Model submission checklist Model submission checklist detailed models Development/project: Application number: 1 Water Item Description 1.1 Model 1.1.1 Model file(s) on CD/DVD/USB Y/N 1.1.2 Model format – convertible to EPANet Y/N 1.1.3 Model file contains only design solutions and options referred to in design/planning report Y/N 1.1.4 Design solutions clearly marked in model Y/N 1.1.5 Model setup summary table completed Y/N 1.1.6 1.1.7 Peak day analysis completed for design solution (3 day simulation 95% Peak day analysis completed for design solution (7 day simulation) Checked Software: Y/N Y/N 1.1.8 Peak hour analysis completed for design solution Y/N 1.1.9 Fire fighting analysis completed for design solution Y/N 1.2 Reporting 1.2.1 Modelling/design report/planning report completed Y/N 1.2.2 Model includes scenarios of any options discussed in report Y/N 1.2.3 Report: (a) Development application number if applicable Y/N (b) Development description Y/N REVISION DATE >> 7 MAY 2014 Notes Townsville City Plan Attachment E SC6.4.3.23 (c) (d) (e) Demand calculations for all design horizons Description of options tested and reasons for failure or compliance against design standards Options analysis (including NPV, Triple Bottom Line Analysis) and reasoning for selection of preferred option Y/N Y/N Y/N (f) Tables: (f)(i) Node label and demand Y/N (f)(ii) Peak hour results Y/N (f)(iii) Node label, elevation, pressure, hydraulic grade line Y/N (f)(iv) Pipe label, flow rate, velocity, hydraulic gradient Y/N (f)(v) Fire fighting results Y/N Node label, required fire fighting flow and pressure, available fire fighting flow, ‘satisfies fire fighting requirements Y/N’ Y/N (g) 1.3 Excel Charts: Pump station system resistance curve with pump selection overlaid (if applicable), duty point marked Y/N Water Model RPEQ Certification Statement Y/N REVISION DATE >> 7 MAY 2014 Townsville City Plan Attachment E SC6.4.3.23 2 Sewer Item Description 2.1 Model 2.1.1 Model file(s) on CD/DVD/USB Y/N 2.1.2 Model format Y/N 2.1.3 Model file contains only design solutions and options referred to in design/planning report Y/N 2.1.4 Design solutions clearly marked in model Y/N 2.1.5 Model setup summary table completed Y/N 2.1.6 2.1.7 Peak day analysis completed for design solution (3 day simulation 95% Peak day analysis completed for design solution (7 day simulation) Checked Y/N Peak hour analysis completed for design solution Y/N 2.1.9 Fire fighting analysis completed for design solution Y/N 2.2 Reporting 2.2.1 Modelling/design report/planning report completed Y/N 2.2.2 Model includes scenarios of any options discussed in report Y/N 2.2.3 Report: (a) Development application number if applicable Y/N (b) Development description Y/N (d) (e) Sewer flow calculations (Manhole and catchment loads) for all design horizons Description of options tested and reasons for failure or compliance against design standards Options analysis (including NPV, Triple Bottom Line Analysis) and reasoning for selection of preferred option Y/N Y/N Y/N (f) Tables: (f)(i) Manhole label and demand Y/N (f)(ii) Peak wet weather flow results: Y/N Manhole maximum hydraulic grade line Y/N Is manhole surcharged? Y/N Gravity pipe flow depth as percentage of diameter Y/N REVISION DATE >> 7 MAY 2014 Software: Y/N 2.1.8 (c) Notes Townsville City Plan Attachment E SC6.4.3.23 (g) 2.3 Gravity pipe flow velocity Y/N Pressure main velocity Y/N Excel Charts: Pump station system resistance curve with pump selection overlaid (if applicable), duty point marked Y/N Sewer Model RPEQ Certification Statement Y/N REVISION DATE >> 7 MAY 2014 Townsville City Plan Attachment E SC6.4.3.23 REVISION DATE >> 7 MAY 2014 Townsville City Plan Attachment E SC6.4.3.23