NG CHING WAI, CHRIS Qualifications Associate member - Canadian Institute of Quantity Surveyor (2012) Associate member - The Chartered Institute of Building UK (2012) Profession Certified Constructor– American Institute of Constructors (2012) Member of Quantity Surveyor– Quantity Surveyor International (2004) Member of the Association for the Advancement of Cost Engineers AACE International (1996) Member of Member International Cost Engineering Council ICEC(1996) Bachelor of Science in Quantity Surveying (2004) Higher Certificate in Building Studies Architectural Stream(2002) Higher Certificate in Building Studies Architectural (2001) Certificate in Building Studies (1999) Practical Approach for Building Sub-Contracts (1996) Practical Quantity Surveying and Costing for Builders (1993) Key Data Experiences in various aspects civil engineering and site management of the Post tensioned bridge structure and the coordination of the temporary works design, with installation supervision of the project. the construction of tensioned bridge structure with associated road, earth embankment, retaining walls, large diameter bored pile, drainage system, box culvert. Landscaping works, and utilities works, Structural steel work etc. Experiences in various aspects of quantity surveying practice including the project financial control and cost planning together with the preparation of tenders, procurement, contract documentation and administration associated with sub-contracts; as well as; responsible for the settlement of final accounts for main and sub contracts in connection with a number of civil and building construction projects for domestic flats, commercial and office buildings, Amendments & Alterations, Retail, Hotel and Fitout work, Structural Steelworks, covered walkways, bored pile walls, retaining wall structures and external works, as well as railway station, etc. Last updated in Oct 06 Selected Projects NEW WORLD CONSTUCTION COMPANY LIMITED Jan 2015-Present Operation Division Deputy Project Manager Project Description Contract Sum: HK$20 B The Project, Avenue of Stars and East Tsim Sha Tsui Promenade, Kowloon (GLA K275 & Extension to GLA K275), Tsimshatsui, Kowloon, is located in the heart of the city centre at East Tsim Sha Tsui, adjacent of Victoria Harbour waterfront. ETST Waterfront Podium Garden (Podium Garden) Works on Tsim Sha Tsui East Waterfront Podium Garden (adjacent to Wing On Plaza) and the linked footbridge. - - AOS’s statues relocation, may involve closure of public road for the relocation new display boxes, signage works and artworks The redesign works to the ETST Promenade from AOS to Ventilation Tower of Cross Harbour Tunnel - - - - - Marine work may be required as necessary for edge treatment with new precast concrete panel along edge of TSTP and installation may require access and working platform over the sea or by vessel Numerous underground utilities existed and relevant record drawings from UU companies have been retrieved Identification / disconnection /diversion of such utilities shall be carried out before commencement of main works Conventional ground investigation and small scale piling works may be required as necessary. Construction of new ancillary structures (max 2-storey) and associated finishing works Conventional minipile foundation work New model type of soft and hard landscape work installation building may be carried out with conventional light weight steel structures Conventional ground investigation and small scale piling works may be required as necessary. Marine work may be required as necessary for edge treatment with new precast concrete panel along edge of TSTP. Such installation may require access and working platform over the sea or by vessel. Such options shall be further investigated and update the insurer accordingly. Numerous underground utilities existed and relevant record drawings from UU company have been retrieved. Identification/ disconnection /diversion of such utilities shall be carried out before commencement of main works Reconstruction works for Avenue of Stars The works includes re-construction of the structure of AOS, which may involve Marine Work as necessary. - - - A&A Work To Existing Food & Beverage Area - A&A works to existing Starbucks - testing to existing piles at sea for verification of structural soundness; demolition of existing decking, temporary working platform; reconstruction of precast structural decking; pile caps and beam construction as necessary that subject to testing above; Demolition and reconstruction of piles as necessary that subject to testing above Marine work may be required as necessary throughout the re-construction of structure of AOS. Such re-construction work may require access, working platform, lifting and pontoon over the sea Transplanting/ protection/ replanting of existing trees demolition of existing kiosks