Qualifications

advertisement
NG CHING WAI, CHRIS
Qualifications
Associate member - Canadian
Institute of Quantity Surveyor (2012)
Associate member - The Chartered
Institute of Building UK (2012)
Profession Certified Constructor–
American Institute of Constructors
(2012)
Member of Quantity Surveyor–
Quantity Surveyor International (2004)
Member of the Association for the
Advancement of Cost Engineers AACE International (1996)
Member of Member
International
Cost
Engineering
Council
ICEC(1996)
Bachelor of Science in Quantity
Surveying (2004)
Higher Certificate in Building Studies Architectural Stream(2002)
Higher Certificate in Building Studies Architectural (2001)
Certificate in Building Studies (1999)
Practical Approach for Building
Sub-Contracts (1996)
Practical Quantity Surveying and
Costing for Builders (1993)
Key Data
Experiences in various aspects civil
engineering and site management of
the Post tensioned bridge structure
and the coordination of the temporary
works
design,
with
installation
supervision of the project. the
construction of tensioned bridge
structure with associated road, earth
embankment, retaining walls, large
diameter bored pile, drainage system,
box culvert. Landscaping works, and
utilities works, Structural steel work
etc.
Experiences in various aspects of
quantity surveying practice including
the project financial control and cost
planning together with the preparation
of tenders, procurement, contract
documentation and administration
associated with sub-contracts; as well
as; responsible for the settlement of
final accounts for main and sub
contracts in connection with a number
of civil and building construction
projects for domestic flats, commercial
and office buildings, Amendments &
Alterations, Retail, Hotel and Fitout
work, Structural Steelworks, covered
walkways, bored pile walls, retaining
wall structures and external works, as
well as railway station, etc.
Last updated in Oct 06
Selected Projects
NEW
WORLD
CONSTUCTION
COMPANY LIMITED
Jan 2015-Present
Operation Division
Deputy Project Manager
Project Description
Contract Sum: HK$20 B
The Project, Avenue of Stars and East
Tsim Sha Tsui Promenade, Kowloon
(GLA K275 & Extension to GLA K275),
Tsimshatsui, Kowloon, is located in
the heart of the city centre at East
Tsim Sha Tsui, adjacent of Victoria
Harbour waterfront.
ETST Waterfront Podium Garden
(Podium Garden)
Works on Tsim Sha Tsui East
Waterfront Podium Garden (adjacent
to Wing On Plaza) and the linked
footbridge.
-
-
AOS’s statues relocation, may
involve closure of public road for
the relocation
new display boxes, signage
works and artworks
The redesign works to the ETST
Promenade from AOS to Ventilation
Tower of Cross Harbour Tunnel
-
-
-
-
-
Marine work may be required as
necessary for edge treatment
with new precast concrete panel
along edge of TSTP and
installation may require access
and working platform over the
sea or by vessel
Numerous underground utilities
existed and relevant record
drawings from UU companies
have been retrieved Identification
/ disconnection /diversion of such
utilities shall be carried out before
commencement of main works
Conventional
ground
investigation and small scale
piling works may be required as
necessary.
Construction of new ancillary
structures (max 2-storey) and
associated finishing works
Conventional minipile foundation
work
New model type of soft and hard
landscape work installation
building may be carried out with
conventional light weight steel
structures
Conventional ground investigation
and small scale piling works may
be required as necessary.
Marine work may be required as
necessary for edge treatment
with new precast concrete panel
along edge of TSTP. Such
installation may require access
and working platform over the
sea or by vessel. Such options
shall be further investigated and
update the insurer accordingly.
Numerous underground utilities
existed and relevant record
drawings from UU company
have been retrieved.
Identification/ disconnection
/diversion of such utilities shall
be carried out before
commencement of main works
Reconstruction works for Avenue
of Stars
The works includes re-construction of
the structure of AOS, which may
involve Marine Work as necessary.
