Risk Action Plan Template (Taken from CGG Event Application Package) Event Risk Action Plan Guidelines Event Coordinators are advised that this document is the required standard for risk action plans undertaken for Events in the City. Should the Event already have a risk action plan of a similar standard which is in accordance with the Australian Standard for Risk Management that maybe submitted in its place. Definitions: Risk – the chance of something happening that will have a detrimental impact on event objectives. Risk Assessment – the overall process of risk identification, risk analysis and risk evaluation. Risk Management – the processes and structures that are put into place to achieve objectives whilst managing any adverse side effects. Risk Identification – is a matter of identifying the hazards/risks, which may occur during the event. Following is a list that can be used as a prompt to assess the risks/hazards that are either present, or may occur during the event. Example Risks may include Note: this is not an exhaustive list Health/Injury/Disease o o o o o o o o o o o o o Drug affected persons Alcohol affected persons Fire caused by electrical installations Fire risk caused by gas bottles Marque collapse Broken glass on reserve Food Poisoning Power Failure Water Failure Manual handling Working at heights Exposure to chemicals Unclean toilets Criminal Activity o o Disorderly conduct Consumption of alcohol Environmental Risk o o Noise nuisance caused to neighbours Excessive litter left at the event Legal/Contractual o Loss of key contractors Operational/Crowd Safety o o o o o o o o Overcrowding/crowd control Lighting failure Trip hazards Extreme weather conditions Inadequate toilet facilities Communications failure Rides and amusements – jumping castles Fireworks malfunctions Traffic Management o o o Lack of parking Inadequate access for emergency vehicles Inadequate pedestrian safety Promotion/PR o o Inadequate funding Loss of key personnel Page 1 of 8 Risk Action Plan Template (Taken from CGG Event Application Package) Risk Analysis - once risks are identified they should be evaluated on a 2 dimensional matrix which rates the likelihood of the hazard and the scale of the possible consequences. By undergoing this process it is possible to analyse the seriousness of the risk that in turn assists to determine which risks need to be treated and which risks are considered to be acceptable. The following matrices can be used for this process: Table 1: Example Consequence Matrix Level 1 2 3 4 5 Descriptor Insignificant Minor Moderate Major Catastrophic Consequence Details No injuries, low financial loss First Aid required, temporary halt of event, medium financial loss Medical treatment required, external assistance required, high financial loss Extensive injuries, major halt of event, emergency services, major financial loss Death, potential prosecution, catastrophic financial loss Table 2: Example Likelihood Matrix Level 5 4 3 2 1 Descriptor Almost Certain Likely Possible Unlikely Rare Likelihood Details Is expected to occur in most circumstances, more than once a year Will probably occur in most circumstances, once a year event Might occur at some time, once in 3 year event Could occur at some time, once in 10 year event May Occur at some time, once in 15 year event Risk Evaluation – by using the above tables the risk ca3n be assessed as either low, medium, high or extreme. This can be demonstrated in Table 3 below. Table 3: Example Consequence Table Likelihood Consequence 5 – Almost Certain 4 – Likely 3– Possible 2 – Unlikely 1 – Rare 1 Insignificant 2 Minor 3 Moderate 4 Major 5 Catastrophic Moderate 5 High 10 High 15 Extreme 20 Extreme 25 Low 4 Low 3 Low 2 Moderate 8 Moderate 6 High 12 Moderate 9 High 16 High 12 Extreme 20 High 15 Low 4 Moderate 6 Moderate 8 High 10 Low 1 Low 2 Low 3 Low 4 Moderate 5 Page 2 of 8 Risk Action Plan Template (Taken from CGG Event Application Package) Risk Controls - All risks need to be eliminated where possible. However, this is not always possible therefore other measures need to be taken to reduce the risk and create a safer event. Use of the hierarchy of controls may be of assistance in this process. Hierarchy of Controls o ELIMINATE – o SUBSTITUTE – e.g. replace ladder with a scissor lift or step platform, use weights instead of pegs for securing structures and marquees. o ENGINEERING CONTROLS – e.g. glass shields in front of food preparation and serving areas, barriers to prevent pedestrian access o ADMINISTRATIVE CONTROLS – o PERSONAL PROTECTIVE EQUIPMENT (PPE) – e.g. sunhats, sunscreen, long