Risk Assessment Template Melbourne Fringe Festival 2015 Example Risk Assessment Amended 20/03/2015 Completion of the checklist indicates the treatment measures recommended for each risk source element will be in effect. The information contained herein is intended as advice and does not remove the responsibility of management/proprietors to ensure all obligations under legislation are adhered to. © Coleby Consulting MELBOURNE FRINGE RISK ASSESSMENT KIT 2015 – P1 RISK ASSESSMENT Melbourne Fringe Festival is committed to assisting you to continually improve your risk management systems for events through a process of education, supervision and incident reporting. We are aware of the importance of addressing occupational health and safety issues in the conceptual stages of the event to ensure that risks are identified and strategies to reduce or minimise identified risks are adopted. This Example Risk Assessment is designed to enable each organisation to address hazards particular to their project and assess them in this uniform format. The last two pages contain a Risk Evaluation Process to enable you to assess the overall level of risk of your event and the measures you should have in place. The basic examples given are to assist you with your Risk Assessment and may suit to your project. The information you present may be reviewed by our risk manager Due to the very nature of projects such as yours it is difficult to foresee all risk source elements and many will be identified or known only by the relevant internal and external event co-ordinators, stakeholders, contractors and/or suppliers of products or services. We must involve all of these experienced people in our risk assessment. The risk assessment is a live document and is never final. Changes to risk source elements and risk controls should be reflected and actioned immediately. The risk assessment must be constantly reviewed and input should be invited from all stakeholders. Under Occupational Health and Safety (OH&S) legislation, common and other related law, we are obliged to ensure that all reasonable steps are taken to ensure that events are conducted in a manner which provides for the safety of all persons that might be present at any time, including public, employees, independent contractors, their employees and attendees. The Act, establishes a general “duty of care” that an employer owes to its employees. This also includes independent contractors and employees of the contractor. Liability arises where a person is “exposed” to the risk of injury to health and safety. This means, it is not necessary for a person to have been actually injured but merely “exposed to risk”. Put in context, we must focus our attention on the risk to health and safety rather than the consequences of an offence. PLEASE NOTE: This work is copyright. However in the interest of constantly improving safety standards in the event industry, Coleby Consulting invite their clients to reproduce and distribute this material for their own use, providing the appropriate acknowledgment is given. The use of this material for any commercial purpose, including its resale in any format, is prohibited under the Copyright Act 1968. Every effort has been made to ensure the accuracy and completeness of this information; however Coleby Consulting makes no warranty regarding its use, and assumes no liability for any damages or loss suffered as a result of any inaccuracy or omission. MELBOURNE FRINGE RISK ASSESSMENT KIT 2015 – P2 Principles of Risk Management For risk management to be effective, an organization should at all levels comply with the principles below. Risk management creates and protects value. Risk management contributes to the demonstrable achievement of objectives and improvement of performance in, for example, human health and safety, security, legal and regulatory compliance, public acceptance, environmental protection, product quality, project management, efficiency in operations, governance and reputation. Risk management is an integral part of all organizational processes. Risk management is not a stand-alone activity that is separate from the main activities and processes of the organization. Risk management is part of the responsibilities of management and an integral part of all organizational processes, including strategic planning and all project and change management processes. Risk management is part of decision making. Risk management helps decision makers make informed choices, prioritize actions and distinguish among alternative courses of action. Risk management explicitly addresses uncertainty. Risk management explicitly takes account of uncertainty, the nature of that uncertainty, and how it can be addressed. Risk management is systematic, structured and timely. A