and souvenir shop, removal of existing paving and furniture, reinstallation to existing statutes, utilities disconnection works, light fittings & programmable lighting control system, LED light fitting to precast concrete panels, Grab-N-Go Kiosk and associated NG CHING WAI, CHRIS - - - fitting out works, edge treatment with precast concrete panel along edge of AOS, shade trellis, reinstallation of hand imprints and statutes, new pavement works, stainless steel balustrade along edge of AOS with RC pedestal, planter seating, viewing balcony, oversize seating bench, street furniture, planting areas / planters with plant, M&E works and utilities connection. approval plan of basement in this contract include approximately 23m and 21.5m for deep excavation and lateral supports from street level, construction of 98nos bore pile, raft footing foundation, underpinning of existing structure, and MTRC connection at basement levels. Including pipe pile wall and ELS Works, superstructure of Retail and podium floor Selected Projects GAMMON CONSTUCTION LIMITED Responsible for the engineering, design detail coordination, project management and monitor work programme with compliance the approval plan of statutory in this contract include approximately 8 nos. marine pile 23m and 21.5m, Marine work may be required as necessary throughout the re-construction of structure and ELS Works, superstructure of Retail April 2011-Present Building Division Senior Project Quantity Surveyor Oct 2012-Dec 2014 Operation Division Senior Project Engineer Responsible for various quantity surveying duties including such as project cost control, the submission of interim payment as well as the valuation of variations, and the settlement of final accounts for both main and sub contract as well as assistance in the preparation of contract documents Project Description Contract Sum: HK$164 B Construction of 4 levels basement, 6 floors retail, 15 floors of Serviced Apartment tower, 59 floors Office and Hotel tower approximately 280m high above ground. The approximate site area is 39,458m2 and the approximate gross floor area is 323,890m2. The structure is of reinforced concrete. Composite columns are used in the basement structure and build by top down method. Formation of basement in this contract include approximately 23m and 21.5m for deep excavation and lateral supports from street level, construction of 98nos bore pile, raft footing foundation, underpinning of existing structure, and MTRC connection at basement levels. Including pipe pile wall and ELS Works Responsible for the engineering, design detail coordination, site management and monitor work programme with compliance the Last updated in Oct 06 Project Description Contract Sum: HK$928 M Redevelopment of the Victoria Park Swimming Pool Complex and construction of one handball court, two skating rinks and landscaped area October 2005 – April 2011 Construction Service Division Senior Project Quantity Surveyor/ Senior Project Coordinators Project Description Sub-Contract Sum: HK$504 M 1.)New Asia Airfreight Terminal Facility T2 - Subcontract Work for Structural Steelwork 2.) Castle Peak Road Improvement Between Sham Tseng and Ka Loon Tsuen, Tsuen Wan - Subcontract Work Steelwork & Noise barrier 3.)Castle Peak Road Improvement Between Tsuen Wan Area 2 and Ting Kau - Subcontract Work Steelwork & Noise barrier 4.)Hong Kong Convention and Exhibition Centre Atrium Link Extension Design and Build ContractSubcontract Work for Structural Steelworks 5.)Pacific Place Mall Contemporization For L4 Restaurant At Pacific Place – Named Sub-Contract for Metal Roof 6.) New International Airport at CLK contract P333 – North Satellite Concourse Building – Structural Steelworks Package 7.) Alteration & Addition Works for 1 Peking Road Christian Dior Shop G/F-2/F – Main Contract of Builder Works and Façade Works Responsible for various aspects engineering and site management of the site coordination and the coordination quantity surveying and construction services duties including such as project cost control, the submission of interim payment, project planning as well as the valuation of variations, and the settlement of final accounts for both main and sub contract as well as assistance in the preparation of contract documents June 2004 – October 2005 The Landmark Scheme - Phase 2 - 5 Quantity Surveyor Project Description Contract Sum: HK$554 M Phase 2-4 The scheme will upgrade the retail environment in the Atrium, add a unique luxury hotel in the low zone of Edinburgh Tower, replace the existing Landmark East building with a new office tower to complement Edinburgh and Gloucester Towers, and improve the overall vehicle and pedestrian access to and within the development. Phase 5 Edinburgh Tower conversion of office levels 5 to 15 into 118-room Hotel including structural alterations, building works and building