M/s. SAI MAATARINI TOLLWAYS LIMITED HYDERABAD
Design, Engineering, Finance, Construction, Operation and
Maintenance of Four Laning of Panikoili - Rimuli Road Section of
NH-215 from Km 0+000 – 163+000 in the State of Orissa under
NHDP Phase-III as BOT (Toll) Basis
MONTHLY PROGRESS REPORT
JUNE-2014
CLIENT
NATIONAL HIGHWAYS AUTHORITY OF INDIA
(MINISTRY OF SHIPPING, ROAD TRANSPORT & HIGHWAYS)
(Government of India)
Independent Engineer
Project Management Consultant
SAI CONSULTING ENGINEERS PVT. LTD,
SHELADIA ASSOCIATES INC., USA,
Ahmedabad
Hyderabad
EPC Contractor
M/s. GAYATRI PROJECTS, LTD., Hyderabad
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from
Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
Table of Contents
1.
PROJECT LOCATION MAP ................................................................................................................................ 3
2.
SCOPE OF THE PROJECT ................................................................................................................................... 4
3.
PROCUREMENT OF THE SITE IN TERMS OF LENGTH OF PROJECT HIGHWAY (KM).................. 6
4.
PRECONSTRUCTION ACTIVITIES ..................................................................................................................... 20
5.
STATUS OF DESIGNS & DRAWINGS ................................................................................................................ 22
6.
PHYSICAL PROGRESS (HIGHWAY) .................................................................................................................. 23
6.1.
6.2.
6.3.
7.
PHYSICAL PROGRESS (STRUCTURES) ......................................................................................................................23
FINANCIAL PROGRESS ........................................................................................................................................24
FINANCIAL S-CURVE ..........................................................................................................................................25
STRIP CHART OF WORK PROGRESS ................................................................................................................ 26
7.1.
PROGRESS OF MAJOR BRIDGES ............................................................................................................................50
7.2.
PROGRESS OF MINOR BRIDGES ............................................................................................................................50
7.3.
PROGRESS ROB ................................................................................................................................................51
7.4.
PROGRESS FLYOVERS .........................................................................................................................................51
FLYOVERS .....................................................................................................................................................................51
7.5.
VEHICULAR UNDER PASS ....................................................................................................................................51
7.6.
PEDESTRIAN UNDER PASS ...................................................................................................................................52
7.7.
CULVERTS (PIPE/BOX/SLAB) ...............................................................................................................................52
8.
CONSTRUCTION CONSTRAINTS: .................................................................................................................... 56
9.
CHANGE OF SCOPE OF WORK ........................................................................................................................ 58
10.
CLAIMS: ..................................................................................................................................................... 58
11.
DISPUTES................................................................................................................................................... 59
12.
NON CONFORMING PRODUCT NOTIFICATIONS (NCPNS). .......................................................................... 61
13.
CORRESPONDENCE .................................................................................................................................... 63
14.
ENVIRONMENTAL REGULATIONS& CLEARANCES: ..................................................................................... 65
15.
STATEMENT SHOWING ROAD ACCIDENT CASES FOR THE MONTH: ........................................................... 68
16.
EVICTION OF ENCROACHMENTS:............................................................................................................... 68
17.
APPENDIX - CONCESSIONAIRE STAFF ......................................................................................................... 70
18.
APPENDIX 2 - SUMMARY OF TEST RESULTS ............................................................................................... 75
19.
APPENDIX 3 - LIST OF PLANT AND EQUIPMENT (0-113) ............................................................................. 83
20.
APPENDIX 4 - LIST OF LAB EQUIPMENT & CALIBRATION STATUS............................................................... 85
21.
APPENDIX 5 - WEATHER REPORT ............................................................................................................... 91
22.
APPENDIX 6 – PHOTOGRAPHS ................................................................................................................... 92
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page
2
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from
Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
1. Project Location Map
The Project Site of the Four-Lane divided Project Highway comprises the section of National
Highway No 215 commencing from Km 0.000 to Km 163.000 i.e. Panikoili – Rimuli section in the
State of Odisha. The present carriageway of the Project Highway is an intermediate lane/twolane/single carriageway.
PROJECT ROUTE
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page
3
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
2. Scope of the Project
S.NO.
1
2
3
4
DESCRIPTION
5
6
7
8
i)
ii)
iii)
iv)
iv)
9
a)
b)
c)
d)
e)
f)
g)
Project Design Stretch
Project Cost (INR)
Construction Period
Concession Period
:
:
:
:
Appointed Date
Financial Close
Scheduled Date of Completion
Details of Project Highway
Carriageway Length
Bypasses Length
Realignment Length
Sub Total
Service/Slip Roads
Built-up Area
Details of Project Structures
Flyovers / Elevated Structures
ROBs
Major Bridges
RUBs
Minor Bridges
PUPs/Cattle Crossings
VUPs
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
M/s. SAI MAATARINI TOLLWAYS LIMITED
REMARKS
Km 0+000 to Km 166+200 (Design Length: 166.173 KM)
1,410 Cr.
VGF Rs.548.49 Cr.
910 Days
24 Years including Construction Period
02/05/2013
04/09/2013
29/10/2015
Existing
163.000 Km
163.000 Km
Existing
2 Nos
5 Nos
1 No
32 Nos
-
Proposed
127.807 Km
32.800 Km
5.566 Km
166.173 Km
42.336 Km
5.400 Km
Proposed
1 No
2 Nos
6 Nos
30 Nos
21 Nos
15 Nos
Page
4
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
h)
i)
j)
k)
l)
m)
10
i)
ii)
iii)
iv)
v)
vi)
Animal Underpasses
Elephant Underpasses
Reptile Underpasses
Slab Culverts
Box Culverts
Pipe Culverts
Sub Total
Project Facilities / Miscellaneous
Grade Intersections
Grade Separated Intersections
Bus Bays
Truck Lay Bays
Toll Plazas
Wayside Amenities
Sub Total
M/s. SAI MAATARINI TOLLWAYS LIMITED
:
:
:
:
:
:
:
:
:
:
:
:
:
:
202 Nos
4 Nos
48 Nos
294 Nos
6 Nos
2 Nos
50 Nos min.
04 Nos
256 Nos
38 Nos
431 Nos
12 Nos
1 No
43 Nos
4 Nos
3 Nos
2 Nos
65 Nos
Page
5
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
3. Procurement of the Site in terms of Length of Project Highway (Km).
3.1 Fragile Working Fronts of Land Available impeding mobilization of Manpower & Machinery:
Continuous
Stretch
Land Available
Length
<0.500
>0.5 to <1
>1 to <2
>2 to <3
>3 to < 4
>4 to <5
>5 to <6
>6 to <7
>7 to <8
>8 to <9
>9 to <10
>10
Total
M/s. SAI MAATARINI TOLLWAYS LIMITED
13.582
13.430
22.728
13.790
16.750
0.000
0.000
0.000
0.000
0.000
0.000
0.000
80.280
Minor Hindrance
Length
7.453
6.280
0.000
4.700
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
18.433
Full
Hindrance
Length
3.110
6.855
13.180
12.550
6.930
4.020
0.000
0.000
0.000
0.000
0.000
0.000
46.645
Reserve
Forest
Length
2.320
3.800
5.445
4.960
0.000
4.300
0.000
0.000
0.000
0.000
0.000
0.000
20.825
Total
26.465
30.365
41.353
36.000
23.680
8.320
0.000
0.000
0.000
0.000
0.000
0.000
166.183
Page
6
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
3.2 Fragile Working Fronts of Land Available impeding mobilization of Manpower & Machinery:
Bar Chart
Land Available Length
Minor Hindrance Length
Full Hindrance Length
Reserve Forest Length
25,000
20,000
15,000
10,000
5,000
0,000
Stretch (kKM)
<0.500
>0.5 to <1
>1 to <2
>2 to <3
>3 to < 4
>4 to <5
>5 to <6
>6 to <7
>7 to <8
>8 to <9
>9 to <10
>10
1. Continuous stretch of land to be available in possession with Concessionaire for efficient mobilization is at least 10 Kms.
2. Continuous stretch of land to be available in possession with Concessionaire for general mobilization is at least 5 Kms.
3. Any length of land in bits less than the above parameters if available in possession with Concessionaire creates problem for mobilization &
efficient execution. The execution in these types of bits shall cause a serious impediment / hindrance to Concessionaire
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page
7
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
3.3. Chainage wise Land Stretches Available:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
JAJPUR BY-PASS
17
18
19
Village Name
Chainage
Length
Land Status
From
To
Alatiri
00+000
00+120
00+120
00+140
0.12
0.02
G
Y
Available
Structure under Arbitration case
Alatiri, Patharapada, M.D Jamalpur,
Ouapada, Dhanpur, Aliya,
00+140
03+350
3.21
G
Available
03+350
03+360
04+200
04+230
05+470
05+500
05+670
05+920
06+340
06+440
06+700
06+820
03+360
04+200
04+230
05+470
05+500
05+670
05+920
06+340
06+440
06+700
06+820
06+880
0.01
0.84
0.03
1.24
0.03
0.17
0.25
0.42
0.10
0.26
0.12
0.06
Y
G
Y
G
Y
G
Y
G
Y
G
G
Y
Temple
Available
Diary Form
Available
Compound wall
Available
Land under 3A notification & Temple
Available
Structure under Arbitration case
Available
Available
Maruti Show room
06+880
09+490
2.61
G
Available
09+490
09+820
09+820
10+300
0.33
0.48
Y
G
10+300
10+440
0.14
Y
Land under 3A notification & Temple
Available
Land acquisition Problem due to non
acceptance of compensation by land owner
(Internal Problem)
Available
Land acquisition Problem due to non
acceptance of compensation by land owner
(Internal Problem)
Available
Land acquisition Problem due to non
acceptance of compensation by land owner
(Internal Problem)
Available
Aliya
Aliya, Ghikoili, Benapur
Benapur
Benapur, Talugaon
Benapur, Talugaon
Benapur, Talugaon
Benapur, Talugaon
Benapur, Talugaon
Benapur, Talugaon
Sanapatuli, Badapatuli,
Tentulikhunta
Tentulikhunta, Dandakiri
Dandakiri
20
Dandakiri, Baladia
10+440
10+580
0.14
G
21
Baladia, Chandama, Santarapur
10+580
10+673
0.09
Y
10+673
10+790
0.12
G
10+790
11+100
0.31
Y
11+100
11+400
0.30
G
22
23
24
Chandama, Santarapur
M/s. SAI MAATARINI TOLLWAYS LIMITED
Land (Hect)
GOVT
PVT
TOTAL
FOREST
Length 06.45 KM.
Sl No.
Page
8
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
Sl No.
Village Name
Chainage
Length
Land Status
From
To
25
11+400
11+695
0.30
Y
Land acquisition Problem due to non
acceptance of compensation by land owner
(Internal Problem), Buiral ground & Pvt Pond
26
27
28
11+695
12+370
12+950
12+370
12+950
13+150
0.68
0.58
0.20
G
Y
G
Available
Alignment Problem
Available
29
Kuanarda, Nayagarh, Naguan
13+150
14+380
1.23
G
Available
30
31
Nayagarh, Naguan
Naguan, Itapur, Talagarh
14+380
14+490
14+490
15+620
0.11
1.13
Y
G
32
Talagarh
15+620
15+640
0.02
Y
33
Talagarh, Uparagarh, Mangarajpur
15+640
15+930
0.29
G
Land under 3A notification
Available
Land acquisition Problem due to non
acceptance of compensation by land owner
(Internal Problem)
Available
34
Talagarh, Uparagarh, Mangarajpur
15+930
16+080
0.15
G
School building
35
Talagarh, Uparagarh, Mangarajpur,
Manjuri, Ragadi
16+080
19+200
3.12
G
Available
19+200
20+800
1.60
F
Ragadi Reserve Forest
20+800
22+800
2.00
G
Available
22+800
23+000
23+150
23+250
23+350
23+400
24+010
24+680
24+730
23+000
23+150
23+250
23+350
23+400
24+010
24+680
24+730
24+770
0.20
0.15
0.10
0.10
0.05
0.61
0.67
0.05
0.04
Y
G
Y
G
Y
G
Y
G
Y
Govt building (Forest dept), School
Available
Pvt building
Available
Temple
Available
Shops, School, P.S, Bank, Market Area
Available
Structure under Arbitration case
11
12
13
14
15
16
17
18
19
20
21
Ragadi
Ragadi, Korabandi, Kadama,
Andhari
Andhari
Andhari, Jarda
Jarda
M/s. SAI MAATARINI TOLLWAYS LIMITED
Land (Hect)
GOVT
PVT
TOTAL
FOREST
4.80
Page
9
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
Sl No.