systematic, timely and structured approach to risk management contributes to efficiency and to consistent, comparable and reliable results. Risk management is based on the best available information. The inputs to the process of managing risk are based on information sources such as historical data, experience, stakeholder feedback, observation, forecasts and expert judgement. However, decision makers should inform themselves of, and should take into account, any limitations of the data or modelling used or the possibility of divergence among experts. MELBOURNE FRINGE RISK ASSESSMENT KIT 2015 – P3 Risk management is tailored. Risk management is aligned with the organization's external and internal context and risk profile. Risk management takes human and cultural factors into account. Risk management recognizes the capabilities, perceptions and intentions of external and internal people that can facilitate or hinder achievement of the organization's objectives. Risk management is transparent and inclusive. Appropriate and timely involvement of stakeholders and, in particular, decision makers at all levels of the organization, ensures that risk management remains relevant and up-to-date. Involvement also allows stakeholders to be properly represented and to have their views taken into account in determining risk criteria. Risk management is dynamic, iterative and responsive to change. Risk management continually senses and responds to change. As external and internal events occur, context and knowledge change, monitoring and review of risks take place, new risks emerge, some change, and others disappear. Risk management facilitates continual improvement of the organization. Organizations should develop and implement strategies to improve their risk management maturity alongside all other aspects of their organization. MELBOURNE FRINGE RISK ASSESSMENT KIT 2015 – P4 Context Planned Environment (Explain the project you are undertaking) Date Venue Time Capacity Total Exit Width Clear Area in Square Metres Full Explanation of Project Assumptions All Stakeholders will review this risk assessment to ascertain their responsibility and ability to implement treatment options. All documents, plans, policies, procedures, staffing levels, training and support referred to and or required to ensure the treatments are effective as intended are going to be in place. Signing off the risk assessment checklist acknowledges all stakeholders are aware of and have agreed to implement the treatments they are responsible for. All persons working to implement the proposed treatment will do so to the best of their ability and as well as can be reasonably expected. References Victoria OH&S Act and Model National WHS Act AS/NZS ISO 31000:2009 Risk Management Principles and Guidelines AS 3745 2010 Planning for Emergencies in Facilities Building Code of Australia Support Documentation Staff Roles and Responsibilities Staff Training Program Communications Plan MELBOURNE FRINGE RISK ASSESSMENT KIT 2015 – P5 Event Risk Management Process – Overview ESTABLISH THE CONTEXT IDENTIFY RISKS Associated with each element ANALYSE RISKS Decide on the need to treat EVALUATE RISKS Stakeholders and Project Management Associated with the activities MONITOR AND REVIEW IDENTIFY ELEMENTS COMMUNICATE AND CONSULT Stakeholders and Project Management Purpose of the Risk Assessment Identify existing process TREAT RISKS Introduce control measures MELBOURNE FRINGE RISK ASSESSMENT KIT 2015 – P6 Consequence Table 1: Risk Consequence Descriptors Consequence Category Business Interruption Environmental Financial Human Public Image & Reputation Catastrophic 5 Essential service failure, or key revenue generating service removed Irreversible damage Above $20,000,000 Death(s) / many critical injuries National and International Concern / exposure Major 4 Service or provider needs to be replaced Harm requiring restorative work Up to $10,000,000 Single Death/ multiple long term or critical injuries State wide Concern / exposure Moderate 3 Temporary, recoverable service failure Residual pollution requiring cleanup work Up to $1,000,000 Single minor disablement/ multiple temporary disablement Local community concern Minor 2 Brief service interruption Remote, temporary pollution Up to $200,000 Injury Customer complaint Negligible 1 Negligible impact, brief reduction/loss of service 2-12 hours Brief, non hazardous, transient pollution Up to $20,000 Minor First Aid Resolved in day-to-day management MELBOURNE FRINGE RISK ASSESSMENT KIT 2015 – P7 Likelihood Table 2: Likelihood Ratings Likelihood Category Description Almost Certain A Likely B The event will probably occur in most circumstances Possible C The event should occur at some time Unlikely D The event could occur at some time Rare E The event may