SCHEDULE OF PERMITS AND GOVERNMENTAL APPROVALS: APPROVALS, CERTIFICATES, PERMITS AND LICENSES (COMPLETE AS REQUIRED) AGENCY PERMIT/CITATION/APPROVAL REASON REQUIRED PERMIT IN NAME OF PREPARE OBTAIN FEE PAYMENT Federal US Army Corps of Engineers (USACE) US Army Corps of Engineers (USACE) US Environmental Protection Agency-USEPA (Construction) US Environmental Protection Agency-USEPA (Operations) US Environmental Protection Agency-USEPA (Construction) US Environmental Protection Agency-USEPA (Operations) Federal Aviation Administration (FAA) US Fish and Wildlife Services (USFWS) 404 Wetlands Fill Permits as required Filling of > .5 Acres of Wetlands Streambed Alteration Permit Altering of stream beds associated with waters of the US. Federal Emergency Management Agency (FEMA) EIA DOT (Construction) Hazardous Waste Generator ID number Hazardous Waste Generator ID number SPCC Plan Spill Prevention Control and Countermeasure Plan SPCC Plan Spill Prevention Control and Countermeasure Plan Notice of Proposed Construction or Alteration Threatened & Endangered Species Act Compliance Acknowledgment Impacts on local airports or aviation Flood Plain Re-designation FEMA designation as a 100 year Flood Plain? Power Plant Registration ORIS Code with DOE Equipment and Materials Handling, Including Materials Disposal Registration of facility Demonstrate no impact Highway transportation for materials and equipment (Equipment Delivery – EPC Contractor and their Suppliers). Owner = Owner Page 1 of 6 EPC = Contractor Owner/EPC = Owner has primary responsibility and EPC Contractor to provide reasonable efforts to support. O = Others November 29, 2012 SCHEDULE OF PERMITS AND GOVERNMENTAL APPROVALS: APPROVALS, CERTIFICATES, PERMITS AND LICENSES (COMPLETE AS REQUIRED) AGENCY PERMIT/CITATION/APPROVAL REASON REQUIRED PERMIT IN NAME OF PREPARE OBTAIN FEE PAYMENT State ODEQ ODEQ Stream Bed Alteration Permit State Pollutant Discharge Elimination System Permit (OPDES) ODOT/OTHER (Construction) Wastewater discharge approval to a water body and for facility and Operational storm water discharges associated with industrial activity. Construction Dewatering & Hydrostatic Permit to discharge water from Construction Water Discharge Permit dewatering activities and for discharge of hydrostatic tests water. Well Drilling Permit Required for any well or boring including monitoring wells. Permit to pump ground water Concurrence by State regarding the transfer of water rights from a Seller to Owner and the assignment of these rights to deep well pumping using existing or new wells. Water rights Transfer Approval for private Needed if purchase existing water rights from an purchase of water supply rights owner. Hazardous Waste Disposal Obtain an ID number for Site – Use LS #1 Existing ID # for LS #2 Tier II Emergency & Hazardous Chemical Submittal of Hazardous Chemical Inventory Inventory within 90 days after initial delivery of hazardous chemicals Construction Storm Water Permit’ Needed if more than 1 acre (includes construction staging/parking areas) will be disturbed DWQ Construction SWPP Storm water plan to support construction. Include with Site Procedures – BMP’s and must be available on site for DWQ audit DWQ Operational SWPP Storm Water Plan to support operations DWQ Groundwater Monitoring Plan During Construction (EPC Contractor prepare, Owner provide input) Equipment and Materials Handling, Highway/road transportation, oversize loads Including Materials Disposal UDOT has jurisdiction over state highways only DEP, DER DEP, DER Variance for Noise During Construction Excavation Materials Disposal ODEQ OWRD (water resources department) OWRD (water resources department) OWRD (water resources department) DAQ, DEQ ODEQ ODEQ ODEQ ODEQ ODEQ Construction noise not in compliance with code. Permit to dispose of excavated materials. Owner = Owner Page 2 of 6 EPC = Contractor Owner/EPC = Owner has primary responsibility and EPC Contractor to provide reasonable efforts to support. O = Others November 29, 2012 SCHEDULE OF PERMITS AND GOVERNMENTAL APPROVALS: APPROVALS, CERTIFICATES, PERMITS AND LICENSES (COMPLETE AS REQUIRED) AGENCY PERMIT/CITATION/APPROVAL REASON REQUIRED PERMIT IN NAME OF PREPARE OBTAIN FEE PAYMENT State Oregon Construction Contractors Board EPA/Oregon Dept. of Public Safety, ODEQ Emergency Response Program and Remediation/SERC/LERC State Emergency Response Commission (SERC) SERC Historic Preservation Office (OSHPO) Oregon Department of Fish and Wildlife ODOT Oregon Department of State Lands Contractor License Required to per State Regulations During Construction - Emergency Planning and Community Right to Know (MSDS, Emergency chemicals Inventory Form/Facility Emergency Response Plan and filing necessary government