Latitude dd:mm:ss Station dd:mm:ss Drainage Region Catchment Area km**2 Page 1 Description ----------------------------------------------------------------------------------------------------------------------------------------B1R001 Olifants River @ Witbank 25:53:30 29:18:18 B11J 3579 Witbank Dam FSL Parameters -------------- B1R001 Data ----------- Gauge Plate (m) 12.19 17.83 35.39 35.39 100.00 215.00 230.01 230.09 275.99 Components of B1R001 -------------0515528 B1H007 B3E002 B1H010 B3E003 B1E001 B1H008 B1H009 B1H011 Reduced Level (m) 1479.49 1485.13 1502.69 1502.69 Surface area (ha) 113.80 207.67 1211.04 1211.20 Level (Metres) Tot Gates' Vol(Ml) Level (m) Level (m) Provincial % Full Net capacity (mill m**3) 5.72 14.54 104.68 104.02 Gross capacity (mill m**3) 5.73 14.56 104.68 104.02 Gate Discharge Volume East Coast 4 Water Cello Olifantsrivier - Sar Pipeline To Treatment Works @ Witbank Loskop Nat. Res. @ Loskop Dam Olifants River @ Witbank Loskop Nat. Res. @ Loskop Dam Witbank @ Witbank Dam Hendrina Power@Station Pipeline @ Witbank Duva Power Station@Pipeline @ Witbank Pipeline To Naauw-@Poort Pump Station @ Naauwpoort 1953-11-04 1958-12-01 1970-11-01 1983-10-01 Basin survey Basin survey Data Period 1953-11-04 2015-11-24 1995-09-01 2007-09-30 2008-07-09 2015-11-26 2012-03-14 2015-12-01 2009-01-01 2009-12-01 Component 1953-11-04 1953-11-04 1953-11-04 1953-11-12 1958-02-06 1964-03-01 1982-08-01 1982-08-01 1982-08-01 16% missing 10% missing Period 1964-02-29 1958-02-05 1964-02-29 ----------------------------------------------------------------------------------------------------------------------------------------B1R002 Little Olifants River @ Rondebosch 25:46:30 29:32:46 B12C 1592 Middelburg Dam FSL Parameters -------------B1R002 Data ----------- Gauge Plate (m) 27.00 100.00 215.00 230.01 230.09 Components of B1R002 -------------0515826 B1E001 B1H012 B1H015 B1E003 B1H013 B1H014 Reduced Level (m) 1512.49 Surface area (ha) 468.00 Level (Metres) Tot Gates' Vol(Ml) Level (m) Level (m) Net capacity (mill m**3) 48.06 Gross capacity (mill m**3) 48.43 Gate Discharge Volume East Coast 4 Water Cello Middelburg - Tnk Witbank @ Witbank Dam Little Olifants@River @ Rondebosch Little Olifants@River @ Rondebosch Rondebosch @ Middelburg Dam Town Pipeline @ Rondebosch Pipeline For Railway @ Rondebosch 1978-01-30 Basin survey Data Period 1978-01-30 2015-10-21 1995-09-01 2013-04-01 2008-06-17 2015-10-26 2012-03-20 2015-10-26 1% missing 15% missing 6% missing Component Period 1978-01-30 1979-04-04 1978-01-30 1979-04-03 1978-02-24 1978-02-24 1979-04-04 1979-06-01 1979-07-01 ----------------------------------------------------------------------------------------------------------------------------------------B2R001 Bronkhorstspruit @ Tweefontein 25:53:14 28:43:17 B20C 1244 Bronkhorstspruit Dam Latitude dd:mm:ss Station B2R001 Longitude Drainage dd:mm:ss Region Catchment Area km**2 Page 2 Description (continued) FSL Parameters -------------- B2R001 Data ----------- Gauge Plate (m) 14.32 14.32 14.32 14.32 14.32 100.00 230.01 230.04 230.09 Components of B2R001 -------------0514408 B3E002 B2H010 B2H011 B3E003 B2E001 B2H012 Reduced Level (m) 1429.42 1429.42 1429.42 1429.41 1429.41 Surface area (ha) 865.12 868.19 864.82 863.17 862.49 Level (Metres) Level (m) Level (m) Level (m) Net capacity (mill m**3) 59.73 