occur only in exceptional circumstances The event is expected to occur in most circumstances Risk Matrix Table 3: Level of Risk Matrix Consequence Label Likelihood Label 1 2 3 4 5 A Medium Medium High Very High Very High B Medium Medium High High Very High C Low Medium Medium High High D Low Low Medium Medium High E Low Low Medium Medium Medium MELBOURNE FRINGE RISK ASSESSMENT KIT 2015 – P8 Control Hierarchy The control hierarchy is a list of control measures, in priority order, that can be used to eliminate or minimize exposure to risk source elements. Below is the control hierarchy with general examples of each control measure: Avoidance of all risk Elimination of certain elements Substitution Isolation Engineering Controls Administrative Controls Personal Protective Equipment Accepting or increasing risk to pursue an opportunity Event Event Managers Compiled by Cancellation of event or not proceeding with activities Avoid the risk by removing the risk source element completely. Use less hazardous procedure/substances equipment/process. Separate the process using design, barriers, enclosures or distance. Mechanical/physical changes to equipment/materials/process. Change procedures & design to reduce exposure to a risk source element Gloves, hats, boots, goggles, masks, clothing etc. Accepting residual risk once all available effective controls are in place Position Phone Email Name: Date: Location: Reviewed by: Position: Review Date: MELBOURNE FRINGE RISK ASSESSMENT KIT 2015 – P9 Risk Assessment Control Checklist NOT NO. RISK SOURCE ELEMENTS OK N/A DETAILS OK 1. Access and egress of patrons at event 2. Criminal activity 3. Broken glass, litter etc 4. Food sales and supplies to patrons 5. Plant and Equipment 6. Live electrical wires or faulty equipment 7. Slip, Trip, Fall and Knock 8. Stages and platforms 9. Heat sources & naked flame 10. Bumping equipment in and out 11. Public liability 12. Structures, fences, stacked materials, etc collapsing 13. Emergency at any of the event sites 14. Medical Emergency MELBOURNE FRINGE RISK ASSESSMENT KIT 2015 – P10 NOT NO. RISK SOURCE ELEMENTS OK N/A DETAILS OK 15. Wind storm, Lightning Strike 16. 17. 18. 19. 20. 21. 22. 23. MELBOURNE FRINGE RISK ASSESSMENT KIT 2015 – P11 We the undersigned have read and understood this risk assessment. We will implement treatments we are responsible for in line with the measures described to the best of our ability and as well as can be reasonably expected. Person Responsible (Print Name) Responsibility Signature Date Time MELBOURNE FRINGE RISK ASSESSMENT KIT 2015 – P12 Element Additional Risk Treatment or Action Plan Accept Reject Required Risk Treatment Rating Risks Residual Risk Source Residual Risk Risk Rating The treatment measures recommended for each risk source element will be in effect Responsible & Accountable as Risk Owners Operational 01 02 Access and egress of patrons at event Criminal activity Confusion Frustration Delays Overcrowding of exits under normal conditions Robbery Bodily injury Trauma Area entry widths such as gates allow in excess of one metre per 800 hundred patrons of large open areas Area entry widths are to allow at least one metre per 100 patrons in enclosed structures All applicable standard exits able to be opened by managers responsible for each exit Designated exits in fence lines to be open or able to be immediately unlocked and clear at all times. Obstructions such as cordoned off areas, barriers, fencing, marquees and infrastructure to be located so as not to restrict egress Dedicated exits to be clearly identified and free from obstructions and trip hazards. No easily movable objects which may become obstructions during egress to be in the vicinity of exits. Illuminated exit signage with battery backup to be visible from all areas in buildings Aisle & stair lighting visible at all times Ushers equipped with torches Event demographic minimizes the potential attractions for such activity. Wardens and staff liaise constantly with patrons in areas and viewing areas to foster communication of Event Management Stakeholders Contractors Area Wardens Wardens Security D1 Accept Low D1 Accept Low Event Management Stakeholders Contractors Area Wardens MELBOURNE FRINGE RISK ASSESSMENT KIT 2015 – P13 03 Broken glass, litter etc Potential cuts and lacerations to hands and feet of patrons and staff or Action Plan Accept Reject Element Additional Risk Treatment Rating Required Risk Treatment Residual Risk Risks Rating Source Residual Risk Risk Responsible & Accountable as Risk Owners issues quickly. Handling of cash to be done in a secure environment with adequate staff. Additional lighting in dark areas of event, parks, car parks and roads in immediate vicinity. Security on site to monitor status of crowd and troublemakers. Wardens