Core Strategy – Proposals for Monitoring

advertisement
Transformation and Sustainability
SHEFFIELD DEVELOPMENT
FRAMEWORK
CORE STRATEGY (Submission Version)
SUSTAINABILITY APPRAISAL
REPORT
Appendix 11
SDF Monitoring Indicators
Development Services
Sheffield City Council
Howden House
1 Union Street
SHEFFIELD
S1 2SH
September 2007
SDF Targets and Output Indicators
Business and Industry
SDF
Policy
Target
SB1
45 hectares of land developed or redeveloped for
offices 2006-2016 (policy SB1)
Indicator(s)
Amount of floorspace developed for employment by type.
Core Output Indicator 1a
Amount of completed office development
Core Output Indicator 4a
(part)
Local Output Indicator
Hectares of land developed for offices
SB1
SB1
SB1
SB1
Capacity for 90,000 square metres of offices
always to be available for development
80 hectares of land developed or redeveloped for
non-office businesses 2006-2016
40 hectares of land mainly for non-office
businesses always to be available
310 hectares of land developed or redeveloped
for industry and distribution 2006-2016
Type of Indicator
Losses of employment land [to non-B1, B2, B8 uses] in (i)
development/ regeneration areas (ii) local authority area
Amount of employment land lost to residential development
Core Output Indicator 1e
Employment land supply by type
Core Output Indicator 1d
Amount of floorspace developed for employment by type.
Core Output Indicator 1a
Hectares of land developed for non-office business
Local Output Indicator
Losses of employment land [to non-B1, B2, B8 uses] in (i)
development/ regeneration areas (ii) local authority area
Amount of employment land lost to residential development
Core Output Indicator 1e
Employment land supply by type
Core Output Indicator 1d
Amount of floorspace developed for employment by type.
Core Output Indicator 1a
Losses of employment land [to non-B1, B2, B8 uses] in (i)
development/ regeneration areas (ii) local authority area
Hectares of land developed for industry and distribution
Core Output Indicator 1e
Amount of employment land lost to residential development
Core Output Indicator 1f
Core Output Indicator 1f
Core Output Indicator 1f
Local Output Indicator
SDF
Policy
Target
SB1
155 hectares of land mainly for industry and
distribution always to be available
97.5% of all land developed for business and
industry in any five-year period is previously
developed
65% of new office floorspace developed in or at
the edge of the City Centre
90% of land for non-office businesses, industry
and distribution to be in named locations
SB2
SB3
SB4
Indicator(s)
Type of Indicator
Employment land supply by type
Core Output Indicator 1d
Percentage of land developed for employment which is on
previously developed land
Core Output Indicator 1c
Percentage of completed office development in the City Centre
Core Output Indicator 4b
Percentage of land developed for non-office businesses, industry
and distribution which is in named locations
Local Output Indicator
Shopping and Leisure
SDF
Policy
Target
SS1
98,500 square metres (gross area) of new retail
(Class A) floorspace in the Core Retail Area of the
City Centre
SS2
16,000 square metres of new retail floorspace in
District Centres
Indicator(s)
Amount of completed retail development
Percentage of completed retail development in town centres [Core
Retail Area of City Centre and District Centres]
Amount of completed retail development in the Core Retail Area of
the City Centre
Percentage of completed retail development in the Core Retail Area
of the City Centre
Amount of completed retail development
Percentage of completed retail development in town centres [Core
Retail Area of City Centre and District Centres]
Amount of completed retail development in District Centres
SS3
SS4
No specific target proposed
95% of major new leisure floorspace in named
locations
Type of Indicator
Core Output Indicator 4a
(part)
Core Output Indicator 4b
Local Output Indicator
Local Output Indicator
Core Output Indicator 4a
(part)
Core Output Indicator 4b
Local Output Indicator
Percentage of completed retail development in District Centres
Local Output Indicator
Amount of completed retail development in Neighbourhood Centres
Local Output Indicator
Percentage of retail units that are vacant in Neighbourhood Centres
Local Output Indicator
Amount of completed leisure development
Core Output Indicator 4a
(part)
Core Output Indicator 4b
Percentage of completed leisure development in town centres [Core
Retail Area of City Centre and District Centres]
Percentage of completed leisure development in the named
locations
Local Output Indicator
Housing
SDF
Policy
Target
SH1
‘Trajectory targets’ from Fig 8.1 achieved in each
year covered by the Core Strategy
Indicator(s)
Housing trajectory showing:
Type of Indicator
Core Output Indicator 2a
(i)
Net additional dwellings over the previous five year period or
since the start of the relevant development plan document
period, whichever is the longer
(ii) Net additional dwellings for the current year
(iii) Projected net additional dwellings to RSS period end date
(iv) The annual net additional dwelling requirement
(v) Annual average number of net additional dwellings needed to
meet overall housing requirements, having regard to previous
years’ performances
Number of dwellings demolished
Number of years supply of deliverable sites
Regional Output Indicator
6.19
Regional Output Indicator
6.14
Regional Significant
Effects Indicator 6.18
Local Output Indicator
Percentage of dwellings built within the existing urban areas
Local Output Indicator
Percentage of new and converted dwellings on previously
developed land
Number of dwellings completed in the Housing Market Renewal
Area
Percentage of new dwellings completed at:
Core Output Indicator 2b
Number of dwellings completed on windfall sites
Housing vacancy rate
SH1
SH2
SH3
SH4
SH5
Five years’ supply of land for housing always
available
97% of dwelling completions within the existing
urban areas 2006-2026
90% of new dwellings built on previously
developed land in any five-year period
12,000 dwellings completed in the Housing
Market Renewal Areas over the period 2004-2018
An average density of 50 dwellings per hectare
across the city in any one year
(i) Less than 30 dwellings per hectare;
(ii) Between 30 and 50 dwellings per hectare; and
(iii) Above 50 dwellings per hectare.
