M/s. SAI MAATARINI TOLLWAYS LIMITED HYDERABAD Design, Engineering, Finance, Construction, Operation and Maintenance of Four Laning of Panikoili - Rimuli Road Section of NH-215 from Km 0+000 – 163+000 in the State of Orissa under NHDP Phase-III as BOT (Toll) Basis MONTHLY PROGRESS REPORT JUNE-2014 CLIENT NATIONAL HIGHWAYS AUTHORITY OF INDIA (MINISTRY OF SHIPPING, ROAD TRANSPORT & HIGHWAYS) (Government of India) Independent Engineer Project Management Consultant SAI CONSULTING ENGINEERS PVT. LTD, SHELADIA ASSOCIATES INC., USA, Ahmedabad Hyderabad EPC Contractor M/s. GAYATRI PROJECTS, LTD., Hyderabad SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 Table of Contents 1. PROJECT LOCATION MAP ................................................................................................................................ 3 2. SCOPE OF THE PROJECT ................................................................................................................................... 4 3. PROCUREMENT OF THE SITE IN TERMS OF LENGTH OF PROJECT HIGHWAY (KM).................. 6 4. PRECONSTRUCTION ACTIVITIES ..................................................................................................................... 20 5. STATUS OF DESIGNS & DRAWINGS ................................................................................................................ 22 6. PHYSICAL PROGRESS (HIGHWAY) .................................................................................................................. 23 6.1. 6.2. 6.3. 7. PHYSICAL PROGRESS (STRUCTURES) ......................................................................................................................23 FINANCIAL PROGRESS ........................................................................................................................................24 FINANCIAL S-CURVE ..........................................................................................................................................25 STRIP CHART OF WORK PROGRESS ................................................................................................................ 26 7.1. PROGRESS OF MAJOR BRIDGES ............................................................................................................................50 7.2. PROGRESS OF MINOR BRIDGES ............................................................................................................................50 7.3. PROGRESS ROB ................................................................................................................................................51 7.4. PROGRESS FLYOVERS .........................................................................................................................................51 FLYOVERS .....................................................................................................................................................................51 7.5. VEHICULAR UNDER PASS ....................................................................................................................................51 7.6. PEDESTRIAN UNDER PASS ...................................................................................................................................52 7.7. CULVERTS (PIPE/BOX/SLAB) ...............................................................................................................................52 8. CONSTRUCTION CONSTRAINTS: .................................................................................................................... 56 9. CHANGE OF SCOPE OF WORK ........................................................................................................................ 58 10. CLAIMS: ..................................................................................................................................................... 58 11. DISPUTES................................................................................................................................................... 59 12. NON CONFORMING PRODUCT NOTIFICATIONS (NCPNS). .......................................................................... 61 13. CORRESPONDENCE .................................................................................................................................... 63 14. ENVIRONMENTAL REGULATIONS& CLEARANCES: ..................................................................................... 65 15. STATEMENT SHOWING ROAD ACCIDENT CASES FOR THE MONTH: ........................................................... 68 16. EVICTION OF ENCROACHMENTS:............................................................................................................... 68 17. APPENDIX - CONCESSIONAIRE STAFF ......................................................................................................... 70 18. APPENDIX 2 - SUMMARY OF TEST RESULTS ............................................................................................... 75 19. APPENDIX 3 - LIST OF PLANT AND EQUIPMENT (0-113) ............................................................................. 83 20. APPENDIX 4 - LIST OF LAB EQUIPMENT & CALIBRATION STATUS............................................................... 85 21. APPENDIX 5 - WEATHER REPORT ............................................................................................................... 91 22. APPENDIX 6 – PHOTOGRAPHS ................................................................................................................... 92 M/s. SAI MAATARINI TOLLWAYS LIMITED Page 2 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 1. Project Location Map The Project Site of the Four-Lane divided Project Highway comprises the section of National Highway No 215 commencing from Km 0.000 to Km 163.000 i.e. Panikoili – Rimuli section in the State of Odisha. The present carriageway of the Project Highway is an intermediate lane/twolane/single carriageway. PROJECT ROUTE M/s. SAI MAATARINI TOLLWAYS LIMITED Page 3 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 2. Scope of the Project S.NO. 1 2 3 4 DESCRIPTION 5 6 7 8 i) ii) iii) iv) iv) 9 a) b) c) d) e) f) g) Project Design Stretch Project Cost (INR) Construction Period Concession Period : : : : Appointed Date Financial Close Scheduled Date of Completion Details of Project Highway Carriageway Length Bypasses Length Realignment Length Sub Total Service/Slip Roads Built-up Area Details of Project Structures Flyovers / Elevated Structures ROBs Major Bridges RUBs Minor Bridges PUPs/Cattle Crossings VUPs : : : : : : : : : : : : : : : : : : M/s. SAI MAATARINI TOLLWAYS LIMITED REMARKS Km 0+000 to Km 166+200 (Design Length: 166.173 KM) 1,410 Cr. VGF Rs.548.49 Cr. 910 Days 24 Years including Construction Period 02/05/2013 04/09/2013 29/10/2015 Existing 163.000 Km 163.000 Km Existing 2 Nos 5 Nos 1 No 32 Nos - Proposed 127.807 Km 32.800 Km 5.566 Km 166.173 Km 42.336 Km 5.400 Km Proposed 1 No 2 Nos 6 Nos 30 Nos 21 Nos 15 Nos Page 4 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 h) i) j) k) l) m) 10 i) ii) iii) iv) v) vi) Animal Underpasses Elephant Underpasses Reptile Underpasses Slab Culverts Box Culverts Pipe Culverts Sub Total Project Facilities / Miscellaneous Grade Intersections Grade Separated Intersections Bus Bays Truck Lay Bays Toll Plazas Wayside Amenities Sub Total M/s. SAI MAATARINI TOLLWAYS LIMITED : : : : : : : : : : : : : : 202 Nos 4 Nos 48 Nos 294 Nos 6 Nos 2 Nos 50 Nos min. 04 Nos 256 Nos 38 Nos 431 Nos 12 Nos 1 No 43 Nos 4 Nos 3 Nos 2 Nos 65 Nos Page 5 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 3. Procurement of the Site in terms of Length of Project Highway (Km). 3.1 Fragile Working Fronts of Land Available impeding mobilization of Manpower & Machinery: Continuous Stretch Land Available Length <0.500 >0.5 to <1 >1 to <2 >2 to <3 >3 to < 4 >4 to <5 >5 to <6 >6 to <7 >7 to <8 >8 to <9 >9 to <10 >10 Total M/s. SAI MAATARINI TOLLWAYS LIMITED 13.582 13.430 22.728 13.790 16.750 0.000 0.000 0.000 0.000 0.000 0.000 0.000 80.280 Minor Hindrance Length 7.453 6.280 0.000 4.700 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 18.433 Full Hindrance Length 3.110 6.855 13.180 12.550 6.930 4.020 0.000 0.000 0.000 0.000 0.000 0.000 46.645 Reserve Forest Length 2.320 3.800 5.445 4.960 0.000 4.300 0.000 0.000 0.000 0.000 0.000 0.000 20.825 Total 26.465 30.365 41.353 36.000 23.680 8.320 0.000 0.000 0.000 0.000 0.000 0.000 166.183 Page 6 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 3.2 Fragile Working Fronts of Land Available impeding mobilization of Manpower & Machinery: Bar Chart Land Available Length Minor Hindrance Length Full Hindrance Length Reserve Forest Length 25,000 20,000 15,000 10,000 5,000 0,000 Stretch (kKM) <0.500 >0.5 to <1 >1 to <2 >2 to <3 >3 to < 4 >4 to <5 >5 to <6 >6 to <7 >7 to <8 >8 to <9 >9 to <10 >10 1. Continuous stretch of land to be available in possession with Concessionaire for efficient mobilization is at least 10 Kms. 2. Continuous stretch of land to be available in possession with Concessionaire for general mobilization is at least 5 Kms. 3. Any length of land in bits less than the above parameters if available in possession with Concessionaire creates problem for mobilization & efficient execution. The execution in these types of bits shall cause a serious impediment / hindrance to Concessionaire M/s. SAI MAATARINI TOLLWAYS LIMITED Page 7 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 3.3. Chainage wise Land Stretches Available: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 JAJPUR BY-PASS 17 18 19 Village Name Chainage Length Land Status From To Alatiri 00+000 00+120 00+120 00+140 0.12 0.02 G Y Available Structure under Arbitration case Alatiri, Patharapada, M.D Jamalpur, Ouapada, Dhanpur, Aliya, 00+140 03+350 3.21 G Available 03+350 03+360 04+200 04+230 05+470 05+500 05+670 05+920 06+340 06+440 06+700 06+820 03+360 04+200 04+230 05+470 05+500 05+670 05+920 06+340 06+440 06+700 06+820 06+880 0.01 0.84 0.03 1.24 0.03 0.17 0.25 0.42 0.10 0.26 0.12 0.06 Y G Y G Y G Y G Y G G Y Temple Available Diary Form Available Compound wall Available Land under 3A notification & Temple Available Structure under Arbitration case Available Available Maruti Show room 06+880 09+490 2.61 G Available 09+490 09+820 09+820 10+300 0.33 0.48 Y G 10+300 10+440 0.14 Y Land under 3A notification & Temple Available Land acquisition Problem due to non acceptance of compensation by land owner (Internal Problem) Available Land acquisition Problem due to non acceptance of compensation by land owner (Internal Problem) Available Land acquisition Problem due to non acceptance of compensation by land owner (Internal Problem) Available Aliya Aliya, Ghikoili, Benapur Benapur Benapur, Talugaon Benapur, Talugaon Benapur, Talugaon Benapur, Talugaon Benapur, Talugaon Benapur, Talugaon Sanapatuli, Badapatuli, Tentulikhunta Tentulikhunta, Dandakiri Dandakiri 20 Dandakiri, Baladia 10+440 10+580 0.14 G 21 Baladia, Chandama, Santarapur 10+580 10+673 0.09 Y 10+673 10+790 0.12 G 10+790 11+100 0.31 Y 11+100 11+400 0.30 G 22 23 24 Chandama, Santarapur M/s. SAI MAATARINI TOLLWAYS LIMITED Land (Hect) GOVT PVT TOTAL FOREST Length 06.45 KM. Sl No. Page 8 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 Sl No. Village Name Chainage Length Land Status From To 25 11+400 11+695 0.30 Y Land acquisition Problem due to non acceptance of compensation by land owner (Internal Problem), Buiral ground & Pvt Pond 26 27 28 11+695 12+370 12+950 12+370 12+950 13+150 0.68 0.58 0.20 G Y G Available Alignment Problem Available 29 Kuanarda, Nayagarh, Naguan 13+150 14+380 1.23 G Available 30 31 Nayagarh, Naguan Naguan, Itapur, Talagarh 14+380 14+490 14+490 15+620 0.11 1.13 Y G 32 Talagarh 15+620 15+640 0.02 Y 33 Talagarh, Uparagarh, Mangarajpur 15+640 15+930 0.29 G Land under 3A notification Available Land acquisition Problem due to non acceptance of compensation by land owner (Internal Problem) Available 34 Talagarh, Uparagarh, Mangarajpur 15+930 16+080 0.15 G School building 35 Talagarh, Uparagarh, Mangarajpur, Manjuri, Ragadi 16+080 19+200 3.12 G Available 19+200 20+800 1.60 F Ragadi Reserve Forest 20+800 22+800 2.00 G Available 22+800 23+000 23+150 23+250 23+350 23+400 24+010 24+680 24+730 23+000 23+150 23+250 23+350 23+400 24+010 24+680 24+730 24+770 0.20 0.15 0.10 0.10 0.05 0.61 0.67 0.05 0.04 Y G Y G Y G Y G Y Govt building (Forest dept), School Available Pvt building Available Temple Available Shops, School, P.S, Bank, Market Area Available Structure under Arbitration case 11 12 13 14 15 16 17 18 19 20 21 Ragadi Ragadi, Korabandi, Kadama, Andhari Andhari Andhari, Jarda Jarda M/s. SAI MAATARINI TOLLWAYS LIMITED Land (Hect) GOVT PVT TOTAL FOREST 4.80 Page 9 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 Sl No. 22 23 24 25 26 Village Name Ramachandrapur Chainage Length Land Status From To 24+770 24+930 25+250 26+100 26+200 24+930 25+250 26+100 26+200 26+620 0.16 0.32 0.85 0.10 0.42 G Y G Y G Available Market, BSNL building, Hospital Available Encroachments, Shops, Houses Available 27 Ramachandrapur, Badapadana, Padanpur, Suanpada 26+620 27+150 0.53 Y Encroachments, Houses 28 29 30 Suanpada 27+150 27+300 27+380 27+300 27+380 27+600 0.15 0.08 0.22 G Y G Available Big Pond Available 31 Suanpada, Nuagaon 27+600 27+960 0.36 Y Land acquisition Problem due to non acceptance of compensation by land owner (Internal Problem) 32 27+960 28+240 0.28 G 33 28+240 28+350 0.11 Y 28+350 28+480 0.13 G 28+480 28+580 0.10 Y 28+580 28+830 29+000 28+830 29+000 29+250 0.25 0.17 0.25 G Y G 29+250 29+290 0.04 Y 29+290 29+500 0.21 G Available 29+500 30+200 0.70 Y Sainkula market, PS 34 Nuagaon 35 36 37 38 39 Nuagaon, Gointhagodi Gointhagodi Gointhagodi, Khalana Khalana 40 41 Khalana, agarda, Sainkula M/s. SAI MAATARINI TOLLWAYS LIMITED Land (Hect) GOVT PVT TOTAL FOREST Available Land acquisition Problem due to non acceptance of compensation by land owner (Internal Problem), GP building Available Land acquisition Problem due to non acceptance of compensation by land owner (Internal Problem) Available Houses Available Land acquisition Problem due to non acceptance of compensation by land owner (Internal Problem) Page 10 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 Chainage From To Length Land Status 42 Khalana, agarda, Sainkula 30+200 30+800 0.60 G Available 43 44 45 Sainkula 30+800 30+940 31+280 30+940 31+280 31+400 0.14 0.34 0.12 Y G Y Land under 3A notification Available Temple, Market, Houses 46 Sainkula, Machala,Rudranarayanapur, Bamphidi 31+400 33+100 1.70 G Available 47 Rudranarayanapur 33+100 33+160 0.06 Y Land acquisition Problem due to non acceptance of compensation by land owner (Internal Problem) 48 Rudranarayanapur, Bamphidi, Hasanpur 33+160 33+430 0.27 G Available 49 Hasanpur 33+430 33+670 0.24 Y 50 Hasanpur 33+670 34+050 0.38 G Land acquisition Problem due to non acceptance of compensation by land owner (Internal Problem) Available 51 Hasanpur, Salapada, Belabahali, Barigaon 34+050 37+000 2.95 G Realignment & Major Bridge Salapada Salapada, Sudusudia, Janra Janra 37+000 37+120 38+120 38+400 38+600 38+800 39+800 39+900 37+120 38+120 38+400 38+600 38+800 39+800 39+900 40+330 0.12 1.00 0.28 0.20 0.20 1.00 0.10 0.43 G G G Y G F G G Available Available Available Govt Structure Available Salapada Reserve Forest Available Available Khaparakhai 40+330 40+650 0.32 G Available ANAND APUR BYPASS 52 53 54 55 56 57 58 59 60 Barigaon Salapada M/s. SAI MAATARINI TOLLWAYS LIMITED Land (Hect) GOVT PVT TOTAL FOREST Length 02.95 KM. Village Name 3.788 7.444 11.232 3.000 Length 03.50 KM. RAG Sl No. Page 11 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 Village Name Length Land Status From To 61 Ghasipura 40+650 41+900 1.25 G Available 62 Kainpura 41+900 42+800 0.90 G Available 63 Sailong 42+800 43+400 0.60 G Available 64 Sailong 65 Morabali 66 67 68 69 70 71 72 73 74 75 Indupura Gohira Talagaon Biragobindapur Bhalukuma Dhakota Amaranga Bandha Nahaguna Kanto 76 Kolimati 77 Kamonda 43+400 44+000 44+100 44+480 45+100 46+400 47+580 50+700 52+800 53+400 55+000 55+650 55+700 57+700 58+500 59+000 60+250 62+060 44+000 44+100 44+480 45+100 46+400 47+580 50+700 52+800 53+400 55+000 55+650 55+700 57+700 58+500 59+000 60+250 62+060 64+900 0.60 0.10 0.38 0.62 1.30 1.18 3.12 2.10 0.60 1.60 0.65 0.05 2.00 0.80 0.50 1.25 1.81 2.84 G Y G G G G G G G G R G R R R R F G Available Shops, Market Complex & Junctions Available Available Available Available Available Available Available Available Compensation is in process Available Compensation is in process Compensation is in process Compensation is in process Compensation is in process Atai Reserve Forest Available 64+900 66+800 1.90 F Atai Reserve Forest 66+800 69+150 2.35 R Compensation is in process 69+150 69+300 0.15 G Available 69+300 70+500 1.20 F Atai Reserve Forest 70+500 74+400 3.90 G Available 78 Darkhola 79 80 81 GHATGA ON BYPASS Chainage Melana Balijodi 82 Balijodi 74+400 74+900 0.50 F Atai Reserve Forest 83 Uperdiha 74+900 76+520 1.62 F Atai Reserve Forest Land (Hect) GOVT PVT TOTAL FOREST 1.947 1.129 3.076 9.814 5.354 3.448 1.574 13.262 6.928 5.430 5.700 19.603 2.323 21.926 1.800 5.610 M/s. SAI MAATARINI TOLLWAYS LIMITED Length 04.60 KM. Sl No. Page 12 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 Village Name Chainage Length Land Status From To 76+520 78+400 1.88 R PVT Compensation is in process 12.040 8.681 20.721 3.634 4.180 7.815 7.883 13.254 2.202 2.214 10.085 15.467 6.682 6.058 2.493 1.566 9.174 7.624 6.246 11.934 5.994 10.858 11.344 16.317 4.464 2.177 1.704 3.298 2.695 4.945 10.710 14.112 7.697 14.156 14.039 21.263 18.102 3.577 Kusunpur 78+400 79+000 0.60 R Compensation is in process 85 86 Kusunpur Golabandha 87 Bataharichandanpur 88 Sanamasinabila 89 90 91 92 93 94 95 96 Sanabarabeda Tikira Nangalkanti Dhenkikote Khantaghar KhajuriJuani Katrabeda Chikinia 97 Pipilia 98 Bankapatuli 99 Gopalapur 100 Gopalapur, Badaposi 101 Badaposi 79+000 79+400 81+000 82+980 83+600 84+700 86+400 88+380 89+500 89+900 90+500 92+600 93+800 96+100 98+300 101+480 101+980 103+200 103+800 107+580 108+180 109+200 110+050 111+430 112+900 113+950 114+080 114+194 79+400 81+000 82+980 83+600 84+700 86+400 88+380 89+500 89+900 90+500 92+600 93+800 96+100 98+300 101+480 101+980 103+200 103+800 107+580 108+180 109+200 110+050 111+430 112+900 113+950 114+080 114+194 114+440 0.40 1.60 1.98 0.62 1.10 1.70 1.98 1.12 0.40 0.60 2.10 1.20 2.30 2.20 3.18 0.50 1.22 0.60 3.78 0.60 1.02 0.85 1.38 1.47 1.05 0.130 0.114 0.246 R R R R R F R R G R R R R R R R R F G G G F G F F G F G Compensation is in process Compensation is in process Compensation is in process Compensation is in process Compensation is in process Masinabila Reserve Forest Compensation is in process Compensation is in process Available Compensation is in process Compensation is in process Compensation is in process Compensation is in process Compensation is in process Compensation is in process Compensation is in process Compensation is in process Pipila Reserve Forest Available