57.53 57.84 57.37 56.99 Gross capacity (mill m**3) 61.03 58.48 58.67 57.88 57.34 1949-11-26 1976-10-01 1983-10-01 1996-10-01 2009-08-01 Basin Basin Basin Basin Basin survey survey survey survey survey Data Period 1949-11-26 2015-11-24 2007-08-30 2015-11-26 2005-03-03 2008-03-13 2012-09-10 2015-12-02 East Coast HYDRAS 3 4 Water Cello Component 1949-11-26 1949-11-26 1950-01-21 1953-10-04 1958-02-06 1967-09-26 1984-05-01 Bronkhorstspruit - Mun Loskop Nat. Res. @ Loskop Dam Right Canal From Dam To River @ Tweefontein Escom Pipeline @ Tweefontein Loskop Nat. Res. @ Loskop Dam Groenfontein @ Bronkhorstsprt.Dam Festive Farms@Pipeline @ Tweefontein 32% missing 18% missing 5% missing Period 1976-09-25 1958-02-05 1967-09-25 ----------------------------------------------------------------------------------------------------------------------------------------B3R001 Elands River @ Rust De Winter Natr. 25:14:02 28:31:03 B31C 1133 Rust De Winter Dam FSL Parameters -------------- B3R001 Data ----------- Gauge Plate (m) 17.94 17.94 17.94 100.00 230.01 230.09 Components of B3R001 -------------0551013 B3H013 B3H014 0551103 B3E004 Reduced Level (m) 1035.10 1035.10 1035.10 Surface area (ha) 492.54 492.54 492.82 Level (Metres) Level (m) Level (m) Net capacity (mill m**3) 29.13 28.18 28.19 Gross capacity (mill m**3) 29.87 28.62 28.60 1933-11-13 1990-10-01 2008-08-01 Basin survey Basin survey Basin survey Data Period 1933-11-13 2015-10-23 2009-04-01 2015-10-26 2012-09-07 2015-10-22 East Coast 4 Water Cello 28% missing 8% missing Component Period 1933-11-13 1953-05-01 1934-06-01 1935-06-18 1953-05-01 1965-09-30 1965-10-01 Rust Der Winter Left Canal From Dam @ Rust De Winter Res. Elands River @ Rust De Winter Res. Rus De Winter - Irr Rust De Winter Res. @ Rust De Winter Dam ----------------------------------------------------------------------------------------------------------------------------------------B3R002 Olifants River @ Loskop Nat. Res. 25:25:05 29:21:31 B32C 12250 Loskop Dam FSL Parameters -------------- Gauge Plate (m) 18.27 18.27 28.00 Reduced Level (m) 992.61 992.61 1001.61 Surface area (ha) 1700.41 1682.49 2427.90 Net capacity (mill m**3) 182.43 176.16 361.47 Gross capacity (mill m**3) 198.98 189.15 374.46 1937-08-09 1976-10-01 1978-12-09 Basin survey Basin survey Basin survey Latitude dd:mm:ss Station B3R002 (continued) 28.00 B3R002 Data ----------- 100.00 230.01 230.03 230.09 Components of B3R002 -------------B3E002 B3H015 B3H016 B3E003 B3H017 1001.61 2427.70 Level (Metres) Level (m) Level (m) Level (m) 361.51 Longitude Drainage dd:mm:ss Region 374.31 1990-10-01 Catchment Area km**2 Page Basin survey Data Period 1937-08-09 2015-10-21 2007-07-09 2015-10-27 2006-06-02 2007-07-09 2012-04-17 2015-10-26 East Coast ProDesign GPRS 4 Water Cello Loskop Nat. Res. @ Loskop Dam Left Canal From Loskop Dam @ Loskop Nat. Res. Right Canal From Loskop Dam @ Loskop Nat. Res. Loskop Nat. Res. @ Loskop Dam Olifants River @ Loskop Nat. Res. 3 Description 10% missing 7% missing Component Period 1937-08-09 1958-02-05 1941-06-01 1941-06-01 1958-02-06 1986-09-18 ----------------------------------------------------------------------------------------------------------------------------------------B3R003 Bloed River @ Brakfontein 25:17:34 29:39:06 B32E 201 Rooikraal Dam FSL Parameters -------------- B3R003 Data ----------- Gauge Plate (m) 4.27 5.18 5.18 6.69 6.69 100.00 Components of B3R003 -------------B3H018 Reduced Level (m) 1180.79 1181.70 1181.70 1183.21 1183.21 Level Surface area (ha) 47.40 65.26 60.95 87.27 89.70 Net capacity (mill m**3) 1.01 1.54 1.05 2.19 2.12 Gross capacity (mill m**3) 1.02 1.54 1.05 2.19 2.12 1951-04-15 1958-10-01 1967-10-01 1967-11-01 1983-10-01 Basin survey Basin survey Basin survey Data Period 1951-04-15 1980-09-30 (Metres) 73% missing Component Period 1951-04-15 Bloed River @ Brakfontein ----------------------------------------------------------------------------------------------------------------------------------------B3R004 Selons River @ Roodepoort 25:23:56 29:29:01 B32C 606 Roodepoort Dam FSL Parameters -------------B3R004 Data ----------- Gauge Plate (m) 11.58 100.00 Components of B3R004 -------------B3H019 Reduced Level (m) 1041.10 Level Surface area (ha) 0.00 Net capacity (mill m**3) 0.00 Gross capacity (mill m**3) 0.00 1978-07-01 Data Period 1979-07-18 1980-04-30 (Metres) 41% missing Component Period 1979-07-18 1988-09-21 Selons River @ Roodepoort ----------------------------------------------------------------------------------------------------------------------------------------B3R005 Elands River @ Rhenosterkop 25:05:55 28:55:05 B31F 3646 Rhenosterkop Dam FSL Parameters -------------B3R005 Data ----------- Gauge Plate (m) 16.50 100.00 Reduced Level (m) 942.00 Level Surface area (ha) 3624.20 (Metres) Net capacity (mill m**3) 204.58 Gross capacity (mill m**3) 205.82 1983-11-05 Basin survey Data Period 1984-11-05 2015-10-23 Latitude dd:mm:ss Station B3R005 (continued) 230.00 230.01 230.09 Components of B3R005 -------------B3H020 B3E007 Level (m) Level (m) Level (m) Longitude Drainage dd:mm:ss Region MeteoSat East Coast 4 Water Cello 2010-01-01 2009-04-02 2012-11-19 Catchment Area km**2 Page 4 Description 2010-04-12 2013-03-14 2015-10-26 15% missing 6% missing Component Period 1984-11-02 1984-12-01 Elands River @ Rhenosterkop Rhenosterkop @ Rhenosterkop Dam ----------------------------------------------------------------------------------------------------------------------------------------B4R001 Tonteldoos River @ Mapochsgronde 25:16:45 29:56:32 B41C 55 Tonteldoos Dam FSL Parameters -------------- B4R001 Data ----------- Gauge Plate (m) 9.15 9.15 9.15 100.00 101.73 230.01 230.09 Components of B4R001 -------------B4H016 B6E001 B4E002 B4E004 Reduced Level (m) 1557.55 1557.55 1557.55 Surface area (ha) 4.50 4.50 4.70 Level (Metres) Cor.Lev. (Metres) Level (m) Level (m) Net capacity (mill m**3) 0.18 0.17 0.19 Gross capacity (mill m**3) 0.19 0.17 0.19 1962-08-24 1979-10-01 2000-10-01 Basin survey Basin survey Basin survey Data Period 1962-08-24 2015-11-16 2011-11-15 2015-05-17 2011-11-15 2015-09-08 2012-03-14 2015-12-02 East Coast 4 Water Cello 70% missing 73% missing 14% missing Component Period 1962-08-24 1962-08-24 1968-10-21 1968-10-22 1971-08-31 1971-09-01 Tonteldoos River @ Mapochsgronde Rozenkranz @ Ohrigstaddamnatres Mapochsgronde @ Tonteldoos Dam Roossenekal ----------------------------------------------------------------------------------------------------------------------------------------B4R002 Vlugkraal River @ Mapochsgronde 25:13:53 29:56:56 B41C 15 Vlugkraal Dam FSL Parameters -------------- B4R002 Data ----------- Gauge Plate (m) 9.45 9.45 