Local Output Indicator
Core Output Indicator 2c
SDF
Policy
Target
Indicator(s)
Average density of new housing development
Type of Indicator
Local Output Indicator
Number of new dwellings by size, category and type
SH6
SH7
SH8
An average density of 80 dwellings per hectare in
or close to centres
300 new affordable homes each year
Average density of new housing development in or close to centres
Local Output Indicator
Affordable housing completions
Core Output Indicator 2d
No specific target proposed
The mix of new housing development will,
however, be partly reflected in the density of the
development (see policy SH5 above). A specific
target in relation to the proportion of new homes
that are family units will be included in the Annual
Monitoring Report once the City Policies
Document has been submitted (see City Policies
Preferred Option PH4)
No specific target proposed
A target will be included once proposed allocated
gypsy and traveller sites have been identified in
the City Sites Preferred Options
Number of student cluster flats and student bed spaces completed
Local Output Indicator
Number of family dwellings completed
Local Output Indicator
Number of new dwellings by size, category and type
Regional Output Indicator
6.17
Number of new gypsy and traveller pitches provided
Local Output Indicator
Schools and Health Facilities
SDF
Policy
Target
SEH1
SEH2
No specific target proposed.
The completion of specific developments will
reflect the resources and more specific priorities
of the providers and these may be subject to
change. The planning process will ensure that
development needs in the named areas are met
Indicator(s)
Percentage of new residential development within 30 minutes public
transport time of a GP, hospital, primary and secondary school, and
a major health centre
Type of Indicator
Core Output Indicator 3b
(part)
Open Space
SDF
Policy
Target
SOS1
One park per year to attain Green Flag standard
SOS1
Completion of the Sheaf Valley park by 2018
SOS1
Completion of the urban park at Parkwood
Springs by 2020
Indicator(s)
Type of Indicator
Percentage of eligible open spaces managed to green flag award
standard
Completion of Sheaf Valley park
Core Output Indicator 4c
Completion of urban park at Parkwood Springs
Local Output Indicator
Local Output Indicator
Environment
SDF
Policy
Target
SE1
No land in Green Belt or safeguarded countryside
at Woodhouse, Mosborough and Hollin Busk
developed other than conversion or infill
Continuity of all strategic green links maintained
and no loss of open space within them
No specific target proposed
Hectares of land developed for non-Green Belt uses in the Green
Belt and at Woodhouse, Mosborough and Hollin Busk
Local Output Indicator
Hectares of open space lost to development within open spaces
forming part of a strategic green link
Kilometres of Gateway Routes improved
Local Output Indicator
Annual mean nitrogen dioxide concentrations and
annual mean particulate (dust) PM10
concentrations will each not exceed 40g/m3
60MW of renewable energy generated within the
city by 2021
Annual mean nitrogen dioxide concentrations and annual mean
particulate (dust) PM10 concentrations
Local Significant Effects
Indicator
Renewable energy capacity installed by type
Core Output Indicator 9
SE2
SE3
SE4
SE5
Indicator(s)
Type of Indicator
Local Output Indicator
Waste Management
SDF
Policy
Target
SW1
80% of municipal waste managed through
recycling/ composting or energy recovery by 2015
SW2
SW3
At least 5.5 million tonnes of waste managed at
facilities at Bernard Road and Parkwood Landfill
Site by 2021
Six household waste recycling centres to be
operating by 2018
Indicator(s)
Type of Indicator
Amount of municipal waste arising, and managed by management
type, and the percentage each management type represents of the
waste managed.
