SAMIR Mohamed PERSON IN CHARGE DISCIPLINES ELECTRICAL& INSTRUMENTSUPERVISOR Street Djebel Metouia 6010. Tunisia (00 216) 23 377740 or ( 00216) 52 377 742 or (00227) 80 000 535 Niger mohasamir2008@yahoo.fr Tunisian nationality 40 years, married (2 Child ) STUDIES 01 02 February 1999 June 1996 Diploma high-level technician in industrial electricity. Baccalaureat: science College Novembre 7 Metouia PROFESSIONAL EXPERIENCE July. 2012-july2014 Person in charge Disciplines: E&I Supervisor (electricity and instrumentation) with TECHNIP: Project: open uranium mine Customer: AREVA Tasks: . Supervise and direct E&I subcontractor activities. . Installation and test of solar panel system (emergency) for the aerodrome. . Supervise and direct the effort on site by the Contractor installing the wiring and electrical equipment. .Ensure that works is completed according to plans and specifications for the project. .Ensure that the working methods and the quality of the finished product are according to the rules of art. .Ensure that works is carried out in a safe manner. . Ensure that work is completed within time and on budget, without incurring additional costs. .Coordinate with supervisors and disciplines on the project to establish common priorities. . Coordinate with representatives of the manufacturers of the equipment on site. . Prepare daily progress report. Coordination with the Site Manager/the persons in charge disciplines and inspectors QC for the inspections and the tests. .HV cable pulling, joint, test and termination. .Transformer test and installation. April 2012-june 2012 Person in charge Disciplines: E&I Supervisor (El-merk project Algeria) with PETROFAC Disciplines: Civil, Structure l, Mechanical, Piping, Painting, Insulation, Electricity & Instrumentation, Customer: PECIL ( Petrofac Engineering & Limited Construction) Final customer: SOATRACH (Algeria) and ANADARKO (USA) . MCC switchgear installation (Schneider) .installation of cables tray .Cables glanding &termination. .Installation of earthing system. 01 02 Curriculum Vitae1 / 4 .Electrical equipment installation (junction box, lighting, electrical switchboard, pumps…) .instrument cable pulling and termination. Jan. 2010 –March 2012 03 Person in charge Disciplines: E&I Superintendent (electricity and instrumentation) with PIRECO: (Petroleum &Industrial Realizations Contractors) Project: Above Ground Installation for LPG Pipelines (between Hasdrubal Terminal andGabès Terminal) - Tunisia. Disciplines: Civil, Structure metal, Mechanical, Piping, Painting, Insulation, Electricity & Instrumentation. Customer: BGT (British Gas Tunisia). Tasks: Coordination with representatives E&I of the Customer for activities E&I of the project. Establishment and implementation of the Plan Project Quality. Preparation, implementation, control, review and update of documentation E&I of the project. Planning and preparation of works E&I. Direction and framing of the supervisors and foreman for the realization of work of the inspections and the tests. Checking and review of the corrective actions and preventive concerning internal non-conformities. Participation in Mechanical Completion (Checking of documentation and the inspections on sites). Preparation and compilation of the final file of the project (File Construction and Mechanical Completion). Person in charge Disciplines superintendent E&I with PIRECO: Project: Hasdrubal Project, Sfax - Tunisia Disciplines: Civil, Structure l, Mechanical, Piping, Painting, Insulation, Electricity & Instrumentation, Telecommunication. Customer: PECIL (Petrofac Engineering & Limited Construction) Final customer: BGT (British Gas Tunisia) onshore & offshore. Jan. 2007 - Dec. 2009 04 Tasks: • installation of high and low voltage power equipment ,controls,MCC, motor starters and plant electrical distribution system cables routing, support system, laying, glanding and termination, heat tracing, punch listing, testing, inspection . •pre-commissioning and commissioning of electrical items such as: power and control cables, cable trays, wiring, lighting, motors, relay/ limit switches, switch gear, control panels, •Coordination with representatives E&I of the Customer & final Customer for all activities E&I of the project. •Preparation, implementation, control, review and update of specific documentation E&I of the project ( procedures, plane of quality control…) in coordination with supervisors E&I and the personnel of construction. •Coordination with the Site Manager/the persons in charge disciplines and inspectors QC for the inspections and the tests. •Direction of supervisors E&I (20 people) for the realization of work and the inspections during the various training courses of the project. •Control and followed performance of the subcontractors with the requirements quality. •Checking and review of the corrective actions and preventive concerning internal nonconformities of the Customer. • To ensure that work is completed according to the plans and estimate of the project. • To ensure that the working methods and the quality of the finished product are according to code's of practice. • To ensure that work is completed safely. • To ensure that work is completed inside the deadlines and of the budget, without generating the Curriculum Vitae2 / 4 additional costs. • To prepare the daily progress report. • Insurance of the maintenance and the calibration of the instruments of the project. • Compilation of the File final Manufacturer of the project. 05 Jan. 2002 - Jan. 2007 Person in charge for maintenance and maintenance for parks machines. Tasks: Checking and review of the corrective actions and preventive concerning park machine. Supervisor electric work with Libyan PIRECO connects: Project: ENNAGUA Project, Libya disciplines: Civil, Structural, Mechanical, Piping, Painting, Insulation, Electricity & Instrumentation, Customer: Libya TOTAL March. 2002 - juil. 2002 06 Tasks: • construction of a station of oil storage and pumping .control and Followed work . coordination with the customer . Study of the electric diagrams Pulling and tests cables . Installation of the cable shelf . Connection and Installation of the electrical equipment BT and MT cells. High-level technician. company: MEDI LOISIRE . 07 juin.1999 - jan. 2002 Tasks: Mar.1999 .juil. 1999 10 and curative maintenance of the machines Company : ETELEC Project : gas turbine (bouchamma, Tunisia) Customer : STEG (Tunisian Company of Electricity and Gas) 08 09 preventive ●Technician. Fev .1997 Fev .1998 Tasks: ● cables pulling, installation & wiring connection in the switchboard. ●Training course of application of one month in factory of Cement Company of Gabés ●Training course of technician of one month in the center of the Gabésienne Company of packing SUMMARY OF COMPETENCES Electric & Instrumentation: installation of cablestray Cablesglanding&termination. Installation of earthing system. Electrical equipment installation (junction box, lighting, electrical switchboard, pumps…) instrumentation Calibration instrumentation Installation (instruments, cables, tubing,…) Inspection of the loops (Loop Check) ● Planning and preparation of works E&I. LANGUAGES Curriculum Vitae3 / 4 1 2 3 Arab French English Verywell Verywell well OTHERS Driving licence (since 2000) Centers of interests: Scouts, Reading (History) Curriculum Vitae4 / 4