22
23
24
25
26
Village Name
Ramachandrapur
Chainage
Length
Land Status
From
To
24+770
24+930
25+250
26+100
26+200
24+930
25+250
26+100
26+200
26+620
0.16
0.32
0.85
0.10
0.42
G
Y
G
Y
G
Available
Market, BSNL building, Hospital
Available
Encroachments, Shops, Houses
Available
27
Ramachandrapur, Badapadana,
Padanpur, Suanpada
26+620
27+150
0.53
Y
Encroachments, Houses
28
29
30
Suanpada
27+150
27+300
27+380
27+300
27+380
27+600
0.15
0.08
0.22
G
Y
G
Available
Big Pond
Available
31
Suanpada, Nuagaon
27+600
27+960
0.36
Y
Land acquisition Problem due to non
acceptance of compensation by land owner
(Internal Problem)
32
27+960
28+240
0.28
G
33
28+240
28+350
0.11
Y
28+350
28+480
0.13
G
28+480
28+580
0.10
Y
28+580
28+830
29+000
28+830
29+000
29+250
0.25
0.17
0.25
G
Y
G
29+250
29+290
0.04
Y
29+290
29+500
0.21
G
Available
29+500
30+200
0.70
Y
Sainkula market, PS
34
Nuagaon
35
36
37
38
39
Nuagaon, Gointhagodi
Gointhagodi
Gointhagodi, Khalana
Khalana
40
41
Khalana, agarda, Sainkula
M/s. SAI MAATARINI TOLLWAYS LIMITED
Land (Hect)
GOVT
PVT
TOTAL
FOREST
Available
Land acquisition Problem due to non
acceptance of compensation by land owner
(Internal Problem), GP building
Available
Land acquisition Problem due to non
acceptance of compensation by land owner
(Internal Problem)
Available
Houses
Available
Land acquisition Problem due to non
acceptance of compensation by land owner
(Internal Problem)
Page
10
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
Chainage
From
To
Length
Land Status
42
Khalana, agarda, Sainkula
30+200
30+800
0.60
G
Available
43
44
45
Sainkula
30+800
30+940
31+280
30+940
31+280
31+400
0.14
0.34
0.12
Y
G
Y
Land under 3A notification
Available
Temple, Market, Houses
46
Sainkula,
Machala,Rudranarayanapur,
Bamphidi
31+400
33+100
1.70
G
Available
47
Rudranarayanapur
33+100
33+160
0.06
Y
Land acquisition Problem due to non
acceptance of compensation by land owner
(Internal Problem)
48
Rudranarayanapur, Bamphidi,
Hasanpur
33+160
33+430
0.27
G
Available
49
Hasanpur
33+430
33+670
0.24
Y
50
Hasanpur
33+670
34+050
0.38
G
Land acquisition Problem due to non
acceptance of compensation by land owner
(Internal Problem)
Available
51
Hasanpur, Salapada, Belabahali,
Barigaon
34+050
37+000
2.95
G
Realignment & Major Bridge
Salapada
Salapada, Sudusudia, Janra
Janra
37+000
37+120
38+120
38+400
38+600
38+800
39+800
39+900
37+120
38+120
38+400
38+600
38+800
39+800
39+900
40+330
0.12
1.00
0.28
0.20
0.20
1.00
0.10
0.43
G
G
G
Y
G
F
G
G
Available
Available
Available
Govt Structure
Available
Salapada Reserve Forest
Available
Available
Khaparakhai
40+330
40+650
0.32
G
Available
ANAND
APUR
BYPASS
52
53
54
55
56
57
58
59
60
Barigaon
Salapada
M/s. SAI MAATARINI TOLLWAYS LIMITED
Land (Hect)
GOVT
PVT
TOTAL
FOREST
Length 02.95 KM.
Village Name
3.788
7.444
11.232
3.000
Length
03.50
KM.
RAG
Sl No.
Page
11
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
Village Name
Length
Land Status
From
To
61
Ghasipura
40+650
41+900
1.25
G
Available
62
Kainpura
41+900
42+800
0.90
G
Available
63
Sailong
42+800
43+400
0.60
G
Available
64
Sailong
65
Morabali
66
67
68
69
70
71
72
73
74
75
Indupura
Gohira
Talagaon
Biragobindapur
Bhalukuma
Dhakota
Amaranga
Bandha
Nahaguna
Kanto
76
Kolimati
77
Kamonda
43+400
44+000
44+100
44+480
45+100
46+400
47+580
50+700
52+800
53+400
55+000
55+650
55+700
57+700
58+500
59+000
60+250
62+060
44+000
44+100
44+480
45+100
46+400
47+580
50+700
52+800
53+400
55+000
55+650
55+700
57+700
58+500
59+000
60+250
62+060
64+900
0.60
0.10
0.38
0.62
1.30
1.18
3.12
2.10
0.60
1.60
0.65
0.05
2.00
0.80
0.50
1.25
1.81
2.84
G
Y
G
G
G
G
G
G
G
G
R
G
R
R
R
R
F
G
Available
Shops, Market Complex & Junctions
Available
Available
Available
Available
Available
Available
Available
Available
Compensation is in process
Available
Compensation is in process
Compensation is in process
Compensation is in process
Compensation is in process
Atai Reserve Forest
Available
64+900
66+800
1.90
F
Atai Reserve Forest
66+800
69+150
2.35
R
Compensation is in process
69+150
69+300
0.15
G
Available
69+300
70+500
1.20
F
Atai Reserve Forest
70+500
74+400
3.90
G
Available
78
Darkhola
79
80
81
GHATGA
ON BYPASS
Chainage
Melana
Balijodi
82
Balijodi
74+400
74+900
0.50
F
Atai Reserve Forest
83
Uperdiha
74+900
76+520
1.62
F
Atai Reserve Forest
Land (Hect)
GOVT
PVT
TOTAL
FOREST
1.947
1.129
3.076
9.814
5.354
3.448
1.574
13.262
6.928
5.430
5.700
19.603
2.323
21.926
1.800
5.610
M/s. SAI MAATARINI TOLLWAYS LIMITED
Length
04.60
KM.
Sl No.
Page
12
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
Village Name
Chainage
Length
Land Status
From
To
76+520
78+400
1.88
R
PVT
Compensation is in process
12.040
8.681
20.721
3.634
4.180
7.815
7.883
13.254
2.202
2.214
10.085
15.467
6.682
6.058
2.493
1.566
9.174
7.624
6.246
11.934
5.994
10.858
11.344
16.317
4.464
2.177
1.704
3.298
2.695
4.945
10.710
14.112
7.697
14.156
14.039
21.263
18.102
3.577
Kusunpur
78+400
79+000
0.60
R
Compensation is in process
85
86
Kusunpur
Golabandha
87
Bataharichandanpur
88
Sanamasinabila
89
90
91
92
93
94
95
96
Sanabarabeda
Tikira
Nangalkanti
Dhenkikote
Khantaghar
KhajuriJuani
Katrabeda
Chikinia
97
Pipilia
98
Bankapatuli
99
Gopalapur
100
Gopalapur, Badaposi
101
Badaposi
79+000
79+400
81+000
82+980
83+600
84+700
86+400
88+380
89+500
89+900
90+500
92+600
93+800
96+100
98+300
101+480
101+980
103+200
103+800
107+580
108+180
109+200
110+050
111+430
112+900
113+950
114+080
114+194
79+400
81+000
82+980
83+600
84+700
86+400
88+380
89+500
89+900
90+500
92+600
93+800
96+100
98+300
101+480
101+980
103+200
103+800
107+580
108+180
109+200
110+050
111+430
112+900
113+950
114+080
114+194
114+440
0.40
1.60
1.98
0.62
1.10
1.70
1.98
1.12
0.40
0.60
2.10
1.20
2.30
2.20
3.18
0.50
1.22
0.60
3.78
0.60
1.02
0.85
1.38
1.47
1.05
0.130
0.114
0.246
R
R
R
R
R
F
R
R
G
R
R
R
R
R
R
R
R
F
G
G
G
F
G
F
F
G
F
G
Compensation is in process
Compensation is in process
Compensation is in process
Compensation is in process
Compensation is in process
Masinabila Reserve Forest
Compensation is in process
Compensation is in process
Available
Compensation is in process
Compensation is in process
Compensation is in process
Compensation is in process
Compensation is in process
Compensation is in process
Compensation is in process
Compensation is in process
Pipila Reserve Forest
Available
Available
Available
Naranapur Reserve Forest
Available
Naranapur Reserve Forest
Naranapur Reserve Forest
Available
Sabik Jungle
Available
114+440
114+615
0.175
F
Sabik Jungle
105
Badaposi
Jamunalia
M/s. SAI MAATARINI TOLLWAYS LIMITED
TOTAL
GOVT
84
102
103
104
Land (Hect)
FOREST
5.100
21.679
0.900
2.550
7.560
Length 15.65
KM
Keonjhar Bypass
Sl No.
Page
13
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
Chainage
Length
Land Status
From
To
114+615
116+615
116+850
117+100
117+400
117+710
116+615
116+850
117+100
117+400
117+710
120+960
2.000
0.235
0.250
0.300
0.310
3.250
F
G
R
G
F
G
Village Forest
Available
Compensation is in process
Available
Village Forest
Available
120+960
121+150
121+150
121+380
0.190
0.230
F
G
Village Forest
Available
114
115
121+380
121+400
121+400
121+750
0.020
0.350
F
G
Village Forest
Available
116
117
118
119
120
121
122
123
124
125
121+750
121+821
123+500
124+100
124+300
125+075
125+100
127+080
127+100
127+300
121+821
123+500
124+100
124+300
125+075
125+100
127+080
127+100
127+300
128+840
0.071
1.679
0.600
0.200
0.775
0.025
1.980
0.020
0.200
1.540
F
G
F
Y
G
Y
G
Y
Y
G
Sabik Jungle
Available
Village Forest
King Fort wall
Available
Muslim Samadhi
Available
Land Acquisition (3A & 3D Missing)
Land & Structure
Available
128+840
128+860
0.020
F
Sabik Jungle
128+860
129+000
129+020
129+800
129+900
129+960
130+340
130+640
131+400
131+420
129+000
129+020
129+800
129+900
129+960
130+340
130+640
131+400
131+420
132+000
0.140
0.020
0.780
0.100
0.060
0.380
0.300
0.760
0.020
0.580
Y
F
G
Y
G
Y
G
Y
Y
G
Structure
Sabik Jungle
Available
Structure
Available
Electrical
Available
Electrical & RWSS Pipe Line
Land Acquisition (3A & 3D Missing)
Available
106
107
108
109
110
111
112
113
126
RAG
Village Name
127
128
129
130
131
132
133
134
135
136
Tolankbahal
Tulashichaura, Sirispal
Sirispal
Sidhmath
Nizgarh
Nizgarh
Maligaon
Gopinathpur Nuagaon
Nuagaon
Dhurpada
Dhurpada
Raisuan
Raisuan & Gopinathpur
M/s. SAI MAATARINI TOLLWAYS LIMITED
Land (Hect)
GOVT
PVT
TOTAL
FOREST
1.350KM
Sl No.
