CIGRE Technical Committee List of SC A3 Working Groups, Task Forces and Advisory Groups STUDY COMMITTEE A3, Jan. 2014 Type 1 Number 2 Title 3 Name of Convener 4 AG AG AG A3.01 A3.02 A3.03 Strategic Planning Tutorials Palnning Green book Planning H. Ito (JP) M. Glinkowski (US) P. Fernandez (BR) WG TF JTF CC 03 13.00.2 23/13/14/21/2216 23/34/13 23/13/33/34/36 JTF SC 13 JTF TF TRV stresses in MV systems / Test circuit topology Revision of IEC standards relevant to switching devices Preparation of guidelines for collection and handling of reliability data Co-ordination Committee on electronic control systems Withstand and test requirements for substation secondary circuits - subjected to EMI 12/13/23.21 Electrical Environment of Transformers TF1 Out-of-phase stresses and testing - TRV in HV networks 23.19(23/12/22) Dynamic loading of electric power transmission equipment 13.01 Electrical Endurance Testing WG WG WG WG WG WG WG 13.04 A3.06 A3.07 13.08 13.09 A3.10 A3.11 JTF JTF Switching test methods Reliability of High Voltage Equipment Controlled switching Life management of circuit-breakers Monitoring and diagnostic techniques for switching equipment Specifications for short-circuit current limiters Application Guide for IEC 60056 and 60694 Created5 Disbanded 6 2002 2002 2013 Permanent Permanent (E. di Bartolomeo) (E. di Bartolomeo) 2000 2000 2001 D. Johnson (US) Ametani (JP) 2001 2001 M.Glinkowski (US) H-H. Schramm (DE) H. Peters (DE) R. Smeets (NL) 2001 2001 2001 2005 2004 I.Bonfanti M. Runde (NO) M.Waldron (GB) A. Jannsen (NL) 2002 1995 H. Schmitt (DE) H.H. Schramm (DE) 1995 1998 1999 2012 2004 2000 2000 2003 2006 Type : Working Group (WG), Task Force (TF), Advisory Group (AG), Co-operation Group (CG), Joint Working Group (JWG), Joint Task Force (JTF), … Number : identification number 3 Title : full title in English 4 Name : Initials NAME (2 letters for nationality) 5 Created : year of creation 6 Disbanded : scheduled year of disbanding 1 2 A3-14(AG01)002-IWD List of A3 WG - 1/2 Last update : 09/02/16 CIGRE Technical Committee WG WG WG WG WG WG WG WG WG WG WG A3.12 A3.13 A3.15 A3.17 A3.18 A3.19 A3.20 A3.21 A3.22 A3.23 A3.24 WG A3.25 WG A3.26 WG A3 27 WG A3.28 WG WG WG A3.29 A3.30 A3.31 JWG A3.32/CIRED WG JWG A3.33 A3/B4.34 WG A3.35 List of SC A3 Working Groups, Task Forces and Advisory Groups Circuit Breaker Controls Changing Network Conditions and System Requirements Non Conventional Instrument Transformers Surge Arrester Grading Capacitors Implication of 3 Phase Line Fault TRVs on cb-standards Simulations and Calculations as Verification Tools Application of HV apparatus with composite insulators Tech. Requirements for Substation Equipment > 800 kV Guidelines and selection of Fault-Current-Limiters Simulating internal arc and current withstand testing MO varistors and surge arresters for emerging system conditions Capacitor bank switching and impact on equipment The impact of the application of vacuum switchgear at transmission voltages Switching phenomena and testing requirements for UHV & EHV equipment Deterioration & ageing of HV substation equipment Overstressing of HV substation equipment Instrument transformers with digital output Non-intrusive methods for condition assessment of distribution and transmission switchgears Experience with equipment for Series / Shunt Compensation DC switchgear Guidelines and Best Practices for Commissioning and Operation of Controlled Switching Projects H. Wilson (US) A. Janssen (NL) P. Tantin (FR) B. Richter (CH) M. Runde (NOR) R. Alexander (US) M. Kriegel (CH) M. De Nigris (IT) H. Ito (JP) H. Schmitt (DE) N. Uzelac (US) 2001 2003 2004 2003 2003 2005 2005 2006 2007 2008 2008 2007 2007 2012 2013 2007 2008 2007 2011 2011 2012 (2014) B. Richter (CH) 2009 (2014) A. Bosma (SE) 2009 (2014) R. Smeets (NL) 2009 (2014) D. Dufournet (FR) 2010 2014 A. Maheshwari (AUS) A. Carvalho (BR) F. Rahmatian (CA) 2010 2010 2011 (2014) (2014) (2014) N. Uzelac (US) 2013 (2016) G. Li (CN) C. Franck (CH) 2013 2013 (2015) (2015) A. Mercier (CA) 2013 (2016) WG A3-14(AG01)002-IWD List of A3 WG - 2/2 Last update : 09/02/16