THIRD QUARTER PERFORMANCE EVALUATION REPORT
OF
GREATER MTHONJANENI REGIONAL BULK WATER
SCHEME
KWAZULU NATAL
CHIEF DIRECTORATE: BULK INFRASTRUCTURE PROGRAMME
PERIOD: 01 OCTOBER 2014 TO 31 DECEMBER 2014
2
REGIONAL BULK INFRASTRUCTURE GRANT
31 DECEMBER 2014
TABLE OF CONTENTS
1
INTRODUCTION ........................................................................................................................... 3
2
BACKGROUND ............................................................................................................................. 3
2.1
Project description ................................................................................................... 3
AREA OF SUPPLY ..................................................................................................................................... 3
3
PROJECT CONTRACT AND COST ................................................................................................. 4
3.1
Contract Details and Cost........................................................................................ 4
3.2
Funding Allocated to the Project .............................................................................. 7
4
PROGRESS ON CURRENT PROJECT ............................................................................................. 8
4.1
Progress on UDM/MIG/23/2011: Kwahlokohloko SSA 1: 5.8 km Steel Bulk pipeline,
900 mm dia ........................................................................................................................ 8
4.2
Progress on UDM/MIG/27/2012: Kwahlokohloko SSA 1: Booster Pump stations 1 &
2.5 Mℓ Balancing Reservoir ................................................................................................ 8
4.3
Progress on UDM/MIG/14/2013: Kwahlokohloko SSA 1: Booster Pump stations 2 &
8 Mℓ Balancing Reservoir ................................................................................................... 8
5
RISKS TAKEN AND MANAGEMENT THEREOF ............................................................................. 8
6
PROJECT RESULTS AND BENEFICIARIES...................................................................................... 9
The project beneficiaries are mentioned below: ...................................................................... 9
6.1
Households Beneficiaries ........................................................................................ 9
6.2
Employment during the Implementation of the Project............................................. 9
7
KEY CHALLENGES WITHIN THE PROJECT .................................................................................... 9
8
CONCLUSIONS ........................................................................................................................... 10
8.1
Lessons Learned................................................................................................... 10
9
RECOMMENDATIONS ............................................................................................................... 10
10
PHOTOGRAPHS ON THE IMPLEMENTATION OF THE PROJECT................................................ 11
3
REGIONAL BULK INFRASTRUCTURE GRANT
1
31 DECEMBER 2014
INTRODUCTION
In terms of Section 10(7) (b) of the Division of Revenue Act No 10 of 2014 (DORA) as
promulgated in Government Gazette No 37595 dated 26 April 2014, the transferring
national officer must submit a quarterly performance report for all Programmes
funded by a Schedule 6 allocation within 45 days after the end of each quarter, in
accordance of the relevant framework to the National Treasury.
The Regional Bulk Infrastructure Grant (RBIG) is a Schedule 6 indirect conditional
grant for the benefit in kind of municipalities.
The objective of this Report is to provide a third quarter performance evaluation
report of RBIG funded projects, in compliance with the DORA. The objective of this
evaluation was to determine whether the progress on the project is commensurate
with the expenditure to date as well as to determine whether the project is still on
course in terms of the original planning.
This quarterly report covering the third quarter of 2014/15 fiscal year, presents the
results of the performance evaluation of Greater Mthonjaneni Regional Bulk Water
Supply Project.
2
BACKGROUND
In accordance with the Water Service Master Plan (2004), the Goedertrouw Regional
Scheme with the Goedertrouw Dam identified as the most viable source will supply
water to Greater Mthonjaneni, Kwahlokohloko and Eshowe supply areas.
2.1
Project description
The Greater Mthonjaneni Bulk Water Scheme obtains its water from the Goedertrouw
Dam. Water gravitates to a new 20 Mℓ Water Treatment Works (WTW) where it is
purified. Water is then pumped from the WTW to the north area (Greater
Mthonjaneni) into a 2.5 Mℓ Zimele Reservoir approximately 9.5 km from the Water
Purification Plant. Another quantity of water will be pumped to the south areas into
the 8Mℓ Kwahlokohloko Reservoir and then gravitates into Kwahlokohloko and
Eshowe supply areas
The components of the project comprise:
a)
b)
c)
d)
e)
40 Mℓ Water Treatment Works
Bulk supply pipelines
Concrete and Steel reservoirs
Balancing Tanks and Booster Pump stations
Reticulation to individual metered connections.