Available Available Naranapur Reserve Forest Available Naranapur Reserve Forest Naranapur Reserve Forest Available Sabik Jungle Available 114+440 114+615 0.175 F Sabik Jungle 105 Badaposi Jamunalia M/s. SAI MAATARINI TOLLWAYS LIMITED TOTAL GOVT 84 102 103 104 Land (Hect) FOREST 5.100 21.679 0.900 2.550 7.560 Length 15.65 KM Keonjhar Bypass Sl No. Page 13 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 Chainage Length Land Status From To 114+615 116+615 116+850 117+100 117+400 117+710 116+615 116+850 117+100 117+400 117+710 120+960 2.000 0.235 0.250 0.300 0.310 3.250 F G R G F G Village Forest Available Compensation is in process Available Village Forest Available 120+960 121+150 121+150 121+380 0.190 0.230 F G Village Forest Available 114 115 121+380 121+400 121+400 121+750 0.020 0.350 F G Village Forest Available 116 117 118 119 120 121 122 123 124 125 121+750 121+821 123+500 124+100 124+300 125+075 125+100 127+080 127+100 127+300 121+821 123+500 124+100 124+300 125+075 125+100 127+080 127+100 127+300 128+840 0.071 1.679 0.600 0.200 0.775 0.025 1.980 0.020 0.200 1.540 F G F Y G Y G Y Y G Sabik Jungle Available Village Forest King Fort wall Available Muslim Samadhi Available Land Acquisition (3A & 3D Missing) Land & Structure Available 128+840 128+860 0.020 F Sabik Jungle 128+860 129+000 129+020 129+800 129+900 129+960 130+340 130+640 131+400 131+420 129+000 129+020 129+800 129+900 129+960 130+340 130+640 131+400 131+420 132+000 0.140 0.020 0.780 0.100 0.060 0.380 0.300 0.760 0.020 0.580 Y F G Y G Y G Y Y G Structure Sabik Jungle Available Structure Available Electrical Available Electrical & RWSS Pipe Line Land Acquisition (3A & 3D Missing) Available 106 107 108 109 110 111 112 113 126 RAG Village Name 127 128 129 130 131 132 133 134 135 136 Tolankbahal Tulashichaura, Sirispal Sirispal Sidhmath Nizgarh Nizgarh Maligaon Gopinathpur Nuagaon Nuagaon Dhurpada Dhurpada Raisuan Raisuan & Gopinathpur M/s. SAI MAATARINI TOLLWAYS LIMITED Land (Hect) GOVT PVT TOTAL FOREST 1.350KM Sl No. Page 14 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 Village Name Length Land Status From To 137 138 139 140 141 142 143 144 132+000 132+200 132+260 132+277 132+300 132+337 132+369 132+515 132+200 132+260 132+277 132+300 132+337 132+369 132+515 132+565 0.200 0.060 0.017 0.023 0.037 0.032 0.146 0.050 F Y F Y F Y F G Sabik Jungle Land Acquisition (3A & 3D Missing) Sabik Jungle Land Acquisition (3A & 3D Missing) Sabik Jungle Land Acquisition (3A & 3D Missing) Sabik Jungle Available 145 132+565 132+600 0.035 F Sabik Jungle 146 132+600 133+420 0.820 G Available 147 133+420 133+450 0.030 Y Electrical 133+450 133+505 0.055 G Available 133+505 133+580 0.075 F Village Forest 133+580 134+010 0.430 Y Electrical 134+010 134+180 0.170 F Village Forest 134+180 134+475 134+575 134+675 134+890 134+910 134+970 134+980 135+249 135+450 136+010 136+600 134+475 134+575 134+675 134+890 134+910 134+970 134+980 135+249 135+450 136+010 136+600 136+900 0.295 0.100 0.100 0.215 0.020 0.060 0.010 0.269 0.201 0.560 0.590 0.300 G F G F G F G F G F Y G Structure Village Forest Available Village Forest Available Village Forest Available Village Forest Available Village Forest RWSS Pipe Line Structure 136+900 136+929 0.029 F Sabik Jungle 136+929 137+300 0.371 G Available 137+300 137+343 0.043 F Sabik Jungle 148 Silisuan 149 150 151 RAG Chainage 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 Banajodi Banajodi Banajodi, Padmapur Padmapur, Putulia M/s. SAI MAATARINI TOLLWAYS LIMITED Land (Hect) GOVT PVT TOTAL FOREST 0.85 KM Sl No. Page 15 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 Chainage Length Land Status From To 137+343 137+400 137+600 137+920 138+420 138+480 137+400 137+600 137+920 138+420 138+480 138+500 0.057 0.200 0.320 0.500 0.060 0.020 G G R G G G Structure Available Compensation is in process Available Structure Available 177 138+500 138+523 138+943 138+963 139+000 139+037 139+469 139+632 138+523 138+943 138+963 139+000 139+037 139+469 139+632 140+200 0.023 0.420 0.020 0.037 0.037 0.432 0.163 0.568 F F F G F G F G Sabik Jungle Village Forest Sabik Jungle Available Sabik Jungle Available Sabik Jungle Available 178 140+200 141+310 1.110 F Tangarani Reserve Forest 141+310 142+120 142+120 142+195 0.810 0.075 G G Structure Available 142+195 142+205 0.010 F Village Forest 142+205 143+200 0.995 Y Structure & Electrical 167 168 169 170 171 172 Jhumpura By-Pass Village Name 173 174 175 176 Putulia Keshpank Jadichatra Bankamarani 179 180 181 Bankamarani, Hundla Jamudiha, Palasponga 182 Land (Hect) GOVT PVT 0.110 1.670 1.170 0.390 1.560 2.030 1.150 143+200 143+465 0.265 R Compensation is in process 184 Palasponga, Murusuan 143+465 144+615 1.150 F Tangarani Reserve Forest 144+615 145+200 0.585 R Compensation is in process 145+200 145+210 145+270 145+295 145+210 145+270 145+295 147+640 0.010 0.060 0.025 2.345 F R F G Village Forest Compensation is in process Village Forest Available 147+640 147+760 0.120 R Compensation is in process 0.850 147+760 148+000 148+000 149+000 0.240 1.000 G R Available Compensation is in process 2.830 190 191 192 Tangarani Jamuposhi ,Spongepatna Jhumpura M/s. SAI MAATARINI TOLLWAYS LIMITED 3.180 1.665 Palasponga 186 187 188 189 FOREST 1.560 183 185 TOTAL 1.360 5.510 0.250 2.470 Length 3.80 KM Sl No. 1.610 7.980 0.850 2.830 Page 16 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 Sl No. Village Name Chainage Length Land Status From To 149+000 149+620 149+649 149+660 149+680 149+770 149+779 149+800 149+823 150+000 150+042 150+115 150+286 150+430 150+460 150+600 150+800 149+620 149+649 149+660 149+680 149+770 149+779 149+800 149+823 150+000 150+042 150+115 150+286 150+430 150+460 150+600 150+800 151+300 0.620 0.029 0.011 0.020 0.090 0.009 0.021 0.023 0.177 0.042 0.073 0.171 0.144 0.030 0.140 0.200 0.500 Y F G F G F G F G F G F G F G F G Structure & RWSS Pipe Line Sabik Jungle Available Sabik Jungle Available Sabik Jungle Available Sabik Jungle Available Sabik Jungle Available Sabik Jungle Available Sabik Jungle Available Sabik Jungle Available 151+300 152+260 0.960 R Compensation is in process 152+260 152+350 152+380 152+460 152+350 152+380 152+460 152+780 0.090 0.030 0.080 0.320 G R G Y Available Compensation is in process Available Structure 152+780 153+040 0.260 R Compensation is in process 153+040 153+140 153+200 153+140 153+200 153+400 0.100 0.060 0.200 G Y G Available Structure Available 219 153+400 153+600 0.200 R Compensation is in process 220 153+600 154+900 1.300 F Balibandha Reserve Forest 154+900 155+000 155+000 155+200 0.100 0.200 Y G Structure Available 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 Jhumpura, Bhaluka & Arsala Arsala 210 211 212 213 214 Sundhimursuan, Balabhadrapur 215 216 217 218 221 222 Balabhadrapur Balabhadrapur, Patabila M/s. SAI MAATARINI TOLLWAYS LIMITED Land (Hect) GOVT PVT TOTAL FOREST 0.980 0.980 1.630 1.630 0.650 0.650 3.250 3.250 3.900 Page 17 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 Village Name Balaibandh Balaibandh,Mursuan Mursuan Mursuan,Parsala, Sijukala RAG 247 248 249 Parsala, Sijukala Rimuli Chainage Length Land Status From To 155+200 155+400 155+550 156+200 157+090 158+405 158+415 159+000 159+400 159+415 159+590 159+618 159+690 159+890 160+110 160+380 160+445 160+573 160+675 160+728 161+085 161+099 162+240 162+270 155+400 155+550 156+200 157+090 158+405 158+415 159+000 159+400 159+415 159+590 159+618 159+690 159+890 160+110 160+380 160+445 160+573 160+675 160+728 161+085 161+099 162+240 162+270 163+000 0.200 0.150 0.650 0.890 1.315 0.010 0.585 0.400 0.015 0.175 0.028 0.072 0.200 0.220 0.270 0.065 0.128 0.102 0.053 0.357 0.014 1.141 0.030 0.730 Y R R Y F F G Y F G F Y F Y F Y F Y F Y F Y F G Structure Compensation is in process Compensation is in process RWSS Pipe Line Balibandha Reserve Forest Village Forest Available Trees, Utility Sabik Jungle Available Sabik Jungle Trees, Utility Sabik Jungle Trees, Utility Sabik Jungle Trees, Utility Sabik Jungle Trees, Utility Sabik Jungle Trees, Utility Sabik Jungle Trees, Utility Village Forest Available 163+000 164+715 1.715 R Compensation is in process 164+715 165+010 0.295 F Village Forest 165+010 166+183 1.173 G Available Land (Hect) GOVT FOREST 9.740 11.630 M/s. SAI MAATARINI TOLLWAYS LIMITED PVT TOTAL 24.300 1.80 KM Sl No. 48.015 26.190 Page 18 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 ABSTRACT Description Type Land Available Length (KM) Minor Hindrance Length (KM) Compensation Not Paid Full Hindrance Length (KM) Reserve Forest (151.94 Hec.) Total Length (KM)>>> M/s. SAI MAATARINI TOLLWAYS LIMITED G y R F Total Length (%) 84.202 50.67% G 15.360 9.24% y 38.695 R F 40.09% 27.926 166.183 100% Page 19 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ 4. Preconstruction Activities A. Shifting of Electrical Poles SL.NO Erection: 1 2 3 Description Concreting of Poles 9m PSC Poles 300 KG Transformers A) 250 KVA 11/0.4 KV B) 150 KVA 11/0.4 KV C) 100 KVA 11/0.4 KV D) 63 KVA 11/0.4 KV E) 25 KVA 11/0.4 KV F) 16 KVA 11/0.4 KV G) 16 KVA 11/0.23 KV H) 10 KVA 11/0.25 KV 4 RS Joist A) 150/150 18M B) 150/150 15M C) 150/150 13M D) 150/150 11M 5 3PH 4W LT Line 6 33 KV HT Line 7 11KV 3Ph. 3W HT Lines 8 55 mm2 AAA Conductor 9 100 mm2 AAA Conductor Sub-Total >>> Dismantling: 1 55 mm2 AAA Conductor 2 34 mm2 AAA Conductor 3 80 mm2 AAA Conductor 4 11 KV Line 5 33 KV Line 6 LT Line Sub-Total >>> 7 8 m Joist Poles 8 8m PSC Poles 200 Kgs. 9 9m PSC Poles Kgs. 10 11m Joist Poles Unit Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Km Km Km Km Km Km.0+000 to Km.24+000 Total Done Balance 352 91 1 1 5 3 1 2 12 40 222 4 0 12 12 21 352 91 0 0 0 1 1 5 3 1 2 0 12 0 40 222 4 0 12 12 21 Km Km Km Km Km Km 20 8 2 20 8 0 0 0 2 Nos Nos Nos Nos 85 148 23 3 85 148 23 3 M/s. SAI MAATARINI TOLLWAYS LIMITED Km.24+000 to Km.113+000 Total Done Balance 296 280 17 6 2 0 13 10 15 2 11 8 46 150 3 1.3 95 7.5 0.54 22 2 1 6 13 10 279 274 0 2 0 13 10 15 2 11 8 0 0 46 150 -3 1.3 0 0 95 7.5 0 -1 0 22 2 1 6 3 0 0 Km.113+000 to Km.163+000 Total Done Balance 693 350 113 1 1 6 4 10 1 6 2 0 26 540 0 13.7 16.8 22 73 23.5 18 6 12 39 2.79 Km.0+000 to Km.163+000 Total Done Balance 693 237 0 1 1 6 4 10 1 6 2 0 0 -13 540 0 13.7 16.8 22 70.21 23.5 1341 721 0 3 1 20 15 30 6 18 12 0 12 72 730 222 19 16.8 34 180 52 17 119 0 0 0 0 0 0 0 0 0 0 0 39 0 3 0 0 0 2.79 0 1324 602 0 3 1 20 15 30 6 18 12 0 12 33 730 219 19 16.8 34 177.21 52 0 0 0 18 6 12 20 8 0 39 8 15 0 1 0 0 0 0 20 7 0 39 8 15 0 0 0 0 91 161 23 3 0 10 0 0 91 151 23 3 Remarks Page 20 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ B. Tree Felling No. A 1 2 3 4 5 Chainage (Km) From To D.F.O. Length B C 0+000 24+000 24+000 58+000 58+000 107+000 104+600 113+100 113+300 143+000 143+000 163+000 Total D 24 34 49 8.50 29.90 20 Estimate Lr. No. E 1171 1171 1520 1520 No of Trees as per Estimate DL. Revised Estimate sanction (Rs.) at Site Felled Balance No. DFO PIU / RO F 1054 1197 4848 1027 4458 2501 15085 G 1054 878 2180 164 1237 787 6300 H=F-G 319 2668 863 3221 1714 8785 I 36 J 1185875 2535000 22330839 K 22330839 39 9284356 9284356 35 8088566 43424636 8088566 43424636 2091000 Authorit y L yet to be received by / from Sl. Avenue Plantation Sanction (Rs.) The estimates for Avenue plantation have been sent to NHAI, H.O., New Delhi for approval of Competent Authority. - C. RWS&S & PH Estimates: These estimates which were prepared based on SSR 2007-08 are to be revised with current SSR (2013-14). PIU has to address EE, RWS&S, Keonjhar & Jajpur and also EE, PH, Rourkela. RWS&S and PH pipe lines & Tube Well shifting revised estimates Sl. No. Description Estimate Amount Remarks a Km 0+000 to Km 24+000 Rs. 9,80,483 Work in Progress b Km 24+000 to Km 163+000 Rs. 2,10,19,000 Work in Progress Sub Total : (+/-) M/s. SAI MAATARINI TOLLWAYS LIMITED Rs. 2,19,99,483 Page 21 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 5. Status of Designs & Drawings A. Plan & Profile : From Km 0+000 to Km 166+173: finalized in conformance of the provisions of C.A. & IRC Codes. B. Structures: The Structural drawings are being confirmed as is consistent with the phased requirement for execution of work. i. Major Bridges : 06 Nos.: ii. Flyover : 01 No: iii. ROBs : 02 Nos: iv. VUPs : 15 Nos.: v. PUPs : 21 Nos.: vi. AUPs : 06 Nos.: vii. EUPs : 02 Nos.: viii. Box Culverts : 260 Nos.: ix. Pipe Culverts : 30 Nos.: M/s. SAI MAATARINI TOLLWAYS LIMITED Page 22 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 6. Physical Progress (Highway) The Total 2-lane Length of Project Kms 332.346 (Kms 166.173 X 2) i.e., LHS & RHS Sr. No. Length (Km) Item LHS 1 C&G 2 Excavation 3 RHS Total Length (Km) (%) Remarks 77.20 63.34 140.54 42.29% 6.57 4.46 11.03 3.32% Embankment-Top 36.19 19.78 55.97 16.84% 4 Subgrade-Top 21.65 10.70 32.35 9.73% 5 GSB 17.77 8.50 26.265 7.90% 6 WMM-1st 11.53 1.30 12.82 3.86% 7 WMM-Top 4.48 0.00 4.48 1.35% 6.1. Physical Progress (Structures) Sr. No. Description Total Nos upto date Commenced | Completed 1 ROB 02 01 - 01 2 Grade Separator 01 01 - - 3 Major Bridge 06 04 - 02 4 Minor Bridge 30 15 01 14 5 VUP 15 07 - 08 6 PUP 21 11 - 10 7 AUP 06 02 - 04 8 EUP 02 - - 02 9 RUP 50 - - 50 10 At Grade Junctions 12 - - 12 11 Culverts (All Types) 295 98 45 152 M/s. SAI MAATARINI TOLLWAYS LIMITED Not Yet Started Page 23 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 6.2. Financial Progress Project Length Km 163.173 Bill No. Description A % Completion % weightage of Contract Value Upto Date 142,254,197 0.704% 11,255,812 20,200,000,000.00 Till Previous Month For this Month Amount till Previous Month Amount for this Month 0.283% 0.236% 0.047% 57,244,486 55,868,842 1,375,644 0.056% 0.012% 0.007% 0.004% 2,332,279 2,174,184 158,095 7,214,175 0.036% 0.007% 0.005% 0.003% 1,494,825 1,393,497 101,328 4,745,691,547 23.494% 1.990% 0.948% 1.042% 402,028,814 371,158,681 30,870,134 3,566,836,110 17.658% 0.047% 0.007% 0.040% 9,449,509 8,843,800 605,709 - 504,630,150 2.498% 0.000% 0.000% 0.000% - - 504,630,150 2.498% 0.000% 0.000% 0.000% - - 1,585,373,571 7.848% 0.594% 0.234% 0.360% 119,980,283 101,004,981 18,975,303 1,585,373,571 7.848% 0.642% 0.267% 0.375% 129,734,698 110,752,599 18,982,099 - 1,815,979,508 8.990% 0.000% 0.000% 0.000% - - 38,292,000 0.190% 0.000% 0.000% 0.000% - - 244,067,986 1.208% 0.000% 0.000% 0.000% - - 333,480,582 1.651% 0.000% 0.000% 0.000% - - 140,414,336 0.695% 0.068% 0.043% 0.025% 13,790,694 13,790,694 31,912,349 0.158% 0.057% 0.014% 0.043% 11,511,240 13,231,515 (1,720,275) 207,875,507 193,924,741 13,950,766 4.528% 1.029% 0.637% 0.392% 246,192,561 1.219% 0.083% 0.019% 0.064% 16,827,303 9,325,476 7,501,827 781,187,936 3.867% 0.486% 0.323% 0.162% 98,156,899 86,801,845 11,355,054 10,951,221 0.054% 0.018% 0.017% 0.001% 3,673,838 3,562,846 110,992 2,943,522,186 14.572% 2.082% 1.312% 0.770% 420,533,886 384,842,530 35,691,356 45,992,534 0.228% 0.023% 0.007% 0.016% 4,599,253 4,599,253 - 20,200,000,000 100.00% 7.422% Amount in Rs. Amount till Date Pre Construction Activity I Site Clearance II Tree Cutting III Dismantling of Structures B Road Works I Widening Side II Existing Side III IV Service Roads LHS Service Roads RHS V Bypass LHS VI Bypass RHS VII Drainage & Protective Works VIII Highway Lighting IX Road Appuarantaces X Toll Plaza C Structures I ROB II Flyover III Underpass (VUP,PUP,AUP& EUP) IV Major Bridges V Minor Bridges VI Pipe Culverts VII Box & Slab Culverts (a) Reconstruction & (b) Proposed New Culverts (c) Rehabilitation Repair / Widening of Culverts a b Total - - 914,747,518 4.076% M/s. SAI MAATARINI TOLLWAYS LIMITED 3.345% 1,499,233,514 1,361,275,484 137,958,032 Page 24 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 6.3. Financial S-Curve Cumulative Month Project Const. Programe (Cr.) Expenditure Schedule (Cr.) May-13 Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Oct-15 2020.00 Sep-15 1996.28 Aug-15 1964.27 Jul-15 1938.54 Jun-15 1917.53 May-15 1859.67 Apr-15 1818.65 Mar-15 1797.70 Feb-15 1765.70 Jan-15 1644.95 Dec-14 1524.71 Nov-14 1414.97 Oct-14 1318.22 Sep-14 1231.52 Aug-14 1175.85 Jul-14 1132.32 Jun-14 1088.65 599.60 May-14 1013.65 585.81 Apr-14 908.65 558.84 Mar-14 806.20 530.87 Feb-14 715.45 507.69 Jan-14 639.50 472.41 Dec-13 575.79 450.41 Nov-13 447.55 331.39 Oct-13 324.00 239.28 Sep-13 212.24 150.82 Aug-13 112.21 84.93 Jul-13 42.96 37.58 Jun-13 9.87 8.52 May-13 0.00 0.00 May-13 Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Monsoon Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-14 Project Const. Programe (Cr.) Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Expenditure Schedule (Cr.) Note: The expenditure schedule shown in S-Curve includes Work done Cost as shown in Finical Progress and Capital Cost incurred till date. M/s. SAI MAATARINI TOLLWAYS LIMITED Page 25 RHS Chainage Exc. Upto Emb. Top BC DBM WMM-Top WMM-1st GSB SG-Top SG-IInd SG-Ist EMB-Top EMB-6th EMB-5th EMB-4th EMB-3rd EMB-2nd EMB-1st OGL Record OGL FDD C&G OGL Samp. 0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 0.400 0.450 0.500 0.550 0.600 0.650 0.700 0.750 0.800 0.850 0.900 0.950 1.000 1.050 1.100 1.150 1.200 1.250 1.300 1.350 1.400 1.450 1.500 1.550 1.600 1.650 1.700 1.750 1.800 1.850 1.900 1.950 2.000 2.050 2.100 2.150 2.200 2.250 2.300 2.350 2.400 2.450 2.500 2.550 2.600 2.650 2.700 2.750 2.800 2.850 2.900 2.950 3.000 3.050 3.100 3.150 3.200 3.250 3.300 3.350 3.400 3.450 3.500 3.550 3.600 3.650 3.700 3.750 3.800 3.850 3.900 3.950 4.000 4.050 4.100 4.150 4.200 4.250 4.300 4.350 4.400 4.450 4.500 4.550 4.600 4.650 4.700 4.750 4.800 4.850 4.900 4.950 5.000 LHS SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 7. Strip chart of work progress OGL Samp. C&G OGL FDD OGL Record EMB-1st EMB-2nd EMB-3rd EMB-4th EMB-5th EMB-6th EMB-Top SG-Ist SG-IInd SG-Top GSB WMM-1st WMM-Top DBM BC M/s. SAI MAATARINI TOLLWAYS LIMITED Page 26 RHS Chainage 5.000 5.050 5.100 5.150 5.200 5.250 5.300 5.350 5.400 5.450 5.500 5.550 5.600 5.650 5.700 5.750 5.800 5.850 5.900 5.950 6.000 6.050 6.100 6.150 6.200 6.250 6.300 6.350 6.400 6.450 6.500 6.550 6.600 6.650 6.700 6.750 6.800 6.850 6.900 6.950 7.000 7.050 7.100 7.150 7.200 7.250 7.300 7.350 7.400 7.450 7.500 7.550 7.600 7.650 7.700 7.750 7.800 7.850 7.900 7.950 8.000 8.050 8.100 8.150 8.200 8.250 8.300 8.350 8.400 8.450 8.500 8.550 8.600 8.650 8.700 8.750 8.800 8.850 8.900 8.950 9.000 9.050 9.100 9.150 9.200 9.250 9.300 9.350 9.400 9.450 9.500 9.550 9.600 9.650 9.700 9.750 9.800 9.850 9.900 9.950 10.000 LHS SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 BC DBM WMM-Top WMM-1st GSB SG-Top SG-IInd SG-Ist EMB-Top EMB-6th EMB-5th EMB-4th EMB-3rd EMB-2nd EMB-1st OGL Record OGL FDD C&G OGL Samp. OGL Samp. C&G OGL FDD OGL Record EMB-1st EMB-2nd EMB-3rd EMB-4th EMB-5th EMB-6th EMB-Top SG-Ist SG-IInd SG-Top GSB WMM-1st WMM-Top DBM BC M/s. SAI MAATARINI TOLLWAYS LIMITED Page 27 RHS Chainage 10.000 10.050 10.100 10.150 10.200 10.250 10.300 10.350 10.400 10.450 10.500 10.550 10.600 10.650 10.700 10.750 10.800 10.850 10.900 10.950 11.000 11.050 11.100 11.150 11.200 11.250 11.300 11.350 11.400 11.450 11.500 11.550 11.600 11.650 11.700 11.750 11.800 11.850 11.900 11.950 12.000 12.050 12.100 12.150 12.200 12.250 12.300 12.350 12.400 12.450 12.500 12.550 12.600 12.650 12.700 12.750 12.800 12.850 12.900 12.950 13.000 13.050 13.100 13.150 13.200 13.250 13.300 13.350 13.400 13.450 13.500 13.550 13.600 13.650 13.700 13.750 13.800 13.850 13.900 13.950 14.000 14.050 14.100 14.150 14.200 14.250 14.300 14.350 14.400 14.450 14.500 14.550 14.600 14.650 14.700 14.750 14.800 14.850 14.900 14.950 15.000 LHS SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 BC DBM WMM-Top WMM-1st GSB SG-Top SG-IInd SG-Ist EMB-Top EMB-6th EMB-5th EMB-4th EMB-3rd EMB-2nd EMB-1st OGL Record OGL FDD C&G OGL Samp. OGL Samp. C&G OGL FDD OGL Record EMB-1st EMB-2nd EMB-3rd EMB-4th EMB-5th EMB-6th EMB-Top SG-Ist SG-IInd SG-Top GSB WMM-1st WMM-Top DBM BC M/s. SAI MAATARINI TOLLWAYS LIMITED Page 28 RHS Chainage 15.000 15.050 15.100 15.150 15.200 15.250 15.300 15.350 15.400 15.450 15.500 15.550 15.600 15.650 15.700 15.750 15.800 15.850 15.900 15.950 16.000 16.050 16.100 16.150 16.200 16.250 16.300 16.350 16.400 16.450 16.500 16.550 16.600 16.650 16.700 16.750 16.800 16.850 16.900 16.950 17.000 17.050 17.100 17.150 17.200 17.250 17.300 17.350 17.400 17.450 17.500 17.550 17.600 17.650 17.700 17.750 17.800 17.850 17.900 17.950 18.000 18.050 18.100 18.150 18.200 18.250 18.300 18.350 18.400 18.450 18.500 18.550 18.600 18.650 18.700 18.750 18.800 18.850 18.900 18.950 19.000 19.050 19.100 19.150 19.200 19.250 19.300 19.350 19.400 19.450 19.500 19.550 19.600 19.650 19.700 19.750 19.800 19.850 19.900 19.950 20.000 LHS SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 BC DBM WMM-Top WMM-1st GSB SG-Top SG-IInd SG-Ist EMB-Top EMB-9th EMB-8th EMB-7th EMB-6th EMB-5th EMB-4th EMB-3rd EMB-2nd EMB-1st OGL Record OGL FDD C&G OGL Samp. OGL Samp. C&G OGL FDD OGL Record EMB-1st EMB-2nd EMB-3rd EMB-4th EMB-5th EMB-6th EMB-Top SG-Ist SG-IInd SG-Top GSB WMM-1st WMM-Top DBM BC M/s. SAI MAATARINI TOLLWAYS LIMITED Page 29 RHS OGL Samp. C&G OGL FDD OGL Record EMB-1st EMB-2nd EMB-3rd EMB-4th EMB-5th EMB-6th EMB-Top SG-Ist SG-IInd SG-Top GSB WMM-1st WMM-Top DBM BC M/s. SAI MAATARINI TOLLWAYS LIMITED EXC upto Emb Top Chainage 20.000 20.050 20.100 20.150 20.200 20.250 20.300 20.350 20.400 20.450 20.500 20.550 20.600 20.650 20.700 20.750 20.800 20.850 20.900 20.950 21.000 21.050 21.100 21.150 21.200 21.250 21.300 21.350 21.400 21.450 21.500 21.550 21.600 21.650 21.700 21.750 21.800 21.850 21.900 21.950 22.000 22.050 22.100 22.150 22.200 22.250 22.300 22.350 22.400 22.450 22.500 22.550 22.600 22.650 22.700 22.750 22.800 22.850 22.900 22.950 23.000 23.050 23.100 23.150 23.200 23.250 23.300 23.350 23.400 23.450 23.500 23.550 23.600 23.650 23.700 23.750 23.800 23.850 23.900 23.950 24.000 24.050 24.100 24.150 24.200 24.250 24.300 24.350 24.400 24.450 24.500 24.550 24.600 24.650 24.700 24.750 24.800 24.850 24.900 24.950 25.000 LHS BC DBM WMM-Top WMM-1st GSB SG-Top SG-IInd SG-Ist EMB-Top EMB-14th EMB-13th EMB-12th EMB-11th EMB-10th EMB-9th EMB-8th EMB-7th EMB-6th EMB-5th EMB-4th EMB-3rd EMB-2nd EMB-1st OGL Record OGL FDD C&G OGL Samp. Exc. Upto Emb. Top EMB. Top NGL Exc. Upto Emb. Top SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 Page 30 RHS Chainage 25.000 25.050 25.100 25.150 25.200 25.250 25.300 25.350 25.400 25.450 25.500 25.550 25.600 25.650 25.700 25.750 25.800 25.850 25.900 25.950 26.000 26.050 26.100 26.150 26.200 26.250 26.300 26.350 26.400 26.450 26.500 26.550 26.600 26.650 26.700 26.750 26.800 26.850 26.900 26.950 27.000 27.050 27.100 27.150 27.200 27.250 27.300 27.350 27.400 27.450 27.500 27.550 27.600 27.650 27.700 27.750 27.800 27.850 27.900 27.950 28.000 28.050 28.100 28.150 28.200 28.250 28.300 28.350 28.400 28.450 28.500 28.550 28.600 28.650 28.700 28.750 28.800 28.850 28.900 28.950 29.000 29.050 29.100 29.150 29.200 29.250 29.300 29.350 29.400 29.450 29.500 29.550 29.600 29.650 29.700 29.750 29.800 29.850 29.900 29.950 30.000 LHS SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 BC DBM WMM-Top WMM-1st GSB SG-Top SG-IInd SG-Ist EMB-Top EMB-8th EMB-7th EMB-6th EMB-5th EMB-4th EMB-3rd EMB-2nd EMB-1st OGL Record OGL FDD C&G OGL Samp. OGL Samp. C&G OGL FDD OGL Record EMB-1st EMB-2nd EMB-3rd EMB-4th EMB-5th EMB-6th EMB-Top SG-Ist SG-IInd SG-Top GSB WMM-1st WMM-Top DBM BC M/s. SAI MAATARINI TOLLWAYS LIMITED Page 31 RHS Chainage 30.000 30.050 30.100 30.150 30.200 30.250 30.300 30.350 30.400 30.450 30.500 30.550 30.600 30.650 30.700 30.750 30.800 30.850 30.900 30.950 31.000 31.050 31.100 31.150 31.200 31.250 31.300 31.350 31.400 31.450 31.500 31.550 31.600 31.650 31.700 31.750 31.800 31.850 31.900 31.950 32.000 32.050 32.100 32.150 32.200 32.250 32.300 32.350 32.400 32.450 32.500 32.550 32.600 32.650 32.700 32.750 32.800 32.850 32.900 32.950 33.000 33.050 33.100 33.150 33.200 33.250 33.300 33.350 33.400 33.450 33.500 33.550 33.600 33.650 33.700 33.750 33.800 33.850 33.900 33.950 34.000 34.050 34.100 34.150 34.200 34.250 34.300 34.350 34.400 34.450 34.500 34.550 34.600 34.650 34.700 34.750 34.800 34.850 34.900 34.950 35.000 LHS BC DBM WMM-Top WMM-1st GSB SG-Top SG-IInd SG-Ist EMB-Top EMB-15th EMB-14th EMB-13th EMB-12th EMB-11th EMB-10th EMB-9th EMB-8th EMB-7th EMB-6th EMB-5th EMB-4th EMB-3rd EMB-2nd EMB-1st OGL Record OGL FDD C&G OGL Samp. Exc upto Emb. Top SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 OGL Samp. C&G OGL FDD OGL Record EMB-1st EMB-2nd EMB-3rd EMB-4th EMB-5th EMB-6th EMB-Top SG-Ist SG-IInd SG-Top GSB WMM-1st WMM-Top DBM BC M/s. SAI MAATARINI TOLLWAYS LIMITED Page 32 RHS Chainage 40.000 40.050 40.100 40.150 40.200 40.250 40.300 40.350 40.400 40.450 40.500 40.550 40.600 40.650 40.700 40.750 40.800 40.850 40.900 40.950 41.000 41.050 41.100 41.150 41.200 41.250 41.300 41.350 41.400 41.450 41.500 41.550 41.600 41.650 41.700 41.750 41.800 41.850 41.900 41.950 42.000 42.050 42.100 42.150 42.200 42.250 42.300 42.350 42.400 42.450 42.500 42.550 42.600 42.650 42.700 42.750 42.800 42.850 42.900 42.950 43.000 43.050 43.100 43.150 43.200 43.250 43.300 43.350 43.400 43.450 43.500 43.550 43.600 43.650 43.700 43.750 43.800 43.850 43.900 43.950 44.000 44.050 44.100 44.150 44.200 44.250 44.300 44.350 44.400 44.450 44.500 44.550 44.600 44.650 44.700 44.750 44.800 44.850 44.900 44.950 45.000 LHS SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 BC DBM WMM-Top WMM-1st GSB SG-Top SG-IInd SG-Ist EMB-Top EMB-14th EMB-13th EMB-12th EMB-11th EMB-10th EMB-9th EMB-8th EMB-7th EMB-6th EMB-5th EMB-4th EMB-3rd EMB-2nd EMB-1st OGL Record OGL FDD C&G OGL Samp. OGL Samp. C&G OGL FDD OGL Record EMB-1st EMB-2nd EMB-3rd EMB-4th EMB-5th EMB-6th EMB-7th EMB-Top SG-Ist SG-IInd SG-Top GSB WMM-1st WMM-Top DBM BC M/s. SAI MAATARINI TOLLWAYS LIMITED Page 33 RHS OGL Samp. C&G OGL FDD OGL Record EMB-1st EMB-2nd EMB-3rd EMB-4th EMB-5th EMB-6th EMB-7th EMB-Top M/s. SAI MAATARINI TOLLWAYS LIMITED Exc upto Emb Top BC DBM WMM-Top WMM-1st GSB SG-Top SG-IInd SG-Ist EMB-Top EMB-20th EMB-19th EMB-18th EMB-17th EMB-16th EMB-15th EMB-14th EMB-13th EMB-12th EMB-11th EMB-10th EMB-9th EMB-8th EMB-7th EMB-6th EMB-5th EMB-4th EMB-3rd EMB-2nd EMB-1st OGL Record OGL FDD C&G OGL Samp. Exc upto Emb Top EXC upto Emb Top EXC upto Emb Top Chainage 45.000 45.050 45.100 45.150 45.200 45.250 45.300 45.350 45.400 45.450 45.500 45.550 45.600 45.650 45.700 45.750 45.800 45.850 45.900 45.950 46.000 46.050 46.100 46.150 46.200 46.250 46.300 46.350 46.400 46.450 46.500 46.550 46.600 46.650 46.700 46.750 46.800 46.850 46.900 46.950 47.000 47.050 47.100 47.150 47.200 47.250 47.300 47.350 47.400 47.450 47.500 47.550 47.600 47.650 47.700 47.750 47.800 47.850 47.900 47.950 48.000 48.050 48.100 48.150 48.200 48.250 48.300 48.350 48.400 48.450 48.500 48.550 48.600 48.650 48.700 48.750 48.800 48.850 48.900 48.950 49.000 49.050 49.100 49.150 49.200 49.250 49.300 49.350 49.400 49.450 49.500 49.550 49.600 49.650 49.700 49.750 49.800 49.850 49.900 49.950 50.000 LHS SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 SG-Ist SG-IInd SG-Top GSB WMM-1st WMM-Top DBM BC Page 34 RHS Chainage OGL Samp. C&G OGL FDD OGL Record EMB-1st EMB-2nd EMB-3rd EMB-4th EMB-5th EMB-6th EMB-Top SG-Ist SG-IInd SG-Top GSB WMM-1st WMM-Top DBM BC M/s. SAI MAATARINI TOLLWAYS LIMITED Exc upto Emb. Top Exc upto Emb. Top 13 Exc upto Emb. Top BC DBM WMM-Top WMM-1st GSB SG-Top SG-IInd SG-Ist EMB-Top EMB-8th EMB-7th EMB-6th EMB-5th EMB-4th EMB-3rd EMB-2nd EMB-1st OGL Record OGL FDD C&G OGL Samp. 50.000 50.050 50.100 50.150 50.200 50.250 50.300 50.350 50.400 50.450 50.500 50.550 50.600 50.650 50.700 50.750 50.800 50.850 50.900 50.950 51.000 51.050 51.100 51.150 51.200 51.250 51.300 51.350 51.400 51.450 51.500 51.550 51.600 51.650 51.700 51.750 51.800 51.850 51.900 51.950 52.000 52.050 52.100 52.150 52.200 52.250 52.300 52.350 52.400 52.450 52.500 52.550 52.600 52.650 52.700 52.750 52.800 52.850 52.900 52.950 53.000 53.050 53.100 53.150 53.200 53.250 53.300 53.350 53.400 53.450 53.500 53.550 53.600 53.650 53.700 53.750 53.800 53.850 53.900 53.950 54.000 54.050 54.100 54.150 54.200 54.250 54.300 54.350 54.400 54.450 54.500 54.550 54.600 54.650 54.700 54.750 54.800 54.850 54.900 54.950 55.000 LHS SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 18th Layer Page 35 RHS Chainage M/s. SAI MAATARINI TOLLWAYS LIMITED Exc upto Emb. Top Exc upto Emb. Top Exc upto Emb. Top BC DBM WMM-Top WMM-1st GSB SG-Top SG-IInd SG-Ist EMB-Top EMB-9th EMB-8th EMB-7th EMB-6th EMB-5th EMB-4th EMB-3rd EMB-2nd EMB-1st OGL Record OGL FDD C&G OGL Samp. 85.000 85.050 85.100 85.150 85.200 85.250 85.300 85.350 85.400 85.450 85.500 85.550 85.600 85.650 85.700 85.750 85.800 85.850 85.900 85.950 86.000 86.050 86.100 86.150 86.200 86.250 86.300 86.350 86.400 86.450 86.500 86.550 86.600 86.650 86.700 86.750 86.800 86.850 86.900 86.950 87.000 87.050 87.100 87.150 87.200 87.250 87.300 87.350 87.400 87.450 87.500 87.550 87.600 87.650 87.700 87.750 87.800 87.850 87.900 87.950 88.000 88.050 88.100 88.150 88.200 88.250 88.300 88.350 88.400 88.450 88.500 88.550 88.600 88.650 88.700 88.750 88.800 88.850 88.900 88.950 89.000 89.050 89.100 89.150 89.200 89.250 89.300 89.350 89.400 89.450 89.500 89.550 89.600 89.650 89.700 89.750 89.800 89.850 89.900 89.950 90.000 LHS SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 OGL Samp. C&G OGL FDD OGL Record EMB-1st EMB-2nd EMB-3rd EMB-4th EMB-5th EMB-6th EMB-7th EMB-8th EMB-9th EMB-10th EMB-11th EMB-Top SG-Ist SG-IInd SG-Top GSB WMM-1st WMM-Top DBM BC Page 36 RHS OGL Samp. C&G OGL FDD OGL Record EMB-1st EMB-2nd EMB-3rd EMB-4th EMB-5th EMB-6th EMB-Top SG-Ist SG-IInd SG-Top GSB WMM-1st WMM-Top DBM BC M/s. SAI MAATARINI TOLLWAYS LIMITED 12th Layer 9th Layer 11th Layer 8th Layer 10th Layer 7th Layer 7th Layer BC DBM WMM-Top WMM-1st GSB SG-Top SG-IInd SG-Ist EMB-Top EMB-6th EMB-5th EMB-4th EMB-3rd EMB-2nd EMB-1st OGL Record OGL FDD C&G OGL Samp. 9thLayer Chainage 90.000 90.050 90.100 90.150 90.200 90.250 90.300 90.350 90.400 90.450 90.500 90.550 90.600 90.650 90.700 90.750 90.800 90.850 90.900 90.950 91.000 91.050 91.100 91.150 91.200 91.250 91.300 91.350 91.400 91.450 91.500 91.550 91.600 91.650 91.700 91.750 91.800 91.850 91.900 91.950 92.000 92.050 92.100 92.150 92.200 92.250 92.300 92.350 92.400 92.450 92.500 92.550 92.600 92.650 92.700 92.750 92.800 92.850 92.900 92.950 93.000 93.050 93.100 93.150 93.200 93.250 93.300 93.350 93.400 93.450 93.500 93.550 93.600 93.650 93.700 93.750 93.800 93.850 93.900 93.950 94.000 94.050 94.100 94.150 94.200 94.250 94.300 94.350 94.400 94.450 94.500 94.550 94.600 94.650 94.700 94.750 94.800 94.850 94.900 94.950 95.000 LHS 8th Layer Exc. Upto Emb. Top SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 Hardrock Rock Page 37 RHS OGL Samp. C&G OGL FDD OGL Record EMB-1st EMB-2nd EMB-3rd EMB-4th EMB-5th EMB-6th EMB-Top SG-Ist SG-IInd SG-Top GSB WMM-1st WMM-Top DBM BC M/s. SAI MAATARINI TOLLWAYS LIMITED Exc. upto E. Top Chainage Exc. Upto Emb. Top Exc. Upto Emb. Top BC DBM WMM-Top WMM-1st GSB SG-Top SG-IInd SG-Ist EMB-Top EMB-6th EMB-5th EMB-4th EMB-3rd EMB-2nd EMB-1st OGL Record OGL FDD C&G OGL Samp. 95.000 95.050 95.100 95.150 95.200 95.250 95.300 95.350 95.400 95.450 95.500 95.550 95.600 95.650 95.700 95.750 95.800 95.850 95.900 95.950 96.000 96.050 96.100 96.150 96.200 96.250 96.300 96.350 96.400 96.450 96.500 96.550 96.600 96.650 96.700 96.750 96.800 96.850 96.900 96.950 97.000 97.050 97.100 97.150 97.200 97.250 97.300 97.350 97.400 97.450 97.500 97.550 97.600 97.650 97.700 97.750 97.800 97.850 97.900 97.950 98.000 98.050 98.100 98.150 98.200 98.250 98.300 98.350 98.400 98.450 98.500 98.550 98.600 98.650 98.700 98.750 98.800 98.850 98.900 98.950 99.000 99.050 99.100 99.150 99.200 99.250 99.300 99.350 99.400 99.450 99.500 99.550 99.600 99.650 99.700 99.750 99.800 99.850 99.900 99.950 100.000 LHS SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 Page 38 RHS Chainage 113+000 113+050 113+100 113+150 113+200 113+250 113+300 113+350 113+400 113+450 113+500 113+550 113+600 113+650 113+700 113+750 113+800 113+850 113+900 113+950 114+000 114+050 114+100 114+150 114+200 114+250 114+300 114+350 114+400 114+450 114+500 114+550 114+600 114+650 114+700 114+750 114+800 114+850 114+900 114+950 115+000 115+050 115+100 115+150 115+200 115+250 115+300 115+350 115+400 115+450 115+500 115+550 115+600 115+650 115+700 115+750 115+800 115+850 115+900 115+950 116+000 116+050 116+100 116+150 116+200 116+250 116+300 116+350 116+400 116+450 116+500 116+550 116+600 116+650 116+700 116+750 116+800 116+850 116+900 116+950 117+000 117+050 117+100 117+150 117+200 117+250 117+300 117+350 117+400 117+450 117+500 117+550 117+600 117+650 117+700 117+750 117+800 117+850 117+900 117+950 118+000 LHS SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 BC DBM WMM-Top WMM-1st GSB SG-Top SG-IInd SG-Ist EMB-Top EMB-11th EMB-10th EMB-9th EMB-8th EMB-7th EMB-6th EMB-5th EMB-4th EMB-3rd EMB-2nd EMB-1st OGL Record OGL FDD C&G OGL Samp. Testing OGL Samp. Testing C&G OGL FDD OGL Record EMB-1st EMB-2nd EMB-3rd EMB-4th EMB-5th EMB-6th EMB-7th EMB-8th EMB-9th EMB-10th EMB-11th EMB-12th EMB-13th EMB-Top SG-Ist SG-IInd SG-Top GSB WMM-1st WMM-Top DBM BC M/s. SAI MAATARINI TOLLWAYS LIMITED Page 39 RHS EMB-10th EMB-9th EMB-8th EMB-7th EMB-6th EMB-5th EMB-4th EMB-3rd EMB-2nd EMB-1st EMB-2nd EMB-3rd EMB-4th EMB-5th EMB-6th EMB-7th EMB-8th EMB-9th EMB-10th EMB-11th EMB-12th EMB-13th M/s. SAI MAATARINI TOLLWAYS LIMITED Excavation upto Emb Top Layer EMB-11th Excavation upto Emb Top layer EMB-12th Excavation upto Emb Top Layer Excavation up to Subgrade Top Layer EMB-13th Excavation upto Subgrade Top layer Chainage 118+000 118+050 118+100 118+150 118+200 118+250 118+300 118+350 118+400 118+450 118+500 118+550 118+600 118+650 118+700 118+750 118+800 118+850 118+900 118+950 119+000 119+050 119+100 119+150 119+200 119+250 119+300 119+350 119+400 119+450 119+500 119+550 119+600 119+650 119+700 119+750 119+800 119+850 119+900 119+950 120+000 120+050 120+100 120+150 120+200 120+250 120+300 120+350 120+400 120+450 120+500 120+550 120+600 120+650 120+700 120+750 120+800 120+850 120+900 120+950 121+000 121+050 121+100 121+150 121+200 121+250 121+300 121+350 121+400 121+450 121+500 121+550 121+600 121+650 121+700 121+750 121+800 121+850 121+900 121+950 122+000 122+050 122+100 122+150 122+200 122+250 122+300 122+350 122+400 122+450 122+500 122+550 122+600 122+650 122+700 122+750 122+800 122+850 122+900 122+950 123+000 LHS SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 BC DBM WMM-Top WMM-1st GSB SG-Top SG-IInd SG-Ist EMB-Top OGL Record OGL FDD C&G OGL Samp. Testing OGL Samp. Testing C&G OGL FDD OGL Record EMB-1st EMB-Top SG-Ist SG-IInd SG-Top GSB WMM-1st WMM-Top DBM BC Page 40 RHS EMB-8th EMB-7th EMB-6th EMB-5th EMB-4th EMB-3rd EMB-2nd EMB-1st OGL Record Chainage EMB-4th EMB-5th EMB-6th EMB-7th EMB-8th EMB-9th EMB-10th EMB-11th EMB-12th EMB-13th EMB-14th . M/s. SAI MAATARINI TOLLWAYS LIMITED . . . Excavation Upto Emb Top Layer Slush Removal . . . . . . . Excavation upto Emb Top Layer EMB-9th Excavation Upto Emb Top Layer EMB-10th Excavation Upto Emb Top Layer EMB-11th Excavation Upto Emb Top Layer EMB-12th Excavation up to Emb Top layer RFI was raised but filling up to 01 layer may be required EMB-13th Excavation Upto Emb Top Layer EMB-14th 123+000 123+050 123+100 123+150 123+200 123+250 123+300 123+350 123+400 123+450 123+500 123+550 123+600 123+650 123+700 123+750 123+800 123+850 123+900 123+950 124+000 124+050 124+100 124+150 124+200 124+250 124+300 124+350 124+400 124+450 124+500 124+550 124+600 124+650 124+700 124+750 124+800 124+850 124+900 124+950 125+000 125+050 125+100 125+150 125+200 125+250 125+300 125+350 125+400 125+450 125+500 125+550 125+600 125+650 125+700 125+750 125+800 125+850 125+900 125+950 126+000 126+050 126+100 126+150 126+200 126+250 126+300 126+350 126+400 126+450 126+500 126+550 126+600 126+650 126+700 126+750 126+800 126+850 126+900 126+950 127+000 127+050 127+100 127+150 127+200 127+250 127+300 127+350 127+400 127+450 127+500 127+550 127+600 127+650 127+700 127+750 127+800 127+850 127+900 127+950 128+000 LHS SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 BC DBM WMM-Top WMM-1st GSB SG-Top SG-IInd SG-Ist EMB-Top . OGL FDD C&G OGL Samp. Testing OGL Samp. Testing C&G OGL FDD OGL Record EMB-1st EMB-2nd EMB-3rd EMB-15th EMB-16th EMB-17th EMB-18th EMB-Top SG-Ist SG-IInd SG-Top GSB WMM-1st WMM-Top DBM BC Page 41 RHS EMB-9th EMB-8th EMB-7th EMB-6th EMB-5th EMB-4th EMB-3rd EMB-2nd EMB-1st Chainage OGL FDD EMB-Top EMB-5th EMB-6th EMB-7th EMB-8th EMB-9th EMB-10th EMB-11th EMB-12th M/s. SAI MAATARINI TOLLWAYS LIMITED Excavation Upto Emb Top Layer Excavation Upto Emb Top Layer EMB-10th Excavation upto Emb Top Layer OGL FDD 128+000 128+050 128+100 128+150 128+200 128+250 128+300 128+350 128+400 128+450 128+500 128+550 128+600 128+650 128+700 128+750 128+800 128+850 128+900 128+950 129+000 129+050 129+100 129+150 129+200 129+250 129+300 129+350 129+400 129+450 129+500 129+550 129+600 129+650 129+700 129+750 129+800 129+850 129+900 129+950 130+000 130+050 130+100 130+150 130+200 130+250 130+300 130+350 130+400 130+450 130+500 130+550 130+600 130+650 130+700 130+750 130+800 130+850 130+900 130+950 131+000 131+050 131+100 131+150 131+200 131+250 131+300 131+350 131+400 131+450 131+500 131+550 131+600 131+650 131+700 131+750 131+800 131+850 131+900 131+950 132+000 132+050 132+100 132+150 132+200 132+250 132+300 132+350 132+400 132+450 132+500 132+550 132+600 132+650 132+700 132+750 132+800 132+850 132+900 132+950 133+000 LHS SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 BC DBM WMM-Top WMM-1st GSB SG-Top SG-IInd SG-Ist OGL Record C&G EXCAVATION OGL Samp. Testing OGL Samp. Testing C&G OGL Record EXCAVATION EMB-1st EMB-2nd EMB-3rd EMB-4th EMB-13th EMB-14th EMB-15th EMB-Top SG-Ist SG-IInd SG-Top GSB WMM-1st WMM-Top DBM BC Page 42 RHS EMB-9th EMB-8th EMB-7th EMB-6th EMB-5th EMB-4th EMB-3rd Chainage EMB-2nd EMB-3rd EMB-4th EMB-5th EMB-6th EMB-7th EMB-8th EMB-9th EMB-10th EMB-11th EMB-12th EMB-13th EMB-14th EMB-15th Excavation was done but RFI was not raised EMB-10th M/s. SAI MAATARINI TOLLWAYS LIMITED Excavation upto Emb Top Layer Excavation upto Emb Top Layer Excavation upto Emb Top Layer EMB-11th 133+000 133+050 133+100 133+150 133+200 133+250 133+300 133+350 133+400 133+450 133+500 133+550 133+600 133+650 133+700 133+750 133+800 