and staff trained in raising alarm to police. Wardens Security No glass receptacles to be used during events at venues in outdoor areas. Additional rubbish bins for designated areas as required. Dedicated rubbish bins in specific venues for broken glass labelled to warn cleaning staff. Cleansing staff on duty all operational hours to minimise time glass or litter is left on ground. Licensed areas have pans and brushes to avoid handling broken glass All staff trained to isolate breakages and organise clean up with pans and brushes while preventing any persons handling the glass. Event Management Stakeholders Contractors Area Wardens Wardens Security D1 Accept Low MELBOURNE FRINGE RISK ASSESSMENT KIT 2015 – P14 04 05 Food sales and supplies to patrons Plant and Equipment Food poisoning Injury to public and staff Appropriately licensed food vendors operate in accordance with all food management regulations. Food vendors subject to City Council regulations and inspections. Food vendors required to attend safety briefing prior to commencing event Food vendors and distributors to take steps to maintain a high standard of food hygiene at all times. Appropriate hand washing facilities to be available. Food temperatures to be checked and recorded by vendors as required by legislation. Sullage storage/disposal units to be available and used in all areas as required. Any food vendors or handlers found to be operating in breach of applicable Australian Standards, Codes of Practice, Local and OH&S legislation may be closed until relevant authorities are satisfied. Only appropriate licensed and competent operators used to operate plant and equipment. Plant and equipment operators to have provided license details during inductions and to have licenses available on request or Action Plan Accept Reject Element Additional Risk Treatment Rating Required Risk Treatment Residual Risk Risks Rating Source Residual Risk Risk Responsible & Accountable as Risk Owners Event Management Stakeholders Contractors Caterers Area Wardens Wardens Security D2 Accept Low E2 Accept Low Event Management Stakeholders Contractors Plant Operators Area Wardens MELBOURNE FRINGE RISK ASSESSMENT KIT 2015 – P15 06 Live electrical wires or faulty equipment Electrocution of staff, public and participants or Action Plan Accept Reject Element Additional Risk Treatment Rating Required Risk Treatment Residual Risk Risks Rating Source Residual Risk Risk Responsible & Accountable as Risk Owners Barricades and warning signage erected around work areas. Public kept clear during plant use. Persons using equipment are trained in safe operation and wear appropriate protective clothing. No unnecessary access to the worksite. All persons within work site must wear fluoro vests and PPE as required. Wardens and Site Managers to supervise all bump in and bump out activity. No plant movement without spotter present Wardens All electric’s to be installed in accordance building regulations and with, AS/NZS/3000:2000 (Amended) Wiring Rules and the Code of Practice temporary installation on building and construction sites (OH&S Act). All electrical installations to be carried out by registered contractors and must be approved by an authorised electrical authority. Leads and appliances to be tested and tagged. Earth leakage protection (RCD) to be fitted and tested. Switchboards are to be identified with signage “Danger – High Voltage”. Switchboards to be mounted off the ground and inaccessible to public. Temporary installations to run overhead where possible. Regular inspections by Staff and Wardens. Emergency and alternative source lighting installed as required. Event Management Stakeholders Contractors Electricians Area Wardens Wardens E3 Accept Medium MELBOURNE FRINGE RISK ASSESSMENT KIT 2015 – P16 07 08 Slip, Trip, Fall and Knock Stages and platforms Bodily injury to public or participants Falls from height Bodily injury Stakeholder site safety induction Staff trained in recognition and prevention Serious trip and fall hazards identified and removed or treated to prevent injury Cables flown overhead where possible Rubber mats & cable traps over cables Barriers placed around protruding equipment Barriers across stage fronts during work phases Changes in height and edges highlighted Hand rails on stairs and treads Slippery surfaces treated or isolated Additional lighting in dark areas Spills and etc isolated, warning signage placed, then cleaned by crews as soon as reported Cables are placed away from access and stairways House lights on for night performances when crowd is in transition, before during and post event ‘Slippery Floor’ signs used in case of spills Crew are briefed to ensure they understand areas where only assessed trained performers are able to perform without fall restraint