AREA OF SUPPLY
The regional water supply scheme is the central portion of the uThungulu District
Municipality encompassing the whole of Mthonjaneni Local Municipality, and parts of
Ntambanana and uMlalazi Local Municipal areas, representing approximately 35%
total area and 40% total population residing within uThungulu District Municipality.
A list of villages that are expected to benefit from the current phases are listed in
Annexure A.
4
REGIONAL BULK INFRASTRUCTURE GRANT
3
31 DECEMBER 2014
PROJECT CONTRACT AND COST
The project is managed by the Department of Water and Sanitation, jointly through
the Regional Bulk Infrastructure Programme and the Construction Unit of the
Department and coordinated by the DWS Regional Office in Region.
The capacities dedicated to the project are as follows:-
3.1




Funder:
Implementing agent:
Operation & Maintenance:
Consulting Engineers:

Contractors (current):
MIG & DWS (RBIG)
uThungulu District Municipality
uThungulu District Municipality
UWP, ZAI, VGC/Ilifa, BKS, Eyethu, Aurecon &
PDNA
Esorfranki Pipelines, Afriscan Construction and
Icon Construction
Contract Details and Cost
The contract details are mentioned below:
a)
Contract UDM/MIG/07/2006: Construction of Greater Mthonjaneni Water
Works Phase 1&2: (UWP)
Contractor
: BiWater SA (Pty) Ltd
Project Component : Construction of 20ML Greater Mthonjaneni WTW
Contract Start date : 14 September 2007
Contract completion : 04 June 2009
Contract Value
: R44 804 384.54 (including VAT & Contingencies)
Percentage Complete : 100%
The contractor has met all financial obligations and has achieved targeted
labour components of the project.
b)
Contract UDM/MIG/17/2006: Supply of ductile iron pipes Phase 1&2:
(ZAI)
Contractor
: DPI Ichweba
Project Component : Supply of 10 km ductile iron pipes
Contract completion : 11 January 2008
Contract Value
: R6 615 079 including VAT & Contingencies)
Percentage Complete : 100%
c)
Bulk Treated Water Rising Main, Pump Stations and Reservoirs: (ZAI)
Contract UDM/MIG/01/2007 (ZAI)
Contractor
: Inhlanhla Civils
Project Component : Construction of 10 km rising main
Contract Start date : August 2007
Contract completion : 06 October 2008
Contract Value
: R14 375 524 (including VAT)
Percentage Complete : 100%
Contract UDM/MIG/03/2007 (ZAI)
Contractor
: Africa Civils & Building Construction
Project Component : Construction of Buildings, Pump station & Reservoirs
Contract Start date : February 2008
5
REGIONAL BULK INFRASTRUCTURE GRANT
31 DECEMBER 2014
Contract completion : 27 November 2008
Contract Value
: R12 602 304 (including VAT)
Percentage Complete : 100%
Contract UDM/MIG/04/2008 (ZAI)
Contractor
: Inhlanhla Civils
Project Component : Electrical and Mechanical Installation
Contract Start date : January 2009
Contract completion : 31 August 2009
Contract Value
: R13 131 451 (including VAT)
Percentage Complete : 100%
d)
Greater Mthonjaneni phase 1: Reticulation (MIG Programme) (ZAI)
Various contracts have been awarded for the implementation of the
reticulation projects. The final contract values is R21 403 088 with progress at
100% for this portion of the project.
e)
UDM/MIG/12/2010: Conversion of Eshowe pipeline (ZAI)
Conversion of existing pipeline to Kwahlokohloko and Eshowe, upgrading of
booster pumps, refurbishment of raw water reservoirs and all related
connections.
Contractor
: Icon Construction
Contract Start date : January 2009
Contract completion : June 2012
Contract Value
: R6 792 049.04 (including VAT)
Amount spent
: R5 636 915
Percentage Complete : 100%
f)
UDM/MIG/19/2008 & UDM/MIG/18/2011: Greater Mthonjaneni phase
2A&2B: Construction of Bulk water pipeline (VGC)
Construction of 19 km of ductile Iron and 12 km uPVC bulk pipeline together
with appurtenant works such as scour valves, air valves and control valves.
This project was stopped in April 2011 due to poor performance by the
Contractor and another contractor was appointed in November 2011 to
complete the works but unfortunately they were liquidated in July 2012 before
the project was complete. The Liquidator then appointed Afriscan
Construction to complete the project.