-
-
-
A&A Work To Existing Food &
Beverage Area
-
A&A works to existing Starbucks
-
testing to existing piles at sea for
verification of structural
soundness; demolition of existing
decking, temporary working
platform; reconstruction of
precast structural decking; pile
caps and beam construction as
necessary that subject to testing
above; Demolition and
reconstruction of piles as
necessary that subject to testing
above
Marine work may be required as
necessary throughout the
re-construction of structure of
AOS. Such re-construction work
may require access, working
platform, lifting and pontoon over
the sea
Transplanting/ protection/
replanting of existing trees
demolition of existing kiosks and
souvenir shop,
removal of existing paving and
furniture,
reinstallation to existing statutes,
utilities disconnection works,
light fittings & programmable
lighting control system,
LED light fitting to precast
concrete panels,
Grab-N-Go Kiosk and associated
NG CHING WAI, CHRIS
-
-
-
fitting out works,
edge treatment with precast
concrete panel along edge of
AOS,
shade trellis, reinstallation of
hand imprints and statutes,
new pavement works, stainless
steel balustrade along edge of
AOS with RC pedestal, planter
seating, viewing balcony,
oversize seating bench, street
furniture, planting areas /
planters with plant,
M&E works and utilities
connection.
approval plan of basement in this
contract include approximately 23m
and 21.5m for deep excavation and
lateral supports from street level,
construction of 98nos bore pile, raft
footing foundation, underpinning of
existing
structure,
and
MTRC
connection at basement levels.
Including pipe pile wall and ELS
Works, superstructure of Retail and
podium floor
Selected Projects
GAMMON CONSTUCTION LIMITED
Responsible for the engineering,
design detail coordination, project
management and monitor work
programme with compliance the
approval plan of statutory in this
contract include approximately 8 nos.
marine pile 23m and 21.5m, Marine
work may be required as necessary
throughout the re-construction of
structure
and
ELS
Works,
superstructure of Retail
April 2011-Present
Building Division
Senior Project Quantity Surveyor
Oct 2012-Dec 2014
Operation Division
Senior Project Engineer
Responsible for various quantity
surveying duties including such as
project cost control, the submission of
interim payment as well as the
valuation of variations, and the
settlement of final accounts for both
main and sub contract as well as
assistance in the preparation of
contract documents
Project Description
Contract Sum: HK$164 B
Construction of 4 levels basement, 6
floors retail, 15 floors of Serviced
Apartment tower, 59 floors Office and
Hotel tower approximately 280m high
above ground. The approximate site
area
is
39,458m2
and
the
approximate gross floor area is
323,890m2.
The structure is of reinforced concrete.
Composite columns are used in the
basement structure and build by top
down method.
Formation of basement in this contract
include approximately 23m and 21.5m
for deep excavation and lateral
supports
from
street
level,
construction of 98nos bore pile, raft
footing foundation, underpinning of
existing
structure,
and
MTRC
connection at basement levels.
Including pipe pile wall and ELS
Works
Responsible for the engineering,
design detail coordination,
site
management and monitor work
programme with compliance the
Last updated in Oct 06
Project Description
Contract Sum: HK$928 M
Redevelopment of the Victoria Park
Swimming
Pool
Complex
and
construction of one handball court,
two skating rinks and landscaped area
October 2005 – April 2011
Construction Service Division
Senior Project Quantity Surveyor/
Senior Project Coordinators
Project Description
Sub-Contract Sum: HK$504 M
1.)New Asia Airfreight Terminal
Facility T2 - Subcontract Work for
Structural Steelwork
2.) Castle Peak Road Improvement
Between Sham Tseng and Ka Loon
Tsuen, Tsuen Wan - Subcontract Work
Steelwork & Noise barrier
3.)Castle Peak Road Improvement
Between Tsuen Wan Area 2 and Ting
Kau - Subcontract Work Steelwork &
Noise barrier
4.)Hong Kong Convention and
Exhibition
Centre
Atrium
Link
Extension Design and Build ContractSubcontract Work for Structural
Steelworks
5.)Pacific
Place
Mall
Contemporization For L4 Restaurant
At
Pacific
Place
–
Named
Sub-Contract for Metal Roof
6.) New International Airport at CLK
contract P333 – North Satellite
Concourse Building – Structural
Steelworks Package
7.) Alteration & Addition Works for 1
Peking Road Christian Dior Shop
G/F-2/F – Main Contract of Builder
Works and Façade Works
Responsible for various aspects
engineering and site management of
the site coordination and the
coordination quantity surveying and
construction services duties including
such as project cost control, the
submission of interim payment,
project planning as well as the
valuation of variations, and the
settlement of final accounts for both
main and sub contract as well as
assistance in the preparation of
contract documents
June 2004 – October 2005
The Landmark Scheme - Phase 2 - 5
Quantity Surveyor
Project Description
Contract Sum: HK$554 M
Phase 2-4
The scheme will upgrade the retail
environment in the Atrium, add a
unique luxury hotel in the low zone of
Edinburgh Tower, replace the existing
Landmark East building with a new
office tower to complement Edinburgh
and Gloucester Towers, and improve
the overall vehicle and pedestrian
access to and within the development.
