $ 20.00 Additions/Alterations/Repairs Cont’d Gas Piping/Fixture Replace/fix Hot water heater PRESSURE TESTS w/inspec Septic Discharge Fee *SEE JIM’S? Sewer Line / Sys Repair/Replace Swimming pool permit Water Line Repair/Replaced $ 35.00 ( tanks, propane, NOT HOT WATER HEATER) – plus inspec. fee $ 40.00 w/inspection $ 35.00 w/inspection $ 25.00 (first 2000 gal/ $5.00 per 1000 over) no inspec. $ 35.00 (includes sewer, septic, cesspool, seepage pit, drainfield) plus inspection $ 50.00 (If fire dept agrees to pump water into pool – us BULK WATER INV @ $ 3.20/1000 gallons $ 35.00 (plus inspection fees) WATER/SEWER TAP FEES – DO NOT INCLUDE STATE FEES or inspection fee Sewer Tap Meter Set No state fee No state fee $50.00 No State Fee ¾ in $ 325.00 1 in $ 375.00 1 ½ in $ 700.00 2 in $ 900.00 4 in $1500.00 6 in $3200.00 DOES NOT INCLUDE METER DEPOSIT TO START WATER SERVICE. 4 Resolution No. 2231 Permit Fees Adopted July 26, 2012 OTHER PERMITS/LICENSE/MISCELLANEOUS Alcohol Beverage Sales Permit/License $500.00 (annual) Animal impound recovery fee $ 15.00 BUILDING RENTAL McLoud City Park $ 25.00 – no deposit required Senior Citizens Building $ 25.00 for 4 hours; $50.00 over 4 hours Ferrell Community Bldg $ 25.00 for 4 hours; $50.00 over 4 hours* Deposit (s) to be refunded: $ 50.00 Cleaning deposit (clean and inspected) and $ 25.00 Key deposit when returned BUSINESS/VENDOR SOLITICATION LIG/REG Business/Vendor Registration Lic. $ 25.00 (ANNUAL RENEWAL w/tax ID Garage/Yard/Sidewalk Sale $ 5.00 (weekend-3 days – wait 60 days Itinerant vendor/solicitation $ 25.00 (only good for one month) Non-profit/Community sidewalk sale N/C (churches, schools, non-profit) SPECIAL EVENTS LICENSE $ 25.00 Burn permit $ 10.00 ** (must contact Fire Dept before burn) Dog License Registration/Tag (annual) $ 5.00 Driveway permit $ 25.00 (new or re-surface) FEMA FLOOD PLAIN – Notice of Intent Fee $ 25.00 maximum Floodplain Development Permit App. Review $100.00 Floodplain Development Permit $ 25.00 Inspection Fee-per inspection $ 25.00 Fire Inspections – $100.00 Lot Split Request $250.00 Rezoning $250.00 Sign permit non-electrical $ 35.00 (plus inspection) Sign Electrical $ 35.00 (plus electrical permit) Seismograph permit $250.00 STORMWATER PERMITS: Construction Storm Water Discharge $ 25.00 plus such additional fees for land disturbing activity or industrial activity as may be required Land disturbing permit $ 25.00 (per location) Existing facility permit $ 25.00 Street cutting permit $ 50.00 plus $4.00 per sq ft plus inspection fee Variance Request $250.00 NOW THEREFORE, BE IT RESOLVED by the McLoud City Council that the Permit Fees dated DECEMBER 21, 2010, RES 2205, are superseded, effective immediately. Resolution 2231 is ADOPTED this 26th day of July 2012, at a regularly scheduled meeting of the McLoud City Council in compliance with the Open Meeting Act, 25 O.S. et seq. Attest: Approved: ________________________________ A Kay Heinz City Clerk ________________________________ Jon Barrett Mayor 5