9.45 100.00 230.01 230.09 Components of B4R002 -------------B4H017 B6E001 B4E002 B4E004 Reduced Level (m) 1528.58 1528.58 1528.58 Surface area (ha) 11.30 12.20 12.40 Level (Metres) Level (m) Level (m) Net capacity (mill m**3) 0.43 0.45 0.44 East Coast 4 Water Cello Vlugkraal River @ Mapochsgronde Rozenkranz @ Ohrigstaddamnatres Mapochsgronde @ Tonteldoos Dam Roossenekal Gross capacity (mill m**3) 0.45 0.46 0.44 1962-08-20 1979-10-01 2001-10-01 Basin survey Basin survey Basin survey Data Period 1962-08-20 2015-11-16 2011-11-24 2015-11-26 2012-04-03 2015-12-02 25% missing 37% missing Component Period 1962-08-20 1962-08-20 1968-10-22 1968-10-22 1971-09-01 1971-09-01 ----------------------------------------------------------------------------------------------------------------------------------------B4R003 Masala River @ Steynsdrift 25:06:12 29:52:49 B41D 303 Mapochs Dam Latitude dd:mm:ss Station B4R003 Longitude Drainage dd:mm:ss Region Catchment Area km**2 Page 5 Description (continued) FSL Parameters -------------- Gauge Plate (m) 12.96 Components of B4R003 -------------B4H018 B4H019 B4H020 Reduced Level (m) 1082.88 Surface area (ha) 7.60 Net capacity (mill m**3) 0.51 Gross capacity (mill m**3) 0.53 Malanslaerloop @ Zwartkop Pipeline For Industry @ Steynsdrift Masala River @ Steynsdrift 1968-10-19 Basin survey Component 1968-10-19 1968-10-19 1968-10-19 Period 1968-10-20 1968-10-20 1968-10-20 ----------------------------------------------------------------------------------------------------------------------------------------B4R004 Waterval River @ Buffelskloof 24:57:19 30:15:55 B42G 281 Buffelskloof Dam FSL Parameters -------------- B4R004 Data ----------- Gauge Plate (m) 22.38 22.38 22.38 100.00 230.01 230.09 Components of B4R004 -------------B4E001 B4E003 B4H021 Reduced Level (m) 1286.84 1286.84 1286.84 Surface area (ha) 60.86 60.66 60.63 Level (Metres) Level (m) Level (m) Net capacity (mill m**3) 5.42 5.33 5.24 Gross capacity (mill m**3) 5.49 5.38 5.28 1972-04-01 1987-10-01 2002-10-01 Basin survey Basin survey Basin survey Data Period 1972-04-01 2015-10-15 2009-05-21 2013-06-19 2014-11-13 2015-11-05 East Coast 4 Water Cello 13% missing 5% missing Component Period 1972-04-01 1972-06-30 1972-07-01 1972-07-03 Lydenburg Buffelskloof @ Buffelskloof Dam Waterval River @ Buffelskloof ----------------------------------------------------------------------------------------------------------------------------------------B4R005 Spitskop Spruit @ Farm Spitskop 874 24:59:57 29:48:14 B41E 36.4 Spitskop Dam FSL Parameters -------------- Gauge Plate (m) 7.40 Reduced Level (m) 1444.56 Surface area (ha) 15.94 Net capacity (mill m**3) 0.54 Gross capacity (mill m**3) 0.54 2007-03-30 Basin survey ----------------------------------------------------------------------------------------------------------------------------------------B4R006 Shakwaneng River @ Farm Steelpoortdrift (Dr Eiselen Dam 24:52:07 29:58:33 B41H 42 Dr Eiselen Dam FSL Parameters -------------- Gauge Plate (m) 21.74 Reduced Level (m) 958.73 Surface area (ha) 17.98 Net capacity (mill m**3) 0.73 Gross capacity (mill m**3) 0.73 2007-03-30 Basin survey ----------------------------------------------------------------------------------------------------------------------------------------B4R007 Steelpoort River @ De Hoop dam 24:57:17 