Page
14
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
Village Name
Length
Land Status
From
To
137
138
139
140
141
142
143
144
132+000
132+200
132+260
132+277
132+300
132+337
132+369
132+515
132+200
132+260
132+277
132+300
132+337
132+369
132+515
132+565
0.200
0.060
0.017
0.023
0.037
0.032
0.146
0.050
F
Y
F
Y
F
Y
F
G
Sabik Jungle
Land Acquisition (3A & 3D Missing)
Sabik Jungle
Land Acquisition (3A & 3D Missing)
Sabik Jungle
Land Acquisition (3A & 3D Missing)
Sabik Jungle
Available
145
132+565
132+600
0.035
F
Sabik Jungle
146
132+600
133+420
0.820
G
Available
147
133+420
133+450
0.030
Y
Electrical
133+450
133+505
0.055
G
Available
133+505
133+580
0.075
F
Village Forest
133+580
134+010
0.430
Y
Electrical
134+010
134+180
0.170
F
Village Forest
134+180
134+475
134+575
134+675
134+890
134+910
134+970
134+980
135+249
135+450
136+010
136+600
134+475
134+575
134+675
134+890
134+910
134+970
134+980
135+249
135+450
136+010
136+600
136+900
0.295
0.100
0.100
0.215
0.020
0.060
0.010
0.269
0.201
0.560
0.590
0.300
G
F
G
F
G
F
G
F
G
F
Y
G
Structure
Village Forest
Available
Village Forest
Available
Village Forest
Available
Village Forest
Available
Village Forest
RWSS Pipe Line
Structure
136+900
136+929
0.029
F
Sabik Jungle
136+929
137+300
0.371
G
Available
137+300
137+343
0.043
F
Sabik Jungle
148
Silisuan
149
150
151
RAG
Chainage
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
Banajodi
Banajodi
Banajodi, Padmapur
Padmapur, Putulia
M/s. SAI MAATARINI TOLLWAYS LIMITED
Land (Hect)
GOVT
PVT
TOTAL
FOREST
0.85 KM
Sl No.
Page
15
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
Chainage
Length
Land Status
From
To
137+343
137+400
137+600
137+920
138+420
138+480
137+400
137+600
137+920
138+420
138+480
138+500
0.057
0.200
0.320
0.500
0.060
0.020
G
G
R
G
G
G
Structure
Available
Compensation is in process
Available
Structure
Available
177
138+500
138+523
138+943
138+963
139+000
139+037
139+469
139+632
138+523
138+943
138+963
139+000
139+037
139+469
139+632
140+200
0.023
0.420
0.020
0.037
0.037
0.432
0.163
0.568
F
F
F
G
F
G
F
G
Sabik Jungle
Village Forest
Sabik Jungle
Available
Sabik Jungle
Available
Sabik Jungle
Available
178
140+200
141+310
1.110
F
Tangarani Reserve Forest
141+310
142+120
142+120
142+195
0.810
0.075
G
G
Structure
Available
142+195
142+205
0.010
F
Village Forest
142+205
143+200
0.995
Y
Structure & Electrical
167
168
169
170
171
172
Jhumpura By-Pass
Village Name
173
174
175
176
Putulia
Keshpank
Jadichatra
Bankamarani
179
180
181
Bankamarani, Hundla
Jamudiha, Palasponga
182
Land (Hect)
GOVT
PVT
0.110
1.670
1.170
0.390
1.560
2.030
1.150
143+200
143+465
0.265
R
Compensation is in process
184
Palasponga, Murusuan
143+465
144+615
1.150
F
Tangarani Reserve Forest
144+615
145+200
0.585
R
Compensation is in process
145+200
145+210
145+270
145+295
145+210
145+270
145+295
147+640
0.010
0.060
0.025
2.345
F
R
F
G
Village Forest
Compensation is in process
Village Forest
Available
147+640
147+760
0.120
R
Compensation is in process
0.850
147+760
148+000
148+000
149+000
0.240
1.000
G
R
Available
Compensation is in process
2.830
190
191
192
Tangarani
Jamuposhi ,Spongepatna
Jhumpura
M/s. SAI MAATARINI TOLLWAYS LIMITED
3.180
1.665
Palasponga
186
187
188
189
FOREST
1.560
183
185
TOTAL
1.360
5.510
0.250
2.470
Length 3.80 KM
Sl No.
1.610
7.980
0.850
2.830
Page
16
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
Sl No.
Village Name
Chainage
Length
Land Status
From
To
149+000
149+620
149+649
149+660
149+680
149+770
149+779
149+800
149+823
150+000
150+042
150+115
150+286
150+430
150+460
150+600
150+800
149+620
149+649
149+660
149+680
149+770
149+779
149+800
149+823
150+000
150+042
150+115
150+286
150+430
150+460
150+600
150+800
151+300
0.620
0.029
0.011
0.020
0.090
0.009
0.021
0.023
0.177
0.042
0.073
0.171
0.144
0.030
0.140
0.200
0.500
Y
F
G
F
G
F
G
F
G
F
G
F
G
F
G
F
G
Structure & RWSS Pipe Line
Sabik Jungle
Available
Sabik Jungle
Available
Sabik Jungle
Available
Sabik Jungle
Available
Sabik Jungle
Available
Sabik Jungle
Available
Sabik Jungle
Available
Sabik Jungle
Available
151+300
152+260
0.960
R
Compensation is in process
152+260
152+350
152+380
152+460
152+350
152+380
152+460
152+780
0.090
0.030
0.080
0.320
G
R
G
Y
Available
Compensation is in process
Available
Structure
152+780
153+040
0.260
R
Compensation is in process
153+040
153+140
153+200
153+140
153+200
153+400
0.100
0.060
0.200
G
Y
G
Available
Structure
Available
219
153+400
153+600
0.200
R
Compensation is in process
220
153+600
154+900
1.300
F
Balibandha Reserve Forest
154+900
155+000
155+000
155+200
0.100
0.200
Y
G
Structure
Available
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
Jhumpura, Bhaluka & Arsala
Arsala
210
211
212
213
214
Sundhimursuan,
Balabhadrapur
215
216
217
218
221
222
Balabhadrapur
Balabhadrapur,
Patabila
M/s. SAI MAATARINI TOLLWAYS LIMITED
Land (Hect)
GOVT
PVT
TOTAL
FOREST
0.980
0.980
1.630
1.630
0.650
0.650
3.250
3.250
3.900
Page
17
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
Village Name
Balaibandh
Balaibandh,Mursuan
Mursuan
Mursuan,Parsala, Sijukala
RAG
247
248
249
Parsala, Sijukala
Rimuli
Chainage
Length
Land Status
From
To
155+200
155+400
155+550
156+200
157+090
158+405
158+415
159+000
159+400
159+415
159+590
159+618
159+690
159+890
160+110
160+380
160+445
160+573
160+675
160+728
161+085
161+099
162+240
162+270
155+400
155+550
156+200
157+090
158+405
158+415
159+000
159+400
159+415
159+590
159+618
159+690
159+890
160+110
160+380
160+445
160+573
160+675
160+728
161+085
161+099
162+240
162+270
163+000
0.200
0.150
0.650
0.890
1.315
0.010
0.585
0.400
0.015
0.175
0.028
0.072
0.200
0.220
0.270
0.065
0.128
0.102
0.053
0.357
0.014
1.141
0.030
0.730
Y
R
R
Y
F
F
G
Y
F
G
F
Y
F
Y
F
Y
F
Y
F
Y
F
Y
F
G
Structure
Compensation is in process
Compensation is in process
RWSS Pipe Line
Balibandha Reserve Forest
Village Forest
Available
Trees, Utility
Sabik Jungle
Available
Sabik Jungle
Trees, Utility
Sabik Jungle
Trees, Utility
Sabik Jungle
Trees, Utility
Sabik Jungle
Trees, Utility
Sabik Jungle
Trees, Utility
Sabik Jungle
Trees, Utility
Village Forest
Available
163+000
164+715
1.715
R
Compensation is in process
164+715
165+010
0.295
F
Village Forest
165+010
166+183
1.173
G
Available
Land (Hect)
GOVT
FOREST
9.740
11.630
M/s. SAI MAATARINI TOLLWAYS LIMITED
PVT
TOTAL
24.300
1.80 KM
Sl No.
48.015
26.190
Page
18
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
ABSTRACT
Description
Type
Land Available Length (KM)
Minor Hindrance Length (KM)
Compensation Not Paid
Full Hindrance Length (KM)
Reserve Forest (151.94 Hec.)
Total Length (KM)>>>
M/s. SAI MAATARINI TOLLWAYS LIMITED
G
y
R
F
Total Length
(%)
84.202
50.67%
G
15.360
9.24%
y
38.695
R
F
40.09%
27.926
166.183
100%
Page
19
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
[
4. Preconstruction Activities
A. Shifting of Electrical Poles
SL.NO
Erection:
1
2
3
Description
Concreting of Poles
9m PSC Poles 300 KG
Transformers
A) 250 KVA 11/0.4 KV
B) 150 KVA 11/0.4 KV
C) 100 KVA 11/0.4 KV
D) 63 KVA 11/0.4 KV
E) 25 KVA 11/0.4 KV
F) 16 KVA 11/0.4 KV
G) 16 KVA 11/0.23 KV
H) 10 KVA 11/0.25 KV
4
RS Joist
A) 150/150 18M
B) 150/150 15M
C) 150/150 13M
D) 150/150 11M
5
3PH 4W LT Line
6
33 KV HT Line
7
11KV 3Ph. 3W HT Lines
8
55 mm2 AAA Conductor
9
100 mm2 AAA Conductor
Sub-Total >>>
Dismantling:
1
55 mm2 AAA Conductor
2
34 mm2 AAA Conductor
3
80 mm2 AAA Conductor
4
11 KV Line
5
33 KV Line
6
LT Line
Sub-Total >>>
7
8 m Joist Poles
8
8m PSC Poles 200 Kgs.
9
9m PSC Poles Kgs.
10
11m Joist Poles
Unit
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Km
Km
Km
Km
Km
Km.0+000 to Km.24+000
Total
Done
Balance
352
91
1
1
5
3
1
2
12
40
222
4
0
12
12
21
352
91
0
0
0
1
1
5
3
1
2
0
12
0
40
222
4
0
12
12
21
Km
Km
Km
Km
Km
Km
20
8
2
20
8
0
0
0
2
Nos
Nos
Nos
Nos
85
148
23
3
85
148
23
3
M/s. SAI MAATARINI TOLLWAYS LIMITED
Km.24+000 to Km.113+000
Total
Done
Balance
296
280
17
6
2
0
13
10
15
2
11
8
46
150
3
1.3
95
7.5
0.54
22
2
1
6
13
10
279
274
0
2
0
13
10
15
2
11
8
0
0
46
150
-3
1.3
0
0
95
7.5
0
-1
0
22
2
1
6
3
0
0
Km.113+000 to Km.163+000
Total
Done
Balance
693
350
113
1
1
6
4
10
1
6
2
0
26
540
0
13.7
16.8
22
73
23.5
18
6
12
39
2.79
Km.0+000 to Km.163+000
Total
Done
Balance
693
237
0
1
1
6
4
10
1
6
2
0
0
-13
540
0
13.7
16.8
22
70.21
23.5
1341
721
0
3
1
20
15
30
6
18
12
0
12
72
730
222
19
16.8
34
180
52
17
119
0
0
0
0
0
0
0
0
0
0
0
39
0
3
0
0
0
2.79
0
1324
602
0
3
1
20
15
30
6
18
12
0
12
33
730
219
19
16.8
34
177.21
52
0
0
0
18
6
12
20
8
0
39
8
15
0
1
0
0
0
0
20
7
0
39
8
15
0
0
0
0
91
161
23
3
0
10
0
0
91
151
23
3
Remarks
Page
20
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
[
B. Tree Felling
No.