or arrest systems Safety barriers/hand rails fixed to all structures where required. Stages to have rope and bollards or similar installed when orchestra pit is open during bump in and out. or Action Plan Accept Reject Element Additional Risk Treatment Rating Required Risk Treatment Residual Risk Risks Rating Source Residual Risk Risk Responsible & Accountable as Risk Owners Event Management Stakeholders Event staff Wardens C1 Accept Low E2 Accept Low Event Management Stakeholders Contractors Area Wardens Wardens Security MELBOURNE FRINGE RISK ASSESSMENT KIT 2015 – P17 or Action Plan Accept Reject Element Additional Risk Treatment Rating Required Risk Treatment Residual Risk Risks Rating Source Residual Risk Risk Responsible & Accountable as Risk Owners Stage boundaries highlighted to assist crew, performers and VIPs. Fall protection systems used on any high work over 2 metres unless trained performers and then only when trained and experienced. Fall protection systems used to eliminate falls from less than 2 metres. General public not permitted on stages or other structures intended for performers. Security monitoring stages when not in use. Performers competent in specific tasks have a thorough knowledge of requirements. Stage Managers supervising all performances to ensure compliance. 09 Heat sources & naked flame Burn injury and loss Heat sources including kitchens, amplifiers, switchboards, dimmer racks, generators and power supplies required having A:B(E) dry chemical or C02 extinguishers and fire blankets at all risk areas. One 4.5 kg A:B(E) dry chemical extinguisher per 200m2 of marquee or stage Hot work permit system completed prior to any welding etc. No permanent venue fire equipment is to be relocated to suit temporary requirements. Fire extinguishers to be mounted securely not more than1.2 metres from the ground and not less than 100mm above the ground with signage attached. Access routes for emergency vehicles to be made available through event areas free of infrastructure with 4 metres of clearance. Fire equipment such as smoke sensors isolated due to smoke machines must be replaced with trained fire Event Management Stakeholders Contractors Area Wardens Wardens Security E2 Accept Low MELBOURNE FRINGE RISK ASSESSMENT KIT 2015 – P18 or Action Plan Accept Reject Element Additional Risk Treatment Rating Required Risk Treatment Residual Risk Risks Rating Source Residual Risk Risk Responsible & Accountable as Risk Owners wardens monitoring the venue. No fire equipment is to be isolated without written venue management approval Fire curtain and fire door operation is not to be compromised. All drapes, props and cloths to be fire rated and treated with retardant and labels attached indicating treatment and date. Performers and participants using naked flame to be dressed in cotton clothing. Naked flame to be placed in suitable holders and clear of flammable materials. Naked flame to be away from clothing of patrons. All hot surfaces and naked flame to be out of reach of public. 10 Bumping equipment in and out Bodily injuries to staff and public Pre event Production Staff briefing as per Staff Training Program. High risk construction work to be carried out by holders of CI certificate D2 Accept Low Event Management Stakeholders Contractors Area Wardens MELBOURNE FRINGE RISK ASSESSMENT KIT 2015 – P19 11 Public liability Payouts as a result of claims made against all concerned and involved or Action Plan Accept Reject Element Additional Risk Treatment Rating Required Risk Treatment Residual Risk Risks Rating Source Residual Risk Risk Responsible & Accountable as Risk Owners Bump in movements to be scheduled and agreed on by all Stakeholders prior to the event. Bump in areas barricaded to isolate general public. Warning signage installed on barriers Public largely where possible kept off site during bump in and out. Pedestrian management measures in place to ensure pedestrians and construction do not mix. Bump out does not commence until area is clear of patrons No major relocations when site is open to public. Staff instructed to exercise care in such circumstances. Ensure clear access to the site and use trolleys where possible. All staff working in the barricaded areas during construction to be wearing fluoro vests and PPE Large or awkward loads moving through public areas to be under close guidance of adequate number of staff as spotters for size of the load in fluoro vests Wardens All contractors and performers to have acceptable levels of effective professional indemnity (where required) and public liability insurance in place as required by the event Insurance provider to be approved by Australian Prudential Regulation Authority (APRA) Legal counsel for Victorian Government, the event and the local council should be advised about aspects of the event with a view to pre-determining liability for Event Management Stakeholders E1 Accept Low MELBOURNE FRINGE RISK ASSESSMENT KIT 2015 – P20 or Action Plan Accept Reject Element Additional Risk Treatment Rating Required Risk Treatment Residual Risk Risks Rating Source Residual Risk Risk Responsible & Accountable as Risk Owners injuries, acts and omissions and liability for financial obligations incurred if it becomes necessary to respond to a major emergency involving the event. 