Watershed Survey Data Form Please e-mail, fax, or mail completed form to Gwinnett Clean & Beautiful Email: gwinnettcb@gwinnettcb.org, Fax: (770) 822-5179 4300 Satellite Boulevard, Duluth, GA, 30096 Directions Use the forms to score each street you survey individually. 1. Land Use Look for what types of buildings or uses of land are along the street. For every building you see, as best you can, place it in one of the categories listed below and write a tally mark for each building on the Land Use Data Chart. a. Automotive- auto repair shops (ex.Jiffy Lube) or car dealerships b. Agricultural- farm area with crops, horses, or cows c. Food Services- restaurants and fast food d. Government- city hall, courthouse, public works, etc. e. Industrial- manufacturing, recycling, warehouses f. Offices- business offices, doctors offices, realtor offices g. Recreation- parks, gyms, bowling, golf h. Retail- shopping centers, stores, or malls i. Residential- houses, neighborhoods, or apartment complexes j. Schools- public or private schools (does not include daycares) k. Other- for a use that does not fit in these categories, write it in the Notes section 2. Water Impacts For this section, mark an X in the blanks provided to provide data for the following scenarios. a. LITTER- Look for any trash or items dumped along the roadside the overall amount you see for that entire road stretch based on this scale: i. Minimal/no litter- you see only maybe 1-2 pieces of trash, but mostly clean ii. Slightly Littered- you see several scattered pieces of trash iii. Littered- you see a piece of trash or small piles every few feet iv. Extremely Littered- you see several large items and piles of trash b. STORM DRAIN- Look at the storm drains on the side of the road to see if there is anything in the drain hole. Mark an X if there is any litter or pinestraw/leaf debris stuck in the hole, or if the storm drain is clean c. Features- Mark an X if you see a bridge, ditch, or signs of erosion anywhere on or along the sides of that road d. NOTES- Make a note of anything unusual you see that you think could be important to the health of the watershed. Watershed Survey Data Form Cont… LAND USE DATA CHART Land Use Ag ric u ltu ral F oo dS er v i ce s Go ve r nm ent I nd ust r ia l Of f i ce s Re si d ent ial Re tail Road Name # O th er l oo Sch Au tom oti ve # 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 Road Name Mi n 2-S /No L l igh itte 3-L tly Li r tte itte red 4-E r ed xtr e Sto mel y rm Li t Li tt D rai n tered er Cle i De n Dra an bri s in i n Bri dge Dr ain Dr a cros sin ina g g e Er o Di t si o ch n 1- WATER IMPACTS DATA # 1 2 3 4 5 6 7 8 9 10 11 12 Watershed Survey Data Form Cont… Road Name Litter Storm Drain Features Notes Watershed Survey Summary Form Please e-mail, fax, or mail completed form to Gwinnett Clean & Beautiful Email: gwinnettcb@gwinnettcb.org, Fax: (770) 822-5179 4300 Satellite Boulevard, Duluth, GA, 30096 Watershed: ________________________ Group Leader: ______________________ Phone: ____________________________ E-mail: ____________________________ Group Name: __________________________________________________________ Date of survey: _____________________ Time of day of survey: _______________ Today’s Weather (circle all that apply): Clear/Sunny Partly Cloudy Short Rain Showers Steady Rainfall Overcast Heavy Rainfall 1. Write in all the road names that your group surveyed. There should only be one listing per individual road. 2. LAND USE- For each category listing for each road, average the surveyors results. Example: a. Add the total # of Agricultural land use tally marks made for Rd #1. Surveyor A saw 2, Surveyor B saw and Surveyor C saw none. b. Total Rd#1-Agricultural= 3 c. Divide the total by the # of surveyors. d. 3 Agricultural / 3 surveyors= Avg of 3 for Rd #1-Agricultural e. After you have averaged the results for all the roads in the Agricultural section, add the total for all the streets surveyed at the bottom. 3. LITTER- Average the Litter Scores for each road. Example: a. For Rd#1, Surveyor A & B rated it a 2 for Slightly Littered while Surveyor C rated it a 1 for Minimal/No Litter. b. Add the scores: 2+2+1= 5. c. Divide by the # of surveyors: 5/3= about 1.7 Litter Score for Rd #1 4. STORM DRAIN- If litter or debris was seen in storm drains along the road, add up all sightings tallied for the road. Write the number in the boxes provided. Example: a. For Rd#1, Surveyor A wrote tally marks for 3 observations of litter in storm drains and 1 of debris. Surveyor B saw 2 with litter and 1 debris. Surveyor C saw 2 with litter and 2 with debris. b. Add the total numbers for litter: 3+2+2= 7 Total Litter observations for Rd#1 c. Add the total numbers for debris: 1+1+2= 4 Total Debris observations for Rd#1 5. - If there is a bridge present on this road, write “YES,” and if not write “NO.” tom # 1 2 3 4 5 6 7 8 9 10 11 12 TOTAL in WATERSHED Comments: Ag otive ric Foo ultur al dS er v Go ver i ces nm en I nd ust t r Off ial i ce s Re si d ent i Re al tail Sch oo l Ot h Li tt er er Sco Li tt re er De Obse bri rve s d Bri Obse dge rve d Dr a cros s ing ina Er o ge Di tch si o n Au Watershed Survey Summary Form Cont… Road Name Land Use Litter Storm Drain Features