A
1
2
3
4
5
Chainage (Km)
From
To
D.F.O.
Length
B
C
0+000
24+000
24+000
58+000
58+000 107+000
104+600 113+100
113+300 143+000
143+000 163+000
Total
D
24
34
49
8.50
29.90
20
Estimate
Lr. No.
E
1171
1171
1520
1520
No of Trees as per Estimate
DL.
Revised Estimate sanction (Rs.)
at Site
Felled
Balance
No.
DFO
PIU / RO
F
1054
1197
4848
1027
4458
2501
15085
G
1054
878
2180
164
1237
787
6300
H=F-G
319
2668
863
3221
1714
8785
I
36
J
1185875
2535000
22330839
K
22330839
39
9284356
9284356
35
8088566
43424636
8088566
43424636
2091000
Authorit
y
L
yet to be
received by /
from
Sl.
Avenue Plantation Sanction
(Rs.)
The estimates for Avenue
plantation have been sent to
NHAI, H.O., New Delhi for
approval of Competent
Authority.
-
C. RWS&S & PH Estimates:
These estimates which were prepared based on SSR 2007-08 are to be revised with current SSR (2013-14). PIU has to address EE, RWS&S, Keonjhar & Jajpur and also
EE, PH, Rourkela.
RWS&S and PH pipe lines & Tube Well shifting revised estimates
Sl. No.
Description
Estimate Amount
Remarks
a
Km 0+000 to Km 24+000
Rs. 9,80,483
Work in Progress
b
Km 24+000 to Km 163+000
Rs. 2,10,19,000
Work in Progress
Sub Total : (+/-)
M/s. SAI MAATARINI TOLLWAYS LIMITED
Rs. 2,19,99,483
Page
21
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III
as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
5. Status of Designs & Drawings
A. Plan & Profile : From Km 0+000 to Km 166+173: finalized in conformance of the provisions of
C.A. & IRC Codes.
B. Structures: The Structural drawings are being confirmed as is consistent with the phased
requirement for execution of work.
i.
Major Bridges : 06 Nos.:
ii.
Flyover
: 01 No:
iii.
ROBs
: 02 Nos:
iv.
VUPs
: 15 Nos.:
v.
PUPs
: 21 Nos.:
vi.
AUPs
: 06 Nos.:
vii.
EUPs
: 02 Nos.:
viii.
Box Culverts
: 260 Nos.:
ix.
Pipe Culverts
: 30 Nos.:
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 22
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III
as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
6. Physical Progress (Highway)
The Total 2-lane Length of Project Kms 332.346 (Kms 166.173 X 2) i.e., LHS & RHS
Sr. No.
Length (Km)
Item
LHS
1
C&G
2
Excavation
3
RHS
Total
Length
(Km)
(%)
Remarks
77.20
63.34
140.54
42.29%
6.57
4.46
11.03
3.32%
Embankment-Top
36.19
19.78
55.97
16.84%
4
Subgrade-Top
21.65
10.70
32.35
9.73%
5
GSB
17.77
8.50
26.265
7.90%
6
WMM-1st
11.53
1.30
12.82
3.86%
7
WMM-Top
4.48
0.00
4.48
1.35%
6.1.
Physical Progress (Structures)
Sr.
No.
Description
Total Nos
upto date
Commenced | Completed
1
ROB
02
01
-
01
2
Grade Separator
01
01
-
-
3
Major Bridge
06
04
-
02
4
Minor Bridge
30
15
01
14
5
VUP
15
07
-
08
6
PUP
21
11
-
10
7
AUP
06
02
-
04
8
EUP
02
-
-
02
9
RUP
50
-
-
50
10
At Grade Junctions
12
-
-
12
11
Culverts (All Types)
295
98
45
152
M/s. SAI MAATARINI TOLLWAYS LIMITED
Not Yet
Started
Page 23
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III
as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
6.2.
Financial Progress
Project Length Km 163.173
Bill
No.
Description
A
% Completion
%
weightage
of Contract
Value
Upto
Date
142,254,197
0.704%
11,255,812
20,200,000,000.00
Till
Previous
Month
For this
Month
Amount till
Previous
Month
Amount for this
Month
0.283%
0.236%
0.047%
57,244,486
55,868,842
1,375,644
0.056%
0.012%
0.007%
0.004%
2,332,279
2,174,184
158,095
7,214,175
0.036%
0.007%
0.005%
0.003%
1,494,825
1,393,497
101,328
4,745,691,547
23.494%
1.990%
0.948%
1.042%
402,028,814
371,158,681
30,870,134
3,566,836,110
17.658%
0.047%
0.007%
0.040%
9,449,509
8,843,800
605,709
-
504,630,150
2.498%
0.000%
0.000%
0.000%
-
-
504,630,150
2.498%
0.000%
0.000%
0.000%
-
-
1,585,373,571
7.848%
0.594%
0.234%
0.360%
119,980,283
101,004,981
18,975,303
1,585,373,571
7.848%
0.642%
0.267%
0.375%
129,734,698
110,752,599
18,982,099
-
1,815,979,508
8.990%
0.000%
0.000%
0.000%
-
-
38,292,000
0.190%
0.000%
0.000%
0.000%
-
-
244,067,986
1.208%
0.000%
0.000%
0.000%
-
-
333,480,582
1.651%
0.000%
0.000%
0.000%
-
-
140,414,336
0.695%
0.068%
0.043%
0.025%
13,790,694
13,790,694
31,912,349
0.158%
0.057%
0.014%
0.043%
11,511,240
13,231,515
(1,720,275)
207,875,507
193,924,741
13,950,766
4.528%
1.029%
0.637%
0.392%
246,192,561
1.219%
0.083%
0.019%
0.064%
16,827,303
9,325,476
7,501,827
781,187,936
3.867%
0.486%
0.323%
0.162%
98,156,899
86,801,845
11,355,054
10,951,221
0.054%
0.018%
0.017%
0.001%
3,673,838
3,562,846
110,992
2,943,522,186
14.572%
2.082%
1.312%
0.770%
420,533,886
384,842,530
35,691,356
45,992,534
0.228%
0.023%
0.007%
0.016%
4,599,253
4,599,253
-
20,200,000,000
100.00%
7.422%
Amount in Rs.
Amount till
Date
Pre Construction Activity
I
Site Clearance
II
Tree Cutting
III
Dismantling of
Structures
B
Road Works
I
Widening Side
II
Existing Side
III
IV
Service Roads
LHS
Service Roads
RHS
V
Bypass LHS
VI
Bypass RHS
VII
Drainage &
Protective Works
VIII
Highway Lighting
IX
Road
Appuarantaces
X
Toll Plaza
C
Structures
I
ROB
II
Flyover
III
Underpass
(VUP,PUP,AUP&
EUP)
IV
Major Bridges
V
Minor Bridges
VI
Pipe Culverts
VII
Box & Slab Culverts
(a)
Reconstruction
& (b) Proposed
New Culverts
(c)
Rehabilitation
Repair
/
Widening
of
Culverts
a
b
Total
-
-
914,747,518
4.076%
M/s. SAI MAATARINI TOLLWAYS LIMITED
3.345%
1,499,233,514
1,361,275,484
137,958,032
Page 24
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state
of Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
6.3.
Financial S-Curve
Cumulative
Month
Project
Const.
Programe
(Cr.)
Expenditure
Schedule
(Cr.)
May-13 Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15
Oct-15
2020.00
Sep-15
1996.28
Aug-15
1964.27
Jul-15
1938.54
Jun-15
1917.53
May-15
1859.67
Apr-15
1818.65
Mar-15
1797.70
Feb-15
1765.70
Jan-15
1644.95
Dec-14
1524.71
Nov-14
1414.97
Oct-14
1318.22
Sep-14
1231.52
Aug-14
1175.85
Jul-14
1132.32
Jun-14
1088.65
599.60
May-14
1013.65
585.81
Apr-14
908.65
558.84
Mar-14
806.20
530.87
Feb-14
715.45
507.69
Jan-14
639.50
472.41
Dec-13
575.79
450.41
Nov-13
447.55
331.39
Oct-13
324.00
239.28
Sep-13
212.24
150.82
Aug-13
112.21
84.93
Jul-13
42.96
37.58
Jun-13
9.87
8.52
May-13
0.00
0.00
May-13
Jun-13
Jul-13
Aug-13
Sep-13
Oct-13
Monsoon
Nov-13
Dec-13
Jan-14
Feb-14 Mar-14
Apr-14 May-14
Jun-14
Jul-14
Aug-14
Project Const. Programe
(Cr.)
Sep-14
Oct-14
Nov-14
Dec-14
Jan-15
Feb-15 Mar-15
Apr-15 May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Expenditure Schedule
(Cr.)
Note: The expenditure schedule shown in S-Curve includes Work done Cost as shown in Finical Progress and Capital Cost incurred till date.
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 25
RHS
Chainage
Exc. Upto Emb. Top
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp.
0.000
0.050
0.100
0.150
0.200
0.250
0.300
0.350
0.400
0.450
0.500
0.550
0.600
0.650
0.700
0.750
0.800
0.850
0.900
0.950
1.000
1.050
1.100
1.150
1.200
1.250
1.300
1.350
1.400
1.450
1.500
1.550
1.600
1.650
1.700
1.750
1.800
1.850
1.900
1.950
2.000
2.050
2.100
2.150
2.200
2.250
2.300
2.350
2.400
2.450
2.500
2.550
2.600
2.650
2.700
2.750
2.800
2.850
2.900
2.950
3.000
3.050
3.100
3.150
3.200
3.250
3.300
3.350
3.400
3.450
3.500
3.550
3.600
3.650
3.700
3.750
3.800
3.850
3.900
3.950
4.000
4.050
4.100
4.150
4.200
4.250
4.300
4.350
4.400
4.450
4.500
4.550
4.600
4.650
4.700
4.750
4.800
4.850
4.900
4.950
5.000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
7. Strip chart of work progress
OGL Samp.
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 26
RHS
Chainage
5.000
5.050
5.100
5.150
5.200
5.250
5.300
5.350
5.400
5.450
5.500
5.550
5.600
5.650
5.700
5.750
5.800
5.850
5.900
5.950
6.000
6.050
6.100
6.150
6.200
6.250
6.300
6.350
6.400
6.450
6.500
6.550
6.600
6.650
6.700
6.750
6.800
6.850
6.900
6.950
7.000
7.050
7.100
7.150
7.200
7.250
7.300
7.350
7.400
7.450
7.500
7.550
7.600
7.650
7.700
7.750
7.800
7.850
7.900
7.950
8.000
8.050
8.100
8.150
8.200
8.250
8.300
8.350
8.400
8.450
8.500
8.550
8.600
8.650
8.700
8.750
8.800
8.850
8.900
8.950
9.000
9.050
9.100
9.150
9.200
9.250
9.300
9.350
9.400
9.450
9.500
9.550
9.600
9.650
9.700
9.750
9.800
9.850
9.900
9.950
10.000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp.
OGL Samp.
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 27
RHS
Chainage
10.000
10.050
10.100
10.150
10.200
10.250
10.300
10.350
10.400
10.450
10.500
10.550
10.600
10.650
10.700
10.750
10.800
10.850
10.900
10.950
11.000
11.050
11.100
11.150
11.200
11.250
11.300
11.350
11.400
11.450
11.500
11.550
11.600
11.650
11.700
11.750
11.800
11.850
11.900
11.950
12.000
12.050
12.100
12.150
12.200
12.250
12.300
12.350
12.400
12.450
12.500
12.550
12.600
12.650
12.700
12.750
12.800
12.850
12.900
12.950
13.000
13.050
13.100
13.150
13.200
13.250
13.300
13.350
13.400
13.450
13.500
13.550
13.600
13.650
13.700
13.750
13.800
13.850
13.900
13.950
14.000
14.050
14.100
14.150
14.200
14.250
14.300
14.350
14.400
14.450
14.500
14.550
14.600
14.650
14.700
14.750
14.800
14.850
14.900
14.950
15.000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp.
