Doc# 106733513 AGENDA Meeting: TP 18 Chair: Omar Elloumi, Alcatel-Lucent (ATIS) omar.elloumi@alcatel-lucent.com Secretary: Karen Hughes, ETSI karen.hughes@etsi.org Meeting Date: 2015-07-20/24 Meeting Details: Face-to-face meeting, Philadelphia, USA link to the meeting invitation Intended purpose of document: Decision Discussion Information Other <specify> Template Version:23 February 2015 (Dot not modify) Participation in, or attendance at, any activity of oneM2M, constitutes acceptance of and agreement to be bound by all provisions of IPR policy of the admitting Partner Type 1 and permission that all communications and statements, oral or written, or other information disclosed or presented, and any translation or derivative thereof, may without compensation, and to the extent such participant or attendee may legally and freely grant such copyright rights, be distributed, published, and posted on oneM2M’s web site, in whole or in part, on a nonexclusive basis by oneM2M or oneM2M Partners Type 1 or their licensees or assignees, or as oneM2M SC directs. oneM2M Procedure Notice: oneM2M activities must adhere to the oneM2M Partnership Agreement and Working Procedures, which are based on principles such as fairness, due process, openness and transparency. IPR Notices: Each oneM2M Partner Type 2 and oneM2M Member contributing to the technical work of oneM2M must grant a perpetual, worldwide, royalty-free, nonexclusive license: to incorporate material from contributions into oneM2M Technical Specifications and Technical Reports; and for the oneM2M Partners Type 1 to publish the contributed material in Technical Specifications and Technical Reports. Care should be taken when making contributions containing third party material to ensure that the contributor has the right to grant the appropriate license for this material. Each oneM2M Member who engages in oneM2M activities through its membership in a Partner shall be required to comply with that Partner Type 1’s IPR policies, procedures and guidelines with respect to the availability of licenses for IPR(s) that are or may be essential to implement Technical Specifications and/or Technical Reports developed in oneM2M. oneM2M cannot ensure the accuracy or completeness of any disclosure, investigate the validity or existence of a patent, or determine whether a patent is essential to the use of a oneM2M Technical Specification or Technical Report. Antitrust Risk Notice: oneM2M participants should be sensitive to, and avoid discussions within oneM2M on, sensitive topics such as licensing terms, price, territories, specific contractual terms, etc. © 2016 oneM2M Partners Page 1 (of 6) Doc# 106733513 Agenda 1 Opening Plenary 1.1 Welcome Delegates are advised to read the legal notices on the cover page of this agenda. 1.2 Welcome address Meeting Logistics Weekly Schedule TP-2015-0741 Weekly Schedule TP18 Karen Hughes, Secretariat 2015-07-15 Invitation to a social event TP-2015-0734 TP18 Social Event Invitation ATIS and InterDigital 2015-06-11 Voting List TP-2015-0730 Karen Hughes, Secretary 2015-06-01 Voting List for TP18 Observers Introduction of observers Presentations from observers 1.3 Meeting Objectives Elections : conduct elections for vacant MAS, PRO and TST WGs leadership positions. announce the forthcoming elections for the position of Architecture WG – 1 Vice Chair Technical: 2 freeze requirements for Release 2 progress R2 maintenance of R1 produce R2 description document conduct a workshop with OIC to seek opportunities for interworking and decide next steps Review & Approval of Agenda TP-2015-0750 3 Agenda TP18 TP Chair Review & Approval of Previous Minutes TP-2015-0729R01 Minutes TP17 Karen Hughes, Secretary 2015-06-01 Agreed by correspondence © 2016 oneM2M Partners Page 2 (of 6) Doc# 106733513 Agenda 4 Review of open Action Status 5 Consideration of input documents / items for action at opening plenary 5.1 Elections Conduct elections for Leadership positions: 1 Vice Chair for MAS WG: 1 nomination received o Chair for PRO WG: 1 nomination received o o Mahdi Ben Alaya, LAAS-CNRS (ETSI) o Philippe Cousin, Easy