Percentage of municipal waste managed through recycling/
composting or energy recovery
Tonnes of waste managed at facilities at Bernard Road and
Parkwood Landfill Site
Core Output Indicator 6b
Capacity of new waste management facilities by type
Core Output Indicator 6a
Number of new household waste recycling centres to be operating
Local Output Indicator
Local Significant Effects
Indicator
Local Output Indicator
Transport
Although the transport targets are linked to specific policies, the achievement of the targets will usually depend on the combined
effect of several policies.
SDF
Policy
Target
ST1(a)
Public transport patronage of 142 million journeys
by 2010 in South Yorkshire
38.5% of journeys into the City Centre by non-car
modes by 2011
75% of new residential development within 30
minutes public transport time of one of the
principal interchange nodes of any one of the
following major employment areas: City Centre,
Meadowhall, Hillsborough
ST1(a)
ST1(b)
ST1(c)
ST1(d)
ST1(e)
ST2
ST3
ST4
ST5
ST6
Person journey times not increased by more than
7.6% by March 2011
Pollutant concentrations (policy ST1(d)) as in
targets for the environment
Fewer than 216 killed and seriously injured
casualties per year by 2013
75% of congestion funding and 65% of bus priority
allocations invested in Key Routes
At least 50 Travel Plans agreed in the City Centre
and 70 in the Lower and Upper Don Valley areas
by 2012
A 4% increase in walking trips as a proportion of
all trips into the City Centre from 2008 to 2013
Completion of development/ improvements of
specific links in policy for cycle routes
A 2% increase in bus trips as a proportion of all
Indicator(s)
Total journeys by public transport
Percentage of journeys into the City Centre by non-car modes
Percentage of new residential development within 30 minutes public
transport time of one of the principal interchange nodes of any one
of the following major employment areas: City Centre, Meadowhall,
Hillsborough
Number (and cumulative %) of new housing developments (10+
dwellings) which meet Regional Transport Strategy accessibility
criteria
Average person journey times
Annual mean nitrogen dioxide concentrations and annual mean
particulate (dust) PM10 concentrations
Number deaths and serious injuries on roads
Percentage of congestion funding and percentage of bus priority
spending spent on Key Routes
Number of Travel Plans agreed in:
(i) the City Centre
(ii) the Lower and Upper Don Valley areas
Percentage change in the number of trips into the City Centre on
foot as a proportion of total trips into the City Centre
Number of named routes improved/ developed
Percentage change in the number of trips into the City Centre by
Type of Indicator
Local Significant Effects
Indicator
Local Significant Effects
Indicator
Core Output Indicator 3b
(part)
Regional Output Indicator
RTS3
Local Significant Effects
Indicator
Local Significant Effects
Indicator
Local Significant Effects
Indicator
Local Output Indicator
Local Output Indicator
Local Significant Effects
Indicator
Local Output Indicator
Local Significant Effects
SDF
Policy
Target
ST8
trips into the City Centre from 2008 to 2013
No specific target proposed
The completion of specific public transport routes
or improvement of services will reflect the
resources and priorities of the Government and
transport operators and these may be subject to
change. The planning policy will ensure that
development needs on the named routes can be
met.
9,500 short-stay parking spaces in City Centre by
2012
3,000 additional park-and-ride spaces by 2018
ST9
No specific target proposed
ST10
Completion of proposed new links by 2021
ST7
ST8
Indicator(s)
Type of Indicator
bus as a proportion of total trips into the City Centre
Indicator
Number of short-stay parking spaces in City Centre
Local Output Indicator
Number of additional park-and-ride spaces
Local Output Indicator
Number of named road schemes completed
Local Output Indicator
LDF Core Output Indicators Not Included in Core Strategy
A small number of the national core output indicators have not been included in the
Core Strategy. The Table below explains the reasons why they have been
omitted.
National Core Output Indicator
3a. Percentage of completed nonresidential development complying
with car parking standards set out in
the local development framework.
Reason for Omission from Core
Strategy Monitoring Framework
Issue dealt with in City Policies
document.
5a. Production of primary land won
aggregates
No workable mineral deposits in
Sheffield
5b. Production of secondary/
recycled aggregates.
No direct planning control over
production of secondary/ recycled
aggregates and it is unclear who
would be responsible for collecting
the data. This is a recognised
problem in the RSS Annual
Monitoring Report
7. Number of planning permissions
Issue dealt with in City Policies
granted contrary to the advice of
document.
the Environment Agency on either
flood defence grounds or water
quality.
8. Change in areas and populations
of biodiversity importance, including:
(i)
(ii)
change in priority habitats
and species (by type); and
change in areas
designated for their
intrinsic environmental
value including sites of
international, national,
regional, sub-regional
significance or local
significance.
Issue dealt with in City Policies
document. However, there are
currently insufficient resources
available to collect this data on an
annual basis (see comment by
English Nature below). A local
indicator will be included instead
(Hectares of designated nature
conservation sites lost to
development)
Download