OGL Samp.
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 28
RHS
Chainage
15.000
15.050
15.100
15.150
15.200
15.250
15.300
15.350
15.400
15.450
15.500
15.550
15.600
15.650
15.700
15.750
15.800
15.850
15.900
15.950
16.000
16.050
16.100
16.150
16.200
16.250
16.300
16.350
16.400
16.450
16.500
16.550
16.600
16.650
16.700
16.750
16.800
16.850
16.900
16.950
17.000
17.050
17.100
17.150
17.200
17.250
17.300
17.350
17.400
17.450
17.500
17.550
17.600
17.650
17.700
17.750
17.800
17.850
17.900
17.950
18.000
18.050
18.100
18.150
18.200
18.250
18.300
18.350
18.400
18.450
18.500
18.550
18.600
18.650
18.700
18.750
18.800
18.850
18.900
18.950
19.000
19.050
19.100
19.150
19.200
19.250
19.300
19.350
19.400
19.450
19.500
19.550
19.600
19.650
19.700
19.750
19.800
19.850
19.900
19.950
20.000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-9th
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp.
OGL Samp.
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 29
RHS
OGL Samp.
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
EXC upto Emb Top
Chainage
20.000
20.050
20.100
20.150
20.200
20.250
20.300
20.350
20.400
20.450
20.500
20.550
20.600
20.650
20.700
20.750
20.800
20.850
20.900
20.950
21.000
21.050
21.100
21.150
21.200
21.250
21.300
21.350
21.400
21.450
21.500
21.550
21.600
21.650
21.700
21.750
21.800
21.850
21.900
21.950
22.000
22.050
22.100
22.150
22.200
22.250
22.300
22.350
22.400
22.450
22.500
22.550
22.600
22.650
22.700
22.750
22.800
22.850
22.900
22.950
23.000
23.050
23.100
23.150
23.200
23.250
23.300
23.350
23.400
23.450
23.500
23.550
23.600
23.650
23.700
23.750
23.800
23.850
23.900
23.950
24.000
24.050
24.100
24.150
24.200
24.250
24.300
24.350
24.400
24.450
24.500
24.550
24.600
24.650
24.700
24.750
24.800
24.850
24.900
24.950
25.000
LHS
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-14th
EMB-13th
EMB-12th
EMB-11th
EMB-10th
EMB-9th
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp.
Exc. Upto Emb. Top
EMB. Top NGL
Exc. Upto Emb. Top
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
Page 30
RHS
Chainage
25.000
25.050
25.100
25.150
25.200
25.250
25.300
25.350
25.400
25.450
25.500
25.550
25.600
25.650
25.700
25.750
25.800
25.850
25.900
25.950
26.000
26.050
26.100
26.150
26.200
26.250
26.300
26.350
26.400
26.450
26.500
26.550
26.600
26.650
26.700
26.750
26.800
26.850
26.900
26.950
27.000
27.050
27.100
27.150
27.200
27.250
27.300
27.350
27.400
27.450
27.500
27.550
27.600
27.650
27.700
27.750
27.800
27.850
27.900
27.950
28.000
28.050
28.100
28.150
28.200
28.250
28.300
28.350
28.400
28.450
28.500
28.550
28.600
28.650
28.700
28.750
28.800
28.850
28.900
28.950
29.000
29.050
29.100
29.150
29.200
29.250
29.300
29.350
29.400
29.450
29.500
29.550
29.600
29.650
29.700
29.750
29.800
29.850
29.900
29.950
30.000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp.
OGL Samp.
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 31
RHS
Chainage
30.000
30.050
30.100
30.150
30.200
30.250
30.300
30.350
30.400
30.450
30.500
30.550
30.600
30.650
30.700
30.750
30.800
30.850
30.900
30.950
31.000
31.050
31.100
31.150
31.200
31.250
31.300
31.350
31.400
31.450
31.500
31.550
31.600
31.650
31.700
31.750
31.800
31.850
31.900
31.950
32.000
32.050
32.100
32.150
32.200
32.250
32.300
32.350
32.400
32.450
32.500
32.550
32.600
32.650
32.700
32.750
32.800
32.850
32.900
32.950
33.000
33.050
33.100
33.150
33.200
33.250
33.300
33.350
33.400
33.450
33.500
33.550
33.600
33.650
33.700
33.750
33.800
33.850
33.900
33.950
34.000
34.050
34.100
34.150
34.200
34.250
34.300
34.350
34.400
34.450
34.500
34.550
34.600
34.650
34.700
34.750
34.800
34.850
34.900
34.950
35.000
LHS
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-15th
EMB-14th
EMB-13th
EMB-12th
EMB-11th
EMB-10th
EMB-9th
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp.
Exc upto Emb. Top
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
OGL Samp.
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 32
RHS
Chainage
40.000
40.050
40.100
40.150
40.200
40.250
40.300
40.350
40.400
40.450
40.500
40.550
40.600
40.650
40.700
40.750
40.800
40.850
40.900
40.950
41.000
41.050
41.100
41.150
41.200
41.250
41.300
41.350
41.400
41.450
41.500
41.550
41.600
41.650
41.700
41.750
41.800
41.850
41.900
41.950
42.000
42.050
42.100
42.150
42.200
42.250
42.300
42.350
42.400
42.450
42.500
42.550
42.600
42.650
42.700
42.750
42.800
42.850
42.900
42.950
43.000
43.050
43.100
43.150
43.200
43.250
43.300
43.350
43.400
43.450
43.500
43.550
43.600
43.650
43.700
43.750
43.800
43.850
43.900
43.950
44.000
44.050
44.100
44.150
44.200
44.250
44.300
44.350
44.400
44.450
44.500
44.550
44.600
44.650
44.700
44.750
44.800
44.850
44.900
44.950
45.000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-14th
EMB-13th
EMB-12th
EMB-11th
EMB-10th
EMB-9th
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp.
OGL Samp.
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-7th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 33
RHS
OGL Samp.
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-7th
EMB-Top
M/s. SAI MAATARINI TOLLWAYS LIMITED
Exc upto Emb Top
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-20th
EMB-19th
EMB-18th
EMB-17th
EMB-16th
EMB-15th
EMB-14th
EMB-13th
EMB-12th
EMB-11th
EMB-10th
EMB-9th
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp.
Exc upto Emb Top
EXC upto Emb Top
EXC upto Emb Top
Chainage
45.000
45.050
45.100
45.150
45.200
45.250
45.300
45.350
45.400
45.450
45.500
45.550
45.600
45.650
45.700
45.750
45.800
45.850
45.900
45.950
46.000
46.050
46.100
46.150
46.200
46.250
46.300
46.350
46.400
46.450
46.500
46.550
46.600
46.650
46.700
46.750
46.800
46.850
46.900
46.950
47.000
47.050
47.100
47.150
47.200
47.250
47.300
47.350
47.400
47.450
47.500
47.550
47.600
47.650
47.700
47.750
47.800
47.850
47.900
47.950
48.000
48.050
48.100
48.150
48.200
48.250
48.300
48.350
48.400
48.450
48.500
48.550
48.600
48.650
48.700
48.750
48.800
48.850
48.900
48.950
49.000
49.050
49.100
49.150
49.200
49.250
49.300
49.350
49.400
49.450
49.500
49.550
49.600
49.650
49.700
49.750
49.800
49.850
49.900
49.950
50.000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
Page 34
RHS
Chainage
OGL Samp.
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
Exc upto Emb. Top
Exc upto Emb. Top
13
Exc upto Emb. Top
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp.
50.000
50.050
50.100
50.150
50.200
50.250
50.300
50.350
50.400
50.450
50.500
50.550
50.600
50.650
50.700
50.750
50.800
50.850
50.900
50.950
51.000
51.050
51.100
51.150
51.200
51.250
51.300
51.350
51.400
51.450
51.500
51.550
51.600
51.650
51.700
51.750
51.800
51.850
51.900
51.950
52.000
52.050
52.100
52.150
52.200
52.250
52.300
52.350
52.400
52.450
52.500
52.550
52.600
52.650
52.700
52.750
52.800
52.850
52.900
52.950
53.000
53.050
53.100
53.150
53.200
53.250
53.300
53.350
53.400
53.450
53.500
53.550
53.600
53.650
53.700
53.750
53.800
53.850
53.900
53.950
54.000
54.050
54.100
54.150
54.200
54.250
54.300
54.350
54.400
54.450
54.500
54.550
54.600
54.650
54.700
54.750
54.800
54.850
54.900
54.950
55.000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
18th Layer
Page 35
RHS
Chainage
M/s. SAI MAATARINI TOLLWAYS LIMITED
Exc upto Emb. Top
Exc upto Emb. Top
Exc upto Emb. Top
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-9th
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp.
85.000
85.050
85.100
85.150
85.200
85.250
85.300
85.350
85.400
85.450
85.500
85.550
85.600
85.650
85.700
85.750
85.800
85.850
85.900
85.950
86.000
86.050
86.100
86.150
86.200
86.250
86.300
86.350
86.400
86.450
86.500
86.550
86.600
86.650
86.700
86.750
86.800
86.850
86.900
86.950
87.000
87.050
87.100
87.150
87.200
87.250
87.300
87.350
87.400
87.450
87.500
87.550
87.600
87.650
87.700
87.750
87.800
87.850
87.900
87.950
88.000
88.050
88.100
88.150
88.200
88.250
88.300
88.350
88.400
88.450
88.500
88.550
88.600
88.650
88.700
88.750
88.800
88.850
88.900
88.950
89.000
89.050
89.100
89.150
89.200
89.250
89.300
89.350
89.400
89.450
89.500
89.550
89.600
89.650
89.700
89.750
89.800
89.850
89.900
89.950
90.000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
OGL Samp.
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-7th
EMB-8th
EMB-9th
EMB-10th
EMB-11th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
Page 36
RHS
OGL Samp.
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
12th Layer
9th
Layer
11th Layer
8th Layer
10th Layer
7th Layer
7th Layer
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp.
9thLayer
Chainage
90.000
90.050
90.100
90.150
90.200
90.250
90.300
90.350
90.400
90.450
90.500
90.550
90.600
90.650
90.700
90.750
90.800
90.850
90.900
90.950
91.000
91.050
91.100
91.150
91.200
91.250
91.300
91.350
91.400
91.450
91.500
91.550
91.600
91.650
91.700
91.750
91.800
91.850
91.900
91.950
92.000
92.050
92.100
92.150
92.200
92.250
92.300
92.350
92.400
92.450
92.500
92.550
92.600
92.650
92.700
92.750
92.800
92.850
92.900
92.950
93.000
93.050
93.100
93.150
93.200
93.250
93.300
93.350
93.400
93.450
93.500
93.550
93.600
93.650
93.700
93.750
93.800
93.850
93.900
93.950
94.000
94.050
94.100
94.150
94.200
94.250
94.300
94.350
94.400
94.450
94.500
94.550
94.600
94.650
94.700
94.750
94.800
94.850
94.900
94.950
95.000
LHS
8th
Layer
Exc. Upto Emb. Top
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
Hardrock
Rock
Page 37
RHS
OGL Samp.
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
Exc. upto E. Top
Chainage
Exc. Upto Emb. Top
Exc. Upto Emb. Top
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp.