Contractor
: Thuthuka Group Limited, Sanyati Civil & Construction
and Afriscan Construction
Contract Start date : 25 June 2009
Contract completion : 30 June 2013
Contract Value
: R45 775 764 (including VAT)
Amount spent
: R44 591 824
Percentage Complete : 100%
6
REGIONAL BULK INFRASTRUCTURE GRANT
g)
31 DECEMBER 2014
UDM/MIG/02/2009: Greater Mthonjaneni phase 2A & 2B: Construction of
Bulk Reservoirs (VGC)
Construction of 12 concrete reservoirs and elevated tanks together with
appurtenant works such as scour valves, air valves and control valves. This
project is dependent on the above project for operation.
Contractor
: Juvansu Trading cc T/A Mazcon Civil & Building
Contract Start date : 09 October 2009
Contract completion : 24 November 2010
Contract Value
: R10 557 869 (including VAT)
Amount spent
: R10 085 974
Percentage Complete : 100%
h)
Greater Mthonjaneni phase 2A & 2B: Reticulation (MIG Programme)
(VGC)
Various contracts have been awarded for the implementation of the
reticulation projects. The total contract value is R18 583 830.92 for this portion
of the project with progress at 100%.
i)
UDM/MIG/13/2010: Greater Mthonjaneni phase 2C & 2D: Construction of
Bulk water pipeline & Reservoirs (BKS)
Construction of 10.5 km uPVC bulk pipeline and 2 x 400 kℓ Steel Tanks
together with appurtenant works such as scour valves, air valves and control
valves:
Contractor
: Hidrotech Infra
Contract Start date : 22 September 2011
Contract completion : 22 September 2012
Contract Value
: R10 799 113 (including VAT)
Amount spent
: R9 908 804
Percentage Complete : 100%
j)
Greater Mthonjaneni phase 2C & 2D: Reticulation (MIG Programme)
(BKS)
Various contracts have been awarded for the implementation of the
reticulation projects. The total contract values are R21 854 750 for this portion
of the project and the amount spent up to 31 December 2014 is
R14 174 073 with progress at 99%.
k)
Greater Mthonjaneni SSA 4: Bulk pipeline and Reservoirs
Construction of bulk pipeline and 4 x reservoirs together with appurtenant
works such as scour valves, air valves and control valves.
Contractor
Contract Start date
Anticipated completion
Contract Value
Amount spent
Percentage Complete
: Shula Construction
: 14 May 2012
: 11 February 2014
: R22 993 775 (including VAT)
: R22 847 240
: 100%
7
REGIONAL BULK INFRASTRUCTURE GRANT
l)
31 DECEMBER 2014
Greater Mthonjaneni SSA 4: Reticulation to Zone 1, 2 & 3
Various contracts have been awarded for the implementation of the
reticulation projects. The total contract value is R9 686 919 for this portion of
the project and the amount spent up to 31 December 2014 is R9 661 260 with
progress at 100%.
m)
Greater Mthonjaneni SSA 5: Bulk pipeline and Reservoirs
Construction of bulk pipeline and 4 x reservoirs together with appurtenant
works such as scour valves, air valves and control valves.
Contractor:
Contract Start date
Anticipated completion
Contract Value
Amount spent
Percentage Complete
n)
: Sanyati Civil Engineering & Construction and
Afriscan
: 13 March 2012
: 28 January 2014
: R29 970000 (including VAT)
: R30 930 169
: 99%
Kwahlokohloko SSA 1: Bulk pipeline and Reservoirs
Construction of 900 mm dia steel bulk pipeline, 2 x pump stations and 2 x
reservoirs together with appurtenant works such as scour valves, air valves
and control valves.
Contractor
Contract Start date
Anticipated completion
Contract Value
Amount spent
Percentage Complete
3.2
: Esorfranki Pipelines and Icon Construction
: 18 May 2012
: 30 November 2015
: R125 084 828.70 (including VAT)
: R73 975 641.41
: 59%
Funding Allocated to the Project
The total project cost is R1 797 364 080 and the planned completion date of the
project is at the end of June 2018.
Table 1 below indicates the RBIG funding that was made available to the project
during the past financial years.