Global Market (ETSI) o Seon H. Kim, Dt&C (TTA) 5.2 upcoming elections Open position of 1 Vice Chair for ARC WG 5.3 New / Updated Work Items TP-2015-0739 TP-2015-0742 TP-2015-0744 TP-2015-0745 TP-2015-0766R02 Shingo Fujimoto, Fujitsu (TTC) 1 Vice Chair for TST WG: 3 nominations received o Peter Niblett, IBM (ETSI) 1 Vice Chair for PRO WG: 1 nomination received o Jieun Keum, Samsung Electronics (TTA) WI-0018_CR_for_Rapporture_change WI-00xx-Application developer guide WI-0018_AllJoyn_interworking_normative_work WI-0017-Home_Domain_Enablement_normative_work WI for OIC interworking LG Electronics ETSI LG Electronics LG Electronics Samsung 2015-07-08 2015-07-10 2015-07-13 2015-07-13 2015-07-2 5.4 Liaison Statements TP-2015-0733 Reply LS on Extension of 3GPP Service-Information AVP TP-2015-0732 LS on 3GPP Rel-13 MTC features for service capability exposure 3GPP SA2 2015-06-02 TP-2015-0740 LSout 3GPP SA5 Code Point Ericsson TP-2015-0749 LS on Exposure of Network Capabilities to M2M OMA ARC 2015-07-15 WG 3GPP SA5 2015-06-03 2015-07-09 5.5 Approval of CR Packs TP-2015-0746 TP-2015-0747 © 2016 oneM2M Partners CR Pack TS0004 V1.2.1 Release 1 CR Pack TS0009 Release 2 PRO Chairman 2015-07-13 PRO Chairman 2015-07-13 Page 3 (of 6) Doc# 106733513 Agenda 5.6 Reports from Ad Hoc Group Methods of Work TP-2015-0737 TP-2015-0738 5.7 Draft MoW 1.4.0 MoW_M&P_Report_at_TP18 MoW(Enrico Scarrone) MoW convenor (Enrico Scarrone) 2015-07-07 2015-07-07 Other Business TP-2015-0748 Introduction of GlobalPlatform as partner type 2 TP-2015-0752 HGI to conclude its work by 2016 TP-2015-0736R01 oneM2M based implementations TP-2015-0743 Connecting ISO TC204 (ITS) TP-2015-0751 AppID CR TP-2015-0735 Application ID Input GlobalPlatform 2015-07-14 HGI JaeSeung Song (KETI) Tseng Infoserv, LLC IFAST, Telit IFAST, ILS, Telxxis (TIA TR-50) 2015-07-1 2015-07-14 2015-07-12 2015-07-18 2015-06-24 == Recess until Interim Plenary == 6 Interim Plenary 6.1 7 Elections 7.1 8 Welcome Back Result of election for position of TST Vice Chair Consideration of input documents / items for action at interim plenary 8.1 New / Updated Work Items TP-2015-0766R02 WI for OIC interworking TP-2015-0745R01 WI-0017Home_Domain_Enablement_normative_work TP-2015-0742R01 WI-00xx-Application developer guide TP-2015-0767 New WI for HGI SH activities integration Samsung LG Electronics 2015-07-22 2015-07-22 ETSI 2015-07-22 Patricia Martigne ORANGE TP-2015-0744R01 WI-0018_AllJoyn_interworking_normative_work LG Electronics 2015-07-21 TP-2015-0765 WI-0028-Update hitachi 2015-07-22 8.2 Liaison Statements TP-2015-0763 LSout Exposure of Network Capabilities to M2M TP-2015-0762 LSout 3GPP Rel-13 MTC features for Service Capability Exposure TP-2015-0740R01 LSout 3GPP SA5 Code Point 8.3 Rajesh Bhalla, 2015-07-22 ZTE Rajesh Bhalla, 2015-07-22 ZTE Ericsson 2015-07-21 CR packs TP-2015-0761 CR Pack TS0008 Release 1 © 2016 oneM2M Partners WG3/PRO Charirman 2015-07-21 Page 4 (of 6) Doc# 106733513 Agenda 8.4 HGI MAS-2015-0599R02 HGI activities transfer to oneM2M WG5 8.5 Patricia MARTIGNE, ORANGE 2015-07-22 Any other business TP-2015-0736R01 TP-2015-0768 TP-2015-0756 TP-2015-0764 oneM2M based implementations Informal feedback on GSC19 IoT session Showcase Tokyo Report ITU-T presentation to oneM2M SC27 JaeSeung Song (KETI) Gerry McAuley ETSI KDDI Omar Elloumi (ALU), TP Chair 2015-07-14 2015-07-22 2015-07-20 2015-07-22 == Recess until Closing Plenary == 9 Closing Plenary 9.1 Welcome Back 10 Consideration of input documents / items for action at closing plenary 10.1 Liaison Statements 10.2 New / Updated Work Items 10.3 Reports from Working Groups Requirements – WG1 Architecture – WG2 Protocols – WG3 Security – WG4 Management Abstraction & Semantics – WG5 Testing – WG6 10.4 Reports from Ad Hoc Group Methods of Work 11 Review Work Programme Status Work Programme Management Release 2 planning 12 Review Meeting Objectives © 2016 oneM2M Partners Page 5 (of 6) Doc# 106733513 Agenda 13 Planning for next Meetings TP-2015-0731 Invitation to TP19_Sophia-Antipolis ETSI 2015-06-02 14 Any other business 15 Closure of meeting © 2016 oneM2M Partners Page 6 (of 6)