95.000
95.050
95.100
95.150
95.200
95.250
95.300
95.350
95.400
95.450
95.500
95.550
95.600
95.650
95.700
95.750
95.800
95.850
95.900
95.950
96.000
96.050
96.100
96.150
96.200
96.250
96.300
96.350
96.400
96.450
96.500
96.550
96.600
96.650
96.700
96.750
96.800
96.850
96.900
96.950
97.000
97.050
97.100
97.150
97.200
97.250
97.300
97.350
97.400
97.450
97.500
97.550
97.600
97.650
97.700
97.750
97.800
97.850
97.900
97.950
98.000
98.050
98.100
98.150
98.200
98.250
98.300
98.350
98.400
98.450
98.500
98.550
98.600
98.650
98.700
98.750
98.800
98.850
98.900
98.950
99.000
99.050
99.100
99.150
99.200
99.250
99.300
99.350
99.400
99.450
99.500
99.550
99.600
99.650
99.700
99.750
99.800
99.850
99.900
99.950
100.000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
Page 38
RHS
Chainage
113+000
113+050
113+100
113+150
113+200
113+250
113+300
113+350
113+400
113+450
113+500
113+550
113+600
113+650
113+700
113+750
113+800
113+850
113+900
113+950
114+000
114+050
114+100
114+150
114+200
114+250
114+300
114+350
114+400
114+450
114+500
114+550
114+600
114+650
114+700
114+750
114+800
114+850
114+900
114+950
115+000
115+050
115+100
115+150
115+200
115+250
115+300
115+350
115+400
115+450
115+500
115+550
115+600
115+650
115+700
115+750
115+800
115+850
115+900
115+950
116+000
116+050
116+100
116+150
116+200
116+250
116+300
116+350
116+400
116+450
116+500
116+550
116+600
116+650
116+700
116+750
116+800
116+850
116+900
116+950
117+000
117+050
117+100
117+150
117+200
117+250
117+300
117+350
117+400
117+450
117+500
117+550
117+600
117+650
117+700
117+750
117+800
117+850
117+900
117+950
118+000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-11th
EMB-10th
EMB-9th
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp. Testing
OGL Samp. Testing
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-7th
EMB-8th
EMB-9th
EMB-10th
EMB-11th
EMB-12th
EMB-13th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 39
RHS
EMB-10th
EMB-9th
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-7th
EMB-8th
EMB-9th
EMB-10th
EMB-11th
EMB-12th
EMB-13th
M/s. SAI MAATARINI TOLLWAYS LIMITED
Excavation upto Emb Top Layer
EMB-11th
Excavation upto Emb Top layer
EMB-12th
Excavation upto Emb Top Layer
Excavation up to Subgrade Top Layer
EMB-13th
Excavation upto Subgrade Top layer
Chainage
118+000
118+050
118+100
118+150
118+200
118+250
118+300
118+350
118+400
118+450
118+500
118+550
118+600
118+650
118+700
118+750
118+800
118+850
118+900
118+950
119+000
119+050
119+100
119+150
119+200
119+250
119+300
119+350
119+400
119+450
119+500
119+550
119+600
119+650
119+700
119+750
119+800
119+850
119+900
119+950
120+000
120+050
120+100
120+150
120+200
120+250
120+300
120+350
120+400
120+450
120+500
120+550
120+600
120+650
120+700
120+750
120+800
120+850
120+900
120+950
121+000
121+050
121+100
121+150
121+200
121+250
121+300
121+350
121+400
121+450
121+500
121+550
121+600
121+650
121+700
121+750
121+800
121+850
121+900
121+950
122+000
122+050
122+100
122+150
122+200
122+250
122+300
122+350
122+400
122+450
122+500
122+550
122+600
122+650
122+700
122+750
122+800
122+850
122+900
122+950
123+000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
OGL Record
OGL FDD
C&G
OGL Samp. Testing
OGL Samp. Testing
C&G
OGL FDD
OGL Record
EMB-1st
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
Page 40
RHS
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
Chainage
EMB-4th
EMB-5th
EMB-6th
EMB-7th
EMB-8th
EMB-9th
EMB-10th
EMB-11th
EMB-12th
EMB-13th
EMB-14th
.
M/s. SAI MAATARINI TOLLWAYS LIMITED
.
.
.
Excavation Upto Emb Top Layer
Slush Removal
.
.
.
.
.
.
.
Excavation upto Emb Top Layer
EMB-9th
Excavation Upto Emb Top Layer
EMB-10th
Excavation Upto Emb Top Layer
EMB-11th
Excavation Upto Emb Top Layer
EMB-12th
Excavation up to Emb Top layer RFI was raised
but filling up to 01 layer may be required
EMB-13th
Excavation Upto Emb Top Layer
EMB-14th
123+000
123+050
123+100
123+150
123+200
123+250
123+300
123+350
123+400
123+450
123+500
123+550
123+600
123+650
123+700
123+750
123+800
123+850
123+900
123+950
124+000
124+050
124+100
124+150
124+200
124+250
124+300
124+350
124+400
124+450
124+500
124+550
124+600
124+650
124+700
124+750
124+800
124+850
124+900
124+950
125+000
125+050
125+100
125+150
125+200
125+250
125+300
125+350
125+400
125+450
125+500
125+550
125+600
125+650
125+700
125+750
125+800
125+850
125+900
125+950
126+000
126+050
126+100
126+150
126+200
126+250
126+300
126+350
126+400
126+450
126+500
126+550
126+600
126+650
126+700
126+750
126+800
126+850
126+900
126+950
127+000
127+050
127+100
127+150
127+200
127+250
127+300
127+350
127+400
127+450
127+500
127+550
127+600
127+650
127+700
127+750
127+800
127+850
127+900
127+950
128+000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
.
OGL FDD
C&G
OGL Samp. Testing
OGL Samp. Testing
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-15th
EMB-16th
EMB-17th
EMB-18th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
Page 41
RHS
EMB-9th
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
Chainage
OGL FDD
EMB-Top
EMB-5th
EMB-6th
EMB-7th
EMB-8th
EMB-9th
EMB-10th
EMB-11th
EMB-12th
M/s. SAI MAATARINI TOLLWAYS LIMITED
Excavation Upto Emb Top Layer
Excavation Upto Emb Top Layer
EMB-10th
Excavation upto Emb Top Layer
OGL FDD
128+000
128+050
128+100
128+150
128+200
128+250
128+300
128+350
128+400
128+450
128+500
128+550
128+600
128+650
128+700
128+750
128+800
128+850
128+900
128+950
129+000
129+050
129+100
129+150
129+200
129+250
129+300
129+350
129+400
129+450
129+500
129+550
129+600
129+650
129+700
129+750
129+800
129+850
129+900
129+950
130+000
130+050
130+100
130+150
130+200
130+250
130+300
130+350
130+400
130+450
130+500
130+550
130+600
130+650
130+700
130+750
130+800
130+850
130+900
130+950
131+000
131+050
131+100
131+150
131+200
131+250
131+300
131+350
131+400
131+450
131+500
131+550
131+600
131+650
131+700
131+750
131+800
131+850
131+900
131+950
132+000
132+050
132+100
132+150
132+200
132+250
132+300
132+350
132+400
132+450
132+500
132+550
132+600
132+650
132+700
132+750
132+800
132+850
132+900
132+950
133+000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
OGL Record
C&G
EXCAVATION
OGL Samp. Testing
OGL Samp. Testing
C&G
OGL Record
EXCAVATION
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-13th
EMB-14th
EMB-15th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
Page 42
RHS
EMB-9th
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
Chainage
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-7th
EMB-8th
EMB-9th
EMB-10th
EMB-11th
EMB-12th
EMB-13th
EMB-14th
EMB-15th
Excavation was done but RFI was not raised
EMB-10th
M/s. SAI MAATARINI TOLLWAYS LIMITED
Excavation upto Emb Top Layer
Excavation upto Emb Top Layer
Excavation upto Emb Top Layer
EMB-11th
133+000
133+050
133+100
133+150
133+200
133+250
133+300
133+350
133+400
133+450
133+500
133+550
133+600
133+650
133+700
133+750
133+800
133+850
133+900
133+950
134+000
134+050
134+100
134+150
134+200
134+250
134+300
134+350
134+400
134+450
134+500
134+550
134+600
134+650
134+700
134+750
134+800
134+850
134+900
134+950
135+000
135+050
135+100
135+150
135+200
135+250
135+300
135+350
135+400
135+450
135+500
135+550
135+600
135+650
135+700
135+750
135+800
135+850
135+900
135+950
136+000
136+050
136+100
136+150
136+200
136+250
136+300
136+350
136+400
136+450
136+500
136+550
136+600
136+650
136+700
136+750
136+800
136+850
136+900
136+950
137+000
137+050
137+100
137+150
137+200
137+250
137+300
137+350
137+400
137+450
137+500
137+550
137+600
137+650
137+700
137+750
137+800
137+850
137+900
137+950
138+000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-12th
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp. Testing
OGL Samp. Testing
C&G
OGL FDD
OGL Record
EMB-1st
EMB-16th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
Page 43
RHS
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
Chainage
Excavation upto Emb. Top
EMB-9th
138+000
138+050
138+100
138+150
138+200
138+250
138+300
138+350
138+400
138+450
138+500
138+550
138+600
138+650
138+700
138+750
138+800
138+850
138+900
138+950
139+000
139+050
139+100
139+150
139+200
139+250
139+300
139+350
139+400
139+450
139+500
139+550
139+600
139+650
139+700
139+750
139+800
139+850
139+900
139+950
140+000
140+050
140+100
140+150
140+200
140+250
140+300
140+350
140+400
140+450
140+500
140+550
140+600
140+650
140+700
140+750
140+800
140+850
140+900
140+950
141+000
141+050
141+100
141+150
141+200
141+250
141+300
141+350
141+400
141+450
141+500
141+550
141+600
141+650
141+700
141+750
141+800
141+850
141+900
141+950
142+000
142+050
142+100
142+150
142+200
142+250
142+300
142+350
142+400
142+450
142+500
142+550
142+600
142+650
142+700
142+750
142+800
142+850
142+900
142+950
143+000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-12th
EMB-11th
EMB-10th
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp. Testing
OGL Samp. Testing
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-7th
EMB-8th
EMB-9th
EMB-10th
EMB-11th
EMB-12th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 44
RHS
Chainage
143+000
143+050
143+100
143+150
143+200
143+250
143+300
143+350
143+400
143+450
143+500
143+550
143+600
143+650
143+700
143+750
143+800
143+850
143+900
143+950
144+000
144+050
144+100
144+150
144+200
144+250
144+300
144+350
144+400
144+450
144+500
144+550
144+600
144+650
144+700
144+750
144+800
144+850
144+900
144+950
145+000
145+050
145+100
145+150
145+200
145+250
145+300
145+350
145+400
145+450
145+500
145+550
145+600
145+650
145+700
145+750
145+800
145+850
145+900
145+950
146+000
146+050
146+100
146+150
146+200
146+250
146+300
146+350
146+400
146+450
146+500
146+550
146+600
146+650
146+700
146+750
146+800
146+850
146+900
146+950
147+000
147+050
147+100
147+150
147+200
147+250
147+300
147+350
147+400
147+450
147+500
147+550
147+600
147+650
147+700
147+750
147+800
147+850
147+900
147+950
148+000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-9th
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp. Testing
OGL Samp. Testing
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-7th
EMB-8th
EMB-9th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 45
RHS
Chainage
148+000
148+050
148+100
148+150
148+200
148+250
148+300
148+350
148+400
148+450
148+500
148+550
148+600
148+650
148+700
148+750
148+800
148+850
148+900
148+950
149+000
149+050
149+100
149+150
149+200
149+250
149+300
149+350
149+400
149+450
149+500
149+550
149+600
149+650
149+700
149+750
149+800
149+850
149+900
149+950
150+000
150+050
150+100
150+150
150+200
150+250
150+300
150+350
150+400
150+450
150+500
150+550
150+600
150+650
150+700
150+750
150+800
150+850
150+900
150+950
151+000
151+050
151+100
151+150
151+200
151+250
151+300
151+350
151+400
151+450
151+500
151+550
151+600
151+650
151+700
151+750
151+800
151+850
151+900
151+950
152+000
152+050
152+100
152+150
152+200
152+250
152+300
152+350
152+400
152+450
152+500
152+550
152+600
152+650
152+700
152+750
152+800
152+850
152+900
152+950
153+000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-9th
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp. Testing
OGL Samp. Testing
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-7th
EMB-8th
EMB-9th
EMB-10th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 46
RHS
Chainage
153+000
153+050
153+100
153+150
153+200
153+250
153+300
153+350
153+400
153+450
153+500
153+550
153+600
153+650
153+700
153+750
153+800
153+850
153+900
153+950
154+000
154+050
154+100
154+150
154+200
154+250
154+300
154+350
154+400
154+450
154+500
154+550
154+600
154+650
154+700
154+750
154+800
154+850
154+900
154+950
155+000
155+050
155+100
155+150
155+200
155+250
155+300
155+350
155+400
155+450
155+500
155+550
155+600
155+650
155+700
155+750
155+800
155+850
155+900
155+950
156+000
156+050
156+100
156+150
156+200
156+250
156+300
156+350
156+400
156+450
156+500
156+550
156+600
156+650
156+700
156+750
156+800
156+850
156+900
156+950
157+000
157+050
157+100
157+150
157+200
157+250
157+300
157+350
157+400
157+450
157+500
157+550
157+600
157+650
157+700
157+750
157+800
157+850
157+900
157+950
158+000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-9th
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp. Testing
OGL Samp. Testing
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-7th
EMB-8th
EMB-9th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 47
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 48
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-17th
EMB-16th
EMB-15th
EMB-14th
LHS
EMB-13th
EMB-12th
EMB-11th
EMB-10th
EMB-9th
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
163+000
163+050
163+100
163+150
163+200
163+250
163+300
163+350
163+400
163+450
163+500
163+550
163+600
163+650
163+700
163+750
163+800
163+850
163+900
163+950
164+000
164+050
164+100
164+150
164+200
164+250
164+300
164+350
164+400
164+450
164+500
164+550
164+600
164+650
164+700
164+750
164+800
164+850
164+900
164+950
165+000
165+050
165+100
165+150
165+200
165+250
165+300
165+350
165+400
165+450
165+500
165+550
165+600
165+650
165+700
165+750
165+800
165+850
165+900
165+950
166+000
166+050
166+100
166+150
166+200
OGL Samp. Testing
Chainage
OGL Samp. Testing
C&G
OGL FDD
OGL Record
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
RHS
EMB-7th
EMB-8th
EMB-9th
EMB-10th
EMB-11th
Excavation Upto Emb Top Layer
EMB-1st
EMB-12th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 49
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
7.1.