29:57:22 B41H 2864 DE HOOP DAM FSL Parameters -------------B4R007 Data ----------- Gauge Plate (m) 51.00 100.00 230.09 Reduced Level (m) 915.00 Surface area (ha) 1694.69 Level (Metres) Level (m) Net capacity (mill m**3) 348.70 4 Water Cello Gross capacity (mill m**3) 351.43 2013-01-01 Basin survey Data Period 2013-01-01 2015-11-16 2014-09-29 2015-11-10 3% missing 23% missing Latitude dd:mm:ss Station dd:mm:ss Drainage Region Catchment Area km**2 Page 6 Description ----------------------------------------------------------------------------------------------------------------------------------------B5R001 Klavervalley River @ Klavervalley 24:37:06 29:02:15 B51E 0 Klavervalley Dam Components of B5R001 -------------B5E003 Component Period 1980-10-15 Klavervalley @ Klavervalley Dam ----------------------------------------------------------------------------------------------------------------------------------------B5R002 Olifants River @ Flag Boshielo 24:46:50 29:25:32 B51B 23555 Flag Boshielo Dam FSL Parameters -------------- B5R002 Data ----------- Gauge Plate (m) 17.01 17.01 22.10 100.00 230.00 230.01 230.04 230.09 Components of B5R002 -------------B5H003 B5H004 B5E004 B5H005 Reduced Level (m) 817.00 817.00 822.09 Level Level Level Level Level Surface area (ha) 1292.10 1287.70 2205.24 Net capacity (mill m**3) 98.83 98.99 185.13 Gross capacity (mill m**3) 103.38 103.96 190.10 Basin survey Basin survey Dam wall raised Data Period 1987-06-30 2015-10-22 2010-01-01 2010-04-12 2007-07-10 2015-10-27 2002-06-20 2007-04-13 2012-04-03 2015-10-26 (Metres) (m) (m) (m) (m) 1987-06-30 1996-10-01 2006-01-01 MeteoSat East Coast HYDRAS 3 4 Water Cello Pipeline From Dam To Treatment Works @ Tambotieboom Olifants River @ Tambotieboom Tambotieboom @ Arabie Dam Pipeline From Dam To Treatment Works @ Tambotieboom 2% missing 10% missing 12% missing Component Period 1987-06-30 1987-09-24 1988-06-16 1998-09-01 ----------------------------------------------------------------------------------------------------------------------------------------B5R003 Motsephili River @ Lola Montes 682 KS (Lola Montes Dam) 24:49:08 29:29:24 B51B 290 Lola Montes Dam FSL Parameters -------------- Gauge Plate (m) 10.71 Reduced Level (m) 918.67 Surface area (ha) 23.27 Net capacity (mill m**3) 1.18 Gross capacity (mill m**3) 1.19 2007-03-30 Basin survey ----------------------------------------------------------------------------------------------------------------------------------------B5R004 Makotswane River @ Farm Coetzeesdraai 641 KS 24:44:48 29:27:27 B51C 0 Buffelsdoorn Dam FSL Parameters -------------- Gauge Plate (m) 18.18 Reduced Level (m) 845.53 Surface area (ha) 59.11 Net capacity (mill m**3) 3.48 Gross capacity (mill m**3) 3.48 2007-03-30 Basin survey ----------------------------------------------------------------------------------------------------------------------------------------B5R005 Ngwaritsi River @ Jane Furse (Vergelegen Dam) 24:47:45 29:50:29 B51H 0 Vergelegen Dam FSL Parameters -------------- Gauge Plate (m) 8.73 Reduced Level (m) 1296.13 Surface area (ha) 40.41 Net capacity (mill m**3) 1.40 Gross capacity (mill m**3) 1.40 2007-03-30 Basin survey ----------------------------------------------------------------------------------------------------------------------------------------B5R006 Ngwaritsi River @ Farm