Phase 5
Edinburgh Tower conversion of office
levels 5 to 15 into 118-room Hotel
including
structural
alterations,
building works and building services
installation. Replacement of windows
to Hotel rooms and refurbishment of
all other Hotel windows. The
installation of finishes and provisions
of fitments, furniture and equipment to
Hotel generally level 5 to 15 and to
Reception and Bar.
Responsible for various quantity
surveying duties including such as
project cost control, the submission of
NG CHING WAI, CHRIS
interim payment as well as the
valuation of variations, and the
settlement of final accounts for both
main and sub contract as well as
assistance in the preparation of
contract documents.
Aug 2001 –June 2004
1 Peking Road
Quantity Surveyor
Project Description
Contract Sum: HK$550 M
The
Project
comprises
the
construction
of
a
30-storey
commercial and office building with 4
storeys of carpark at basement in
Tsim Sha Tsui, Kowloon. The gross
floor area is approximately 43,000 m2
and the overall height of the building is
about 139.1 m from ground level to
main roof level. The structure is
generally
built
with
reinforced
concrete load bearing walls, columns
and beam framing and slabs. The
elevation of the tower is mainly
finished with glass and curtain
wallings; the elevation of the podium
is mainly finished with glazed walling
and metal cladding. Photovoltaic
panels are installed at the top of the
tower.
Responsible for various quantity
surveying duties including such as
project cost control, the submission of
interim payment and EOT applications
as well as the valuation of variations,
and the settlement of final accounts
for both main and sub contract as well
as assistance in the preparation of
contract documents.
Jan 2000 - Aug 2001
Redevelopment of Sau Mau Ping
Estate 9
Quantity Surveyor
Project Description
Contract Sum: HK$828 M
This project was a redevelopment of
residential project which is resident at
Sau Mau Ping, Kwun Tong in Kowloon
Peninsula. The contract included the
construction of three 41-storey
Harmony Blocks of which each block
has an overall on-plan area at 53.2m x
48.15m approximately, together with a
21-storey Annex Building.
These
blocks contain a total of 2,537 nos. of
residential flats.
In addition, a
6-classroom
kindergarten
was
Last updated in Oct 06
designed and well-fitted on the ground
floor of Block 11 whilst an estate
management office was located in
Block 12. The project also included
the associated drainage and external
works such as slope stabilization,
retaining structures and contiguous
bored piles, roads, emergency and
vehicles access, children play areas,
ball courts, covered walkways,
services mains and refuse storage
areas. The buildings were built with
a reinforced concrete structure frame
in conjunction with the pre-cast
concrete façade units for various
components located in living rooms,
bedrooms and kitchens. All façade
units were designed to support their
own weight and jointed monolithically
to the building structure in-situ.
Responsible for various quantity
surveying duties such as project cost
control, the submission of interim
payment and EOT applications as well
as the valuation of variations, and the
settlement of final accounts for both
main and sub contracts. In addition,
assistance in preparing proposals of
alternatives furnished to the Housing
Authority aiming at fundamental cost
savings and improvement in quality
and technicality resulting from value
engineering exercises.
Mar 1999 - Jan 2000
1063 King’s Road
Quantity Surveyor
Project Description
Contract Sum: HK$375 M
The
Project
comprises
the
construction of a 30-story office
consisting of 4-storey podium and 26
storey, formed on pile cap in Quarry
Bay, Hong Kong. The gross floor area
is approximately 43,000 m2 and the
overall height of the building is about
139.1 m from ground level to main
roof level. The structure is generally
built with reinforced concrete load
bearing walls, columns and beam
framing and slabs. The elevation of
the tower is mainly finished with glass
and curtain wallings; the elevation of
the podium is mainly finished with
louver and stone cladding.
Responsible for various quantity
surveying
duties
including
the
preparation for and submissions of
quotations and valuation of variations
as well as assistance in the
preparation of contract documents for
both main and sub contracts
Oct 1998 - Mar 1999
Super Terminal No. 1
Quantity Surveyor
Project Description
Contract Sum: HK$4.1Billion
The Project was the construction of
one of world’s largest airfreight
handling centre.
The JV was
responsible for the construction of the
five-storey Cargo Terminal Building
and the two-storey Express Centre,
altogether providing some 315,000 sq
m of floor area. This contract also
included all the mechanical &
electrical works, construction of the
elevated roads providing access
linking the
two
cargo-handling
facilities, together with
extensive external paving works.
