instrumentation disciplines

advertisement
SAMIR Mohamed
PERSON IN CHARGE DISCIPLINES
ELECTRICAL& INSTRUMENTSUPERVISOR
 Street Djebel Metouia 6010. Tunisia
(00 216) 23 377740 or ( 00216) 52 377 742 or (00227) 80 000 535 Niger

 mohasamir2008@yahoo.fr
Tunisian nationality
40 years, married (2 Child )
STUDIES
01
02
February 1999
June 1996
Diploma high-level technician in industrial electricity.
Baccalaureat: science
College Novembre 7 Metouia
PROFESSIONAL EXPERIENCE
July. 2012-july2014
Person in charge Disciplines: E&I Supervisor (electricity and instrumentation) with TECHNIP:
Project: open uranium mine
Customer: AREVA
Tasks:
. Supervise and direct E&I subcontractor activities.
. Installation and test of solar panel system (emergency) for the aerodrome.
. Supervise and direct the effort on site by the Contractor installing the wiring and electrical
equipment.
.Ensure that works is completed according to plans and specifications for the project.
.Ensure that the working methods and the quality of the finished product are according to the
rules of art.
.Ensure that works is carried out in a safe manner.
. Ensure that work is completed within time and on budget, without incurring additional
costs.
.Coordinate with supervisors and disciplines on the project to establish common priorities.
. Coordinate with representatives of the manufacturers of the equipment on site.
. Prepare daily progress report. 
Coordination with the Site Manager/the persons in charge disciplines and inspectors QC for the
inspections and the tests.
.HV cable pulling, joint, test and termination.
.Transformer test and installation.
April 2012-june 2012
Person in charge Disciplines: E&I Supervisor (El-merk project Algeria) with PETROFAC
Disciplines: Civil, Structure l, Mechanical, Piping, Painting, Insulation, Electricity & Instrumentation,
Customer: PECIL ( Petrofac Engineering & Limited Construction)
Final customer: SOATRACH (Algeria) and ANADARKO (USA)
. MCC switchgear installation (Schneider)
.installation of cables tray
.Cables glanding &termination.
.Installation of earthing system.
01
02
Curriculum Vitae1 / 4
.Electrical equipment installation (junction box, lighting, electrical switchboard, pumps…)
.instrument cable pulling and termination.
Jan. 2010 –March 2012
03
Person in charge Disciplines: E&I Superintendent (electricity and instrumentation) with PIRECO:
(Petroleum &Industrial Realizations Contractors)
Project: Above Ground Installation for LPG Pipelines (between Hasdrubal Terminal andGabès Terminal)
- Tunisia.
Disciplines: Civil, Structure metal, Mechanical, Piping, Painting, Insulation, Electricity & Instrumentation.
Customer: BGT (British Gas Tunisia).
Tasks:
Coordination with representatives E&I of the Customer for activities E&I of the project.
Establishment and implementation of the Plan Project Quality.
Preparation, implementation, control, review and update of documentation E&I of the project.
Planning and preparation of works E&I.
Direction and framing of the supervisors and foreman for the realization of work of the inspections and
the tests.
Checking and review of the corrective actions and preventive concerning internal non-conformities.
Participation in Mechanical Completion (Checking of documentation and the inspections on sites).
Preparation and compilation of the final file of the project (File Construction and Mechanical Completion).
Person in charge Disciplines superintendent E&I with PIRECO:
Project: Hasdrubal Project, Sfax - Tunisia
Disciplines: Civil, Structure l, Mechanical, Piping, Painting, Insulation, Electricity & Instrumentation,
Telecommunication.
Customer: PECIL (Petrofac Engineering & Limited Construction)
Final customer: BGT (British Gas Tunisia) onshore & offshore.

Jan. 2007 - Dec. 2009
04
Tasks:
• installation of high and low voltage power equipment ,controls,MCC, motor starters and
plant electrical distribution system cables routing, support system, laying, glanding and
termination, heat tracing, punch listing, testing, inspection
.
•pre-commissioning and commissioning of electrical items such as: power and control
cables, cable trays, wiring, lighting, motors, relay/ limit switches, switch gear, control panels,
•Coordination with representatives E&I of the Customer & final Customer for all activities E&I of the
project.

•Preparation, implementation, control, review and update of specific documentation E&I of the project (
procedures, plane of quality control…) in coordination with supervisors E&I and the personnel of
construction.

•Coordination with the Site Manager/the persons in charge disciplines and inspectors QC for the
inspections and the tests.

•Direction of supervisors E&I (20 people) for the realization of work and the inspections during the
various training courses of the project.

•Control and followed performance of the subcontractors with the requirements quality.
•Checking and review of the corrective actions and preventive concerning internal nonconformities of
the Customer.
• To ensure that work is completed according to the plans and estimate of the project.
• To ensure that the working methods and the quality of the finished product are according to code's of
practice.
• To ensure that work is completed safely.
• To ensure that work is completed inside the deadlines and of the budget, without generating the
Curriculum Vitae2 / 4
additional costs.
• To prepare the daily progress report.
• Insurance of the maintenance and the calibration of the instruments of the project.
• Compilation of the File final Manufacturer of the project.
05
Jan. 2002 - Jan. 2007
Person in charge for maintenance and maintenance for parks machines.
Tasks:
Checking and review of the corrective actions and preventive concerning park machine.
Supervisor electric work with Libyan PIRECO connects:
Project: ENNAGUA Project, Libya
disciplines: Civil, Structural, Mechanical, Piping, Painting, Insulation, Electricity & Instrumentation,
Customer: Libya TOTAL

March. 2002 - juil. 2002
06
Tasks:
• construction of a station of oil storage and pumping
.control and Followed work
. coordination with the customer
. Study of the electric diagrams
Pulling and tests cables
. Installation of the cable shelf
. Connection and Installation of the electrical equipment BT and MT cells.
High-level technician.
company: MEDI LOISIRE
.
07
juin.1999 - jan. 2002
Tasks:
Mar.1999 .juil. 1999
10
and curative maintenance of the machines
Company : ETELEC
Project : gas turbine (bouchamma, Tunisia)
Customer : STEG (Tunisian Company of Electricity and Gas)
08
09
preventive
●Technician.
Fev .1997
Fev .1998
Tasks:
● cables pulling, installation & wiring connection in the switchboard.
●Training course of application of one month in factory of Cement Company of
Gabés
●Training course of technician of one month in the center of the Gabésienne
Company of packing
SUMMARY OF COMPETENCES
Electric & Instrumentation:
 installation of cablestray
 Cablesglanding&termination.
 Installation of earthing system.
 Electrical equipment installation (junction box, lighting, electrical switchboard, pumps…)
 instrumentation Calibration
 instrumentation Installation (instruments, cables, tubing,…)
 Inspection of the loops (Loop Check)
● Planning and preparation of works E&I.
LANGUAGES
Curriculum Vitae3 / 4
1
2
3
Arab
French
English
Verywell
Verywell
well
OTHERS
Driving licence (since 2000)
Centers of interests: Scouts, Reading (History)
Curriculum Vitae4 / 4
Download