sleeve clothing, high visibility vests, enclosed footwear. e.g. ban the use of jumping castles on days where winds exceed 30km/per hour e.g. training and induction for all event staff, emergency plans, worksite inspections The Risk items listed below are risks that most events are exposed to in one form or another. Should a risk item not be relevant to the event delete it or state NA Risk Item Consequence Likelihood Risk Rating Preventative Controls Prior to Risk Occurring Due Date For Preventative Controls Response Controls Responsible Person If Risk Occurs For Risk 1.1 Medical Incidents - Minor Injuries 1.2 Medical Incidents – Moderate-Major Injuries 1.3 Fatality 1.4 Dehydration 2.1 Asset Damage 2.2 Damage to lawn by heavy vehicles 2.3 Damage to Temporary Fence 2.4 Excessive Noise Page 3 of 8 Risk Action Plan Template (Taken from CGG Event Application Package) Risk Item Consequence Likelihood Risk Rating Preventative Actions Due Date Prior to Risk Occurring For Preventative Action Response Actions If Risk Occurs Responsible Person 2.5 Illegal Street traders and entertainers 2.6 Littering 2.7 Reticulation timing 2.8 Lack of electrical Compliance approval 3.1 Broken Glass 3.2 Syringes 4.1 Fire on stage 4.2 Temporary structure fire 4.3 Vehicle fire 5.1 Injury sustained at the event 6.1 Delays in Public Transport 7.1 Communication failure 7.2 Sound Equipment Failure 8.1 Run out of food 8.2 Run out of water 8.3 Access to free water supply 9.1 Bomb Threat 9.2 Criminal conduct Page 4 of 8 Risk Action Plan Template (Taken from CGG Event Application Package) Risk Item Consequence Likelihood Risk Rating Preventative Actions Due Date Prior to Risk Occurring For Preventative Action Response Actions If Risk Occurs Responsible Person 9.3 Disorderly conduct 9.4 Illegal Alcohol Consumption 9.5 Person on unsafe viewing platform 9.6 Substance overdose 10.1 Need to evacuate 10.2 Structural Collapse 11.1 Lost property 11.2 Lost children 12.1 Event delayed 12.2 Lack of contact details 13.1 Inclement weather (Plan B) 13.2 Electrical storm 13.3 Heavy Rains 14.1 Contractor No show 14.2 Inadequate briefing 14.3 Lack of Performers Page 5 of 8 Risk Action Plan Template (Taken from CGG Event Application Package) Risk Item Consequence Likelihood Risk Rating Preventative Actions Due Date Prior to Risk Occurring For Preventative Action Response Actions If Risk Occurs Responsible Person 14.4 Lack of crowd control staff 14.5 Forced redeployment of emergency services 14.6 Key personnel no show 15.1 Wet/Slippery or uneven ground 15.2 Lack of disabled access 15.3 Overcrowding 16.1 Public toilet failure 16.2 Power failure 17.1 Illegal parking and obstruction 18.1 Car and Pedestrian Crash 18.2 Lack of emergency service access 19.1Tripping over cables 19.2 Stage invasion 19.3 Stage electrocution 19.4 Crowd surfing and diving 20.1 Food contamination 20.2 Lack of Refuse Disposal Page 6 of 8 Risk Action Plan Template (Taken from CGG Event Application Package) Risk Item Consequence Likelihood Risk Rating Preventative Actions Due Date Prior to Risk Occurring For Preventative Action Response Actions If Risk Occurs Responsible Person 20.3 Non Compliance with Health (Food Hygiene) Regulations 1993 20.4 Non Compliance with Health (Public Buildings) Regulations 1992 Lighting Failure Insert Risk Insert Risk Insert Risk Insert Risk Insert Risk Insert Risk Insert Risk Insert Risk Insert Risk Insert Risk Page 7 of 8 Risk Action Plan Template (Taken from CGG Event Application Package) Site Plan It is required that Event Coordinators provide a basic layout of their stalls, structures, features and equipment. This is to inform the City of your specific requirements and any specific risks that need to be accounted for in the overall event management. Please be advised that the City acknowledges that issues on the day may require minor variation to the below basic layout and this is accepted and such changes can take place. The City however requires notification if a significant change takes place as this may need to be accounted for in the overall event management approval. Event Coordinators are to advise the Dimensions of any stalls or structure (i.e. 2m x 2m) ____________________________________________________________________________________ Possible features may include the follow: Equipment Electricity cables Seating First aid if required Cooking equipment Lighting Stall Specific equipment Water sources Tables / benches Fire extinguisher if required Possible Marquee/ tent guide lines or tie down points Marquee entrances and walls if relevant Please use below guide to draw your layout Page 8 of 8