133+850 133+900 133+950 134+000 134+050 134+100 134+150 134+200 134+250 134+300 134+350 134+400 134+450 134+500 134+550 134+600 134+650 134+700 134+750 134+800 134+850 134+900 134+950 135+000 135+050 135+100 135+150 135+200 135+250 135+300 135+350 135+400 135+450 135+500 135+550 135+600 135+650 135+700 135+750 135+800 135+850 135+900 135+950 136+000 136+050 136+100 136+150 136+200 136+250 136+300 136+350 136+400 136+450 136+500 136+550 136+600 136+650 136+700 136+750 136+800 136+850 136+900 136+950 137+000 137+050 137+100 137+150 137+200 137+250 137+300 137+350 137+400 137+450 137+500 137+550 137+600 137+650 137+700 137+750 137+800 137+850 137+900 137+950 138+000 LHS SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 BC DBM WMM-Top WMM-1st GSB SG-Top SG-IInd SG-Ist EMB-Top EMB-12th EMB-2nd EMB-1st OGL Record OGL FDD C&G OGL Samp. Testing OGL Samp. Testing C&G OGL FDD OGL Record EMB-1st EMB-16th EMB-Top SG-Ist SG-IInd SG-Top GSB WMM-1st WMM-Top DBM BC Page 43 RHS EMB-8th EMB-7th EMB-6th EMB-5th EMB-4th EMB-3rd EMB-2nd Chainage Excavation upto Emb. Top EMB-9th 138+000 138+050 138+100 138+150 138+200 138+250 138+300 138+350 138+400 138+450 138+500 138+550 138+600 138+650 138+700 138+750 138+800 138+850 138+900 138+950 139+000 139+050 139+100 139+150 139+200 139+250 139+300 139+350 139+400 139+450 139+500 139+550 139+600 139+650 139+700 139+750 139+800 139+850 139+900 139+950 140+000 140+050 140+100 140+150 140+200 140+250 140+300 140+350 140+400 140+450 140+500 140+550 140+600 140+650 140+700 140+750 140+800 140+850 140+900 140+950 141+000 141+050 141+100 141+150 141+200 141+250 141+300 141+350 141+400 141+450 141+500 141+550 141+600 141+650 141+700 141+750 141+800 141+850 141+900 141+950 142+000 142+050 142+100 142+150 142+200 142+250 142+300 142+350 142+400 142+450 142+500 142+550 142+600 142+650 142+700 142+750 142+800 142+850 142+900 142+950 143+000 LHS SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 BC DBM WMM-Top WMM-1st GSB SG-Top SG-IInd SG-Ist EMB-Top EMB-12th EMB-11th EMB-10th EMB-1st OGL Record OGL FDD C&G OGL Samp. Testing OGL Samp. Testing C&G OGL FDD OGL Record EMB-1st EMB-2nd EMB-3rd EMB-4th EMB-5th EMB-6th EMB-7th EMB-8th EMB-9th EMB-10th EMB-11th EMB-12th EMB-Top SG-Ist SG-IInd SG-Top GSB WMM-1st WMM-Top DBM BC M/s. SAI MAATARINI TOLLWAYS LIMITED Page 44 RHS Chainage 143+000 143+050 143+100 143+150 143+200 143+250 143+300 143+350 143+400 143+450 143+500 143+550 143+600 143+650 143+700 143+750 143+800 143+850 143+900 143+950 144+000 144+050 144+100 144+150 144+200 144+250 144+300 144+350 144+400 144+450 144+500 144+550 144+600 144+650 144+700 144+750 144+800 144+850 144+900 144+950 145+000 145+050 145+100 145+150 145+200 145+250 145+300 145+350 145+400 145+450 145+500 145+550 145+600 145+650 145+700 145+750 145+800 145+850 145+900 145+950 146+000 146+050 146+100 146+150 146+200 146+250 146+300 146+350 146+400 146+450 146+500 146+550 146+600 146+650 146+700 146+750 146+800 146+850 146+900 146+950 147+000 147+050 147+100 147+150 147+200 147+250 147+300 147+350 147+400 147+450 147+500 147+550 147+600 147+650 147+700 147+750 147+800 147+850 147+900 147+950 148+000 LHS SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 BC DBM WMM-Top WMM-1st GSB SG-Top SG-IInd SG-Ist EMB-Top EMB-9th EMB-8th EMB-7th EMB-6th EMB-5th EMB-4th EMB-3rd EMB-2nd EMB-1st OGL Record OGL FDD C&G OGL Samp. Testing OGL Samp. Testing C&G OGL FDD OGL Record EMB-1st EMB-2nd EMB-3rd EMB-4th EMB-5th EMB-6th EMB-7th EMB-8th EMB-9th EMB-Top SG-Ist SG-IInd SG-Top GSB WMM-1st WMM-Top DBM BC M/s. SAI MAATARINI TOLLWAYS LIMITED Page 45 RHS Chainage 148+000 148+050 148+100 148+150 148+200 148+250 148+300 148+350 148+400 148+450 148+500 148+550 148+600 148+650 148+700 148+750 148+800 148+850 148+900 148+950 149+000 149+050 149+100 149+150 149+200 149+250 149+300 149+350 149+400 149+450 149+500 149+550 149+600 149+650 149+700 149+750 149+800 149+850 149+900 149+950 150+000 150+050 150+100 150+150 150+200 150+250 150+300 150+350 150+400 150+450 150+500 150+550 150+600 150+650 150+700 150+750 150+800 150+850 150+900 150+950 151+000 151+050 151+100 151+150 151+200 151+250 151+300 151+350 151+400 151+450 151+500 151+550 151+600 151+650 151+700 151+750 151+800 151+850 151+900 151+950 152+000 152+050 152+100 152+150 152+200 152+250 152+300 152+350 152+400 152+450 152+500 152+550 152+600 152+650 152+700 152+750 152+800 152+850 152+900 152+950 153+000 LHS SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 BC DBM WMM-Top WMM-1st GSB SG-Top SG-IInd SG-Ist EMB-Top EMB-9th EMB-8th EMB-7th EMB-6th EMB-5th EMB-4th EMB-3rd EMB-2nd EMB-1st OGL Record OGL FDD C&G OGL Samp. Testing OGL Samp. Testing C&G OGL FDD OGL Record EMB-1st EMB-2nd EMB-3rd EMB-4th EMB-5th EMB-6th EMB-7th EMB-8th EMB-9th EMB-10th EMB-Top SG-Ist SG-IInd SG-Top GSB WMM-1st WMM-Top DBM BC M/s. SAI MAATARINI TOLLWAYS LIMITED Page 46 RHS Chainage 153+000 153+050 153+100 153+150 153+200 153+250 153+300 153+350 153+400 153+450 153+500 153+550 153+600 153+650 153+700 153+750 153+800 153+850 153+900 153+950 154+000 154+050 154+100 154+150 154+200 154+250 154+300 154+350 154+400 154+450 154+500 154+550 154+600 154+650 154+700 154+750 154+800 154+850 154+900 154+950 155+000 155+050 155+100 155+150 155+200 155+250 155+300 155+350 155+400 155+450 155+500 155+550 155+600 155+650 155+700 155+750 155+800 155+850 155+900 155+950 156+000 156+050 156+100 156+150 156+200 156+250 156+300 156+350 156+400 156+450 156+500 156+550 156+600 156+650 156+700 156+750 156+800 156+850 156+900 156+950 157+000 157+050 157+100 157+150 157+200 157+250 157+300 157+350 157+400 157+450 157+500 157+550 157+600 157+650 157+700 157+750 157+800 157+850 157+900 157+950 158+000 LHS SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 BC DBM WMM-Top WMM-1st GSB SG-Top SG-IInd SG-Ist EMB-Top EMB-9th EMB-8th EMB-7th EMB-6th EMB-5th EMB-4th EMB-3rd EMB-2nd EMB-1st OGL Record OGL FDD C&G OGL Samp. Testing OGL Samp. Testing C&G OGL FDD OGL Record EMB-1st EMB-2nd EMB-3rd EMB-4th EMB-5th EMB-6th EMB-7th EMB-8th EMB-9th EMB-Top SG-Ist SG-IInd SG-Top GSB WMM-1st WMM-Top DBM BC M/s. SAI MAATARINI TOLLWAYS LIMITED Page 47 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 M/s. SAI MAATARINI TOLLWAYS LIMITED Page 48 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 BC DBM WMM-Top WMM-1st GSB SG-Top SG-IInd SG-Ist EMB-Top EMB-17th EMB-16th EMB-15th EMB-14th LHS EMB-13th EMB-12th EMB-11th EMB-10th EMB-9th EMB-8th EMB-7th EMB-6th EMB-5th EMB-4th EMB-3rd EMB-2nd EMB-1st OGL Record OGL FDD C&G 163+000 163+050 163+100 163+150 163+200 163+250 163+300 163+350 163+400 163+450 163+500 163+550 163+600 163+650 163+700 163+750 163+800 163+850 163+900 163+950 164+000 164+050 164+100 164+150 164+200 164+250 164+300 164+350 164+400 164+450 164+500 164+550 164+600 164+650 164+700 164+750 164+800 164+850 164+900 164+950 165+000 165+050 165+100 165+150 165+200 165+250 165+300 165+350 165+400 165+450 165+500 165+550 165+600 165+650 165+700 165+750 165+800 165+850 165+900 165+950 166+000 166+050 166+100 166+150 166+200 OGL Samp. Testing Chainage OGL Samp. Testing C&G OGL FDD OGL Record EMB-2nd EMB-3rd EMB-4th EMB-5th EMB-6th RHS EMB-7th EMB-8th EMB-9th EMB-10th EMB-11th Excavation Upto Emb Top Layer EMB-1st EMB-12th EMB-Top SG-Ist SG-IInd SG-Top GSB WMM-1st WMM-Top DBM BC M/s. SAI MAATARINI TOLLWAYS LIMITED Page 49 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis. Monthly Progress Report : June - 2014 7.1. Progress of Major Bridges S. NO CHAINAGE (KM) 1 35+342 KUSAI RIVER 2 56+800 IDENTIFICATION 3 83+568 MUSHAL RIVER KURKURKUTA RIVER 4 108+085 KHALIJORE RIVER 5 139+495 ARDEI RIVER 6 C 7.2. 151+200 ARDEI RIVER COMPLETED P FOUNDATION LHS SUB STRUCTURE RHS LHS IN PROGRESS NA RHS SUPER STRUCTURE LHS RHS NOT APPLICABLE Progress of Minor Bridges S. NO CHAINAGE (KM) 1 17+100 BANDI RIVER 2 22+017 ANDHARI RIVER 3 24+818 GHAGIA NALLA 4 25+543 KALLAPAL JORE 5 31+982 SASAN RIVER 6 33+672 DHANAGHARA NALLAH 7 36+512 KANNADIAPATA RIVER IDENTIFICATION FOUNDATION LHS RHS SUB STRUCTURE LHS RHS SUPER STRUCTURE LHS RHS 40+071 8 44+400 JHADESWAR RIVER 9 49+422 MUHAN 10 57+322 11 67+297 12 82+625 SAGADIA NALLAH 13 95+410 SITA RIVER 14 97+913 ANIADHAR 15 106+926 RIVER 16 111+551 KHALIGHAT 17 116+163 New construction 18 117+007 New construction 19 143+238 New construction 20 146+695 New construction 21 148+605 New construction 22 148+959 New construction 23 152+089 New construction 24 153+942 New construction 25 155+566 26 156+870 New construction New construction 27 158+315 New construction M/s. SAI MAATARINI TOLLWAYS LIMITED Page 50 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ S. NO CHAINAGE (KM) IDENTIFICATION 28 163+136 New construction 29 New construction 166+065 COMPLETED P 115+639.5 JAJPUR BYPASS New Construction COMPLETED P IN PROGRESS NOT APPLICABLE NA CHAINAGE IDENTIFICATION CRASH BARRIER Progress Flyovers DECK SLAB SR. NO. RHS NOT APPLICABLE GIRDER 7.4. NA LHS PEDESTAL C IN PROGRESS RHS PIER CAP 2 LHS SUPER STRUCTURE Progress ROB 09+233 1 RHS PIER / WALLS 7.3. LHS SUB STRUCTURE OPEN FOUNDATION C FOUNDATION Flyovers 1 7.5. 125+284.5 New construction Vehicular Under Pass STATUS OF STRUCTURE SL. NO DESIGN CHAINAGE SIZE FOUNDATION LHS 1 10+673 1 x 12.00 x 5.50 2 20+038 1 x 12.00 x 5.50 3 23+544 1 x 12.00 x 5.50 4 29+857 1 x 12.00 x 5.50 5 38+783 1 x 12.00 x 5.50 6 42+133 1 x 12.00 x 5.50 7 45+448 1 x 12.00 x 5.50 8 53+382 1 x 12.00 x 5.50 9 77+950 1 x 12.00 x 5.50 10 90+500 1 x 12.00 x 5.50 11 115+121 1 x 12 x 5.50 12 117+688 1 x 12 x 5.50 13 122+929 1 x 12 x 5.50 14 128+849 1 x 12 x 5.50 15 131+412 1 x12 x 5.5 M/s. SAI MAATARINI TOLLWAYS LIMITED RHS SUB STRUCTURE LHS RHS SUPER STRUCTURE LHS RHS Page 51 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ 7.6. Pedestrian Under Pass STATUS OF STRUCTURE SL. NO DESIGN CHAINAGE SIZE FOUNDATION LHS 1 05+665 1x5x3 2 09+630 1 x 5.00 x 3.00 3 15+838 1 x 5.00 x 3.00 4 22+705 1 x 5.00 x 3.00 5 29+857 1 x 5.00 x 3.00 6 37+187 1x5x3 7 40+838 1x5x3 8 51+512 1x5x3 9 76+800 1 x 5.0 x 3.0 10 94+257 1 x 5.0 x 3.0 11 109+840 1 x 5.0 x 3.0 12 114+579 1x5x3 13 118+275 1x5x3 14 120+680 1x5x3 15 126+984 1x5x3 16 127+635 1x5x3 17 136+521 1x5x3 18 142+654 1x5x3 19 149+900 1x5x3 20 156+198 1x5x3 21 164+366 1x5x3 7.7. Culverts (Pipe/Box/Slab) RHS SUB STRUCTURE LHS SUPER STRUCTURE RHS LHS RHS STATUS OF STRUCTURE SL. NO DESIGN CHAINAGE STRUCTURE TYPE SIZE 1 01+177 Box Culvert 3.0 x 1.8 2 02+115 HP Culvert 1 x 1.2 Ø 3 03+051 HP Culvert 1 x 1.2 Ø 4 03+452 HP Culvert 1 x 1.2 Ø 5 03+871 HP Culvert 2 x 1.2 Ø 6 04+363 HP Culvert 2 x 1.2 Ø 7 05+069 HP Culvert 1 x 1.2 Ø 8 05+956 HP Culvert 1 x 1.2 Ø 9 08+556 HP Culvert 1 x 1.2 Ø 10 09+170 Box Culvert 3.0 x 3.0 11 11+370 HP Culvert 1 x 1.2 Ø M/s. SAI MAATARINI TOLLWAYS LIMITED FOUNDATION SUB STRUCTURE LHS LHS RHS RHS SUPER STRUCTURE LHS RHS Page 52 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ STATUS OF STRUCTURE SL. NO DESIGN CHAINAGE STRUCTURE TYPE SIZE 12 11+600 HP Culvert 1 x 1.2 Ø 13 12+376 HP Culvert 1 x 1.2 Ø 14 13+060 Box Culvert 1 x 2.00 15 13+223 HP Culvert 2 x 1.2 Ø 16 13+952 HP Culvert 1 x 1.2 Ø 17 14+240 HP Culvert 1 x 1.2 Ø 18 14+700 Box Culvert 1 x 2.0 x 2.0 19 15+680 HP Culvert 1 x 1.2 Ø 20 16+382 HP Culvert 1 x 1.2 Ø 21 17+375 HP Culvert 1 x 1.2 Ø 22 17+563 HP Culvert 1 x 1.2 Ø 23 18+300 HP Culvert 1 x 1.2 Ø 24 19+901 HP Culvert 1 x 1.2 Ø 25 20+627 HP Culvert 1 x 1.2 Ø 26 20+783 Box Culvert 3.0 x 1.40 27 21+070 HP Culvert 1 x 1.2 Ø 28 21+224 HP Culvert 2 x 1.2 Ø 29 21+692 HP Culvert 1 x 1.2 Ø 30 21+852 Box Culvert 3.0 x 2.0 31 20+783 Box Culvert 3.0 x 2.0 32 23+015 Slab Culvert 1 x 2.00 33 23+925 Box Culvert 1 x 2.0 x 2.0 34 25+956 Box Culvert 1 x 3.0 x 3.0 35 26+360 Box Culvert 1 x 4.0 x 3.0 36 27+075 Box Culvert 1 x 4.0 x 3.0 37 27+494 Slab Culvert 1 x 2.0 38 27+753 Box Culvert 39 28+147 Box Culvert 1 x 3.0 x 2.1 1 x 5.00 x 1.60 40 30+307 Box Culvert 1 x 2.0 x 1.2 41 30+646 Box Culvert 1 x 2.0 x 1.7 42 32+319 Box Culvert 1 x 3.0 x 2.7 43 32+460 Box Culvert 1 x 2.0 x 2.0 44 32+646 Box Culvert 1 x 2.0 x 2.0 45 33+125 Box Culvert 1 x 2.0 x 1.4 46 34+252 Box Culvert 1 x 2.0 x 2.0 47 39+101 Box Culvert 1 x 3.0 x 2.0 48 39+920 Box Culvert 1 x 3.0 x 2.0 49 40+195 Box Culvert 2 x 2.8 50 41+245 Box Culvert 1 x 2.0 x 2.0 M/s. SAI MAATARINI TOLLWAYS LIMITED FOUNDATION SUB STRUCTURE LHS LHS RHS RHS SUPER STRUCTURE LHS RHS Page 53 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ STATUS OF STRUCTURE SL. NO DESIGN CHAINAGE STRUCTURE TYPE SIZE 51 43+577 Box Culvert 1 x 4.0 x 3.0 52 47+024 Box Culvert 2 x 2.7 53 47+235 Box Culvert 1 x 2.0 x 1.4 54 47+359 Box Culvert 1 x 2.0 x 2.0 55 Box Culvert 1 x 3.0 x 2.0 56 47+705 47+870 Box Culvert 1 x 3.0 x 2.0 57 48+080 Box Culvert 2 x 2.8 58 49+066 Box Culvert 1 x 2.0 x 1.4 59 58+877 Box Culvert 1 x 2.0 x 2.0 60 60+529 Box Culvert 1 x 3.0 x 2.0 61 62+305 Box Culvert 1 x 3.0 x 2.0 62 62+734 Box Culvert 2 x 2.8 63 86+550 Box Culvert 1 x 5.0 x 3.0 64 91+817 Box Culvert 1 x 3.0 x 3.0 65 92+402 Box Culvert 1 x 3.0 x 3.0 66 93+362 Box Culvert 1 x 3.0 x 3.0 67 94+166 Box Culvert 1 x 3.0 x 3.0 68 96+701 Box Culvert 1 x 5.0 x 2.5 69 96+810 Box Culvert 1 x 5.0 x 1.5 70 99+676 Box Culvert 1 x 3.0 x 2.0 71 100+042 Box Culvert 1 x 4.0 x 3.0 72 105+625 Box Culvert 1 x 2.0 x 3.0 73 105+768 Slab Culvert 1 x 3.0 x 1.0 74 105+875 Box Culvert 1 x 5.0 x 3.0 75 106+062 Box Culvert 1 x 2.0 x 2.0 76 106+335 Box Culvert 1 x 4.0 x 2.0 77 113+540 Box Culvert 3x3 78 113+880 Box Culvert 3x3 79 114+140 Box Culvert 3x3 80 114+930 Box Culvert 3x3 81 115+190 Box Culvert 3x3 82 115+325 Box Culvert 5x3 83 115+605 Box Culvert 5x4 84 116+420 Box Culvert 5x4 85 116+690 Box Culvert 3x3 86 117+225 Box Culvert 3x3 87 117+400 Box Culvert 3x3 88 117+817 Box Culvert 3x3 89 118+106 Box Culvert 3 x 2.5 M/s. SAI MAATARINI TOLLWAYS LIMITED FOUNDATION SUB STRUCTURE LHS LHS RHS RHS SUPER STRUCTURE LHS RHS Page 54 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ STATUS OF STRUCTURE SL. NO DESIGN CHAINAGE STRUCTURE TYPE SIZE 90 118+440 Box Culvert 3x3 91 118+680 Box Culvert 2x2 92 118+982 Box Culvert 2x2 93 119+200 Box Culvert 3x3 94 119+460 Box Culvert 3x2 95 119+700 Box Culvert 3x3 96 119+800 Box Culvert 3x3 97 120+090 Box Culvert 5 x2 98 120+677 Box Culvert 5 x2 99 120+770 Box Culvert 5 x2 100 120+910 Box Culvert 5 x3 101 121+120 Box Culvert 5 x3 102 121+300 Box Culvert 3x3 103 121+470 Box Culvert 3x2 104 121+940 Box Culvert 3x3 105 122+109 Box Culvert 3x3 106 122+237 Box Culvert 3x3 107 122+597 Box Culvert 3x2 108 123+117 Box Culvert 3x2 109 123+677 Box Culvert 3x2 110 126+265 Box Culvert 5x3 111 126+420 Box Culvert 5x3 112 127+330 Box Culvert 5x3 113 127+470 Box Culvert 5x3 114 128+570 Box Culvert 3x3 115 128+710 Box Culvert 2x2 116 129+540 HP Culvert 1 x 1.2 117 130+094 Box Culvert 3 x3 118 130+460 Box Culvert 2x1 119 130+898.5 Box Culvert 2 x1.5 120 130+993 Box Culvert 2 x1.5 121 131+500 Box Culvert 3 x 1.5 122 133+830 Box Culvert 3 x 1.5 123 134+475 Box Culvert 2x2 124 135+554 Box Culvert 2x2 125 139+853 Box Culvert 2x2 126 140+596 Box Culvert 4x4 127 140+887 Box Culvert 4x4 128 141+365 Box Culvert 2x2 M/s. SAI MAATARINI TOLLWAYS LIMITED FOUNDATION SUB STRUCTURE LHS LHS RHS RHS SUPER STRUCTURE LHS RHS Page 55 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ STATUS OF STRUCTURE SL. NO DESIGN CHAINAGE STRUCTURE TYPE SIZE 129 141+656 Box Culvert 4 x 1.5 130 141+767 Box Culvert 2x1 131 142+240 Box Culvert 2x2 132 152+443.284 Box Culvert 2x1 133 156+300 Box Culvert 2x1 134 158+590.902 Box Culvert 5x3 135 159+323 Box Culvert 136 160+421 Box Culvert 137 163+331 Box Culvert 5x3 138 163+801 Box Culvert 5x3 139 164+036 Box Culvert 140 164+191 Box Culvert 5 x 2.5 141 164+520 Box Culvert 5 x 2.5 142 164+631 Box Culvert 143 165+070 Slab Culvert 8. FOUNDATION SUB STRUCTURE LHS LHS RHS RHS SUPER STRUCTURE LHS RHS 1x3 Construction Constraints: A. Land Acquisition: A status report on the acquisition of private land by the end of June-14 is furnished hereunder which reveals the following facts. (a). Keonjhar District (between Km 24+000 to Km 113+000): 1. No of Tahisil: 4 Nos. (Gasipura, Anandpur, Ghatgaon &Sadar) (b). Total No of Villages: 58 Nos.: 1. No. of villages for which compensation has been mostly disbursed – 42 Nos. 2. No of villages pending disbursement of compensation – 16 Nos. 3. Percentage villages for which compensation is yet to be paid – 27.59% (c). Total No of Khatas / Awards: 2358 Nos. : 1. No. of awards for which compensation has been disbursed – 1303 Nos. 2. No of awards pending disbursement of compensation – 1055 Nos. 3. % awards for which disbursement of compensation is pending – 44.74% (d). Total area in these Tahasils / Villages to be acquired – 327.60 Acres: 1. Area for which compensation has been disbursed –153.89 Acres. 2. Area pending disbursement of compensation – 173.71 Acres. 3. % Area for which disbursement of compensation is pending – 53% Ostensibly, the balance land for which compensation is yet to be disbursed, which constitutes53%in the stretch, looks alarming and disturbing and it is necessary that matter is to be addressed by calling up on Competent Authority (LA). M/s. SAI MAATARINI TOLLWAYS LIMITED Page 56 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ However, the private land acquisition between Km 113+000 to Km 166+173, has been accomplished to an extent of 82.52% and the payment for balance land has just been started but sluggish on account of concentration of CALA in Tahasils of Anandapur, Ghasipura, Ghatgaon &Sadar. However certain missing bits are also to be procured by direct purchase. Jajpur District: Km 0+000 to Km 24+000: 3D Notification has been issued for about 517 missing bits which was published in local paper dated 01-06-2014. As these bits are spread over in entire 24 Kms, the formation work in the entire stretch is getting affected and therefore, the payment of compensation gains urgency for these bits. The above process shall take at least 2 more months and 517 bits in these 24 Kms may come into possession by 31-08-2014 provided if Project Director liaises with Competent Authority (L.A.) vigorously and get the amount estimated by CALA vide Section-3G and deposited by Authority vide Section-3H of NH Act-1956. B. Forest Land Diversion Proposal: The Stage-II clearance for the “Forest Land Diversion Proposal” for 151.94 Hectares is yet to be obtained. It shows that more than 424 days was elapsed after Appointed Date for getting this clearance. It may take further 120 days to PIU to accomplish the compliances on conditions communicated in Stage-I clearance and at least another 90 daysfor clearance at MoEF level; thus, the time of 634 days would be lost from Appointed Date by the time Stage-II clearance is obtained from MoEF, presumed. C. Missing bits from 3D Notifications requiring direct purchase by P.D: There are at least 2 missing bits between Km 0+000 to Km 24+000, about 98 missing bits between Km 24+000 to Km 58+000 and11 missing bits between Km 113+000 to Km 166+173 requiring direct purchase by PIU. The missing bits in between Km 58+000 to Km 113+000 are still to be identified as the compensation payment is still in process. D. Total Govt. Buildings and length affected in execution: It is noticed that at least 81 Govt. Buildings/Structures/Compound walls are standing on Project Highway effecting execution of Highway to a length of 5438 meters or 5.438 KMs. PD has to furnish these estimates to RO, NHAI, Bhubaneswar for sanction. PIU has also to make effective efforts and assistance to prevail upon Govt. departments to identify and provide land for construction of buildings to shift the existing offices / schools etc., E. Eviction of Encroachments – “The evection of encroachment in Dhankikoteis in progress”. F. Religious Structures like Temples & Mosques: Total length of execution getting affected due to existence of 12 temples and 1 mosque is 453 Mts.as on 30-04-2014 and the same issue was deliberated in the Monthly Review Meeting held on 29-052014 and Project Director informed for a joint verification with all concerned from 04th to 6th of June’14 to resolve and take a decision, but verification is yet to take place. G. Govt. Land Alienation: M/s. SAI MAATARINI TOLLWAYS LIMITED Page 57 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ Jajpur District: 59 cases were filed with Vyasanagar Tahasil Keonjhar District: 305 cases (Ghasipura-78, Anandpur-30, Ghatgaon-60, Sadar-97, Bansapal (new)-3, Champua-10, Jhumpura (New)27) were filed. The alienation may take some time for official transfer of land to Authority. Project Director has to take suitable steps on the matter. H. Court cases, Arbitration cases: There are about 217 Arbitration cases in Keonjhar District and a dozen cases in Jajpur District. I. I. Resolution of Public Resentment at Belabahali villagers protesting the construction of work of Major Bridge proper at Km 35+803 across Kusei River along the approved alignment as a result of which work in about 5Kms Length (Realignment length is 1.56Kms) has come to a grinding halt. The issue is yet to be resolved. 