Progress of Major Bridges
S. NO
CHAINAGE
(KM)
1
35+342
KUSAI RIVER
2
56+800
IDENTIFICATION
3
83+568
MUSHAL RIVER
KURKURKUTA
RIVER
4
108+085
KHALIJORE RIVER
5
139+495
ARDEI RIVER
6
C
7.2.
151+200
ARDEI RIVER
COMPLETED
P
FOUNDATION
LHS
SUB STRUCTURE
RHS
LHS
IN PROGRESS
NA
RHS
SUPER STRUCTURE
LHS
RHS
NOT APPLICABLE
Progress of Minor Bridges
S. NO
CHAINAGE
(KM)
1
17+100
BANDI RIVER
2
22+017
ANDHARI RIVER
3
24+818
GHAGIA NALLA
4
25+543
KALLAPAL JORE
5
31+982
SASAN RIVER
6
33+672
DHANAGHARA NALLAH
7
36+512
KANNADIAPATA RIVER
IDENTIFICATION
FOUNDATION
LHS
RHS
SUB STRUCTURE
LHS
RHS
SUPER STRUCTURE
LHS
RHS
40+071
8
44+400
JHADESWAR RIVER
9
49+422
MUHAN
10
57+322
11
67+297
12
82+625
SAGADIA NALLAH
13
95+410
SITA RIVER
14
97+913
ANIADHAR
15
106+926
RIVER
16
111+551
KHALIGHAT
17
116+163
New construction
18
117+007
New construction
19
143+238
New construction
20
146+695
New construction
21
148+605
New construction
22
148+959
New construction
23
152+089
New construction
24
153+942
New construction
25
155+566
26
156+870
New construction
New construction
27
158+315
New construction
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page
50
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
[
S. NO
CHAINAGE
(KM)
IDENTIFICATION
28
163+136
New construction
29
New construction
166+065
COMPLETED
P
115+639.5
JAJPUR BYPASS
New Construction
COMPLETED
P
IN PROGRESS
NOT APPLICABLE
NA
CHAINAGE
IDENTIFICATION
CRASH BARRIER
Progress Flyovers
DECK SLAB
SR.
NO.
RHS
NOT APPLICABLE
GIRDER
7.4.
NA
LHS
PEDESTAL
C
IN PROGRESS
RHS
PIER CAP
2
LHS
SUPER STRUCTURE
Progress ROB
09+233
1
RHS
PIER / WALLS
7.3.
LHS
SUB STRUCTURE
OPEN
FOUNDATION
C
FOUNDATION
Flyovers
1
7.5.
125+284.5
New construction
Vehicular Under Pass
STATUS OF STRUCTURE
SL.
NO
DESIGN
CHAINAGE
SIZE
FOUNDATION
LHS
1
10+673
1 x 12.00 x 5.50
2
20+038
1 x 12.00 x 5.50
3
23+544
1 x 12.00 x 5.50
4
29+857
1 x 12.00 x 5.50
5
38+783
1 x 12.00 x 5.50
6
42+133
1 x 12.00 x 5.50
7
45+448
1 x 12.00 x 5.50
8
53+382
1 x 12.00 x 5.50
9
77+950
1 x 12.00 x 5.50
10
90+500
1 x 12.00 x 5.50
11
115+121
1 x 12 x 5.50
12
117+688
1 x 12 x 5.50
13
122+929
1 x 12 x 5.50
14
128+849
1 x 12 x 5.50
15
131+412
1 x12 x 5.5
M/s. SAI MAATARINI TOLLWAYS LIMITED
RHS
SUB STRUCTURE
LHS
RHS
SUPER STRUCTURE
LHS
RHS
Page 51
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
[
7.6.
Pedestrian Under Pass
STATUS OF STRUCTURE
SL.
NO
DESIGN
CHAINAGE
SIZE
FOUNDATION
LHS
1
05+665
1x5x3
2
09+630
1 x 5.00 x 3.00
3
15+838
1 x 5.00 x 3.00
4
22+705
1 x 5.00 x 3.00
5
29+857
1 x 5.00 x 3.00
6
37+187
1x5x3
7
40+838
1x5x3
8
51+512
1x5x3
9
76+800
1 x 5.0 x 3.0
10
94+257
1 x 5.0 x 3.0
11
109+840
1 x 5.0 x 3.0
12
114+579
1x5x3
13
118+275
1x5x3
14
120+680
1x5x3
15
126+984
1x5x3
16
127+635
1x5x3
17
136+521
1x5x3
18
142+654
1x5x3
19
149+900
1x5x3
20
156+198
1x5x3
21
164+366
1x5x3
7.7.
Culverts (Pipe/Box/Slab)
RHS
SUB STRUCTURE
LHS
SUPER STRUCTURE
RHS
LHS
RHS
STATUS OF STRUCTURE
SL. NO
DESIGN
CHAINAGE
STRUCTURE
TYPE
SIZE
1
01+177
Box Culvert
3.0 x 1.8
2
02+115
HP Culvert
1 x 1.2 Ø
3
03+051
HP Culvert
1 x 1.2 Ø
4
03+452
HP Culvert
1 x 1.2 Ø
5
03+871
HP Culvert
2 x 1.2 Ø
6
04+363
HP Culvert
2 x 1.2 Ø
7
05+069
HP Culvert
1 x 1.2 Ø
8
05+956
HP Culvert
1 x 1.2 Ø
9
08+556
HP Culvert
1 x 1.2 Ø
10
09+170
Box Culvert
3.0 x 3.0
11
11+370
HP Culvert
1 x 1.2 Ø
M/s. SAI MAATARINI TOLLWAYS LIMITED
FOUNDATION
SUB STRUCTURE
LHS
LHS
RHS
RHS
SUPER STRUCTURE
LHS
RHS
Page 52
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
[
STATUS OF STRUCTURE
SL. NO
DESIGN
CHAINAGE
STRUCTURE
TYPE
SIZE
12
11+600
HP Culvert
1 x 1.2 Ø
13
12+376
HP Culvert
1 x 1.2 Ø
14
13+060
Box Culvert
1 x 2.00
15
13+223
HP Culvert
2 x 1.2 Ø
16
13+952
HP Culvert
1 x 1.2 Ø
17
14+240
HP Culvert
1 x 1.2 Ø
18
14+700
Box Culvert
1 x 2.0 x 2.0
19
15+680
HP Culvert
1 x 1.2 Ø
20
16+382
HP Culvert
1 x 1.2 Ø
21
17+375
HP Culvert
1 x 1.2 Ø
22
17+563
HP Culvert
1 x 1.2 Ø
23
18+300
HP Culvert
1 x 1.2 Ø
24
19+901
HP Culvert
1 x 1.2 Ø
25
20+627
HP Culvert
1 x 1.2 Ø
26
20+783
Box Culvert
3.0 x 1.40
27
21+070
HP Culvert
1 x 1.2 Ø
28
21+224
HP Culvert
2 x 1.2 Ø
29
21+692
HP Culvert
1 x 1.2 Ø
30
21+852
Box Culvert
3.0 x 2.0
31
20+783
Box Culvert
3.0 x 2.0
32
23+015
Slab Culvert
1 x 2.00
33
23+925
Box Culvert
1 x 2.0 x 2.0
34
25+956
Box Culvert
1 x 3.0 x 3.0
35
26+360
Box Culvert
1 x 4.0 x 3.0
36
27+075
Box Culvert
1 x 4.0 x 3.0
37
27+494
Slab Culvert
1 x 2.0
38
27+753
Box Culvert
39
28+147
Box Culvert
1 x 3.0 x 2.1
1 x 5.00 x
1.60
40
30+307
Box Culvert
1 x 2.0 x 1.2
41
30+646
Box Culvert
1 x 2.0 x 1.7
42
32+319
Box Culvert
1 x 3.0 x 2.7
43
32+460
Box Culvert
1 x 2.0 x 2.0
44
32+646
Box Culvert
1 x 2.0 x 2.0
45
33+125
Box Culvert
1 x 2.0 x 1.4
46
34+252
Box Culvert
1 x 2.0 x 2.0
47
39+101
Box Culvert
1 x 3.0 x 2.0
48
39+920
Box Culvert
1 x 3.0 x 2.0
49
40+195
Box Culvert
2 x 2.8
50
41+245
Box Culvert
1 x 2.0 x 2.0
M/s. SAI MAATARINI TOLLWAYS LIMITED
FOUNDATION
SUB STRUCTURE
LHS
LHS
RHS
RHS
SUPER STRUCTURE
LHS
RHS
Page 53
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
[
STATUS OF STRUCTURE
SL. NO
DESIGN
CHAINAGE
STRUCTURE
TYPE
SIZE
51
43+577
Box Culvert
1 x 4.0 x 3.0
52
47+024
Box Culvert
2 x 2.7
53
47+235
Box Culvert
1 x 2.0 x 1.4
54
47+359
Box Culvert
1 x 2.0 x 2.0
55
Box Culvert
1 x 3.0 x 2.0
56
47+705
47+870
Box Culvert
1 x 3.0 x 2.0
57
48+080
Box Culvert
2 x 2.8
58
49+066
Box Culvert
1 x 2.0 x 1.4
59
58+877
Box Culvert
1 x 2.0 x 2.0
60
60+529
Box Culvert
1 x 3.0 x 2.0
61
62+305
Box Culvert
1 x 3.0 x 2.0
62
62+734
Box Culvert
2 x 2.8
63
86+550
Box Culvert
1 x 5.0 x 3.0
64
91+817
Box Culvert
1 x 3.0 x 3.0
65
92+402
Box Culvert
1 x 3.0 x 3.0
66
93+362
Box Culvert
1 x 3.0 x 3.0
67
94+166
Box Culvert
1 x 3.0 x 3.0
68
96+701
Box Culvert
1 x 5.0 x 2.5
69
96+810
Box Culvert
1 x 5.0 x 1.5
70
99+676
Box Culvert
1 x 3.0 x 2.0
71
100+042
Box Culvert
1 x 4.0 x 3.0
72
105+625
Box Culvert
1 x 2.0 x 3.0
73
105+768
Slab Culvert
1 x 3.0 x 1.0
74
105+875
Box Culvert
1 x 5.0 x 3.0
75
106+062
Box Culvert
1 x 2.0 x 2.0
76
106+335
Box Culvert
1 x 4.0 x 2.0
77
113+540
Box Culvert
3x3
78
113+880
Box Culvert
3x3
79
114+140
Box Culvert
3x3
80
114+930
Box Culvert
3x3
81
115+190
Box Culvert
3x3
82
115+325
Box Culvert
5x3
83
115+605
Box Culvert
5x4
84
116+420
Box Culvert
5x4
85
116+690
Box Culvert
3x3
86
117+225
Box Culvert
3x3
87
117+400
Box Culvert
3x3
88
117+817
Box Culvert
3x3
89
118+106
Box Culvert
3 x 2.5
M/s. SAI MAATARINI TOLLWAYS LIMITED
FOUNDATION
SUB STRUCTURE
LHS
LHS
RHS
RHS
SUPER STRUCTURE
LHS
RHS
Page 54
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
[
STATUS OF STRUCTURE
SL. NO
DESIGN
CHAINAGE
STRUCTURE
TYPE
SIZE
90
118+440
Box Culvert
3x3
91
118+680
Box Culvert
2x2
92
118+982
Box Culvert
2x2
93
119+200
Box Culvert
3x3
94
119+460
Box Culvert
3x2
95
119+700
Box Culvert
3x3
96
119+800
Box Culvert
3x3
97
120+090
Box Culvert
5 x2
98
120+677
Box Culvert
5 x2
99
120+770
Box Culvert
5 x2
100
120+910
Box Culvert
5 x3
101
121+120
Box Culvert
5 x3
102
121+300
Box Culvert
3x3
103
121+470
Box Culvert
3x2
104
121+940
Box Culvert
3x3
105
122+109
Box Culvert
3x3
106
122+237
Box Culvert
3x3
107
122+597
Box Culvert
3x2
108
123+117
Box Culvert
3x2
109
123+677
Box Culvert
3x2
110
126+265
Box Culvert
5x3
111
126+420
Box Culvert
5x3
112
127+330
Box Culvert
5x3
113
127+470
Box Culvert
5x3
114
128+570
Box Culvert
3x3
115
128+710
Box Culvert
2x2
116
129+540
HP Culvert
1 x 1.2
117
130+094
Box Culvert
3 x3
118
130+460
Box Culvert
2x1
119
130+898.5
Box Culvert
2 x1.5
120
130+993
Box Culvert
2 x1.5
121
131+500
Box Culvert
3 x 1.5
122
133+830
Box Culvert
3 x 1.5
123
134+475
Box Culvert
2x2
124
135+554
Box Culvert
2x2
125
139+853
Box Culvert
2x2
126
140+596
Box Culvert
4x4
127
140+887
Box Culvert
4x4
128
141+365
Box Culvert
2x2
M/s. SAI MAATARINI TOLLWAYS LIMITED
FOUNDATION
SUB STRUCTURE
LHS
LHS
RHS
RHS
SUPER STRUCTURE
LHS
RHS
Page 55
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
[
STATUS OF STRUCTURE
SL. NO
DESIGN
CHAINAGE
STRUCTURE
TYPE
SIZE
129
141+656
Box Culvert