12 13 Structures, fences, stacked materials, etc collapsing Emergency at any of the event sites Collapse of structures Crushing injury to public or participants Bodily injury Negative publicity Structures constructed by staff or contractors with relevant qualifications. Structures erected according to Safe Work Method Statements and building regulations. Use of materials with manufacturer’s specifications. Fences with scrim attached to be adequately braced Scrim able to be removed rapidly if high winds are forecast Building control group requirements for occupancy of temporary structures. Engineers certification sought where required Stacked materials held by suitable racking systems and devices to prevent collapse. Quantities of materials and fencing to be stacked flat to prevent collapse. Wardens and Venue Managers monitor all structures. All buildings and structures to have capacity posted at entry and adhered to. Risk Management Plans in place in all areas to reduce and mitigate the risks of emergencies Daily and area checklists to be undertaken Site audits to be undertaken Event Safety & Emergency Plan developed to encompass all sites and to dovetail into existing venue emergency arrangements Gridded maps of all areas available to all management teams Event Management Stakeholders Contractors Area Wardens Wardens Security E2 Accept Low Event Management Stakeholders Participants E2 Accept Low MELBOURNE FRINGE RISK ASSESSMENT KIT 2015 – P21 or Action Plan Accept Reject Element Additional Risk Treatment Rating Required Risk Treatment Residual Risk Risks Rating Source Residual Risk Risk Responsible & Accountable as Risk Owners Wardens and security to have gridded maps on lanyards All maps to be clearly marked with North, South, East and West. Wardens briefed in guiding Emergency vehicles to the scene and evacuation of patrons from affected areas. Emergency Control Organisation to be identified and trained accordingly Event Crisis Management Plan to be in effect 14 15 Medical Emergency Wind storm, Lightning Strike Poor access for emergency vehicles Potential injuries to public and staff Loss and damage to infrastructure Bodily Injury Strategically placed First Aid stations in locations accessible by ambulance Ambulance manager in Event Management Centre First Aid Staff on site & in radio contact with Event Management Centre First aid supervisor in Event Management Centre Wardens & security trained in ambulance response & crowd management for emergency vehicles Designated emergency accesses Event Management Centre in operation during event AV to attended high risk events and times Event safety induction at each venue. Reliable means of obtaining and monitoring wind and weather conditions. Venue Manager to monitor the weather. Event ceased if necessary and public evacuated or sheltered when threat is known as per Safety and Emergency Plans Event Management Stakeholders Contractors Area Wardens Wardens Security E2 Accept Low C2 Accept Medium Event Management Stakeholders Contractors Area Wardens Wardens Security MELBOURNE FRINGE RISK ASSESSMENT KIT 2015 – P22 or Action Plan Accept Reject Element Additional Risk Treatment Rating Required Risk Treatment Residual Risk Risks Rating Source Residual Risk Risk Responsible & Accountable as Risk Owners Lightning storms may result in cancellation of some events as per Safety and Emergency Plans Strong wind warnings 50 kph or storm warning issued by weather bureau is to result in constant monitoring of situation. Winds at venue exceeding 55 kph may result in evacuation of certain structures and suspension of some entertainment Evacuation of certain structures subject to weather conditions and engineers ratings. Ensure all tents and marquees are adequately fastened down. Remove loose items and umbrellas if the threat of wind exists. Action in accordance with Safety & Emergency Plans 16 17 18 19 MELBOURNE FRINGE RISK ASSESSMENT KIT 2015 – P23 or Action Plan Rating Additional Risk Treatment Accept Reject Element Required Risk Treatment Residual Risk Risks Rating Source Residual Risk Risk Responsible & Accountable as Risk Owners 20 21 22 23 24 25 MELBOURNE FRINGE RISK ASSESSMENT KIT 2015 – P24 Appendix 4: Safety Advice for Producers Provided by Bill Coleby 1. SHOULD PUBLIC EVENTS