Nooitverwaght (Piet Gouws Dam) 24:34:05 29:36:29 B51H 690 Piet Gouws Dam FSL Parameters -------------- Gauge Plate (m) 16.46 Reduced Level (m) 849.56 Surface area (ha) 92.14 Net capacity (mill m**3) 3.92 Gross capacity (mill m**3) 3.93 2007-03-30 Basin survey Latitude dd:mm:ss Station B5R006 (continued) B5R006 Data ----------100.00 230.01 Level (Metres) Level (m) Longitude Drainage dd:mm:ss Region Catchment Area km**2 Page Data Period 2009-11-23 2015-10-16 2009-11-23 2015-11-06 East Coast 7 Description 50% missing 53% missing ----------------------------------------------------------------------------------------------------------------------------------------B5R007 Chunie River @ R37 (Burgersfort Road)(Chuniespoort Dam) 24:12:23 29:29:45 B52C 0 Chuniespoort Dam FSL Parameters -------------- Gauge Plate (m) 11.64 Reduced Level (m) 1145.14 Surface area (ha) 61.22 Net capacity (mill m**3) 2.47 Gross capacity (mill m**3) 2.47 2007-03-30 Basin survey ----------------------------------------------------------------------------------------------------------------------------------------B5R008 Tlhabasane @ Molepo Dam 24:01:15 29:46:12 B52C 257 Molepo Dam ----------------------------------------------------------------------------------------------------------------------------------------B6R001 Ohrigstad River @ Naauwpoort Ohrigstaddamnatres 24:55:59 30:37:55 B60E 83 Ohrigstad Dam FSL Parameters -------------- B6R001 Data ----------- Gauge Plate (m) 24.35 24.35 24.35 24.35 100.00 230.01 Components of B6R001 -------------B6E001 B6H012 B6H011 B6H013 Reduced Level (m) 1377.27 1377.27 1377.27 1377.27 Surface area (ha) 94.20 100.00 100.50 99.16 Level (Metres) Level (m) Net capacity (mill m**3) 12.34 13.55 13.52 13.45 Gross capacity (mill m**3) 12.89 14.44 14.42 14.22 1956-05-01 1979-10-01 1990-10-01 2002-10-01 Basin Basin Basin Basin survey survey survey survey Data Period 1956-05-01 2015-06-01 2011-06-14 2013-06-19 East Coast 1% missing 8% missing Component Period 1956-05-01 1957-02-22 1962-08-28 1971-05-01 Rozenkranz @ Ohrigstaddamnatres Ohrigstad River @ Naauwpoort Ohrigstad River @ Naauwpoort Left Canal From Dam @ Naauwpoort ----------------------------------------------------------------------------------------------------------------------------------------B6R003 Blyde River @ Blyderivierpoort Res 24:32:12 30:47:52 B60H 2169 Blyderivierpoort Dam FSL Parameters -------------- B6R003 Data ----------- Gauge Plate (m) 44.83 44.83 44.83 100.00 230.01 230.03 230.04 Components of B6R003 -------------B6E003 B6H015 B6H014 Reduced Level (m) 664.56 664.56 664.56 Surface area (ha) 248.70 247.41 249.40 Level (Metres) Level (m) Level (m) Level (m) Net capacity (mill m**3) 55.09 55.17 54.37 East Coast ProDesign GPRS HYDRAS 3 Blyderiv.Poortnatres @ Blyderiv.Poort Dam Pipeline From Dam @ Blyderiv.Poortnatres Blyde River @ Driehoek Gross capacity (mill m**3) 55.97 56.06 55.09 1975-01-27 1979-10-01 1998-10-01 Basin survey Basin survey Basin survey Data Period 1975-01-27 2015-09-17 2007-05-26 2015-09-29 2005-07-18 2007-03-07 2006-03-04 2007-08-14 Component Period 1975-01-27 1980-06-11 1989-01-31 6% missing Latitude dd:mm:ss Station dd:mm:ss Drainage Region Catchment Area km**2 Page 8 Description ----------------------------------------------------------------------------------------------------------------------------------------B7R001 