services installation. Replacement of windows to Hotel rooms and refurbishment of all other Hotel windows. The installation of finishes and provisions of fitments, furniture and equipment to Hotel generally level 5 to 15 and to Reception and Bar. Responsible for various quantity surveying duties including such as project cost control, the submission of NG CHING WAI, CHRIS interim payment as well as the valuation of variations, and the settlement of final accounts for both main and sub contract as well as assistance in the preparation of contract documents. Aug 2001 –June 2004 1 Peking Road Quantity Surveyor Project Description Contract Sum: HK$550 M The Project comprises the construction of a 30-storey commercial and office building with 4 storeys of carpark at basement in Tsim Sha Tsui, Kowloon. The gross floor area is approximately 43,000 m2 and the overall height of the building is about 139.1 m from ground level to main roof level. The structure is generally built with reinforced concrete load bearing walls, columns and beam framing and slabs. The elevation of the tower is mainly finished with glass and curtain wallings; the elevation of the podium is mainly finished with glazed walling and metal cladding. Photovoltaic panels are installed at the top of the tower. Responsible for various quantity surveying duties including such as project cost control, the submission of interim payment and EOT applications as well as the valuation of variations, and the settlement of final accounts for both main and sub contract as well as assistance in the preparation of contract documents. Jan 2000 - Aug 2001 Redevelopment of Sau Mau Ping Estate 9 Quantity Surveyor Project Description Contract Sum: HK$828 M This project was a redevelopment of residential project which is resident at Sau Mau Ping, Kwun Tong in Kowloon Peninsula. The contract included the construction of three 41-storey Harmony Blocks of which each block has an overall on-plan area at 53.2m x 48.15m approximately, together with a 21-storey Annex Building. These blocks contain a total of 2,537 nos. of residential flats. In addition, a 6-classroom kindergarten was Last updated in Oct 06 designed and well-fitted on the ground floor of Block 11 whilst an estate management office was located in Block 12. The project also included the associated drainage and external works such as slope stabilization, retaining structures and contiguous bored piles, roads, emergency and vehicles access, children play areas, ball courts, covered walkways, services mains and refuse storage areas. The buildings were built with a reinforced concrete structure frame in conjunction with the pre-cast concrete façade units for various components located in living rooms, bedrooms and kitchens. All façade units were designed to support their own weight and jointed monolithically to the building structure in-situ. Responsible for various quantity surveying duties such as project cost control, the submission of interim payment and EOT applications as well as the valuation of variations, and the settlement of final accounts for both main and sub contracts. In addition, assistance in preparing proposals of alternatives furnished to the Housing Authority aiming at fundamental cost savings and improvement in quality and technicality resulting from value engineering exercises. Mar 1999 - Jan 2000 1063 King’s Road Quantity Surveyor Project Description Contract Sum: HK$375 M The Project comprises the construction of a 30-story office consisting of 4-storey podium and 26 storey, formed on pile cap in Quarry Bay, Hong Kong. The gross floor area is approximately 43,000 m2 and the overall height of the building is about 139.1 m from ground level to main roof level. The structure is generally built with reinforced concrete load bearing walls, columns and beam framing and slabs. The elevation of the tower is mainly finished with glass and curtain wallings; the elevation of the podium is mainly finished with louver and stone cladding. Responsible for various quantity surveying duties including the preparation for and submissions of quotations and valuation of variations as well as assistance in the preparation of contract documents for both main and sub contracts Oct 1998 - Mar 1999 Super Terminal No. 1 Quantity Surveyor Project Description Contract Sum: HK$4.1Billion The Project was the construction of one of world’s largest airfreight handling centre. The JV was responsible for the construction of the five-storey Cargo Terminal Building and the two-storey Express Centre, altogether providing some 315,000 sq m of floor area. This contract also included all the mechanical & electrical works, construction of the elevated roads providing access linking the two cargo-handling facilities, together with extensive external paving works. Responsible for various quantity surveying duties including the preparation