Table 1: Funding to date
Financial Year
2007/08
2008/09
2009/10
2010/11
2011/12
2012/13
2013/14
2014/15
Total
Approved budget
R11 000 000
R27 787 000
R1 213 000
R4 743 000
R22 976 500
R35 735 687
R32 164 043
R100 000 000
R 235 619 227
8
REGIONAL BULK INFRASTRUCTURE GRANT
31 DECEMBER 2014
Co-funding streams:

4
District Municipality (MIG)
: R248 404 430
PROGRESS ON CURRENT PROJECT
The project was visited and the spot check was conducted on 16 January 2015. A
team from the uThungulu DM and DWS Officials (Regional) visited the project.
Progress was discussed during the site visit.
The site was visited by the following people:1.
2.
3.
4.1
Nathaniel Padayachee
Kenneth Cezula
Mirek Paczynski
-
Department of Water & Sanitation
uThungulu DM (Project Manager)
Eyethu Engineers
Progress on UDM/MIG/23/2011: Kwahlokohloko SSA 1: 5.8 km Steel Bulk
pipeline, 900 mm dia
The overall progress on this project is 99%. The overall progress on this project was
slow at the beginning but there’s been huge improvement. There have been delays
with testing of the pipeline due to the high demand of water in the existing schemes.
4.2
Progress on UDM/MIG/27/2012: Kwahlokohloko SSA 1: Booster Pump stations 1
& 2.5 Mℓ Balancing Reservoir
The tender for the construction of the booster pump station and the balancing
reservoir was awarded to Esorfranki Construction at the end of July 2013. The
progress to date is 80% and the contractor is busy with concrete work and brickwork
on the pump station.
4.3
Progress on UDM/MIG/14/2013: Kwahlokohloko SSA 1: Booster Pump stations 2
& 8 Mℓ Balancing Reservoir
The tender for the construction of the 2nd booster pump station and 8 Mℓ reservoir was
awarded to Icon Construction in June 2014. However, the site has not been handed
over to the Contractor due to the Eskom service which was only moved in November
2014 from the reservoir site.
5
RISKS TAKEN AND MANAGEMENT THEREOF
At the planning phase of the project there was a risk since the following documents
and approvals were not in place:



Land ownership/occupation
Environmental approval
Abstraction permit
Confirmation of electricity supply
UWP Consulting Engineers, ZAI and Eyethu Consulting Engineers proceeded with the
design of the project prior to the above approvals. These applications and processes
were undertaken simultaneously with the design.
9
REGIONAL BULK INFRASTRUCTURE GRANT
6
31 DECEMBER 2014
PROJECT RESULTS AND BENEFICIARIES
The project beneficiaries are mentioned below:
6.1
Households Beneficiaries
The bulk pipeline project is aimed at eradicating water backlogs of 30% of the
uThungulu District Municipality communities. When completed, the project will provide
water services to over 281 864 people within the service area. The completion of the
project will also ensure the delivery of sustainable basic water services, the
enhancement of economic development towards achieving the national services
target by 2014, the objectives of water for growth and development, employment and
redistribution.
6.2
Employment during the Implementation of the Project
Due to unrests in the area as a result of people looking for employment, the
Implementing Agent laid down a procedure of dealing with unrest on site, including
procedures for hiring and laying off workers.
The employment created during the implementation of the project is indicated in
Annexure B.
7
KEY CHALLENGES WITHIN THE PROJECT
The key challenges experienced during the implementation of the project are
mentioned below:
a)
The delay in the power supply connection by Eskom delayed the
commissioning of the Water Works. Due to the lack of power supply on the
pipeline and booster pump stations no testing could be performed. Application
for power supply was submitted in 2005 and Eskom managed to complete the
installation by November 2011.
b)
Contract (Phase 2A & 2B; UDM/MIG/19/2008) terminated due to the
Contractors failure to meet deadlines on the construction of the 19 km of
ductile iron and 12 km uPVC bulk pipeline together with appurtenant works
such as scour valves, air valves and control valves. This caused a delay in all
other projects linked to this one. In November 2011, Sanyati Civil Engineering
and Construction was appointed to complete this project but in July 2012, they
were liquidated without completing the project. This caused further delays to
the commissioning of other projects linked to it.
c)
Greater Mthonjaneni SSA 5 Bulk was also awarded to Sanyati Civil
Engineering and Construction in February 2012 and was liquidated in July
2012. This affected the planned expenditure and service delivery.
d)
Delivery of pipes delayed due to delays in raw material (steel coil) for the raw
material suppliers affected progress at Kwahlokohloko SSA 1.
e)
Local unrest occurred on site due to Labour wage strikes. The local labourers
were demanding to be paid according to the Gazetted minimum rates for the
Civil Engineering Construction projects instead of the Gazetted Expanded
Public Works Programme (EPWP) minimum rates. The construction on
Kwahlokohloko SSA 1 was stopped for 28 days.