Klaserie River @ Fleur De Lys 24:31:26 31:04:14 B73A 164 Klaserie Dam FSL Parameters -------------- B7R001 Data ----------- Gauge Plate (m) 10.65 13.69 13.69 13.69 100.00 230.03 230.09 Components of B7R001 -------------B7E001 B7H024 B7H022 B7E002 B7E003 Reduced Level (m) 538.00 541.04 541.04 541.04 Surface area (ha) 78.70 119.80 118.80 118.00 Level (Metres) Level (m) Level (m) Net capacity (mill m**3) 3.25 6.22 5.76 5.60 Gross capacity (mill m**3) 3.28 6.25 5.78 5.61 1961-09-01 1968-04-01 1979-10-01 2001-10-01 Basin survey Basin survey Basin survey Data Period 1961-09-01 2015-11-17 2011-06-13 2012-01-27 2011-06-13 2015-09-28 ProDesign GPRS 4 Water Cello 1% missing 7% missing 10% missing Component Period 1961-09-01 1962-06-30 1961-09-01 1961-09-07 1962-07-01 1963-10-22 1963-10-23 Fleur De Lys @ Klaserie Dam Right Canal From Dam To River @ Fleur De Lys Left Upstream Canal @ Fleur De Lys Wegsteek @ Phalaborwa-Station Guernsey @ Klaserie Dam ----------------------------------------------------------------------------------------------------------------------------------------B7R002 Olifants River @ Sheila 24:04:12 31:08:44 B72D 47485 Phalaborwa Barrage FSL Parameters -------------- B7R002 Data ----------- Gauge Plate (m) 7.24 7.24 7.24 100.00 149.00 Components of B7R002 -------------0681209 B7E003 B7H021 B7E004 Reduced Level (m) 309.14 309.14 309.14 Surface area (ha) 173.31 196.30 196.07 Net capacity (mill m**3) 5.40 8.82 8.98 Gross capacity (mill m**3) 5.46 10.19 10.59 1800-01-01 1966-04-01 1995-10-01 Basin survey Basin survey Basin survey Level (Metres) Combined (cumecs) Data Period 1966-04-01 2005-06-30 1966-05-01 2005-07-01 Phalaborwa Guernsey @ Klaserie Dam Pipeline To Purification Works @ Sheila Sheila @ Phalaborwa Barrage Component Period 1966-05-01 1967-01-31 1966-05-01 1967-01-31 1966-05-01 1967-02-01 1% missing 1% missing ----------------------------------------------------------------------------------------------------------------------------------------B7R003 Ngwabitsi River @ Tours 24:05:55 30:15:17 B72E 45 Tours Dam FSL Parameters -------------- B7R003 Data ----------- Gauge Plate (m) 19.40 19.40 100.00 230.03 230.09 Components of B7R003 Reduced Level (m) 780.50 780.50 Surface area (ha) 56.30 59.22 Level (Metres) Level (m) Level (m) Net capacity (mill m**3) 5.57 6.08 ProDesign GPRS 4 Water Cello Gross capacity (mill m**3) 5.58 6.14 1992-08-07 2007-03-30 Basin survey Basin survey Data Period 1992-08-07 2015-09-17 2011-11-25 2012-01-09 2011-11-25 2015-09-28 Component Period 8% missing 8% missing 8% missing -------------- B7H002 B7E006 Ngwabitsi River @ Tours Tours @ Tours Dam 1960-07-31 1992-08-07 Latitude dd:mm:ss Station B7R003 (continued) B7H025 Pipeline From Dam@Compensation Water @ Tours Longitude Drainage dd:mm:ss Region 1992-08-07 Catchment Area km**2 Page Description 9 Blyderivierpoort Dam Bronkhorstspruit Dam Buffelsdoorn Dam Buffelskloof Dam Chuniespoort Dam DE HOOP DAM Dr Eiselen Dam Flag Boshielo Dam Klaserie Dam Klavervalley Dam Lola Montes Dam Loskop Dam Mapochs Dam Middelburg Dam Molepo Dam Ohrigstad Dam Phalaborwa Barrage Piet Gouws Dam Rhenosterkop Dam Roodepoort Dam Rooikraal Dam Rust De Winter Dam Spitskop Dam Tonteldoos Dam Tours Dam Vergelegen Dam Vlugkraal Dam Witbank Dam 7 1 6 5 7 5 5 6 8 6 6 2 4 1 7 7 8 6 3 3 3 2 5 4 8 6 4 1