BTEC Construction Unit 7 Carpentry – Planter Assignment Date: CW/HW Practical Task being undertaken Wooden Planter Initial Specification (as given) A wooden planter of framed construction built from pre-prepared treated timber. Use suitable fixings. The planter should have an open top of area approximately 0.5m². The planter should have a minimum height of 300mm. The planter may be either square or rectangular. The sides should be of solid construction and not of the open lattice type. The base of the planter should be raised off the floor by no more than 75mm to allow for drainage. The base, and all the corners and legs, must be connected using suitable wood jointing methods. What are the component parts of a Wooden Planter? Analysis of the set agreed Brief (What needs to be considered in the manufacture of the Wooden Planter) Appearance Construction Dimensional Restrictions Ergonomics Function Fittings Materials Expected Processes Surface Finish Time Constraint Research Sources Sunnyhill Garden Centre, Saundersfoot Lidstep Garden Centre, Tenby www.all-about-planters.com www.huayi-wood.com www.wellandwood.com Candidate No.: Candidate Name: Centre: Ysgol Greenhill School, Tenby Centre No.: 68287 Page BTEC Construction Unit 7 Carpentry – Planter Assignment Date: CW/HW Existing Designs on the market Example A Example B Example C Example D Analysis of a chosen Existing Product – Example ________ What methods of construction have been used? How many components are there? How many different components are there? List them. Estimate: The overall sizes of the product? Height: Length: Width: What is the area of the top of the planter? (l x w) How are the component fixed to each other? What finish has been applied to the product? 3D Sketch Drawing of the chosen Existing Product. (Perspective / Isometric) Candidate No.: 2D Orthographic Elevation (with estimated or dimensions) of chosen Existing Product Candidate Name: Centre: Ysgol Greenhill School, Tenby Centre No.: 68287 Page BTEC Construction Unit 7 Carpentry – Planter Assignment Date: CW/HW Research Images with comments Comments: Comments: Comments: Not appropriate for C&BE Carpentry practical. Comments: Comments: Not appropriate for C&BE Carpentry practical. Comments: Overall comments or observations Candidate No.: Candidate Name: Centre: Ysgol Greenhill School, Tenby Centre No.: 68287 Page BTEC Construction Candidate No.: Unit 7 Carpentry – Planter Assignment Date: CW/HW Candidate Name: Centre: Ysgol Greenhill School, Tenby Centre No.: 68287 Page