Appendix 4 - Major Public Sector Infrastructure Projects (Planned/ ongoing) Infrastructure Project/ Location Description/ Comment Status Midlands Dam Construction of an asphalt concrete faced rockfill dam on the Grand River South East (GRSE) to send water for irrigation and potable use to La Nicoliere Reservoir and satisfy the need for water in the north of Mauritius. Completed at the end of 2002. Bagatelle Dam Feasibility study for a new dam on the Terre Rouge River to supply water for Port Louis and possibly for irrigation use. Studies also needed for Calebasses and Mon Vallon Dams. Study not commenced yet. WRU indicate that the dam is essential and will be needed by 2010. In PSIP 2002-2006 Rehabilitation of Municipal Dyke The dyke is simply a diversion structure that sends water to the Pailles WTW. Remedial works are required to the structure. Should be completed in 2003. In PSIP 2002-2006 Rehabilitation of Nicoliere Dam Remedial works are required to the structure of the dam prior to the Midlands Dam coming on-stream. Works should be completed during early 2003. In PSIP 2002-2006 Rehabilitation of La Nicoliere Feeder Canal The canal diverts water from the Grand River South East and other rivers in the area to the Nicoliere Dam. The canal is to be renovated to reduce losses and will also convey water from the new Midlands Dam Works are expected to be completed by December 2003. In PSIP 2002-2006 Groundwater Development Several new boreholes have been drilled in recent years and five more are planned at Trianon, Melrose, Forbach, Petite Riviere and an observation well at Coromandel Expected to be completed by end of 2002. In PSIP 2002-2005 Master Plan for the Development of a Sustainable Water Supply in Mauritius Consultant to be appointed to prepare a Master Plan for the whole island and to prepare a computerised network model of the networks. Funding is being sought from the EU. Likely to be awarded towards the end of 2002. Project/ Location Description/ Comment Status Mare aux Vacoas Water Supply Project Works are in two phases. Phase one, consisting of the rehabilitation of the existing water treatment works and various works to pumping stations, has been completed. Phase 2 consists of a new feeder canal, new 800mm diameter pipelines and a new water treatment works of 70Mld capacity. Phase 2 is planned for completion in 2004. In PSIP 2002-2004 Improvement of Water Supply in the East The project caters to the provision of potable water to those sites identified for development and allocation to employees of the sugar sector by the sugar estates under the VRS scheme. The project also caters for expected developments in the tourism sector in the eastern districts, in particular around Beau-Champ. Phase I shall be implemented in 2003. Bois Cheri Water Supply Project The project involves the upgrading and extension of the water distribution network for improvement of water supply to (1) La Flora (2) Grand Bois (3) Bois Cheri (4) Camp Bananes and upgrading of the Nouvelle France Pumping Station. Tenders are being invited. Civil works tentatively starting by early September 2002. Grand Baie Sewerage To be constructed in three phases. Phase 1A for the Grand Baie waterfront area is under Under construction. Due for completion in 2004. construction and consists of a 3500m3/day sewage treatment works with tertiary In PSIP 2002 – 2006. treatment to allow effluent to be used for irrigation, 33km of main sewers, 13 pumping stations and 1600 house connections. Subsequent phases (1B and 2) will expand the sewered area and generate more effluent for irrigation of sugar cane. St Martin Treatment Works Stage 1 works consist of the construction of a new treatment plant at the existing works Due for completion in 2004. In PSIP 2002 – 2006. m3/day providing tertiary treatment for 63000 of sewage. Effluent will be used for irrigation. Digested sludge will possibly be used as an organic fertiliser. Plaines Wilhems Sewerage – The project consists of the construction of 27km of trunk sewers to collect sewage from Expected to be completed in 2006. In PSIP 2002 – Stage II the existing sewerage system to the new St Martin STW. Other components include 270km of collection sewers and 32000 house connections. 2006. Project/ Location Description/ Comment Status Baie du Tombeau Sewerage Construction of a new STW at Baie du Tombeau with primary treatment and a long sea Works for Stage 1 have been completed. In PSIP Project outfall. Trunk sewers and 2100 house connections to service the Baie du Tombeau area and collect sewage from northern Port Louis. 2002 – 2006. Environmental Sewerage and Sanitation Project New STW at Montagne Jacquot to provide primary treatment and disinfection for 48000 Due for completion in 2003. In PSIP 2002 – 2006. m3/day of sewage prior to discharge to a long (645m) sea outfall. New trunk sewers will be provided to collect sewage from southern Port Louis (Fort William to Pointe aux Sables), Lower Beau Bassin and Coromandel. Rural Area Sewerage Projects – Sewerage systems for other densely populated areas (Goodlands, Triolet, Mahebourg, Flic Donors meeting to be held soon to discuss Phase I en Flac, Centre de Flacq) are planned to be carried out as soon as financing is available. financing for these projects. Rural Area Sewerage Projects – Phase II To support National Development Strategy, Rural Regeneration and clustered growth for mixed use developments at Pamplemousses, Bon Accueil, Bel Air, Rose Belle, Bambous, Surinam/Souillac and Chemin Grenier. New Proposal Source: Development Projects in Water Sector, Ministry of Public Utilities, March 2002. Plus current status from Consultant’s research.