reports) EPCRA Notice of Facility Subject to EPCRA 40 CFR 355.30(b) Required for on-site storage of chemicals, fuels, lubricants, etc. used during construction if present above threshold amounts. EPC Contractor covers in Site Procedures & Policies. Hazardous Materials Inventory Confirmation of no Artifacts or Sites of Archaeological, Cultural or Historic Significance Confirmation of no threatened or endangered species Construction of utility across a state highway or along the state highway ROW Easements across state-owned lands. EPC Contractor to provide input Confirmation of no interference for construction. Only if have extremely hazardous materials above threshold quantities. Confirmation of no interference for construction. May be required for new distribution/transmission facilities May be required for new distribution/transmission facilities Owner = Owner Page 3 of 6 EPC = Contractor Owner/EPC = Owner has primary responsibility and EPC Contractor to provide reasonable efforts to support. O = Others November 29, 2012 SCHEDULE OF PERMITS AND GOVERNMENTAL APPROVALS: APPROVALS, CERTIFICATES, PERMITS AND LICENSES (COMPLETE AS REQUIRED) AGENCY PERMIT/CITATION/APPROVAL REASON REQUIRED PERMIT IN NAME OF PREPARE OBTAIN FEE PAYMENT Local/County Local/County Local Town/County Planning Board Site Plan Approval, Conditional Use Permit Sewer Connection for Temporary Construction Facilities Potable Water for Temporary Construction Facilities Variance for Noise During Construction Local Town/county Building Department Road Cutting Permit Construction/Building Permit Fire & Local Police Agencies (Construction) Local Police Agencies & Traffic Department Construction Security and Safety Procedures and Equipment Approval of site procedures. Construction Equipment and Materials Handling, Including Materials Disposal Street transportation and delivery for Contractor supplied equipment. – Heavy Hauls Local Police Agencies Chief & Traffic Department Fire Chief and Emergency Management Coordinator Construction Personnel Parking and Transportation Traffic management. Local Town/County Local Town/County Local Fire Department County Community Emergency Response Team (CERT) Review of Site Plan, Architectural Plans, Landscaping, access, Fire Protection, etc. Sewer connection for Construction Offices Water connection for Construction Offices Construction noise not in compliance with local ordinances (if required). Cutting/disturbing road. Authorization to construct. Approval for On-site Storage of Chemicals, Approval to allow storage and usage. Fuels, Lubricants, etc. used during construction SARA TIER II Form Reports Needed if stored more than threshold amounts. Local Town/County Conditional Use Permit Building Department (Construction Offices) Certificate of Occupancy Construction along or across the ROW of a county/town highway. May apply to Transmission Crossing/Interconnection Occupancy of structures. Owner = Owner Page 4 of 6 EPC = Contractor Owner/EPC = Owner has primary responsibility and EPC Contractor to provide reasonable efforts to support. O = Others November 29, 2012 SCHEDULE OF PERMITS AND GOVERNMENTAL APPROVALS: APPROVALS, CERTIFICATES, PERMITS AND LICENSES (COMPLETE AS REQUIRED) AGENCY PERMIT/CITATION/APPROVAL REASON REQUIRED PERMIT IN NAME OF PREPARE OBTAIN FEE PAYMENT Local/County Building Department (Permanent Offices) Building Department Police & Fire Chiefs Certificate of Occupancy Occupancy of structures (if needed) Soil Erosion & Sedimentation Control Plan Soil Erosion and Sedimentation Control Plan (for construction activities) during construction. Permits for Signs and Fencing – Authorization to erect. Construction Owner = Owner Page 5 of 6 EPC = Contractor Owner/EPC = Owner has primary responsibility and EPC Contractor to provide reasonable efforts to support. O = Others November 29, 2012 SCHEDULE OF PERMITS AND GOVERNMENTAL APPROVALS: APPROVALS, CERTIFICATES, PERMITS AND LICENSES (COMPLETE AS REQUIRED) AGENCY PERMIT/CITATION/APPROVAL REASON REQUIRED PERMIT IN NAME OF PREPARE OBTAIN FEE PAYMENT Miscellaneous Interconnection PacifiCorp Transmission Interconnection Study & Facilities Agreement Network Service Agreement Land Owners including Easements and Rights of Way private owners, local governments and rail roads Interconnection of the Project to the distribution or transmission system. Buyer enters into Network Agreement with PacifiCorp Transmission to interconnect the generation into the PacifiCorp System If required for construction of permanent facilities or temporary facilities, parking or laydown Owner = Owner Page 6 of 6 EPC = Contractor Owner/EPC = Owner has primary responsibility and EPC Contractor to provide reasonable efforts to support. O = Others November 29, 2012