9. Change of Scope of Work 1. 31 Nos. New Culverts pertaining to Khaneipur Irrigation Department: Project Director has communicated in principle approval of these additional culverts vide Lr. No. 6067, dated 24-04-2014for which Change of Scope Notice has to be issued for all 31 culverts as I.E. vide Lr. No. 123 dated30-05-2014 has communicated to PD, a comprehensive or confirmed proposal on the matter. As Work on 31 Nos. irrigation culverts, therefore could not be commenced which are spread over the Chainages from Km 0+000 to Km 42+000 & Km 145+000 to Km 162+000 thus stalling the work spread over a length of 59Kms. of Project Highway. Concessionaire has furnished GADs for 11 Nos. ofKanupur Irrigation Project for irrigation canals crossing NH-215 highway vide Lr. No. 336, dated 25-05-2014 to Project Director for review and acceptance. 2. Slip/Service Roads for Flyover @ Km 125+284: It was agreed to provide Change of Scope Notice and therefore Concessionaire was asked to provide cost implication with details drawings for slip roads &island/round about arrangement. 3. VUP at KM 115+189 (MDR-Tulasichunura): As required by NHAI the cost implication for double vent VUP in lieu of single vent VUP have been furnished to I.E. to cause issuance of Change of Scope Notice. 10. Claims: a. Extension of Time (EOT) for achieving Mile stones & Scheduled 4-Laning Date: M/s. SAI MAATARINI TOLLWAYS LIMITED Page 58 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ 1) Letter No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/023, dated 21-09-2013 addressed to I.E. for E.O.T. – Delay in acceptance of Designs & Drawings by 1 year 3 months & accessibility of land of 72 Kms (43.37%) for Project Work. 2) Letter No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/025, dated 22-09-2013 addressed to I.E. for E.O.T. of 5 months – Delay in permissions / approvals for electrical utility shifting. 3) Letter No. REF: SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/055, dated 11-11-2013 addressed to I.E. indicating the facts of delay on the obligation of NHAI before commencement of execution of 4-laning pursuant to Cl. 12.4.1 of C.A. 4) Letter No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/071, dated 23-11-2013 addressed to I.E. for E.O.T. of 7 Month – Delay in Tree felling. 5) Letter No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/075, dated 26-11-2013 addressed to I.E. for E.O.T. of 7 Months.– Delay for shifting of RWSS & PH Pipe lines 6) Letter No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/076, dated 26-11-2013 addressed to I.E. for E.O.T. of 7 Months. – Delay in Tree felling. 7) Letter No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/182, dated 10-03-2014 addressed to I.E. for E.O.T. – Review of Design & Drawings by Independent Engineer pursuant to Cl. 12.3 of C.A. – Abnormal delay in review of about 10 months from Appointed Date after submission of Design & Drawings – Determination of Extension of Time for Project Milestones & Scheduled Four Laning Date pursuant to Cl. 12.4.2 of C.A. and Cl. 3.1 (vii) & Cl. 8.2 Schedule-Q of C.A. – Requested. 8) Letter No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/183, dated 10-03-2014 addressed to I.E. for E.O.T. – Determination of extension of Time for all Milestones or the Scheduled Four Laning Date and amendment for them as stipulated in Cl. 6 of Schedule-G and Cl. 12.4.2 of Concession Agreement for the reasons of delay in obligations attributable to Authority / Independent Engineer – Requested. 9) Lr. No. SAI/IC/03/241/2014, dated 27-03-2014 – I.E. has stated that the extension of time is not justified and untenable without calling for verifying relevant documents, records of evidence from either NHAI / Concessionaire. Thus the action of IE is arbitrary & indiscreet. 10) Lr. No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/309, dated 21-06-2014addressed to I.E. substantiating its claim for occurrence of Milestone-I with a detailed substance. 11. Disputes a) Letter No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/182, dated 10-03-2014 addressed to I.E. for E.O.T. – Review of Design & Drawings by Independent Engineer pursuant to Cl. 12.3 of C.A. – Abnormal delay in review of about 10 months from Appointed Date after submission of Design & Drawings – Determination of Extension of Time for Project M/s. SAI MAATARINI TOLLWAYS LIMITED Page 59 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ Milestones & Scheduled Four Laning Date pursuant to Cl. 12.4.2 of C.A. and Cl. 3.1 (vii) & Cl. 8.2 Schedule-Q of C.A. – Requested. b) Letter No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/183, dated 10-03-2014 addressed to I.E. for E.O.T. – Determination of extension of Time for all Milestones or the Scheduled Four Laning Date and amendment for them as stipulated in Cl. 6 of Schedule-G and Cl. 12.4.2 of Concession Agreement for the reasons of delay in obligations attributable to Authority / Independent Engineer – Requested. c) Lr. No. SAI/IC/03/241/2014, dated 27-03-2014 – I.E. has stated that the extension of time is not justified and untenable. Claim of Concessionaire for EOT for 10 Monthsvide letter 182 dated 10-3-2014 and rejection of I.E. vide their Lr. No. 241 dated 27-03-2014 stating the EOT as unjustified constitutes a clear case of“Dispute”. d) In Lr. No. SAI/IC/03/247/2014, dated 01-04-2014 I.E. has rejected the plea of Concessionaire for EOT for 10 months. e) In Lr. No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/211, dated 01-04-2014 Concessionaire has informed I.E. that it would go for “Dispute Resolution” vide Cl. 44 of C.A. f) Concessionaire vide its Lr. No. SMTL/P-R/NH-215/TSN-CGM/NHAI/2014-15/309, dated 18-04-2014 addressed to P.D. requesting him to restrain from imposing damages for Non-occurrence of Milestone-1 as recommended by IE. vide their letter No. 1399 dated 04-04-2014, the contents of which are not agreed to by Concessionaire who requested to maintain status quo until EOT case under dispute settled g) Concessionaire vides its Lr. No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/238, dated 2104-2014 notified I.E. with a request to mediate and assist the parties to dispute for arriving at an amicable settlement pursuant to Cl. 44.2 (conciliation) of C.A. h) I.E. vide their Lr. No. SAI/IC/02/110/2014, dated 29-04-2014 informed P.D. on the intention of Concessionaire for dispute resolution and narrated the provisions in Cl. 44.2 of C.A. with a copy to Concessionaire. i) Concessionairevide its Lr. No. SMTL/P-R/NH-215/TSN-CGM/I.E./2014-15/254, dated 0605-2014 requested IE to take up dispute resolution in consonance with Cl. 44.2 of C.A. through conciliation. j) Concessionaire vide its Lr. No. REF: SMTL/P-R/NH-215/TSN-CGM/NHAI/2013-14/325, dated 09-05-2014addressed to PD for EOT for 10 months k) Concessionaire vodeitsLr. No. SMTL/P-R/NH-215/TSN-CGM/NHAI/2013-14/326, dated 11-05-2014 addressed to PD for EOT for 10 months. l) Concessionairevide its Lr. No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/274, dated 1705-2014 addressed to I.E. requested for EOT of 365 days for project milestones under various reasons. M/s. SAI MAATARINI TOLLWAYS LIMITED Page 60 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ m) IE vide their Lr. No. SAI/IC/02/120/2014, dated 26-05-2014 addressed to P.D. asked to provide details and documents related to action taken by PIU under Cl. 10.3 of C.A. n) As a reply to PDsLr. No. NHAI/11011/1/PKR(SMTPL)/2012/PIU/KJR/6162, dated 29-052014, Concessionaire vide its Lr. No. SMTL/P-R/NH-215/TSN-CGM/NHAI/2013-14/342, dated 31-05-2014 has replied with its legitimate demand of EOT for 365 days as on 3105-2014. The dispute in regard to Extension of Time for Project completion is under stalemate because of PIU not providing relevant data to I.E. as asked by it vide point no (m) above. 12. Non Conforming Product Notifications (NCPNs). NCPN No I.E.'s Lr.No. 1 SAI/IC/03 /100/201 3 Dt.0712-2014 2 SAI/IC/03 /178/201 3 Dt.0802-2014 3 SAI/IC/03 /179/201 4 Dt.1002-2014 4 SAI/IC/03 /188/201 4 Dt.1402-2014 Description Embankment Material 16+380 - 16+550 LHS NCW Embankment Material dumped from unidentified, un reviewed source of borrow area and it appears to be highly plastic, expensive soil which are not suitable for embankment works. Hence the material dumped at side is not acceptable Major Bridge at Km 56+800 (A2). Since the Design related issues (Founding Level) has not resolved/settled for Major Bridge at Km 56+800, the Concessionaire has constructed the Raft (A2) without submission of compliance report, as IE designer's commented on submitted design and drawings of aforementioned structure. Fly Over at Km 125+284.5 (A2&P3). Since the Design related issues (Overlapped pressure bulbs of Abutment & adjacent pier is not considered in the design) has not resolved/settled for Fly Over at Km 125+284.5, the Concessionaire has constructed the Raft (A2&P3) without submission of compliance report, as IE designer commented on submitted design and drawings of aforementioned structure. PMC Lr. No. & Date SMTL Lr. No. & Date Sheladia/PM C/NH215/201314/25 Dt. 21-12-2013 SMTL/P-R/NH215/TSNCGM/IE/201314/090 dt.26-12-2013 Km 146 (Batching Plant). Without Calibration of Admixture at Km 146 Batching Plant, Production of Concrete started. Sheladia/PM C/NH215/201314/97 Dt. 18-02-2014 SMTL/P-R/NH215/TSNCGM/I.E./201314/152 dt.19-02-2014 5 SAI/IC/03 /196/201 4 Dt.1702-2014 Major Bridge at Ch. 56+800. 1st lift of Abutment/Return Wall: A2 1. Haunch not provided as shown in the Drgs 2. Dowels for lap is very less (500mm to 1500mm instead of two layers as shown in the drawings). 3. Vertical bars in Abutment wall are fixed in one layer instead of two layer as shown in the drawings. 4. RFIs are not submitted but the Concessionaire for casting footing and 1st lift of wall. 5. 1st lift of wall (Abutment & Return) is casted after all NCR has been issued to Concessionaire. Sheladia/PM C/NH215/201314/122 Dt. 19-032014 SMTL/P-R/NH215/TSNCGM/I.E./201314/197 Dt.19-03-2014 6 SAI/IC/03 /200/201 4 Dt.2402-2014 Box Culvert at Km 141+764 (LHS) A lot of cracks were found on the top of Raft and also looking very porous. Structurally it is not acceptable. Sheladia/PM C/NH215/201314/151 Dt. 15-042014 SMTL/P-R/NH215/TSNCGM/I.E./201314/230 Dt.16-04-2014 M/s. SAI MAATARINI TOLLWAYS LIMITED Compliance The material collected from site and tested, the test results are found suitable as per Technical Specification hence NCPN-1 has been closed. Repairing work has been done as per methodology submitted on 11-03-2014 adopting MORTH specification. Page 61 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ NCPN No I.E.'s Lr.No. Description 7 SAI/IC/03 /201/201 4 Dt.2402-2014 VUP at Km 131+412 : A lot of honey comb surface found in 2nd lift wall in whole length (inside face) and also embedded reinforcement were exposed. Structurally it is not acceptable. 8 SAI/IC/03 /203/201 4 Dt.2502-2014 At Km 151+200 (Batching Plant) : Without Calibration of Admixture component at Km 151+200 batching plant, Production of Concrete Started. 9 SAI/IC/03 /219/201 4 Dt.0603-2014 At Km 140+600 to 140+750: Dumped embankment material found lots of boulder (Over size material) 10 SAI/IC/03 /220/201 4 Dt.0603-2014 11 SAI/IC/03 /223/201 4 Dt.0803-2014 12 SAI/IC/03 /225/201 4 dt.0803-2014 13 SAI/IC/03 /271/201 4 dt.2104-2014. 14 SAI/IC/03 /283/201 4 dt.0105-2014. At Km 135+060 to 135+250: Subgrade material used over unjustified material of embankment top which is not verified. FDD & levels of embankment top has not been concurred by IE. GSB material has been dumped over un concurred layer of Subgarde. AT Km 56+800 Major Bridge: As per IE designer comments, concessionaire has to furnish the data of RQD, UCS and core recovery for all abutments and piers for conformity of hard rock, but without submission of aforesaid data PCC for P4 has been done and further reinforcement has been placed for concrete (Raft) works. Hence it is considered as non-conformity of work till submission of required of necessary data. At Km 23+100 to 23+380 (LHS): The embankment 1st layer has been done at above chainage from unconcurred / untested source of barrow area. In this connection WIR No.4 (Material) dated 26.02.14 has been issued but no necessary action has been taken, instead further layers are in progress. Hence the executed beneath layer has not considered as acceptance in accordance to the TS as set in Schedule D of CA. At Km 22+380 to Km 22+540 (LHS): Embankment 2nd layer work is in progress over bulged / uncompacted 1st layer at above mentioned chainage. The same has been communicated vide our WIR No.07 for your necessary action. Despite repeated instructions further layers (3rd Layer) is in progress without attending any rectification measures and approval of beneath layers. Since the embankment layers are not being constructed as per the MORTH Specifications the aforesaid works are treated as not approved. PMC Lr. No. & Date Sheladia/PM C/NH215/201314/135 Dt. 26-032014 Sheladia/PM C/NH215/201314/127 Dt. 22-032014 Sheladia/PM C/NH215/201314/130 Dt. 23-032014 Sheladia/PM C/NH215/201314/159 Dt. 25-042014 Sheladia/PM C/NH215/201314/143 Dt. 05-042014 SMTL Lr. No. & Date Compliance SMTL/P-R/NH215/TSNCGM/I.E./201314/206 Dt.28-03-2014 The repairing work is done as per methodology submitted on dt.11-03-2014. The ongoing work was satisfactory. SMTL/P-R/NH215/TSNCGM/I.E./201314/200 Dt.22-03-2014 Calibration of Admixture component completed at Km.151+200 Batching plant. SMTL/P-R/NH215/TSNCGM/I.E./201314/202 Dt.24-03-2014 Over Size material has been removed on above said location and also the Borrow Area material which was used on that location is extended. SMTL/P-R/NH215/TSNCGM/I.E./201314/218 Dt.05-04-2014 Sheladia/P MC/NH215/201314/194 Dt. 09-062014 Safety during Construction: M/s. SAI MAATARINI TOLLWAYS LIMITED Page 62 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ NCPN No 15 I.E.'s Lr.No. Description PMC Lr. No. & Date SAI/IC/03 /299/201 4 dt.1305-2014. At Km 10+000 to 10+320 (RHS): The embankment 4th layer is under progress on loose, uncompacted and without approval of beneath layer because of it was containing Marshy type material which is not suitable for embankment works in accordance to MORTH specification. In this respect WIR no. 8 & 9 had been issued for removal of the unsuitable material (Copy enclosed for ready reference). But without attending rectification works the next layer is in process this is also contaminated with Marshy type material. Sheladia/P MC/NH215/201314/194 Dt. 09-062014 SMTL Lr. No. & Date Compliance 13. Correspondence INCOMING CORRESPONDENCE Sl No Ref No. Date Subject Encl: Address To CC: 1 SAI/IC/03/319/2014 13-Jun-14 Closure of NCPN. Nil CGM, SMTL PD, NHAI,Keonjhar, 2 SAI/IC/03/320/2014 14-Jun-14 Nil CGM, SMTL PD, NHAI,Keonjhar, 3 SAI/IC/03/321/2014 14-Jun-14 Nil CGM, SMTL PD, NHAI,Keonjhar, 4 SAI/IC/03/322/2014 17-Jun-14 Nil CGM, SMTL PD, NHAI,Keonjhar, 5 SAI/IC/03/323/2014 21-Jun-14 Nil CGM, SMTL PD, NHAI,Keonjhar, 6 SAI/IC/03/324/2014 21-Jun-14 Nil CGM, SMTL PD, NHAI,Keonjhar, 7 SAI/IC/03/325/2014 21-Jun-14 Comments on Compliance for RCC Superstructures. Use of Fly Ash. Comments on Design and Drawings of Median wall for 4 nos. of Major Bridges and 24 nos. of Minor Bridges dated 17-06-2014. Review of Borrow Area No.86, 86A, 91, 95, 97, 99, 105 & 109. Review of 3rd Party Test Report of SIKAMENT-122 for Source approval. Review of Borrow Area No.12 Nil CGM, SMTL PD, NHAI,Keonjhar, 8 SAI/IC/03/326/2014 21-Jun-14 Review of Sanfield Source approval for POT/POT cum PTFE Bearings. Nil CGM, SMTL PD, NHAI,Keonjhar, 9 SAI/IC/03/327/2014 21-Jun-14 Review of Material. GSB Nil CGM, SMTL PD, NHAI,Keonjhar, 10 SAI/IC/03/328/2014 21-Jun-14 Review of Borrow Area No.13 & 15. Nil CGM, SMTL PD, NHAI,Keonjhar, 11 SAI/IC/03/329/2014 21-Jun-14 Nil CGM, SMTL PD, NHAI,Keonjhar, Nil CGM, SMTL PD, NHAI,Keonjhar, Nil CGM, SMTL PD, NHAI,Keonjhar, Nil CGM, SMTL PD, NHAI,Keonjhar, Nil CGM, SMTL PD, NHAI,Keonjhar, Dhenkikote Review of Filter Media Mix Design. 12 SAI/IC/03/330/2014 21-Jun-14 13 SAI/IC/03/331/2014 21-Jun-14 14 SAI/IC/03/332/2014 21-Jun-14 15 SAI/IC/03/333/2014 28-Jun-14 Review of Procurement of GSB Material. Review of Concrete Mix Design M15, M-20, M-25, M-30 & M-35. Lack of Safety arrangements in the project highway. Compliance for extension of GSB Single layer underneath Earthen Shoulder and Median-Compliance furnished-Review and Acceptance in conformance with C.A. M/s. SAI MAATARINI TOLLWAYS LIMITED Page 63 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ OUTGOING CORRESPONDENCE Sl N o 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Ref No. SMTL/P-R/NH215/TSNCGM/NHAI/201 3-14/344 SMTL/P-R/NH215/TSNCGM/I.E./201415/292 SMTL/P-R/NH215/TSNCGM/I.E./201415/296 SMTL/P-R/NH215/TSNCGM/NHAI/201 3-14/345 SMTL/P-R/NH215/TSNCGM/NHAI/201 3-14/346 SMTL/P-R/NH215/TSNCGM/NHAI/201 3-14/347 SMTL/P-R/NH215/TSNCGM/NHAI/201 3-14/348 SMTL/P-R/NH215/TSNCGM/NHAI/201 3-14/349 SMTL/P-R/NH215/TSNCGM/NHAI/201 3-14/350 SMTL/P-R/NH215/TSNCGM/NHAI/201 3-14/351 SMTL/P-R/NH215/TSNCGM/I.E./201314/299 SMTL/P-R/NH215/TSNCGM/I.E./201314/300 SMTL/P-R/NH215/TSNCGM/I.E./201314/301 SMTL/P-R/NH215/TSNCGM/NHAI/201 3-14/354 SMTL/P-R/NH215/TSNCGM/NHAI/201 Date 04-Jun-14 06-Jun-14 07-Jun-14 07-Jun-14 07-Jun-14 08-Jun-14 08-Jun-14 08-Jun-14 08-Jun-14 09-Jun-14 10-Jun-14 11-Jun-14 11-Jun-14 11-Jun-14 20-Jun-14 Subject Evection of Encroachments on the Project stretch in Sec-1 of Gayatri Projects Ltd.