10
REGIONAL BULK INFRASTRUCTURE GRANT
f)
8
31 DECEMBER 2014
Another challenge was caused by the delay in the relocation of the Eskom
service at the reservoir site at Kwahlokohloko SSA 1. An application was
done in February 2014 and the works were done in November 2014. This
caused delays with the Reservoir contractor of 6 months resulting in poor
expenditure.
CONCLUSIONS
The communities in Phases 1 & 2 have started benefiting from the completed reticulation while in other areas they are eagerly awaiting the completion of the project
as it will resolve the long standing issues of shortage of potable water within the
regional supply areas.
8.1
9
Lessons Learned
a)
Application for electricity must be done as early as possible to prevent delays
in commissioning of completed projects due to delays in electricity
installations by Eskom.
b)
Due diligence must be conducted on all contracts/tenders in excess of R10 m
to reduce the risk of liquidation of contractors during construction.
c)
Whenever a project is started, local labourers as well as local authorities must
be informed about the wage rates applicable to each project.
RECOMMENDATIONS

The implementation of the Greater Mthonjaneni project is successful and there
is no need for any recommendations other than those identified in Point 8.1.
11
REGIONAL BULK INFRASTRUCTURE GRANT
31 DECEMBER 2014
10 PHOTOGRAPHS ON THE IMPLEMENTATION OF THE PROJECT
The photographs on the implementation of the project are shown below:
Photo 1: Kwahlokohloko SSA 1A: Scour outlets
Photo 2: Kwahlokohloko SSA 1A: Gabions
12
REGIONAL BULK INFRASTRUCTURE GRANT
31 DECEMBER 2014
Photo 3: Kwahlokohloko SSA 1B: 2.5 Mℓ Balancing Reservoir
Photo 4: Kwahlokohloko SSA 1B: Pump station
13
REGIONAL BULK INFRASTRUCTURE GRANT
Photo 5: Kwahlokohloko SSA 1B: Pump station
Photo 5: Kwahlokohloko SSA 1B: MV Switch room
31 DECEMBER 2014
14
REGIONAL BULK INFRASTRUCTURE GRANT
31 DECEMBER 2014
ANNEXURE A
LIST OF VILLAGES TO BENEFIT FROM SCHEME:
GREATER MTHONJANENI PHASE 1 &2: Total of 2 762 Households
Ekuthuleni
Nkunzempunga
Matshansundu
Nduro
Zigagayi
Esibhonsweni
Dloziyane
Memezi
Msuthu
Nogajuka
Siyavuna
Emukhindini
Mehlamasha
Goqozwayo
Edubeni
Ndundulu
Sibayeskhulu
Emashobeni
Mabhungu
Makhasaneni
Ezihlabathini
Makhothapani
Zimele
Okhalweni
GREATER MTHONJANENI SSA 4: Total of 2 750 Households
Hawule
Wambaza
Enkwenkwe
Nomponjwana
Makhasaneni
Emasangweni
GREATER MTHONJANENI SSA 5: Total of 3 754 Households
Oqhabiyeni
Ongelweni
Esikadeni
Gobihlahla
Mpevu
Emfeceni
Emkhandlwini
KWAHLOKOHLOKO SSA 1: Total of 4 436 Households
Mandawe
Mbizo 2
Ncemaneni
Emaqeleni
Isiphezi
KwaMpofu
Kwahlokohloko
Thintumkhaba
Mhlathuzana
Mtilombo
Mbizo 1
ANNEXURE B
VUSUMUZI
MANDLAKAYISE
VELA
NTOMBIYENKOSI
BUHLE BUYEZA
LINDIWE
DLOKWAKHE
MKHULEKELENI
SIBUSISO
NSINDISO
PHUMLANI
NKOSINATHI
XOLANI
NONHLE
SIBONAKALISO
BONISIWE GUGU
KHANYISILE
PHUMELELE
NELISIWE
PHUMZILEGUGU
VS
XULU
MMN
LUTHULI
V
SISHI
NT BUTHELEZI
BBM