for and submissions of quotations and valuation of variations as well as assistance in the preparation of contract documents for both main and sub contracts Gammon - Paul Y Joint Venture July 1997 - Oct 1998 Super Terminal No. 1 Quantity Surveyor Project Description Contract Sum: HK$4.1Billion The Project was the construction of one of world’s largest airfreight handling centre. The JV was responsible for the construction of the five-storey Cargo Terminal Building and the two-storey Express Centre, altogether providing some 315,000 sq m of floor area. This contract also included all the mechanical & electrical works, construction of the elevated roads providing access linking the two cargo-handling facilities, together with extensive external paving works. Responsible for various quantity surveying duties including the preparation for and submissions of quotations and valuation of variations as well as assistance in the preparation of contract documents for both main and sub contracts NG CHING WAI, CHRIS Aoki Corporation Dec 1995 - July 1997 Hong Kong Station and Tunnels Contract No. MTRC C501 Hong Kong Station Development Contract No. MTRC NSB-CS1 and roadwork’s, a vehicular underpass, earth embankment, retaining walls, large diameter bored pile, land reclamation, drainage system , box Culvert. landscaping, and utilities works. Quantity Surveyor Responsible for various quantity surveying duties including the evaluation of interim payment application from the sub-contractors; the cost study, evaluation and control of the involved cost elements Preparation of measurement & daywork and record keeping as well. Project Description Contract Sum: HK$4.7Billion The Project was Hong Kong Central Station consisting carried out for the construction of five basement level; i.e. two platform level, two concourse level and mezzanine; and five storey superstructure at the east and west ends with a four storey entrance hall in the center, associated tunnels, chiller building, ventilation building, Hong Kong Power Supply building, footbridges, other ancillary building, the lower levels of IFC South West Office Tower and additional Government and external Work and landscaping, drainage and utilities works altogether providing some 155,800 sq m of floor area. This contract also included all foundations consisting of diaphragm wall, barrettes and soil mix wall and entire was constructed mainly enhancing the utilization top down techniques. . Responsible for various quantity surveying duties including the evaluation of interim payment application from the sub-contractors; the cost study, evaluation and control of the involved cost elements. Following receipt of alteration of the client requirements vide the issue of new drawing revisions or modification to specification, I would locate the variations which were deviated from the original contract requirement and inform of my immediate supervisor any arising cost and/or time effect to for his further action. China State Construction Engineering Corporation (Hong Kong) May 1995 - Dec 1995 West Kowloon Reclamation Phase II Contract No. UA9/91 Kwan Kee Construction Co., Limited April 1994 - May 1995 West Kowloon Expressway Northern Section Contract No. HY/92/17 Quality Assurance Engineer/ Assistant Quantity Surveyor Project Description Sub-Contract Sum: HK$300M The Project was for the construction of Meifoo and Cheung Sha Wan post tensioned bridge structure with associated road, earth embankment, retaining walls, large diameter bored pile, drainage system, box culvert. landscaping, and utilities works. Responsible for the engineering and site management of the Post tensioned bridge structure and the coordination of the temporary works design, with installation supervision to all areas of the project Responsible for various quantity surveying duties included the evaluation of interim payment application from the sub-contractors; the cost study, evaluation and control of the involved cost elements Preparation of measurement & daywork and record keeping as well. Assistant Quantity Surveyor Sang Hing Engineering Company Jun 1993 - April 1994 Site Formation Works for Black Point Power Station - Contract No. CAPCO 443437 Project Description Contract Sum: HK$2.7Billion Trainee / Surveyor The Project was for the construction of submarine pipelines, marine jacket sea island structure, approach bridges Project Description Sub-Contract Sum: HK$300M Last updated in Oct 06 Assistant Quantity The works of this project included land reclamation works, drainage system works, box culvert construction. Landscaping works and utilities works. Responsible for various quantity surveying duties included the evaluation of interim payment application from the sub-contractors; the cost study, evaluation and control of the involved cost elements Preparation of measurement & daywork and record keeping as well.