P R O J E C T S C O M P L E T E D

advertisement
Facilities 120 years old require ongoing repair and/or restoration. Below are
listed repairs and improvements completed since the fall of 2008, currently
pending, and yet needed. The cost of replacing the failed church gutters,
downspouts, and cornice as well as the aged cafeteria roof has all but depleted
our meager maintenance fund as well as parish savings. The first weekend of
each month there is a special second collection reserved for ongoing
maintenance and repairs.
PROJECTS COMPLETED
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
Repaired rectory porch light 7/2008
Renovated two existing church bathrooms
Created a third handicap accessible church bathroom
Restored donor designations on two stained glass windows
Posted “No Trespassing” signs on property and buildings
Installed closer on both main and inside cafeteria doors
Installed security alarm system on rectory
Completed four camera rectory video security system
Renovated cafeteria (painting, light fixtures, curtains, and table cloths)
Removed three trees between church and rectory
Repaired leak in rectory roof above laundry
Repaired rectory and church shingles blown off by storm
Repaired storm damaged flat roof above church facade
Repaired leak in rectory garage roof
Repaired brickwork on front right corner of rectory
Repaired brickwork above two church windows
Installed awning above cafeteria entrance
Repainted iron fence in front of church
Repaired rain-caused ceiling stains in pastor’s bedroom
Installed eight additional fire extinguishers
Repaired rectory gas pipes and leak
Refinished floor in pastor’s bedroom
Obtained tax exemption for land adjacent to rectory nd
Replaced three non-functioning Exit lightsndon church 2 floor
Replaced emergency lighting on church 2 floor
Put tabernacle spots on timer switch
Replaced malfunctioning courtyard night light fixture 6/2010
Installed new fire alarm system on church and rectory 7/2010
Installed portable air conditioner in choir loft
7/2010
Replaced missing ceiling globes on church 2nd floor 8/2010
Replaced storm-damaged cross nd
atop church steeple 8/2010
Installed door locks on church 2 floor 8/2010
Installed handrails at rectory and church steps 10/2010
Replaced church gutters, downspouts, and cornice 11/2010
Repaired leaking rectory bathroom toilet seal 11/2010
Restored church yard and handicap ramp grass area 12/2010
Replaced failing cafeteria kitchen refrigerator 1/2011
Upgraded electric outlet boxes near water sources 1/2011
Replaced rectory casts iron pipe and damaged flooring 2/2011
Replaced aged, leaking cafeteria roof 2/2011
Installed new cafeteria ceiling tiles 3/2011
PROJECTS PENDING
None currently
FIFTEEN PROJECTS NEEDED
RECTORY
1
2
3
4
Repair eroded kitchen drywall
Repair kitchen and office bathroom peeling wallpaper
Repair broken window panes
Clean all windows
CHURCH
1
2
3
4
5
6
7
8
9
Repair plaster erosion onndstairwell and 2nd floor
Repair ceiling stains on 2 floor
Replace window Plexiglass
Clean discolored exterior
Replace aged carpet
Refinish pews
Purchase pew cushions
Install additional ceiling light fixtures, one on each side aisle
Lower sanctuary floor
OUTSIDE
1
2
Determine if parking surfaces require re-sealing or re-asphalting
Replace aged wooden ramp with permanent concrete ramp