NTULI
LC MTHETHWA
DE
ZUNGU
MM
MAHAYE
S
NGIDI
NK
KHANYILE
P
GWALA
NT
XULU
X
DLUDLA
N
NDLOVU
S MDLETSHE
BG MDLETSHE
K
DLUDLA
PN
XULU
NP
MAHAYE
PG
MAHAYE
8604285512084
8807285680088
5407155740089
6905030839082
7301145352089
6506210447082
6007065875089
8409175743082
8604285841087
9212125623084
9311185459080
9008066350087
9101255919083
8609061043089
8608110654086
8905071221081
9208160593083
7506250592085
8109141264086
7509020690080
DOB
dd/mm/yyy
y
28/04/1986
28/07/1988
15/07/1957
3/05/1969
14/01/1973
21/06/1965
6/07/1960
17/09/1984
28/04/1986
12/12/1992
18/11/1993
6/08/1990
25/01/1991
6/09/1986
11/08/1986
7/05/1989
16/08/1992
25/06/1975
14/09/1981
2/09/1975
M or F
MALE
MALE
MALE
FEMALE
MALE
FEMALE
MALE
MALE
MALE
MALE
MALE
MALE
MALE
FEMALE
FEMALE
FEMALE
FEMALE
FEMALE
FEMALE
FEMALE
Has
Education
disability See
level
Start date
codes at dd/mm/yyy
Y or N
the TOP y
1 11/10/2013
NO
1 11/10/2013
NO
1 11/10/2013
NO
1 11/10/2013
NO
1 11/10/2013
NO
1 11/10/2013
NO
1 11/10/2013
NO
1 11/10/2013
NO
1 11/10/2013
NO
9 11/10/2013
NO
1 11/10/2013
NO
1 11/10/2013
NO
1 11/10/2013
NO
1 11/10/2013
NO
1 11/10/2013
NO
1 11/10/2013
NO
1 11/10/2013
NO
1 11/10/2013
NO
1 11/10/2013
NO
1 11/10/2013
NO
24
0
24
24
24
24
24
24
0
24
24
24
0
0
0
0
0
24
24
0
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
3600
0
3600
3600
3600
3600
3600
3600
0
3600
3600
3600
0
0
0
0
0
3600
3600
0
19
0
19
19
0
19
19
19
0
19
19
19
0
0
0
0
0
19
19
0
150
150
150
150
0
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
2850
0
2850
2850
0
2850
2850
2850
0
2850
2850
2850
0
0
0
0
0
2850
2850
0
9
9
9
9
9
9
9
9
9
9
9
150
150
150
150
0
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
Total wages paid
December
Total number of
training days
I.D. Number
Number of labour
days for November
Daily wage rate for
December
Last name
Dec-14
Total number of
training days
Initials
Total wages paid
November
First name
Number of labour
days for October
Daily wage rate for
November
Gender
Nov-14
Total number of
training days
Oct-14
Number of labour
days for October
Daily wage rate for
October
9
Total wages paid
October

BENEFICIARY INFORMATION
PLEASE PROVIDE BENEFICIARY INFORMATION ON THIS SHEET FOR EACH MONTH OF THE YEAR
Education Levels – use the codes (1,2,3) on the excel spreadsheet
o
(1) Unknown
o
(2) No Schooling
o
(3) Grade 1-3 (Sub A – Std 1)
o
(4) Grad 4 (Std 2) ABET 1
o
(5) Grade 5-6 (Std 3-4) ABET 2
o
(6) Grade 7-8 (Std 5-6) ABET 3
o
(7) Grade 9 (Std 7) ABET 4
o
(8) Grade 10-11 (Std 8-9)
o
(9) Grade 12 (Std 10)
o
(10) Post Matric
1350
0
1350
1350
0
1350
1350
1350
0
1350
1350
1350
0
0
0
0
0
1350
1350
0
2
REGIONAL BULK INFRASTRUCTURE GRANT
DUMISANI
BHEKISISA
NHLANHLA
SDUMISILE
SINENHLANHLA
PHUMELELE
SINDISIWE
PHILLIP
SIYABONGA
ZILETHILE
THEMBA
LAYEZILE
BUYILE
SENZO
NTOMBIYESAZI
NTOMBIYENKOSI
MUZOMUHLE
ZAKHELE
ZAMOKUHLE
FIKELEPHI
BONGINKOSI
JABULILE
BONISIWE
LUNGILE
THANDO
KHANYISANI
KHULEKANI
MVELO
ZWELITHINI
SIBUSISO
MLUNGISI
ZAMOKWAKHE
NKAZIMULO