Responsible for various quantity
surveying
duties
including
the
preparation for and submissions of
quotations and valuation of variations
as well as assistance in the
preparation of contract documents for
both main and sub contracts
Gammon - Paul Y Joint Venture
July 1997 - Oct 1998
Super Terminal No. 1
Quantity Surveyor
Project Description
Contract Sum: HK$4.1Billion
The Project was the construction of
one of world’s largest airfreight
handling centre.
The JV was
responsible for the construction of the
five-storey Cargo Terminal Building
and the two-storey Express Centre,
altogether providing some 315,000 sq
m of floor area. This contract also
included all the mechanical &
electrical works, construction of the
elevated roads providing access
linking the
two
cargo-handling
facilities, together with
extensive external paving works.
Responsible for various quantity
surveying
duties
including
the
preparation for and submissions of
quotations and valuation of variations
as well as assistance in the
preparation of contract documents for
both main and sub contracts
NG CHING WAI, CHRIS
Aoki Corporation
Dec 1995 - July 1997
Hong Kong Station and Tunnels
Contract No. MTRC C501
Hong Kong Station Development
Contract No. MTRC NSB-CS1
and
roadwork’s,
a
vehicular
underpass,
earth
embankment,
retaining walls, large diameter bored
pile, land reclamation, drainage
system , box Culvert. landscaping,
and utilities works.
Quantity Surveyor
Responsible for various quantity
surveying
duties
including
the
evaluation
of
interim
payment
application from the sub-contractors;
the cost study, evaluation and control
of the involved cost elements
Preparation of measurement &
daywork and record keeping as well.
Project Description
Contract Sum: HK$4.7Billion
The Project was Hong Kong Central
Station consisting carried out for the
construction of five basement level; i.e.
two platform level, two concourse
level and mezzanine; and five storey
superstructure at the east and west
ends with a four storey entrance hall
in the center, associated tunnels,
chiller building, ventilation building,
Hong Kong Power Supply building,
footbridges, other ancillary building,
the lower levels of IFC South West
Office
Tower
and
additional
Government and external Work and
landscaping, drainage and utilities
works altogether providing some
155,800 sq m of floor area. This
contract also included all foundations
consisting
of
diaphragm
wall,
barrettes and soil mix wall and entire
was constructed mainly enhancing the
utilization top down techniques. .
Responsible for various quantity
surveying
duties
including
the
evaluation
of
interim
payment
application from the sub-contractors;
the cost study, evaluation and control
of the involved cost elements.
Following receipt of alteration of the
client requirements vide the issue of
new drawing revisions or modification
to specification, I would locate the
variations which were deviated from
the original contract requirement and
inform of my immediate supervisor
any arising cost and/or time effect to
for his further action.
China
State
Construction
Engineering Corporation (Hong
Kong)
May 1995 - Dec 1995
West Kowloon Reclamation Phase
II
Contract No. UA9/91
Kwan Kee Construction Co.,
Limited
April 1994 - May 1995
West
Kowloon
Expressway
Northern Section Contract No.
HY/92/17
Quality
Assurance
Engineer/
Assistant Quantity Surveyor
Project Description
Sub-Contract Sum: HK$300M
The Project was for the construction of
Meifoo and Cheung Sha Wan post
tensioned bridge structure with
associated road, earth embankment,
retaining walls, large diameter bored
pile, drainage system, box culvert.
landscaping, and utilities works.
Responsible for the engineering and
site management of the Post
tensioned bridge structure and the
coordination of the temporary works
design, with installation supervision to
all areas of the project
Responsible for various quantity
surveying
duties
included
the
evaluation
of
interim
payment
application from the sub-contractors;
the cost study, evaluation and control
of the involved cost elements
Preparation of measurement &
daywork and record keeping as well.
Assistant Quantity Surveyor
Sang Hing Engineering Company
Jun 1993 - April 1994
Site Formation Works for Black
Point Power Station - Contract No.
CAPCO 443437
Project Description
Contract Sum: HK$2.7Billion
Trainee
/
Surveyor
The Project was for the construction of
submarine pipelines, marine jacket
sea island structure, approach bridges
Project Description
Sub-Contract Sum: HK$300M
Last updated in Oct 06
Assistant
Quantity
The works of this project included land
reclamation works, drainage system
works, box culvert construction.
Landscaping works and utilities works.
Responsible for various quantity
surveying
duties
included
the
evaluation
of
interim
payment
application from the sub-contractors;
the cost study, evaluation and control
of the involved cost elements
Preparation of measurement &
daywork and record keeping as well.