BE RISKY? Biggest is not necessarily the best. Nor is it the most spectacular. Everyone seems to think they have to do more than the last event when the truth is the public are not expecting that. A better question is: Can you afford to do the event safely? We are tired of hearing “we don’t have the budget to do that”. If you cannot afford to do the event properly, don’t do it at all or change it until it is affordable. Some events cannot be done on a small budget. Under the OH&S Act “Cost” is not simply a matter of whether you can afford to do something about the risk, as is commonly assumed. Cost must be weighed up against the other factors – including the degree of harm in terms of pain and suffering to workers and others, should the risk be realised. Under the OH&S Act the importance of health and safety requires that all persons at work and members of the public be given the highest level of protection against risks to their health and safety that is reasonably practicable in the circumstances. Also persons (YOU) who control or manage matters that give rise or may give rise to risks to health or safety are responsible for eliminating or reducing those risks so far as reasonably practicable. 2. RISK MANAGEMENT There is an enormous amount of emphasis placed on the Risk Assessment. I have recently had cause to be very distressed about the incredible lack of understanding by performers, caterers, exhibitors, contractors and vendors about risk assessments. The Event Risk assessment must be conducted during the initial design of your event – not once you have completed your program. Risk assessments are the backbone of every good event plan. For too long we have focussed on attracting huge crowds to our events with little or no thought as to their safety. We must all move with the times, as some risks appear virtually overnight. This is where our duty to perform risk management begins. Just because an accident has not occurred due to a known risk source, does not mean it will not. All too often I hear the words “we have been doing that for years and have never had an accident”, then I hear that has never happened before. We must first conduct a Risk assessment of all known hazards associated with our event. This process should have input by all interested parties and you have an obligation to search for risk sources far and wide. You must look up on the www etc. You cannot use the excuse you did not know if the problem is well known around the world. You then need to explore the measures you are able to use to eliminate or control the risks. This process will give you a risk rating and a list of controls and people responsible for implementing the controls. Page 25 of 26 3. PRO ACTIVE RISK MANAGEMENT Now you must implement pro-active risk management. No matter how good your planning is there is always someone willing to bring you undone. You need lots of eyes and ears on the job. You must create a safety culture with your staff and volunteers. No one person can watch everything. These people need to be trained and given the tools such as the checklists and incident sheets in order to be able to perform these tasks. They also need to be able to consult with someone if there is an issue they need advice or support with. You must induct all of your stakeholders and include risk management specific to the event. Keep the inductions short and simple to increase effectiveness. Warden and staff training are vital and must be simple and relevant to increase effectiveness. Document their training and have them sign off on it. If safety is not managed as a holistic part of your event, you have failed in your duty of care. 4. SUPERVISION & RESPONSIBILITY ON ALL LEVELS You don’t need create new staff to perform responsibilities – give ownership to your existing collaborators. Appoint staff as Area Wardens and Wardens to supervise all aspects of the event. Give them their responsibilities, they must all understand and support your safety plan. Risk management is everyone’s responsibility. No one person can be in all places at once. One weak link in your team and it all falls down – you are exposed! The nature of events makes it practically impossible to get it right all of the time. Get it right 95% of the time and you only have a 5% chance of something going wrong, and you will pick this up with your incident reporting procedure. There is no substitute for supervision. You are now well on the way to creating an overall safety plan for your event. Melbourne Fringe L2, 225 Bourke St Melbourne VIC 3000 ACKNOWLEDGEMENTS ©Melbourne Fringe 2015 PO Box 24118, Melbourne VIC 3001 Ph 03 9660 9600 Fax 03 9660 9687 This publication is copyright. No part may be reproduced or redistributed without the prior consent of Melbourne Fringe. Page 26 of 26