FWG WHSR’s monthly meeting Agenda and Minutes Date: Time: Location: Purpose: 30th September 2015 1:30-2:30pm Mansergh-Shaw Lunchroom 45-125 To discuss FWG OHS issues. Attendees/Invitees Name Valentin Valkov Mark Lynne Neil Duncan Dejan Subaric Ian Moore Grant Tayles X Sam Butler Contact v.valkov@uq.edu.au 336 54464 m.lynne@uq.edu.au 334 67566 n.duncan@uq.edu.au 336 53637 d.subaric@uq.edu.au 334 68746 i.moore@uq.edu.au 334 69967 g.tayles@uq.edu.au 336 53611 sam.butler@uq.edu.au 336 53724 Working Area FWG Manager Mansergh-Shaw Store Precision Eng Wksp Mansergh-Shaw Instrumentation Workshop ManserghShaw AEB Workshops (Heavy Eng and Electrical Wksp) Development Wksp Hawken. Arch Workshop Zelman Cowen Agenda Item Topic A1 Confirmation of previous minutes A2 Workshop Inspection A3 New business FWG WHRS 30/09/15 Discussion Item A2.1 Precision workshop: Workshop toilets. Topic A2.2 Precision workshop: Relocation fire extinguisher. A2.3 Precision workshop: Extraction unit in plastic fabrication area. A2.4 Precision workshop: Welding bay area. A2.5 iAudit demo rollout. A2.6 Heavy Eng Wksp: Oil leak on hydraulic bender. A2.7 Heavy Eng Wksp: Hopper bin for scrap steel. A3.1 Heavy Eng Wksp: Internal gutter in welding bay. A3.2 Precision Wksp: Investigate options to move the first aid cabinet. Action Items Item Action Item A2.1 Precision workshop: Workshop toilets. Options to be investigated due to the poor condition of the toilets. VV has addressed this issue to the faculty, P&F will be contacted to organize a quote to refurbish the toilets. Precision workshop: Fire extinguisher locations in workshop need to be audited. David Peebles will be contacted to assist once final layout of workshop is complete. Precision workshop: The plastic fabrication unit has been moved to the Heavy Eng Wksp. This will allow the plastic fabrication area to use the local building extraction system. The move is to be completed by 18/12/15. Precision workshop: Fabricate steel shelf for welding bay. iAudit: iAudit to be used at next WHSR’s monthly inspection 14/10/15. Heavy Eng Wksp: Small oil leak on hydraulic bender needs to be repaired. Heavy Eng Wksp: Hopper bin to be ordered to store and transport scrap steel. RA, SOP and CA will need to be completed. A2.2 A2.3 A2.4 A2.5 A2.6 A2.7 FWG WHRS 30/09/15 Date Added Assign ed To 17/3/15 VV 17/3/15 VV 18/12/15 15/4/15 VV 18/12/15 8/7/15 ND 8/7/15 DS,ML 2/9/15 IM 2/9/15 IM, ML Date Due 30/9/15 Status New Business Item Action Item A3.1 Heavy Eng Wksp: The internal gutter that was installed to manage the rain water leak that runs down the building wall needs to be extended in welding bay area to handle the water flow. Precision Wksp: Investigate options to move the first aid cabinet from the work store to the fitting room. A3.2 Date Added Assign ed To 30/9/15 IM VV 30/9/15 ND Date Due Status Meeting closed 2:00pm Next meeting will be held on 28th October 2015, at 1:30pm in the FWG Meeting Room (45-138) FWG WHRS 30/09/15