- Programme-Reg. Conduct Lateral Traffic Volume Count from 09-06-2014 to 11-062014 at Km.45+448 to verify the need of VUP-Deputation of IE's representative to witness count-Requested- Reg. Submission of Modified Plan & Profile Drawings duly justification for certain areas(10 locations)-Review of Independent EngineerRequested-Reg. Acquisition of left out plots in the stretch between Km.24+000 to Km.58+000 by direct purchase under NHAI provisions-List of land plots attached-Action-Requested-Reg. Vedio recording as on 31-05-2014 for the stretch from Km.113+000 to Km.166+173 projecting the status of progress of construction works purusant to CL.13.6 of C.A.- Furnished-Reg. Increasing the Electrical Towers height of 132 KV HT line at Km.7+010 & 220 KV HT Line at 7+670 in Jajpur Bypass because of shortage in vertical clearance from FRL to the live wires Additional cost estimate from line department - Requested - Reg. Non-accomplishment of Joint Inspection of Project Highway from 4th to 6th June 2014 as decided in Monthly Review Meeting held on 29-05-2014-Revised Programme-Requested-Reg. Non Payment of Copmpensation in between Km.113+000 to Km.166+173-(A) Plots for immediate payment and (B) Plots for balance Tahasils / villagers - Immediate action for expeditious payment by CALA-Requested - Reg. Additional Land requirementfor diverging Junction at Km.113+502 Keonjhar Bypass and Toll Plaza at Km.134 - Certain inherent difficulties - Communicated for resolution - Requested - Reg. Construction of ROBs at Km.9+180 (Jajpur Bypass) and Km.115+636 (Keonjhar Bypass) supervision by Officers of East Coast Railway - Requested - Reg. , P1, P2 & P3 - Review and acceptance in comformance with C.A.Requested-Reg. Shifting of location of PUP from Ch.149+580 to Ch.149+502 Requested - Reg. Occurrence of Milestone-1 consistent with Cl.2.2 of Schedule of C.A. - Documents in proof of occurrence of Milestone-1 Furnished - Reg. Resistance of Land Owners of about 517 Missing pits in Jajpur District despite issuance of 3D Notification in local newspapers dated 01-06-2014 - Initiation and extension of sustained support to Concessionaire to proceed with the work - Requested - Reg. Forest Land Diversion proposal and lease of Govt. Land for Junction at Km.113+502 at keonjhar bypass & establishing Toll Plaza at Km.134+000- Processing the proposals - Requested -Reg. M/s. SAI MAATARINI TOLLWAYS LIMITED Encl : Address To Nil PD, NHAI, Keonjhar The Team Leader, Keonjhar Nil The Team Leader, Keonjhar The PD, NHAI, Keonjhar Yes The Team Leader, Keonjhar The PD, NHAI, Keonjhar Nil PD, NHAI, Keonjhar GM, Sec-I, GPL Yes PD, NHAI, Keonjhar The Team Leader, Keonjhar Nil PD, NHAI, Keonjhar The Team Leader, Keonjhar , GM, Sec-I, GPL. Nil PD, NHAI, Keonjhar The Team Leader, Keonjhar Yes PD, NHAI, Keonjhar The Team Leader, Keonjhar Yes PD, NHAI, Keonjhar The Team Leader, Keonjhar Nil PD, NHAI, Keonjhar The Team Leader, Keonjhar Yes The Team Leader, Keonjhar The PD, NHAI, Keonjhar Nil The Team Leader, Keonjhar PD, NHAI, Keonjhar Yes The Team Leader, Keonjhar PD, NHAI, Keonjhar Yes PD, NHAI, Keonjhar The Team Leader, Keonjhar Nil PD, NHAI, Keonjhar The Team Leader, Keonjhar CC: Page 64 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ 16 17 18 19 20 21 22 23 24 25 3-14/357 SMTL/P-R/NH215/TSNCGM/NHAI/201 3-14/358 SMTL/P-R/NH215/TSNCGM/I.E./201314/309 SMTL/P-R/NH215/TSNCGM/I.E./201314/315 SMTL/P-R/NH215/TSNCGM/I.E./201314/316 SMTL/P-R/NH215/TSNCGM/I.E./201314/318 SMTL/P-R/NH215/TSNCGM/NHAI/201 3-14/359 SMTL/P-R/NH215/TSNCGM/I.E./201314/319 SMTL/P-R/NH215/TSNCGM/NHAI/201 3-14/360 SMTL/P-R/NH215/TSNCGM/NHAI/201 3-14/361 SMTL/P-R/NH215/TSNCGM/NHAI/201 3-14/362 20-Jun-14 21-Jun-14 25-Jun-14 25-Jun-14 27-Jun-14 28-Jun-14 28-Jun-14 29-Jun-14 29-Jun-14 Construction of double cell VUP at Km.115+118 of 2x10.00mx5.50m in lieu of existing provision of VUP of size 1x12mx5.5m - Issuance of change of scope of Notice pursuant to Cl.16.2.1 of C.A. - Requested - Reg. Occurrence of Project Milestone-1 pursuant to Cl.2.1 & Cl.2.2 of Schedule of -G, within a period of 90 days in consonace with Cl.12.4.2 of C.A. from the date set forth in Cl.2.1 of Schedule-G for Milestone-1 - Accomplishment of Milestone -1 - Notified afresh for consideration and acceptance - Reg. Monthly Review Meeting held on 29-05-2014 - Communication of minutes of review meeting - Requested -Reg. Monthly Return on MIS, Form-I, Form-II and ROB/RUB status Furnished for the month of June'14 - Reg. Design and GA & R/F Drawings for canal Minor Bridge at Km.146+697 in Jhumpura Bypass - Review of Independent Engineer - Requested -Reg. Status of Procurement(for private land) for the Concessionaire the Right-of-Way to the site in accordance with provision of Cl.10.3.1 by the end of June 2014 - Notified - Expeditious support pursuant to Cl.6.1.2(h) and (g) for completion of L.A. -Requested - Reg. Installation and functioning of laboratory at Bandho camp located at Km.56+000 w.e.f. from 21-06-2014 - Intimation -Reg. 2 missing plots in Jajpur District - Direct purchase by PIU Requested - Reg. Obstruction of execution between Km.15+550 to Km.16+100 Resolution of tussel - Requested - Reg. 30-Jun-14 PD, NHAI, Keonjhar The Team Leader, Keonjhar Nil The Team Leader, Keonjhar The CGM, RO, NHAI, Bhubanesw ar, PD, NHAI, Keonjhar Nil The Team Leader, Keonjhar PD, NHAI, Keonjhar Yes The Team Leader, Keonjhar PD, NHAI, Keonjhar Yes The Team Leader, Keonjhar PD, NHAI, Keonjhar Yes PD, NHAI, Keonjhar The Team Leader, Keonjhar Nil The Team Leader, Keonjhar PD, NHAI, Keonjhar Yes PD, NHAI, Keonjhar The Team Leader, Keonjhar Yes PD, NHAI, Keonjhar The Team Leader, Keonjhar PD, NHAI, Keonjhar The G. M., Sec I & II, Gayatri Projects Ltd., Jajpur & Keonjhar. Yes Nil Relocation of Government Structures between Km.0+000 to Km.166+000 - Requested - Reg. 14. Environmental Regulations& Clearances: APPLICABLE PERMITS (Cl. 4.1.3 (d) and Schedule-E of C.A. SEC-II (Km.0 – Km.113) Sl No. Description of Permission / License Manjuri Km. 18+500 Manjuri (Km. 19+000) Hasanpur Km. 33+000 M/s. SAI MAATARINI TOLLWAYS LIMITED Ostapura (Km. 42+000) Bandha / Arjun Bania (Km. 58+000) Langalakanthi (92+000) Khajirijiani (Km. 94+000) Page 65 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ WMM Plant a b c d e f g Permission of the state Government for extraction of boulders from quarry Permission of Village Panchayata and Pollution Control Board for installation of crushers License for use of explosives Permission of the state Government for drawing water from river / reservoir License from Inspector of factories or other competent Authority for setting up Batching Plant Clearance of Pollution Control Board for setting of Batching Plant Clearance of Village Panchayats and Pollution Control Board for Asphalt Plant NA NA NA Batching Plant NA NA NA Stone Quarry Crusher Batching Plant HM Plant WMM Plant HSD Pump Stone Quarry Crusher Stone Quarry Crusher WMM Plant HM Plant Batching Plant HSD Pump Approved (25% Part payment deposited for renewal) Hot Mix Plant HSD Pump Stone Quarry Crusher NA Approved (Part payment deposited for renewal) FDP under Process To be applied for Permission NA Approved (Valid up to 31-12015) Approved (Valid up to 31-12-015) To be applied for Permission Approved (Valid up to 31-12-015) NA Approved (Renewed up to 3112-014) Approved (Renewed up to 31-12-014) Approved Approved (Renewed up to 31-032015) NA Under Process (Plan Approved but not applied for licence) NA Not Applied NA Approved (Renewed up to 31-032015) NA Approved for total stretch (Km. 00+000 to 163+000) NA In Process NA In Process Approved NA NA Approved (Renewed up to 31-03-2015) In Process NA Approved NA Approved h Permission of Village Panchayat and State Government for borrow earth In Process i Permission of State Government for cutting of trees In Process M/s. SAI MAATARINI TOLLWAYS LIMITED Page 66 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ Manjuri Km. 18+500 Description of Permission / License Sl No. j WMM Plant Manjuri (Km. 19+000) Hasanpur Km. 33+000 Batching Plant Hot Mix Plant HSD Pump Ostapura (Km. 42+000) Bandha / Arjun Bania (Km. 58+000) Langalakanthi (92+000) Stone Quarry Crusher Stone Quarry Crusher Batching Plant HM Plant WMM Plant HSD Pump Stone Quarry Crusher Khajirijiani (Km. 94+000) Stone Quarry Crusher WMM Plant HM Plant Batching Plant HSD Pump Labour License - Done Any other permits or clearance required under Applicable Laws SEC-II (Km.113 – Km.163) SL.NO: A B C D E F G H I DESCRIPTION Permission of the State Government for extraction of boulders from quarry Permission of Village Panchayat State Pollution Control Board for installation of Crushers State Pollution Control Board for Crushing of Granite Stone Chips License for use of explosives Permission of the State Government for drawing water from river/reservoir License from Inspector of factories or other competent authority for setting up Batching Plant Clearance of Pollution Control Board for setting up Batching Plant Clearance of Village Panchayats and Pollution Control Board for Asphalt Plant Permission of Village Panchayat and State Government for borrow earth Permission of State Government for cutting of trees. GPL @ 115 (Ramachandrapur) 1.Permission for quarry obtained through auction at Km. 115 Tulasichoura Stone Quarry -3, Tulasichoura Village of 12 Aces for long term Memo NO. 8028 dated 21.12.2013 for 3 years. Environmental Clearance is pending with /SEIAA.office Completed Order No GP/2012-13/1209 & 07-83-2013 Completed Order No NOC/242 & 15-05-2012 943/IND-I- @ 135 (Raisuan) 1.Permission for quarry obtained through auction at Km. 135 Tikarpada Stone Quarry No-1,Tikarpada Village of 12 Aces on dated 01.04.2014. To be renew by 31-03-2015 Environmental Clearance is pending with /SEIAA.office -NA-NA- Completed order no 220/APC & 05-042014 -NA- Completed (Tulasichoura) Order No 5/2013 & 01-01-2014 Completed (Tikarpada) Order No 14/2012 & 01-01-2014 -NA- -NA- Completed (Order 595/210061200110 & 06-03-2012) No -NA- Completed ( Order No 347/IND-INOC/240 & 19-03-2012) -NA- Completed, Village Panchayat Order No 87 & 19-12-2012, Pollution Control Board Order No 347-IND-NOC/240 & 19-03-2012 -NA- Completed -NA- Completed Order No 3196/Lease on dated, Keonjhar the 24-04.2013 for DL39, & Order No 8478/Lease on dated, Keonjhar the 20-11.2013 for DL-35 (Only for Non forest & Govt land) M/s. SAI MAATARINI TOLLWAYS LIMITED Page 67 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ GPL SL.NO: DESCRIPTION J Any other permits or clearances required under Applicable Laws. @ 115 (Ramachandrapur) @ 135 (Raisuan) WMM Plant Completed 15. Statement showing Road Accident cases for the month: MAR '14 Stretch / NH Detail of Accident Sl. No. State PIU/CMU NH No. From (Km) To (Km) 1 Odisha Keonjhar 215 Panikoili Remuli Length No. of Animals Killed (If Any) Fatal Grievous Minor Total 4 6 8 18 NA 4 6 8 18 NA 163 TOTAL Remarks APR '14 Stretch / NH Sl. No. State 1 Odisha PIU/CMU NH No. Keonjhar 215 Detail of Accident Length From (Km) To (Km) Panikoili Remuli No. of Animals Killed (If Any) Fatal Grievous Minor Total 4 4 2 10 NA 4 4 2 10 NA 163 TOTAL Remarks MAY '14 Stretch / NH Detail of Accident Sl. No. State PIU/CMU NH No. From (Km) To (Km) 1 Odisha Keonjhar 215 Panikoili Remuli Length No. of Animals Killed (If Any) Fatal Grievous Minor Total 4 8 14 26 NA 4 8 14 26 NA 163 TOTAL Remarks 16. Eviction of Encroachments: Private Building Sl N o Name of the Village Tota l Nos Compensatio n Total no of encroachments Dismantle Pai d Balanc e Complet e Balanc e Tota l Nos No of Notice s Issued Balanc e to Issue Notice s Govt. Structure Dismantle Complete d Balanc e 11 0 Tota l Dismantl e Balanc e Sadar Tahasil 1 Jamunalia 2 1 1 1 0 5 5 0 2 Tolankbahal 1 1 0 1 0 0 0 0 3 Sirispal 2 2 0 2 0 0 0 0 4 Nizgarh 13 13 0 10 3 11 11 0 5 Maligaon Gopinathpur Nuagaon 1 1 0 1 0 3 3 0 4 4 0 4 0 0 0 0 6 M/s. SAI MAATARINI TOLLWAYS LIMITED 1 1 Page 68 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ Private Building Sl N o Name of the Village 7 Dhrupada 8 Raisuan Tota l Nos Compensatio n Total no of encroachments Complet e Balanc e 0 2 0 0 0 Balanc e to Issue Notice s 0 4 20 2 16 16 21 21 Pai d Balanc e 2 2 26 22 Dismantle Tota l Nos No of Notice s Issued Govt. Structure Dismantle Complete d Balanc e Tota l 0 14 2 8 8 0 18 3 1 9 Gopinathpur 22 22 0 20 2 10 Khuntapada 0 0 0 0 0 11 Silisuan 3 2 1 2 0 9 9 0 9 0 1 12 Banajodi 8 5 3 5 0 18 18 0 14 4 1 13 Padmapur 20 19 1 19 0 17 17 0 17 0 7 14 Putulia 32 30 2 20 10 2 2 0 2 0 0 15 Keshpank 3 2 1 2 0 16 Jadichatara 0 0 0 0 0 1 1 0 1 0 2 17 Bankamaruni 2 1 1 0 1 9 5 4 18 Hundula 0 0 0 0 0 5 4 1 19 Jamudiha 18 10 8 10 0 6 3 3 4 20 Palaspanga 20 18 2 18 0 27 17 10 12 21 Mursuan 2 1 1 0 1 1 1 22 Spongepatna 0 0 0 0 0 34 23 Tangarani Sub Total Sadar Tahasil 4 4 0 2 2 185 160 25 139 21 Dismantl e Balanc e 0 1 4 3 4 14 22 0 0 9 7 2 0 0 34 0 185 133 52 1 86 9 37 Jhumpura Tahasil 1 Bhaluka 3 0 3 0 0 0 2 27 0 0 0 0 0 0 0 0 0 0 2 2 7 6 1 0 6 2 2 5 Arsala Sundhimursu an Balabhadrapu r Katalposi 16 11 5 8 3 11 11 6 Balibandh 27 16 11 12 4 7 7 14 7 Mursuan Sub Total Jhumpura Tahasil 5 2 3 0 2 3 3 2 85 35 23 20 15 25 3 4 0 25 5 1 0 0 Champua Tahsil 1 Sijukala 3 2 1 2 0 9 9 0 9 0 2 Parsala 12 2 10 2 0 13 13 0 13 0 3 Rimuli Sub Total Champua Tahasil 4 1 3 1 0 19 5 14 5 0 22 22 0 22 0 9 7 2 Grand Total 289 200 62 164 36 232 155 77 108 9 68 11 16 0 M/s. SAI MAATARINI TOLLWAYS LIMITED Page 69 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ STAFF OF SPV & Its TEAM 17. Appendix - Concessionaire Staff S. No. 1 2 3 Name Mr. T. Suryanarayana Mr. U. Anil Kumar Mr. Gopal Mandal Designation Chief General Manager (Tech.) Sr. Planning Engineer / Quantity Surveyor Office Asst. Project Management Consultants Team Staff S. No. Name Designation 1 2 3 Mr. B Krishna Rao M D Rami Reddy Mr. S K S Marar Team Leader Cum Senior Highway Engineer Senior Material Engineer Senior Planner 4 T S Sundaram Resident Highway Engineer-I 5 Marri Bala Raju Resident Highway Engineer - II 6 Ranjit Kumar Resident Highway Engineer - III 7 Sanjay Kumar Acharya Bridge Engineer - I 8 A. K. Singh Bridge Engineer - II 9 S. K. Singh Bridge Engineer - III 10 Mangulu Charan Panda Field Engineer (Highways) - I 11 Umesh Kumar Nayak Field Engineer (Highways) - II 12 Govind Narayan Dubey Field Engineer (Highways) - III 13 Laxman Rao V Field Engineer (Bridges) - I 14 Mahaboob Subhani Field Engineer (Bridges) - II 15 Balachandrudu Field Engineer (Bridges) - III 16 Satya Ranjan Mohapatra Quality Control Engineer - I 17 Shaik. Rahamatulla Quality Control Engineer - II 18 B C Ramanjaneyulu Quality Control Engineer - III 19 Suvendu Das Lab Technician - I 20 Anirvan Banerjee Lab Technician - I 21 Mrutyunjaya Mohanty Lab Technician - II 22 Ranjan Kumar Sahoo Lab Technician - III 23 Arjun Kumar Jha Lab Technician - III 24 Chitaranjan Pattanaik Surveyor - I 25 Sarvendra Kumar Singh Surveyor - II 26 Shashikanta Sahoo QS – I 27 M B Gangadhar Rao QS-II 28 Sanjeev Kumar Goyal Office Manager 29 R. K. Nayak Computer Operator M/s. SAI MAATARINI TOLLWAYS LIMITED Page 70 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 11.0 Appendixes Appendix – 1 Concessionaire’s EPC Contractor’s Staff M/s. SAI MAATARINI TOLLWAYS LIMITED Page 71 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis. Monthly Progress Report : June - 2014 SEC – I STAFF LIST SL.NO. NAME OF EMPLOYEE 1 2 3 BVU BHASKAR S.Venkata Reddy D.S.R. Ratnakar DESIGNATION REMARKS General Manager Project Manager Project Manager PLANNING & BILLING 1 2 3 4 5 V.Sunil Kumar S.Mahapathro G C Senapathi Ram Chandra Sahoo Uma maheswa rao Sr.PE (Planning) Sr.PE (Billing) Billing Asst. Billing Asst. Jr Engineer ADMIN & LIAISIONING 1 2 3 4 5 6 B.Patnaik Vijay Bhatia Umesh Chandra Jena N. C. Jena Siba Prasad Mohapatra Sk. Equebal Mohd. CM (HR & Admin) Dy. Project Manager Manager (HR/Admin) P.R.O. Dy. Manager, HR/Admin Liasioning Officer Bheemudu Amarnath Das Pavan Sr. Engineer Structure Engineer Engineer P.Nagendra Tapas Sen Naidu Madhu AGM Manager Accounts Accountant Cashier Tirupathy Reddy Purnachandra rao Material Engineer Lab Technician Mohd. Akhtar Sai Prasad Pradhan Venkatesh DGM Structures P.E Site Engineer Site Engineer P.RAMU Ravi kiran Manager Asst. Manager Rakesh Kumar Sahoo Tapas Kumar Behra Sesha sai Sr. Surveyor Jr.Surveryor Jr.Surveryor 4HIGHWAYS 1 2 3 ACCOUNTS 1 2 3 4 QA & AC 1 2 STRUCTURES 1 2 3 4 STORES 1 2 SURVEY 1 2 3 MECHANICAL DIVISION 1 2 3 Y. Venkataramaih K. Vijay Kumar K. Basava Raj M/s. SAI MAATARINI TOLLWAYS LIMITED DGM (P&M) Manager, Plants Crusher Incharge Page 72 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 M/s. SAI MAATARINI TOLLWAYS LIMITED Page 73 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June -2014 SEC – II STAFF LIST Sl.No Name of Employee KV.Saikrishna Rao 1 2 B.S.N.Murthy ADMIN & STORE 1 S.Maruthakasi 2 Asish Kumar Swain 3 M.Arunakar Reddy 4 Loknatha Mahanta 5 R K Mishra 6 M.Venkateswar Rao 7 M.K. Naidu PLANNING & Q.S 1 Ishwari Prasad Nath FINANCE /ACCOUNT 1 N.Tirupathi Rao Shibu.P 2 QA & QC Dinesh Chandra Seth 1 2 K S Akhil Gupteswar Routray 3 4 G Chiranjeevi Ramesh Chowhan 5 SURVEY B.Krishana Rao 1 2 Krishna Lal HIGHWAY 1 K.Ravi Kumar Kanchu Simhadri 2 3 A. Klayana Raju Om Prakash Singh 4 5 Ganesh Singha MECHANICAL & PLANTS 1 N.Srinivasa Rao D.N.Raju 2 3 L.Srinivasa Rao Designation Remarks General Manager Additional General Manager Senior Manager (Stores) Manager (Liasioning) Manager (Liasioning) Admin Foreman ( Electrical) Store Keeper Weigh Bridge Operator Planning Engineer Asst. Manager (F & A) Accounts Officer Deputy General Manager Asst Material Engineer Asst. Engineer ( Materials) QC Engineer Lab Technician Senior Surveyor Surveyor Construction Manager Construction Manager Sr. DGM(Structural) DGM(Structural) Manager (Structural) Dy. General Manager (Mechanical) Dy. General Manager (Plants) Foreman M/s. SAI MAATARINI TOLLWAYS LIMITED Page 74 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June -2014 18. Appendix 2 - Summary of test Results QC Test Summary – Section-I (Km 0.000 to Km 55.000) S.No Name of Test A. Borrow Area 1 Gradation 2 Plasticity Test 3 Max.Dry Density Test 4 Deleterious Content Testing Method 5 CBR Test 6 Free Swell Index IS 2720 Part 4 IS 2720 Part 5 IS 2720 Part 8 IS 2720 Part 27 IS 2720 Part 16 & AASTHO : T 193-93 IS 2720 Part 40 7 Sulphate Content BS:1377(tests9/10) 8 Field Density of Comp. Layer EMB 9 Field Density of Comp. Layer Subgrade B. O.G.L. 1 Sand Content 2 Plasticity Test 3 Free Swell Index 4 Max.Dry Density Test 5 Field Density of Comp. Layer OGL 6 CBR Test C. GRANULAR SUB-BASE 1 Gradation 2 Atterberg Limits 3 Moisture Content 4 Field Density of Compaction Layer 5 Deleterious Content 2 Test /3000m3 2 Test /3000m3 2 Test /3000m3 1 Test/Source 2 Test 1516500 69000 1585500 /3000m3 Number of Tests Conducted In This Month Previous Month Total to Date Passed Failed Total Passed Failed Total Passed Failed Total 1011 1011 1011 0 0 0 0 0 1011 1011 1011 0 46 46 46 0 0 0 0 0 46 46 46 0 1057 1057 1057 0 0 0 0 0 1057 1057 1057 0 145 10 155 21 0 21 166 10 176 1011 0 1011 46 0 46 1057 0 1057 As Required Initially one, as and when required by the Engineer 1 Set /1000 m2 1 Set /500m2 0 0 0 0 0 0 0 0 0 10040 2323 159 49 10199 2372 930 484 9 9 939 493 10970 2807 168 58 11138 2865 IS 2720 Part 4 IS 2720 Part 5 IS 2720 Part 40 IS 2720 Part 8 IS 2720 Part 28 IS 2720 Part 16 & AASTHO : T 193-93 As Required As Required As Required As Required 1 Set /1000 m2 436 431 477 436 2266 0 0 8 0 24 436 431 485 436 2290 16 16 16 16 0 0 0 0 0 0 16 16 16 16 0 452 447 493 452 2266 0 0 8 0 24 452 447 501 452 2290 As Required 17 6 23 80 0 80 97 6 103 MORTH T 400 - 2 IS 2720 Part 5 IS 2720 Part 2 IS 2720 Part 28 IS 2720 Part 27 IS 2720 Part 16 & AASTHO : T 193-93 1 Test /200m3 1 Test /200m3 1 Test /250m2 1 Test /500m2 1 Test/Source 1 Test/Source as when required by Engineer 1 Test/Source as when required by Engineer 1 Test/Source as when required by Engineer 1 Test/Source as when required by Engineer 136 131 424 424 1 1 0 6 6 0 137 131 430 430 1 27 27 121 121 0 0 0 3 3 0 27 27 124 124 0 163 158 545 545 1 1 0 9 9 0 164 158 554 554 1 23221.6 3 0 3 0 0 0 3 0 3 2 0 2 0 0 0 2 0 2 1 0 1 0 0 0 1 0 1 2 0 2 0 0 0 2 0 2 1 Test /200m3 6749.06 50 0 50 46 0 46 96 0 96 IS 2720 Part 28 IS 2720 Part 28 6 CBR Test 7 Max.Dry Density Test IS 2720 Part 8 8 Water Absorption IS 2386 Part 3 9 10% Fine Value BS 812 Part 111 D. WET MIX MACADAM 1 Aggregate Impact Value Frequency of Test Executed Quantity Upto Present Previous Cumm. Month Month IS 2386 PART 4 M/s. SAI MAATARINI TOLLWAYS LIMITED 4844 8275 28065.6 15024.06 Page 75 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ S.No Name of Test Testing Method 2 3 4 5 Gradation Flakiness & Elongation Atterberg Limits Field Density of Compaction Layer MORTH T 400 - 11 IS 2386 PART 1 IS 2720 Part 5 IS 2720 Part 28 6 Max.Dry Density Test IS 2720 Part 8 7 Los Angles Abrasion Value IS 2386 Part 4 8 Water Absorption IS 2386 Part 3 Frequency of Test Number of Tests Conducted In This Month Previous Month Total to Date Passed Failed Total Passed Failed Total Passed Failed Total 1 Test /100m3 1 Test /200m3 1 Test /100m3 1 Test /500m2 1 Test/Source as when required by Engineer 1 Test/Source as when required by Engineer 1 Test/Source as when required by Engineer 110 50 83 241 0 0 0 0 110 50 83 241 79 46 79 317 0 0 0 0 79 46 79 317 189 96 162 558 0 0 0 0 189 96 162 558 2 0 2 0 0 0 2 0 2 1 0 1 0 0 0 1 0 1 1 0 1 0 0 0 1 0 1 14 14 4 14 14 2 27 24 21 0 0 0 0 0 0 0 0 0 14 14 4 14 14 2 27 24 21 1 1 1 1 1 0 3 6 6 0 0 0 0 0 0 0 0 0 1 1 1 1 1 0 3 6 6 15 15 5 15 15 2 30 30 27 0 0 0 0 0 0 0 0 0 15 15 5 15 15 2 30 30 27 E. CEMENT TEST 1 Initial Setting Time 2 Final Setting Time 3 Soundness by Le-chatlier's method(%) 4 Fineness Of Cement 5 Consistency Test 6 Chemical analysis IS 4031 Part 5 IS 4031 Part 5 IS 4031 Part 3 IS 4031 Part 3 IS 4031 Part 4 IS 8112 1 TEST /CONSIGNMENT 1 TEST /CONSIGNMENT 1 TEST /CONSIGNMENT 1 TEST /CONSIGNMENT 1 TEST /CONSIGNMENT 1 TEST /SOURCE 7 IS 4031 Part 6 1 TEST /CONSIGNMENT Compressive Strength Executed Quantity Upto Present Previous Cumm. Month Month F. COARSE AGGREGATE 1 Dust Content IS 2386-Part 2 2 Moisture Content IS 2386 Part 3 3 Specific Gravity IS 2386 Part 3 4 Gradation 40,20 & 10mm IS 383 / IS 2386 Part 1 5 Aggregate Impact Value IS 2386 Part 4 6 Flakiness & Elongation IS 2386 Part 1 7 Water Absorption of Aggregate IS 2386 Part 3 Soundness ( Sodium & Magnesium sulphate) 9 Alkali - Aggregate Reactivity 10 Petrographic Analysis 11 Chloride & Sulphate 12 Deleterious content F. FINE AGGREGATE 1 Silt Content 8 1 Test weekly / Day of concrete Daily / Day of concrete One per Source / Once in a month 1 test / Day One per Source / Once in a week One per Source / Once in a week One per Source / Once in a month Concrete Qty. in m3 9682.42 1729.4 11411.82 0 0 0 0 0 0 0 0 0 173 0 173 23 0 23 196 0 196 15 0 15 1 0 1 16 0 16 193 0 193 23 0 23 216 0 216 127 0 127 5 0 5 132 0 132 108 0 108 5 0 5 113 0 113 15 0 15 1 0 1 16 0 16 IS 2386 Part 5 One per Source 4 0 4 0 0 0 4 0 4 IS 2386 Part 7 IS 2386 Part 8 SP 23 IS:2386-Part 2 One per Source One per Source One per Source One per Source 4 4 4 4 0 0 0 0 4 4 4 4 0 0 0 0 0 0 0 0 0 0 0 0 4 4 4 4 0 0 0 0 4 4 4 4 IS 2386 Part 2 1 test / Day 181 0 181 23 0 23 204 0 204 M/s. SAI MAATARINI TOLLWAYS LIMITED Concrete Qty. in m3 Page 76 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ S.No Name of Test Testing Method 2 3 Moisture Content Clay Lumps IS 2386 Part 3 IS 2386 Part 2 4 Specific Gravity IS 2386 Part 3 5 Gradation, Fineness of Modulus IS 383 / IS 2386 Part 1 6 Water Absorption of Aggregate IS 2386 Part 3 7 8 Chloride & Sulphate Deleterious content Soundness ( Sodium & Magnesium 9 sulphate) G. ADMIXTURE TEST 1 Chloride Content 2 Dry Material Content 3 Ash Content 4 Relative Density G. CONCRETE TEST COMPRESSIVE STRENGTH (MIX DESIGN CUBES) No. Of Cubes 1 Frequency of Test : 1/Design Mix (or) 1/Change of Source COMPRESSIVE STRENGTH (SITE CUBES) No. Of Cubes 2 Frequency of Test : MORTH Sec.1700 Table:1700-8 Frequency of Test SP 23 IS:2386-Part 2 Daily / Day of concrete Daily / Day of concrete One per Source / Once in a month 1 test/Day One per Source / Once in a month One per Source One per Source IS 2386 Part 5 One per Source IS 9103 IS 9104 IS 9105 IS 9106 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 M/s. SAI MAATARINI TOLLWAYS LIMITED 1 TEST /CONSIGNMENT M15 7days M15 28 days M20 7days M20 28 days M25 7days M25 28 days M30 7days M30 28 days M35 7days M35 28 days M40 7days M40 28 days M15 7days M15 28 days M20 7days M20 28 days M25 7days M25 28 days M30 7days M30 28 days M35 7days M35 28 days M40 7days M40 28 days Executed Quantity Upto Present Previous Cumm. Month Month 9682.42 1729.4 11411.82 Number of Tests Conducted In This Month Previous Month Total to Date Passed Failed Total Passed Failed Total Passed Failed Total 173 0 0 0 173 0 23 0 0 0 23 0 196 0 0 0 196 0 39 0 39 1 0 1 40 0 40 181 0 181 23 0 23 204 0 204 39 0 39 1 0 1 40 0 40 1 1 0 0 1 1 0 0 0 0 0 0 1 1 0 0 1 1 1 0 1 0 0 0 1 0 1 3 3 3 3 0 0 0 0 3 3 3 3 0 0 0 0 0 0 0 0 0 0 0 0 3 3 3 3 0 0 0 0 3 3 3 3 36 60 30 60 18 30 39 81 18 30 18 30 423 564 204 192 39 42 519 1206 57 96 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 36 60 30 60 18 30 39 81 18 30 18 30 423 564 204 192 39 42 519 1206 57 96 0 0 0 0 0 0 0 6 0 0 0 6 0 0 60 177 0 3 0 0 108 324 9 120 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 0 0 0 6 0 0 60 177 0 3 0 0 108 324 9 120 0 0 36 60 30 60 18 36 39 81 18 36 18 30 483 741 204 195 39 42 627 1530 66 216 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 36 60 30 60 18 36 39 81 18 36 18 30 483 741 204 195 39 42 627 1530 66 216 0 0 Page 77 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ QC Test Summary – Section-II (Km 55.000 to Km 113.000) Executed Quantity S.No Name of Test A. Borrow Area 1 FREE SWELLING INDEX 2 GRAIN SIZE ANALYSIS 3 ATTERBERG LIMITS 4 MAX. DRY DENSITY TEST 5 CALIFORNIA BEARING RATIO TEST 6 DENSITY OF COMP. LAYER EMBANKMENT 5 DENSITY OF COMP. LAYER SUB GRADE B. Shoulder/Cutting Material 1 FREE SWELLING INDEX 2 GRAIN SIZE ANALYSIS 3 ATTERBERG LIMITS 4 MAX. DRY DENSITY TEST 5 CALIFORNIA BEARING RATIO TEST 6 DENSITY OF COMP. LAYER EMBANKMENT 5 DENSITY OF COMP. LAYER SUB GRADE C. O.G.L. 1 FREE SWELLING INDEX 2 GRAIN SIZE ANALYSIS 3 ATTERBERG LIMITS 4 MAX.DRY DENSITY TEST 5 DENSITY OF COMP. LAYER (No of Pits) 6 CALIFORNIA BEARING RATIO TEST D. GRANULAR SUB-BASE 1 GRADATION 2 ATTERBERG LIMITS 3 CALIFORNIA BEARING RATIO TEST 4 DENSITY OF COMP. LAYER (No of Pits) 5 WATER ABSORPTION 6 MAX.DRY DENSITY TEST 7 10% FINEVALUE E. WET MIX MACADAM 1 MAX.DRY DENSITY TEST 2 ATTERBERG LIMITS 3 AGGREGATE IMPACT VALUE 4 GRADATION 5 FLAKINESS & ELONGATION INDEX 6 DENSITY OF COMP. LAYER (No of Pits) Testing Method Frequency of Test IS 2720 Part 40 IS 2720 Part 4 IS 2720 Part 5 IS 2720 Part 8 IS 2720 Part 16 IS 2720 Part 28 IS 2720 Part 28 As Required 2 Test /3000M3 2 Test /3000M3 2 Test /3000M3 1 Test /3000M3 1 Test /1000 M2 1 Test /500M2 IS 2720 Part 40 IS 2720 Part 4 IS 2720 Part 5 IS 2720 Part 8 IS 2720 Part 16 IS 2720 Part 28 IS 2720 Part 28 As Required 2 Test /3000M3 2 Test /3000M3 2 Test /3000M3 1 Test /3000M3 1 Test /1000 M2 1 Test /500M2 IS 2720 Part 40 IS 2720 Part 4 IS 2720 Part 5 IS 2720 Part 8 IS 2720 Part 28 IS 2720 Part 16 As Required As Required As Required As Required 1 Test /1000 M2 As Required IS 2720 Part 9 IS 2720 Part 5 IS 2720 Part 16 IS 2720 Part 28 IS 2386 Part 3 IS 2720 Part 8 BS 812 Part 111 1 Test /200M3 1 Test /200M3 As Required 1 Test /500M2 1 Test/Source 1 Test/Source 1 Test/Source IS 2720 Part 8 IS 2720 Part 5 IS 2386 PART 4 IS 2386 PART 1 IS 2386 PART 1 IS 2720 Part 28 1 Test/Source 1 Test /100M3 1 Test /200M3 1 Test /100M3 1 Test /200M3 1 Test /500M2 M/s. SAI MAATARINI TOLLWAYS LIMITED Upto Previous Month 66,098 3,845 4,555 0 129,443 4,144 Present Month 13,033 7,712 1,036 0 5,235 1,457 Number of Tests Conducted Present Month Previous Month Total to Date Cumm. Passed Failed Total Passed Failed Total Passed Failed Total 79,131 11,557 253 253 253 253 54 2103 742 0 0 0 0 17 40 32 253 253 253 253 71 2143 774 94 94 94 94 33 281 306 0 0 0 0 0 18 36 94 94 94 94 33 299 342 347 347 347 347 87 2384 1048 0 0 0 0 17 58 68 347 347 347 347 104 2442 1116 5,591 0 21 20 21 21 0 142 0 0 5 0 0 2 0 0 21 25 21 21 2 142 0 0 0 0 0 0 27 0 0 0 0 0 0 0 0 0 0 0 0 0 27 0 21 20 21 21 0 169 0 0 5 0 0 2 0 0 21 25 21 21 2 169 0 232 232 232 232 108 0 0 0 0 0 4 0 232 232 232 232 112 0 18 18 18 18 21 0 0 0 0 0 0 0 18 18 18 18 21 0 250 250 250 250 129 0 0 0 0 0 4 0 250 250 250 250 133 0 31 28 2 77 2 2 2 0 0 0 0 0 0 0 31 28 2 77 2 2 2 8 7 0 37 0 0 0 0 0 0 6 0 0 0 8 7 0 43 0 0 0 39 35 2 114 2 2 2 0 0 0 6 0 0 0 39 35 2 120 2 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 2 28 2 0 0 0 0 0 0 0 2 2 2 28 2 0 2 2 2 28 2 0 0 0 0 0 0 0 2 2 2 28 2 0 134,678 5,601 Page 78 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ Executed Quantity S.No Name of Test 7 MOISTURE CONTENT F. CEMENT TEST 1 CONSISTENCY TEST 2 SETTING TIME 3 FINENESS TEST COMPRESSIVE STRENGTH 4 Testing Method COMPRESSIVE STRENGTH (MIX DESIGN CUBES) No. Of Cubes 1 Frequency of Test : 1/Design Mix (or) 1/Change of Source COMPRESSIVE STRENGTH (SITE CUBES) No. Of Cubes 2 Frequency of Test : MORTH Sec.1700 Table:1700-8 Upto Previous Month Present Month Cumm. Total to Date Passed Failed Total Passed Failed Total Passed Failed Total IS 2720 Part 2 As Required 0 0 0 0 0 0 0 0 0 IS 4031 Part 4 IS 4031 Part 5 IS 4031 Part 3 IS 4031 Part 6 1 Test/Consignment 1 Test/Consignment 1 Test/Consignment 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 Days 7 Days 28 Days G. COARSE & FINE AGGREGATE 1 COARSE AGG. GRADATION 40,20 & 10MM 2 FINE AGGREGATES GRADATION 3 WATER ABSORPTION 4 SPECIFIC GRAVITY TEST 5 AGGREGATE IMPACT VALUE 6 FLAKINESS TEST H. CONCRETE TEST Frequency of Test Number of Tests Conducted Present Month Previous Month 1 Test/Consignment IS 383 IS 2386 Part 1 IS 2386 Part 3 IS 2386 Part 3 IS 2386 PART 4 IS 2386 PART 1 1 test/Day 1 test/Day As Required As Required As Required As Required 116 108 0 0 64 64 0 0 0 0 0 0 116 108 0 0 64 64 96 43 0 0 7 7 0 0 0 0 0 0 96 43 0 0 7 7 212 151 0 0 71 71 0 0 0 0 0 0 212 151 0 0 71 71 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 M15 7days M15 28 days M20 7days M20 28 days M25 7days M25 28 days M30 7days M30 28 days M35 7days M35 28 days M40 7days M40 28 days M15 7days M15 28 days M20 7days M20 28 days M25 7days M25 28 days M30 7days M30 28 days M35 7days M35 28 days M40 7days 0 0 0 0 0 0 0 0 0 0 0 0 87 159 0 0 0 0 177 378 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 87 159 0 0 0 0 177 378 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 24 66 6 0 0 0 138 291 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 24 66 6 0 0 0 138 291 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 111 225 6 0 0 0 315 669 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 111 225 6 0 0 0 315 669 0 0 0 M/s. SAI MAATARINI TOLLWAYS LIMITED 350.5 454.5 805.0 0.0 12.5 12.5 2,271.5 1,015.0 3,286.5 Page 79 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ Executed Quantity S.No Name of Test Testing Method IS 516 Frequency of Test Upto Previous Month Present Month Number of Tests Conducted Present Month Previous Month Cumm. M40 28 days Total to Date Passed Failed Total Passed Failed Total Passed Failed Total 0 0 0 0 0 0 0 0 0 QC Test Summary – Section-III (Km 113.000 to Km 166.173) S.No Name of Test A. Borrow Area 1 FREE SWELLING INDEX 2 GRADATION 3 ATTERBERG LIMITS 4 MAX. DRY DENSITY TEST 5 Deleterious content 6 CBR 7 DENSITY OF COMP. LAYER EMBANKMENT 8 DENSITY OF COMP. LAYER SUB GRADE B. O.G.L. 1 FREE SWELLING INDEX 2 GRADATION 3 ATTERBERG LIMITS 4 Deleterious content 5 MAX.DRY DENSITY TEST 6 DENSITY OF COMP. LAYER (No of Pits) 7 CBR C. GRANULAR SUB-BASE 1 GRADATION 2 ATTERBERG LIMITS 3 CBR 4 MOISTURE CONTENT 5 Deleterious content 6 DENSITY OF COMP. LAYER (No of Pits) 7 WATER ABSORPTION 8 MAX. DRY DENSITY TEST 9 10% FINE VALUE D. WET MIX MACADAM 1 MAX. DRY DENSITY TEST 2 ATTERBERG LIMITS 3 AGGREGATE IMPACT VALUE 4 GRADATION 5 Flakiness & Elongation 6 Abrasion Value Testing Method Frequency of Test Executed Quantity Till Previous Month Passed Failed Total Number of Tests Conducted In This Month Passed Failed Total Passed Till Date Failed Total IS 2720 Part 40 IS 2720 Part 4 IS 2720 Part 5 IS 2720 Part 8 IS 2720 part 27 IS 2720 Part 16 IS 2720 Part 28 IS 2720 Part 28 AS REQUIRED 2 Test /3000M3 2 Test /3000M3 2 Test /3000M3 AS REQUIRED 1 Test /3000M3 1 Test /1000 M2 1 Test /500M2 1318500 1339500 1333500 1333500 _ 438000 10400000 969500 820 834 834 834 1 131 8890 1477 24 24 20 20 0 5 491 101 844 858 854 854 1 136 9381 1578 35 35 35 35 0 5 987 336 0 0 0 0 0 5 32 25 35 35 35 35 0 10 1019 361 855 869 869 869 1 136 9877 1813 24 24 20 20 0 10 523 126 879 893 889 889 1 146 10400 1939 IS 2720 Part 40 IS 2720 Part 4 IS 2720 Part 5 IS 2720 part 27 IS 2720 Part 8 IS 2720 Part 28 IS 2720 Part 16 AS REQUIRED AS REQUIRED AS REQUIRED AS REQUIRED AS REQUIRED 1 Test /1000 M2 AS REQUIRED _ _ _ _ _ 1125000 _ 196 196 196 1 196 925 2 0 0 0 0 0 114 0 196 196 196 1 196 1039 2 0 0 0 0 0 78 0 0 0 0 0 0 8 0 0 0 0 0 0 86 0 196 196 196 1 196 1003 2 0 0 0 0 0 122 0 196 196 196 1 196 1125 2 IS 2720 Part 9 IS 2720 Part 5 IS 2720 Part 16 IS 2720 Part 2 IS 2720 part 27 IS 2720 Part 28 IS 2386 Part 3 IS 2720 Part 8 BS 812 Part 111 1 Test /200M3 1 Test /200M3 AS REQUIRED 1 Test /250M2 AS REQUIRED 1 Test /500M2 1 TEST PER SOURCE 1 TEST /SOURCE 1 TEST PER SOURCE 31000 30200 0 13000 _ 0 0 0 0 113 113 4 52 1 162 5 4 6 4 0 0 0 0 25 0 0 0 117 113 4 52 1 187 5 4 6 38 38 0 0 0 56 0 0 0 0 0 0 0 0 8 0 0 0 38 38 0 0 0 64 0 0 0 151 151 4 52 1 218 5 4 6 4 0 0 0 0 33 0 0 0 155 151 4 52 1 251 5 4 6 IS 2720 Part 8 IS 2720 Part 5 IS 2386 PART 4 IS 2386 PART 1 IS 2386 PART 1 IS 2386 Part 3 1 TEST PER SOURCE 1 Test /100M3 1 Test /200M3 1 Test /100M3 1 Test /200M3 AS REQUIRED 0 8200 9800 8500 9800 _ 2 66 39 69 39 0 0 0 0 0 0 0 2 66 39 69 39 0 0 16 10 16 10 0 0 0 0 0 0 0 0 16 10 16 10 0 2 82 49 85 49 0 0 0 0 0 0 0 2 82 49 85 49 0 M/s. SAI MAATARINI TOLLWAYS LIMITED Page 80 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ S.No Name of Test Testing Method Frequency of Test Executed Quantity Till Previous Month Passed Failed Total 90 11 101 16 0 16 Number of Tests Conducted In This Month Passed Failed Total 12 0 12 8 0 8 Passed 102 24 Till Date Failed 11 0 Total 113 24 7 DENSITY OF COMP. LAYER (No of Pits) 8 MOISTURE CONTENT E. CEMENT TEST 1 CONSISTENCY TEST 2 SETTING TIME 3 Soundness by Le-chatlier's method(%) 4 Chemical analysis 5 FINENESS TEST IS 2720 Part 28 IS 2720 Part 2 1 Test /500M2 AS REQUIRED 0 0 IS 4031 Part 4 IS 4031 Part 5 IS 4031 IS 8112 IS 4031 Part 3 1 TEST /CONSIGNMENT 1 TEST /CONSIGNMENT 1 TEST /CONSIGNMENT 1 TEST /SOURCE 1 TEST /CONSIGNMENT 6 IS 4031 Part 6 1 TEST /CONSIGNMENT _ _ _ _ _ _ _ _ 15 15 0 5 15 20 19 18 0 0 0 0 0 0 0 0 15 15 0 0 15 20 19 18 2 2 1 0 2 2 3 2 0 0 0 0 0 0 0 0 2 2 1 0 2 2 3 2 17 17 1 5 17 22 22 20 0 0 0 0 0 0 0 0 17 17 1 0 17 22 22 20 IS 383 IS 2386 Part 1 IS 2386 Part 2 IS 2386 Part 3 IS 2386 Part 3 IS 2386 Part 7 IS 2386 Part 8 IS 2386 Part 2 IS 2386 Part 5 IS 2386 PART 4 IS 2386 PART 1 1 test/Day 1 test/Day AS REQUIRED AS REQUIRED AS REQUIRED One per Source One per Source One per Source One per Source AS REQUIRED AS REQUIRED 0 0 0 0 0 0 0 0 0 0 0 182 182 14 2 5 3 3 3 3 40 39 0 0 0 0 0 0 0 0 0 0 0 182 182 14 2 5 3 3 3 3 40 39 42 42 4 0 0 0 0 0 0 4 4 0 0 0 0 0 0 0 0 0 0 0 42 42 4 0 0 0 0 0 0 4 4 224 224 14 2 5 3 3 3 3 44 43 0 0 0 0 0 0 0 0 0 0 0 224 224 18 2 5 3 3 3 3 44 43 1 TEST /CONSIGNMENT 0 0 0 0 4 4 4 4 0 0 0 0 4 4 4 4 0 0 0 0 0 0 0 0 0 0 0 0 4 4 4 4 0 0 0 0 4 4 4 4 17 17 12 12 0 0 14 15 7 7 7 0 0 0 0 0 0 0 0 0 0 0 17 17 12 12 0 0 14 15 7 7 7 0 4 0 0 0 0 0 6 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 6 0 6 0 17 21 12 12 0 0 14 21 7 13 7 0 0 0 0 0 0 0 0 0 0 0 17 21 12 12 0 0 14 21 7 13 7 COMPRESSIVE STRENGTH F. COARSE & FINE AGGREGATE 1 COARSE AGG. GRADATION 40,20 & 10MM 2 FINE AGGREGATES GRADATION 3 Silt Content 4 Water Absorption of Aggregate CA/FA 5 Specific Gravity CA/FA 6 Alkali-Aggregate reactivity 7 Petrographic Analysis 8 Deleterious content 9 Soundness ( Sodium & Magnesium sulphate) 10 AGGREGATE IMPACT VALUE 11 FLAKINESS TEST G. ADMIXTURE TEST 1 2 3 4 CHLORIDE CONTENT DRY MATERIAL CONTENT ASH CONTENT RELATIVE DENSITY H. CONCRETE TEST 1 COMPRESSIVE STRENGTH (MIX DESIGN CUBES) No. Of Cubes IS 9103 IS 9104 IS 9105 IS 9106 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 M/s. SAI MAATARINI TOLLWAYS LIMITED M15 7days M15 28 days M20 7days M20 28 days M25 7days M25 28 days M30 7days M30 28 days M35 7days M35 28 days M40 7days 0 0 0 0 0 0 Page 81 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ S.No 2 Name of Test COMPRESSIVE STRENGTH (SITE CUBES) No. Of Cubes Testing Method IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 IS 516 M/s. SAI MAATARINI TOLLWAYS LIMITED Frequency of Test Executed Quantity M40 28 days M15 7days M15 28 days M20 7days M20 28 days M25 7days M25 28 days M30 7days M30 28 days M35 7days M35 28 days M40 7days M40 28 days 1939CUM 0 0 14229 CUM 48 CUM 0 Till Previous Month Passed Failed Total 7 0 7 190 0 190 301 0 301 0 0 0 0 0 0 0 0 0 0 0 0 555 0 555 1218 0 1218 1 0 1 6 0 6 0 0 0 0 0 0 Number of Tests Conducted In This Month Passed Failed Total 6 0 6 26 0 26 97 0 97 0 0 0 0 0 0 0 0 0 0 0 0 162 0 162 381 0 381 0 0 0 0 0 0 0 0 0 0 0 0 Passed 13 216 398 0 0 0 0 717 1599 1 6 0 0 Till Date Failed 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 13 216 398 0 0 0 0 717 1599 1 6 0 0 Page 82 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June -2014 19. Appendix 3 - List of Plant and Equipment (0-113) SL.NO. PLANTS 1 2 3 4 5 6 7 8 9 DESCRIPTION OF P&M Crusher Crusher Crusher Batching Plant Batching Plant Batching Plant Wet Mix Plant Wet Mix Plant Wet Mix Plant 10 Hot Mix Plant MACHINERY 1 JCB 2 HIRE JCB 3 EXCAVATOR 320D 4 EXCAVATOR 5 LOADER-3036 6 HIRE LOADER (SOWBHAGYA) 7 SOIL COMPACTORS 8 GRADER CAT120K(MGD/47) 9 GRADER CAT120K(MGD/47) DOZERS 10 DOZZER D-50 (MDZ/1) 11 HIRE DOZER KOMATSU PAVERS 12 PAVER-DYNAPAC(MPV/44) 13 PAVER-APOLLO(MPV/47) CRANES 14 CRANE HYDRO(MCR/15) 15 HIRE HYDRA ESCORT 3069 DUMPERS 16 DUMPER 17 HIRE HYVA 18 BT SPRAYER 19 HIRE TIPPER & DUMPERS LIGHT VEHICLES 20 BOLERO 21 CAMPER GENIO 22 CAMPER 23 DIESEL TANKER 24 DOZER TRACTOR AP26J4393(VTR/9) 25 INNOVA OR04H 2222 (LMV/193) 26 SCORPIO 27 SUMO AP05AA 1266 (LMV/172) 28 TATA MAGIC D G SET & COMPRESSOR 29 COMPRESSOR 30 CONCRETE MIXTURE - 1 31 CONCRETE PUMP 32 DEWATERING PUMP 33 DG 10KVA 34 DG 125KVA 35 DG 1500VOLTS 36 DG 15KVA 37 DG 160KVA 38 DG 20 KV 39 DG 250KVA 40 DG 25KVA 41 DG 30KVA MAKE / BRAND CAPACITY WORKING IDLE OWN / HIRE LOCATION Metso Metso Puzzolana Schwing Stetter Schwing Stetter Schwing Stetter Apollo Apollo MAXMECH 240 TPH 240 TPH 200 TPH 30 CPH 60 CPH 30 CPH 160 TPH 250 TPH 200 TPH 1 1 1 1 1 1 1 1 1 Own Own Own Own Own Own Own Own Own KM-42 KM-58 KM-94 KM-19 KM-58 KM-94 KM-18 KM-94 KM-58 Speco 160 TPH 1 Own KM-58 4 3 7 18 4 1 8 9 2 Own Hire Own Hire Own Hire Hire Own Hire 1 9 Own Hire - 1 1 Own Own 20 MT 35 MT - 3 5 Own Hire 28 6 2 80 Own Hire Own Hire NA NA NA NA NA NA NA NA NA 11 3 12 4 1 1 7 1 2 Own Own Own Own Own Own Own Own Own (MCP/12) 1 2 2 11 2 5 1 4 1 9 1 2 4 Own Own Own Own Own Own Own Own Own Own Own Own Own D-50 DYNAPAC APOLLO M/s. SAI MAATARINI TOLLWAYS LIMITED 10KVA 125KVA 1500VOLTS 15KVA 160KVA 20 KV 250KVA 25KVA 30KVA REMARKS Erection in progress Page 83 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ SL.NO. 