Curriculum Vitae Name Jens Christoffersen Specialisation Project management road-, bridge and civil engineering Nationality Danish Year of Birth 1968 Civil Status Married, three children Academic Title Ph.D. - Technical University of Denmark. Memberships The Society of Danish Engineers, member No. 592099 Eur. Ing. (European Engineer), FEANI Parchment No. 23023 Further Training M.Sc. in Engineering - Technical University of Denmark. Degree awarded 31st January 1992. Diploma in Finance (HD) - Copenhagen Business School. Degree awarded 7th August 1998. FIDIC Management Training Course, 2004. Key Qualifications Jens Christoffersen has experience in general management by currently being Regional Vice President for COWI Denmark, including subsidiaries in Africa, India, Belgium and the UK. Experience as a project manager in charge of a broad range of civil- and structural engineering projects including highways, roads, drainage, urban development, bridges and terminals. Experience in new project delivery systems such as partnering, Design & Build and Build Operate and Transfer (BOT) including training of staff and clients in these topics. Language Speaking Reading Writing Danish English German Mother tongue Excellent Fair Excellent Fair Excellent Fair D:\116092391.doc Rev. 07 Jul 2011 2/3 Employment record Period Employer Position 2011- COWI A/S, Copenhagen, Denmark Regional Vice President, Denmark 2007-2011 COWI A/S, Copenhagen, Denmark Senior Vice president Railroads, Roads and Airports 2004-2007 COWI Tanzania Ltd. Managing Director 2004 COWI AS Consulting Engineers and Planners, Aarhus, Denmark Chief Project Manager Department of roads, bridges and geotechnical investigations. 1999-2004 COWI AS Consulting Engineers and Planners, Aarhus, Denmark Chief Project Manager Department of roads, bridges and geotechnical investigations. 1995-1999 COWI AS Consulting Engineers and Planners, Copenhagen, Denmark Project Engineer/project manager: Structural assessment, inspection, repair and retrofit of bridges. Design of road and railway bridges 1992-1994 Technical University of Denmark Ph.D. Studies and teaching Selected Assignments Project Manager. Design and build contract for the Unity Bridge. Tender assistance, site investigations, preliminary and detailed design of a 720m long bridge across the Ruvuma River and 10km of access roads. Duties: Overall responsible for execution of the job which involves a road design team in Tanzania and a bridge design team in Denmark. Was furthermore team leader for the road design team. Tanzania. Client: China Geo Engineering Corporation. 2005-2007. Project Manager. Design and build contract for the Kyamyorwa-Busirayombo Road. Tender assistance, site investigations, preliminary and detailed design of a 120km rural road section south of Bukoba. Duties: Overall responsible for execution of the job. Tanzania. Client: China Geo Engineering Corporation. 2005-07 Project Manager. Highway Ris-Ølholm. Design and supervision of 14 km highway in rural area of Denmark including all drainage facilities and 14 bridges. The project is the first major design and build contract tendered by the Danish Road Directorate. Denmark. Client: Vejcon I/S a consortium of contractors. 2002-2004 Project Manager. Søften-Skødstrup Motorway. Project: Tender design for approximately 11 km motorway including 30 bridges and drainage facilities for Design & Build consortium. Denmark. Client: Vejcon. 2004 D:\116092391.doc 3/3 Chief Engineer. Suspension Bridges over Skjern River. Design of two suspension bridges across the River Skjern in Denmark. Client: Danish Forest and Nature Agency. 2003. Project Manager. Herning Footbridge. Design and supervision of a cable stayed footbridge with 80 m span. Denmark. Client: Danish Road Directorate. 1997-1999. Project Manager. Aarhus-Grenå Rail Line Upgrade. Structural evaluation, design and supervision of strengthening measures of railway bridges in poor condition on the Aarhus-Grenaa Line. More than 15 bridges were evaluated and approximately 5 strengthened in order to comply with international standards for bearing capacity of rail bridges. Denmark. Client: Danish Railway Authority. 2000 and 2004 Structural Engineer. Addis Ababa - Woldiya Road Rehabilitation Project. The project involved the rehabilitation of the Addis Ababa - Woldiya road. As part of the project a number of concrete bridges across streams and rivers were designed. Ethiopia. Client: Danida. 1998. Project Manager. Dar es Salaam (Waso Hill) - Bagamoyo Road Project. Design of two composite bridges for the Dar es Salaam (Waso Hill) Bagamoyo Road Project. Tanzania. Client: EU. 1996. Project Engineer. Standard drainage facilities. Design of COWIs standard drainage facilities (multiple box and pipe culverts etc.) used on a number of projects including: • Dar es Salaam - Mlandizi Road, Tanzania • Chalinze-Melela Road, Tanzania • Somanga-Mantandu, Tanzania • Dar es Salaam (Waso Hill) - Bagamoyo road project, Tanzania • Addis Ababa - Woldiya road rehabilitation project, Ethiopia • Gondar - Mereb Road upgrading project, Ethiopia • Kampala - Fort Portal road upgrading project, Uganda Client: EU. 1998. Structural Engineer. Assessment of Danish Railway Bridges. Project: Structural assessment and retrofit recommendation of Danish railway bridges. The project involved the screening of several hundred bridges and tunnels with respect to structural integrity and load bearing capacity. Denmark. Client: Danish Railway Authority. 1996 D:\116092391.doc