DM
ZULU
B
LUTHULI
NP
NZUZA
SH
NXUMALO
SS
NGEMA
PP
NGEMA
SP NTOMBELA
PIM
NZUZA
S
MCINEKA
ZT
KHANYILE
TP MTHETHWA
L
MPANZA
BZ
MAGWAZA
S
XULU
NK
MKHIZE
N
NZUZA
M
KHANYILE
ZSL
SHANGE
Z
MKHIZE
F MDLETSHE
BB
MNGADI
J
ZULU
B
NZUZA
L
KHUMALO
T.F MPUNGOSE
K
NZUZA
K.H MDLETSHE
M
BIYELA
Z
KHUMALO
S NTOMBELA
M
MCHUNU
ZZ
SHANDU
NS MDLETSHE
31 DECEMBER 2014
7210055504086
8507255488088
5207195251083
7807200824085
9007071071084
8309031173088
8805270537081
6201085473088
8008135699085
9002171057083
5501225395088
8906030814081
9403300517080
8705026308086
6907040413080
9307020689089
7604305499081
9412115572081
9106061504056
9001300663084
9003305310083
9202110969084
8709240580082
5/10/1972
25/07/1985
19/07/1952
20/07/1978
7/07/1990
3/09/1983
27/05/1988
8/01/1962
13/08/1980
17/02/1990
22/01/1955
3/06/1989
30/03/1994
2/05/1987
4/07/1969
02/07/1993
30/04/1976
11/12/1994
6/06/1991
30/01/1990
30/03/1990
04/06/2014
24/09/1987
8509150749085
8111135324082
8711106111085
9301096075083
750615558082
8305185543084
9202056022083
6409015480087
9209285873087
15/09/1985
13/11/1981
10/11/1987
09/01/1993
15/05/1975
18/05/1983
05/02/1992
01/09/1964
28/09/1992
MALE
MALE
MALE
FEMALE
FEMALE
FEMALE
FEMALE
MALE
MALE
FEMALE
FEMALE
FEMALE
FEMALE
MALE
FEMALE
FEMALE
MALE
MALE
FEMALE
FEMALE
MALE
FEMALE
FEMALE
FEMALE
FEMALE
MALE
MALE
MALE
MALE
MALE
MALE
MALE
MALE
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
No
No
No
NO
NO
1
1
1
1
8
9
10
1
1
1
1
9
1
1
1
1
9
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
14/01/2014
14/01/2014
30/01/2014
30/01/2014
11/10/2013
11/10/2013
11/10/2013
03/04/2014
03/04/2014
03/04/2014
03/04/2014
03/04/2014
03/04/2014
03/04/2014
03/04/2014
03/04/2014
03/04/2014
20/03/2014
20/03/2014
20/03/2014
20/03/2014
04/06/2014
04/08/2014
04/08/2014
06/08/2014
23/10/2014
23/10/2014
23/10/2014
05/06/2014
05/06/2014
05/06/2014
23/10/2014
23/10/2014
24
24
24
24
24
0
0
24
24
24
24
24
24
24
24
0
24
24
24
24
24
24
24
24
24
2
2
2
8
8
8
2
2
150
150
150
150
150
0
185
150
150
150
150
150
150
150
150
150
300
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
3600
3600
3600
3600
3600
0
0
3600
3600
3600
3600
3600
3600
3600
3600
0
7200
3600
3600
3600
3600
3600
3600
3600
3600
300
300
300
1200
1200
1200
300
300
19
19
19
19
19
0
0
19
19
19
19
19
19
19
19
0
19
19
19
19
19
19
19
19
19
19
19
19
19
19
19
19
19
150
150
150
150
150
0
185
150
150
150
150
150
150
150
150
150
300
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
2850
2850
2850
2850
2850
0
0
2850
2850
2850
2850
2850
2850
2850
2850
0
5700
2850
2850
2850
2850
2850
2850
2850
2850
2850
2850
2850
2850
2850
2850
2850
2850
9
9
9
9
9
9
9
9
9
9
9
9
9
0
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
150
150
150
150
150
0
185
150
150
150
150
150
150
150
150
150
300
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
1350
1350
1350
1350
1350
0
0
1350
1350
1350
1350
1350
1350
1350
1350
0
2700
1350
1350
1350
1350
1350
1350
1350
1350
1350
1350
1350
1350
1350
1350
1350
1350