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 DESCRIPTION OF P&M DG 40KVA DG 45KVA DG 500KVA DG 5KVA DG 62.5KVA DG 625KVA DG 750KVA DG 82.5KVA KERB CUTTER MIXER MACHINE ROCK BREAKER TROLLEY AIR COMPRESSOR WEIGH BRIDGE WATER TANKER WATER TANKER WATER TANKER TRANSIT MIXER TRANSIT MIXER TRAILERS TRAILERS MAKE / BRAND CAPACITY 40KVA 45KVA 500KVA 5KVA 62.5KVA 625KVA 750KVA 82.5KVA - WORKING 4 4 5 4 2 1 1 1 1 1 1 1 3 IDLE OWN / HIRE Own Own Own Own Own Own Own Own Own Own Own Own Own 12 KL 12 KL 10 6 Own Hire 6.5 Cum 12 Own 3 Own LOCATION REMARKS Section II Sr. No. A 1 2 3 Plant Crusher Crusher Crusher Puzzolana Puzzolana Taurian 4 Batching Plant Schwing Stetter B 1 2 3 4 5 6 7 8 9 10 11 12 13 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Machinery Excavator Excavator Dumper Tipper Dozer (D80) Grader Escort Roller JCB Roller Water Tanker JCB Transit Mixer Transit Mixer Transit Mixer Loader BT Sprayer Tractor Broomer Kerb Cutting Machine Plate Earth Compacter – 1 Concrete Pump Electrical Vibrator 3 Phase - 1 Petrol Vibrator – 1 DG Set DG Set DG Set Silent DG Set Silent DG Gen Set Name of P&M Make/Brand TATA-210 L&T Ashok Leyland TATA Hindustan CAT Escort JCB Ashok Leyland CAT Asia Motors Ashok Leyland Hindustan Ashok Leyland Ford Appolo Testwell Greaves Cotton Ltd. Killic Eng Killic Caterpillar Caterpillar Kirloskar Kirloskar Kirloskar M/s. SAI MAATARINI TOLLWAYS LIMITED Capacity Available at Site 200 TPH 240 TPH 150 TPH 01 01 01 30 cum/Hr 03 1 m3 1 m3 14m3 12 KL 0.3 m3 6 m3 6 m3 4 m3 1.7 m3 500 KVA 250 KVA 125 KVA 100 KVA 63 KVA 22 05 84 03 14 08 13 01 18 06 02 02 04 03 01 01 01 01 01 01 04 01 03 01 01 01 01 Remarks @ Ch 115+000 @ Ch 116+000 @ Ch 135+800 1-@ Ch 115+400, 2- @ Ch 148+800 & 3- @ Ch 151+200 Page 84 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ Sr. No. 27 28 29 30 31 32 33 20 KVA 5 KVA Available at Site 01 02 3 PHASE 01 Shaketech 3 PHASE 01 Rama Vishwakarma TATA 3 PHASE 80MT 3 KL 01 03 01 Name of P&M DG Gen Set Trolley Based Search Light Air Compressor with Patch Heater Welding Transformer 450 Amp – 1 Welding Machine – 2 Weigh Bridge 80/100 Tata 407 HSD Distributer Make/Brand Kirloskar Sigma N/A Capacity Remarks 20. Appendix 4 - List of Lab Equipment & Calibration Status Lab at Km 19 S.No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 NAME OF EQUIPMENT / INSTRUMENT 300o Thermostatic Controlled Oven ( 0 to Capacity) Big Thermostatic Controlled Oven ( 0 to 300o Capacity) Medium Electronic balance (30 kg ) 2 gm accuracy Electronic balance (30 kg ) 2 gm accuracy Electronic balance (30 kg ) 1 gm accuracy Electronic balance (1000 gm ) 0.1 gm accuracy Electronic balance (15 kg) 1g accuracy Electronic balance (15 kg) 0.5g accuracy Electronic balance (600 gm ) 0.01 gm accuracy Rapid Moisture Meters Rapid Moisture Meters Rapid Moisture Meters 100 mm 75 mm 63 mm 53 mm 50 mm 45 mm 40 mm 37.5 mm 31.5 mm 26.5 mm 25 mm 22.4 mm 20 mm 19 mm 16 mm 14 mm 13.2 mm 12.5 mm 11.2 mm 10 mm 9.5 mm 6.3 mm 5.6 mm 4.75 2.36 4.75mm 2.36mm 2.8 mm M/s. SAI MAATARINI TOLLWAYS LIMITED Quantity 1 1 1 1 2 1 1 2 1 1 1 1 1 1 2 1 1 1 2 1 1 2 2 1 1 1 1 2 1 1 2 1 1 1 1 3 2 2 1 1 Calibration Status Remarks Done Done Done Done Done Done Done Done Done Done Done Done Done Done Page 85 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ S.No 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 NAME OF EQUIPMENT / INSTRUMENT 2.00mm 1.4 mm 1.18mm 1.00mm 710 mic 600 mic 500 mic 425 mic 355 mic 300 mic 180 mic 150 mic 90 mic 75 mic Lid and pan Casagrande Liquid limit testing device Casagrande Liquid limit testing device CBR Testing Machine Cone penetrometer Proctor mould 2250 cc with 4.9kg rammer Proctor mould 2250 cc with 4.9kg rammer Proctor mould 2250 cc with 4.9kg rammer Proctor mould 1000 cc with2.6kg rammer Proctor mould 1000 cc with2.6kg rammer Sand Pouring Cylinders with complete set Sand Pouring Cylinders with complete set Sand Pouring Cylinders with complete set Sand Pouring Cylinders with complete set Sand Pouring Cylinders with complete set Sand Pouring Cylinders with complete set 100 lm glass measuring jars (FSI) CBR moulds Surcharge weight (2.5 Kg) Spacer disc with handle Aluminum containers Perforated plates Proving Ring (50 KN) Proving Ring (50 KN) Vicat Needle Apparatus ( with dash pot) Cement Mortar Cube Moulds (7.06x7.06x7.06 cm) Aggregate Impact Value Test Apparatus Flakiness Gauge Flakiness Gauge Elongation Gauge Elongation Gauge Concrete Cube moulds ( 150x150x150 mm) Slump cone Slump cone Slump cone Slump cone Slump rod Compressive Testing Machine (2000 kn) (CTM) Cement mortar cube vibrating machine Soundness apparatus 100 mm dia 100 mm dia 150 mm dia 150 mm dia 200 mm dia 200 mm dia Quantity 2 1 2 4 1 6 1 6 1 2 1 3 1 6 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 24 56 112 2 151 56 1 1 1 15 1 1 1 1 1 93 1 1 1 1 5 1 1 5 Calibration Status Remarks Done Done Done Done Done Done Done Done Done Done Done Done Done Done Done Done Done Done Done Done Done Done Done Done Done Done Done Done Done Done Done Done Done Done Done Done Done Done Done Lab at Km 94+300 M/s. SAI MAATARINI TOLLWAYS LIMITED Page 86 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ S No Description Instrument Make/Brand Modal/Instrument Code Nos. Purpose Last Date of Calibration Calibration Freq. Due Date for next calibration Steco 2000 KN - 07442 1 Comp. Cube Test 08/02/2014 12 Months 07/02/2015 25/01/2014 6 Months 25/07/2014 25/01/2014 6 Months 25/07/2014 28/02/2014 6 Months 27/08/2014 16/01/2014 18 Months 16/07/2014 26/02/2014 18 Months 26/08/2014 1 Compressive Testing Machine (2000KN) 2 CBR Moulds Not Available C-01 30 3 Proctor Moulds Not Available MPM-01 3 4 IS Sieves Not Available Not Available 24 4 Proving Ring 50 KN Mercer India 50KN-01479 1 5 Proving Ring 30 KN Mercer India 30KN-866 1 Shivaki ML-5370 1 Soil Testing 08/02/2014 12 Months 07/02/2015 Bio Tech Not Available 1 Soil Testing 24/01/2014 12 Months 23/01/2015 Phoenix E-1209384 1 24/02/2014 12 Months 23/02/2015 Swtwik Not Available 1 24/02/2014 12 Months 23/02/2015 Phoenix 209754 1 24/02/2014 12 Months 23/02/2015 Contech Not Available 1 24/02/2014 12 Months 23/02/2015 GREEN GP/MG/01 1 20/04/2014 3 Months 19/07/2014 GREEN GP/MG/02 1 20/04/2014 3 Months 19/07/2014 Not Available SPC-01 1 FDD Testing 20/05/2014 3 Months 19/08/2014 Not Available SPC-02 1 FDD Testing 26/05/2014 3 Months 25/08/2014 Schwing Stetter M-01 (BMP-01) 1 Concrete Mix 26/12/2013 6 Months 26/06/2014 Schwing Stetter T-500 (BMP-02) 1 Concrete Mix 11/03/2014 6 Months 11/09/2014 6 7 8 9 10 11 12 13 14 15 16 17 Thermostatically Controlled Oven-01 (0-300OC) Thermostatically Controlled Oven-02 (0-150OC) Digital Weighing Scale-01 (cap.30kg) Digital Weighing Scale-02 (cap.30kg) Digital Weighing Scale-03 (cap.60kg) Digital Weighing Scale-04 (cap.600 gm) Rapid Moisture Meter (No-01) Rapid Moisture Meter (No-02) Sand Pouring Cylinder (150 mm Dia) Sand Pouring Cylinder (200 mm Dia) Concrete Batching Plant-01 (60 Cum/H) Concrete Batching Plant-02 (30 Cum/H) CBR Casting Proctor Testing Sieving CBR Testing CBR Testing Lab Testing Lab Testing Lab Testing Lab Testing FDD Testing FDD Testing Lab at Km 115+500 Sr. Sub. No. No. (A) General 1 2 a b c d e Item/Specification As per MOST Oven-Electrically Operated Thermostatically Controlled From 100o C to 200o C Sensitivity 1o C Balance 30 Kg capacity self Indicating Type Balance 20 Kg capacity self Indicating Type 600 gm capacity self indicating Electronic Type-Accuracy 0.01 GM Platform Scale-300Kg capacity Electronic Platform Scale-200Kg capacity M/s. SAI MAATARINI TOLLWAYS LIMITED Available Qty. Calibration Status 2 Yet to be done 2 1 2 1 1 Done Done Done Done Done Remarks Page 87 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ Sr. No. Sub. No. Item/Specification As per MOST 3 Water Bath-Electrically Operated and thermostatically controlled with adjustable shelves, sensitivity 1oc. 4 Thermometers: Yet to be done 2 Yet to be done Mercury in glass thermometer with 30 cm stem, range 100°C upto 360°C 2 Yet to be done 3 Yet to be done a Kerosene or Gas stove / electric hot plate Glasswares, spatulas, wire gauzes, steel scales, measuring tape, casseroles, karahis, enameled trays of assoted sizes, pestle-mortar, porcelain dishes, gunny bags, plastic bags, chemicals, digging tools like pickaxes, shovels etc. Glass Beaker 1000ml capacity, Borosil 1 Yet to be done b Glass Measuring Cylinder, 100ml capacity 12 Yet to be done c Glass Measuring Cylinder, 250ml capacity 2 Yet to be done d Glass Measuring Cylinder, 500 capacity 2 Yet to be done e Glass Measuring Cylinder, 1000 capacity 1 Yet to be done 6 Yet to be done Yet to be done 2 b 450mm x 300mm x 40mm 6 Yet to be done c 300mm x 250 mm 40mm 4 Yet to be done d Circular Plate of 250 mm dia.. 4 Yet to be done 3 Yet to be done e Spatula Set of 100 and 200 long Sieves as per IS 460-1962 IS Sieves 450mm internal dia. of sieves sets as per BIS of required sieves sizes complete with lid and pan, 80mm, 75mm, 63mm, 50mm, 45mm, a 40mm, 37.5mm, 31.5mm, 25mm, 22.4mm, 20mm, 16mm, 12.5mm, 10mm, 8mm, 6.7mm, 4.75mm, lid and pan IS Sieves 200mm internal dia. (brass frame and steel or brass wire cloth mesh) consisting of sieves sets of required sieve sizes 4mm, 4.75mm, b 2.36mm, 1.18mm, 600 microns, 300 micron, 150 micron, 75 micron complete with lid and pan. Optional Test Sieves IS Sieves 450mm internal dia. of sieves sets as per BIS 53mm, 26.5mm, for GSB 11.2mm,13.2mm, 9.5mm and WMM Optional Test Sieves IS Sieves, Brass, 200mm internal dia. of sieves sets as per BIS 180micron, for GSB 425micron and WMM Sieve Shaker Capable of Taking 200mm and 450mm dia. Sieve electrically operated with time switch assembly (As per BIS) Rain Gauge Remarks Yet to be done Mercury in glass thermometer range 0°C to 110°C Enamel Trays/GI Trays a 600mm x 450mm x 50 mm 9 1 a 6 8 Calibration Status b 5 7 Available Qty. Yet to be done 1set Yet to be done 2set Yet to be done 1set Yet to be done 1set 1 Yet to be done 1 Yet to be done 3 Yet to be done B) For Soil and Aggregates 1 Atterberg limits (liquid & plastic Limits) determination apparatus 2 proctor Test App both 2.6 kg and 4.9 kg rammers (light and heavy compact efforts) a a Straight Edge for trimming Compacted soil sample in the lab 100mm dia. Sand Pouring cylinder with conical funnel and tap and complete as per IS 2720 (Part 28) 1980 including modified equipment. M/s. SAI MAATARINI TOLLWAYS LIMITED 2 set Yet to be done 2 Yet to be done 3 Done Page 88 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ Sr. No. Sub. No. b c 3 4 5 6 7 a b c d f g h i j 8 9 Item/Specification As per MOST 150mm dia. Sand Pouring cylinder with conical funnel and tap and complete as per IS 2720 (Part 28) 1980 including modified equipment. 200mm dia. Sand Pouring cylinder with conical funnel and tap and complete as per IS 2720 (Part 28) 1980 including modified equipment. Speedy Moisture meter complete with chemicals Core cutter apparatus 10 cm dai, 10/15 cm height, complete with dolly, rammer etc. (Soil) Aggregate Impact Test Apparatus Flakiness and Elongation apparatus California Bearing Ratio test apparatus CBR moulds 150mm dia.-175mm ht. Complete with collar base plate etc CBR plunger with settlement dial gauge holder Surcharge weights 147-mm dia 2.5Kg weight with central hole. Spacer disk 148-mm dia 47.7mm height with handle Soaking Tank for accommodating 24 CBR moulds Proving Ring of 50 KN capacity Proving Ring of 30 KN capacity Dial Gauges, 25mm Travel-0.01mm/div Moisture Boxes ii)Big iii)Small Standard penetration test equipment(LL) Hydrometer Available Qty. Calibration Status 4 Done 4 Done Remarks 1 1 Yet to be done 1 1 1 18 1 18 1 1 1 1 6 Done Done Done Yet to be done Yet to be done Yet to be done Yet to be done Done Done Done 140 82 1 2 Yet to be done Yet to be done Done Yet to be done 1 Yet to be done 1 22 1 2 1 1 Yet to be done Yet to be done Yet to be done Yet to be done Yet to be done Yet to be done 1 5 1 1 1 1 1 104 1 9 Yet to be done Yet to be done Done Yet to be done Yet to be done Yet to be done Yet to be done Yet to be done Yet to be done Yet to be done Yet to be done 2 Yet to be done 2 Yet to be done 1 Yet to be done 1 Yet to be done 1 1 6 Yet to be done Yet to be done Yet to be done C ) For Bitumen and Bituminous Mixes 1 a 2 b c e d e h Penetrometer automatic type, adjustable weight arrangement and needles as per IS 1203-1978 Marshall stability test apparatus, complete with all accessories Standard Marshall Mould-100mm dia Vacuum pump and 3 specific gravity bottles Ring and Ball Apparatus as per 1205-1978 Apparatus to determination of Ductility test as per IS 1208-1978 Apparatus for Elastic Recovery Test for Modified Bitumen D) For Cement, Cement Concrete and Materials 1 2 3 4 5 6 7 b d e f g Vicat Needle Apparatus for setting time Slump testing apparatus Compression testing machine of 2000 tone capacity Motor cube machine Flexural Strength Testing Machine Concrete mini mixer Cube Vibrator Moulds 150mm x150mm x 150mm cubes for compressive strength High Frequency mortar cube vibrator for cement testing Prism Mould 70.7mm x 70.7mm x 70.7mm for cement test Equipment for determination of Specific Gravity for Fine and Coarse Aggregate as per IS 2386 (Part 3) 1963(Phyconmeter) Soundness testing apparatus for cement, Le Chatlier mould E) Optional Requirement 1 Optional 4 Optional Aggregate crushing value cum 10% Fines Value mould + base plate, plunger, Tamping road complete Tape 5mt length Additional Equipment Received 1 2 3 Water Bath Motorised Bitumen Extractor GI Trays for Prime Coat and Tack Coat M/s. SAI MAATARINI TOLLWAYS LIMITED Page 89 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ Sr. No. 4 7 8 S. No Sub. No. Available Qty. 1 4 1 Item/Specification As per MOST Saybolt Viscometer Rapid Moisture Meter Permeability Apparatus NAME OF EQUIPMENT / INSTRUMENT Calibration Status Yet to be done Yet to be done Yet to be done MAKE / BRAND NO'S Last Date of Calibration Calibration Frequency Due Date of Calibration 1 WMM Plant @ 17+860 LHS Appolo 200TPH 1 14.02.14 6 Months 13.08.14 2 Concrete Batch mix Plant @ 18+500 LHS Schwing Stetter, CP30 1 09.12.13 6 Months 08.06.14 3 Concrete Batch mix Plant @ 55+400 LHS Schwing Stetter, CP60 1 26.12.13 6 Months 25.06.14 4 WMM Plant @ 55+400 LHS Appolo 200TPH 1 To be erected 5 Concrete Batch mix Plant @ 93+600 LHS Schwing Stetter, CP30 1 Calibration to be done M/s. SAI MAATARINI TOLLWAYS LIMITED Remarks REMARKS Plant Erected Page 90 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ 21. Appendix 5 - Weather Report Section-I (Ch. 0+000 to Ch. 55+000) DD-MM-YY Min Temp (˚C) Max Temp (˚C) 1-Jun-14 28 35.9 2-Jun-14 28 3-Jun-14 Average Rainfall Section-I (Ch. 55+000 to Ch. 113+000) Min Temp (˚C) Max Temp (˚C) - 28.9 32.7 35.8 - 29.8 28.2 36.4 - 4-Jun-14 29.8 36.1 5-Jun-14 30 6-Jun-14 Average Rainfall Section- II (Ch. 113+000 to Ch. 166+173) Average Rainfall Min Temp (˚C) Max Temp (˚C) - 26.2 36.4 - 30 - 25.8 37.3 - 29.5 33.2 - 25 35.2 2 - 29.7 30 7 25.1 37.9 18.6 35.9 - 29.6 34.4 13 27.9 38.2 - 30 35.9 - 29.6 33.2 - 25.7 37.9 - 7-Jun-14 28.4 35.9 - 28.9 32.7 9 24.1 39.3 7 8-Jun-14 27.8 35.1 - 29.3 33.4 - 25.3 38.8 9 9-Jun-14 28.6 34.8 - 28.8 33.4 - 25.9 38 - 10-Jun-14 29.1 35.9 - 28.8 33.8 - 26.7 38.7 - 11-Jun-14 29.1 35.9 - 29.4 33.6 - 25.3 38.9 - 12-Jun-14 32.6 37.9 - 31.2 36.7 - 27.6 41.8 - 13-Jun-14 27.9 36.6 - 31.2 36.9 - 30.4 42.3 - 14-Jun-14 NA NA NA 31.5 4.7 - 29.7 41.9 - 15-Jun-14 NA NA NA 31.5 30.6 5 29.4 40.4 30 16-Jun-14 28.6 38.1 - 31.5 35.4 7 28.6 39.8 130.4 17-Jun-14 28.6 34.1 - 29.8 35.4 - 27.5 40.1 - 18-Jun-14 29 32.9 - 29.8 33.1 4 26.9 39.6 3.5 19-Jun-14 27.4 31 - 29.4 33.1 12 26.2 37.6 15 20-Jun-14 27.4 31 - 28.9 33.1 8 26 38.4 1 21-Jun-14 26.3 31 - 27.9 29.3 - 25.7 32.2 - 22-Jun-14 30 34.1 - 27.8 30.8 - 26.1 33.6 - 23-Jun-14 30 37.9 3.5 30.1 34.1 - 26.8 35.1 - 24-Jun-14 29.4 37.9 5.2 30.1 34.5 45 27.2 36.2 50.4 25-Jun-14 28.1 36 11.2 29.8 35 62 26.2 35.2 25 26-Jun-14 28.6 30.9 - 28.4 35 6 26.5 34 24 27-Jun-14 28.1 31.9 3.2 28.4 31.2 - 26.7 35.7 - 28-Jun-14 28.1 32.9 - 28.7 31.6 - 27.1 36 - 29-Jun-14 28 33 1.2 29 32.4 - 83 35.2 13 30-Jun-14 26 32.1 69.8 27.8 29 40 25.3 29.9 45 (in mm) M/s. SAI MAATARINI TOLLWAYS LIMITED (in mm) (in mm) Page 91 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ 22. Appendix 6 – Photographs WMM Top layer in progress at Km 14+100 (LHS) & WMM 1st layer laying in progress at Km 32+000 (LHS) Tree cutting progress at Ch 37+050 & Hard Rock excavation at Km 49+130 (LHS) Tree cutting progress at Ch 55+000 & Temporary diversion at 51+512 (PUP) M/s. SAI MAATARINI TOLLWAYS LIMITED Page 92 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ Eviction at Ch 53+382 & PCC of P-2 of MJB at Km 108+081 Rock breaking & Reinforcement in progress at Km 108+081 (MJB) Raft concrete in progress in MJB Km : 108+081 (RHS) & Hard rock blasting at ch. 114+040 M/s. SAI MAATARINI TOLLWAYS LIMITED Page 93 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ WMM 1st Layer at ch. 114+360 & Embankment at ch. 118+400 WMM top at ch. 119+000 & GSB at ch. 121+600 WMM 1st layer at ch. 121+930 & GSB Top at ch. 138+120 M/s. SAI MAATARINI TOLLWAYS LIMITED Page 94 SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis. Monthly Progress Report : June - 2014 [ GSB Top at ch 138+120 & GSB at ch. 165+520 VUP at ch. 117+685 & Box Culvert at ch. 117+800 Box Culvert at ch. 141+900 & Box Culvert at ch. 158+590 M/s. SAI MAATARINI TOLLWAYS LIMITED Page 95