4 x 1.5
130
141+767
Box Culvert
2x1
131
142+240
Box Culvert
2x2
132
152+443.284
Box Culvert
2x1
133
156+300
Box Culvert
2x1
134
158+590.902
Box Culvert
5x3
135
159+323
Box Culvert
136
160+421
Box Culvert
137
163+331
Box Culvert
5x3
138
163+801
Box Culvert
5x3
139
164+036
Box Culvert
140
164+191
Box Culvert
5 x 2.5
141
164+520
Box Culvert
5 x 2.5
142
164+631
Box Culvert
143
165+070
Slab Culvert
8.
FOUNDATION
SUB STRUCTURE
LHS
LHS
RHS
RHS
SUPER STRUCTURE
LHS
RHS
1x3
Construction Constraints:
A. Land Acquisition:
A status report on the acquisition of private land by the end of June-14 is furnished
hereunder which reveals the following facts.
(a). Keonjhar District (between Km 24+000 to Km 113+000):
1. No of Tahisil: 4 Nos. (Gasipura, Anandpur, Ghatgaon &Sadar)
(b). Total No of Villages: 58 Nos.:
1. No. of villages for which compensation has been mostly disbursed – 42 Nos.
2. No of villages pending disbursement of compensation
– 16 Nos.
3. Percentage villages for which compensation is yet to be paid
– 27.59%
(c). Total No of Khatas / Awards: 2358 Nos. :
1. No. of awards for which compensation has been disbursed
– 1303 Nos.
2. No of awards pending disbursement of compensation
– 1055 Nos.
3. % awards for which disbursement of compensation is pending
– 44.74%
(d). Total area in these Tahasils / Villages to be acquired
– 327.60 Acres:
1. Area for which compensation has been disbursed
–153.89 Acres.
2. Area pending disbursement of compensation
– 173.71 Acres.
3. % Area for which disbursement of compensation is pending – 53%
Ostensibly, the balance land for which compensation is yet to be disbursed, which
constitutes53%in the stretch, looks alarming and disturbing and it is necessary that matter is
to be addressed by calling up on Competent Authority (LA).
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 56
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
[
However, the private land acquisition between Km 113+000 to Km 166+173, has been
accomplished to an extent of 82.52% and the payment for balance land has just been started but
sluggish on account of concentration of CALA in Tahasils of Anandapur, Ghasipura, Ghatgaon
&Sadar. However certain missing bits are also to be procured by direct purchase.
Jajpur District: Km 0+000 to Km 24+000:
3D Notification has been issued for about 517 missing bits which was published in local
paper dated 01-06-2014.
As these bits are spread over in entire 24 Kms, the formation work in the entire stretch is
getting affected and therefore, the payment of compensation gains urgency for these bits.
The above process shall take at least 2 more months and 517 bits in these 24 Kms may come into
possession by 31-08-2014 provided if Project Director liaises with Competent Authority (L.A.) vigorously
and get the amount estimated by CALA vide Section-3G and deposited by Authority vide Section-3H of NH
Act-1956.
B. Forest Land Diversion Proposal: The Stage-II clearance for the “Forest Land Diversion
Proposal” for 151.94 Hectares is yet to be obtained. It shows that more than 424 days
was elapsed after Appointed Date for getting this clearance. It may take further 120
days to PIU to accomplish the compliances on conditions communicated in Stage-I
clearance and at least another 90 daysfor clearance at MoEF level; thus, the time of
634 days would be lost from Appointed Date by the time Stage-II clearance is
obtained from MoEF, presumed.
C. Missing bits from 3D Notifications requiring direct purchase by P.D: There are at
least 2 missing bits between Km 0+000 to Km 24+000, about 98 missing bits between
Km 24+000 to Km 58+000 and11 missing bits between Km 113+000 to Km 166+173
requiring direct purchase by PIU. The missing bits in between Km 58+000 to Km
113+000 are still to be identified as the compensation payment is still in process.
D. Total Govt. Buildings and length affected in execution: It is noticed that at least 81
Govt. Buildings/Structures/Compound walls are standing on Project Highway
effecting execution of Highway to a length of 5438 meters or 5.438 KMs. PD has to
furnish these estimates to RO, NHAI, Bhubaneswar for sanction. PIU has also to make
effective efforts and assistance to prevail upon Govt. departments to identify and
provide land for construction of buildings to shift the existing offices / schools etc.,
E. Eviction of Encroachments – “The evection of encroachment in Dhankikoteis in
progress”.
F. Religious Structures like Temples & Mosques: Total length of execution getting
affected due to existence of 12 temples and 1 mosque is 453 Mts.as on 30-04-2014
and the same issue was deliberated in the Monthly Review Meeting held on 29-052014 and Project Director informed for a joint verification with all concerned from
04th to 6th of June’14 to resolve and take a decision, but verification is yet to take
place.
G. Govt. Land Alienation:
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 57
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
[
Jajpur District: 59 cases were filed with Vyasanagar Tahasil
Keonjhar District: 305 cases (Ghasipura-78, Anandpur-30, Ghatgaon-60, Sadar-97,
Bansapal (new)-3, Champua-10, Jhumpura (New)27) were filed.
The alienation may take some time for official transfer of land to Authority. Project
Director has to take suitable steps on the matter.
H. Court cases, Arbitration cases:
There are about 217 Arbitration cases in Keonjhar District and a dozen cases in Jajpur
District.
I. I. Resolution of Public Resentment at Belabahali villagers protesting the
construction of work of Major Bridge proper at Km 35+803 across Kusei River along
the approved alignment as a result of which work in about 5Kms Length (Realignment
length is 1.56Kms) has come to a grinding halt. The issue is yet to be resolved.
9. Change of Scope of Work
1. 31 Nos. New Culverts pertaining to Khaneipur Irrigation Department:
Project Director has communicated in principle approval of these additional culverts vide Lr.
No. 6067, dated 24-04-2014for which Change of Scope Notice has to be issued for all 31
culverts as I.E. vide Lr. No. 123 dated30-05-2014 has communicated to PD, a comprehensive
or confirmed proposal on the matter.
As Work on 31 Nos. irrigation culverts, therefore could not be commenced which are spread
over the Chainages from Km 0+000 to Km 42+000 & Km 145+000 to Km 162+000 thus
stalling the work spread over a length of 59Kms. of Project Highway.
Concessionaire has furnished GADs for 11 Nos. ofKanupur Irrigation Project for irrigation
canals crossing NH-215 highway vide Lr. No. 336, dated 25-05-2014 to Project Director for
review and acceptance.
2. Slip/Service Roads for Flyover @ Km 125+284:
It was agreed to provide Change of Scope Notice and therefore Concessionaire was asked to
provide cost implication with details drawings for slip roads &island/round about
arrangement.
3. VUP at KM 115+189 (MDR-Tulasichunura):
As required by NHAI the cost implication for double vent VUP in lieu of single vent VUP have
been furnished to I.E. to cause issuance of Change of Scope Notice.
10. Claims:
a. Extension of Time (EOT) for achieving Mile stones & Scheduled 4-Laning Date:
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 58
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
[
1) Letter No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/023, dated 21-09-2013 addressed
to I.E. for E.O.T. – Delay in acceptance of Designs & Drawings by 1 year 3 months &
accessibility of land of 72 Kms (43.37%) for Project Work.
2) Letter No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/025, dated 22-09-2013 addressed
to I.E. for E.O.T. of 5 months – Delay in permissions / approvals for electrical utility
shifting.
3) Letter No. REF: SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/055, dated 11-11-2013
addressed to I.E. indicating the facts of delay on the obligation of NHAI before
commencement of execution of 4-laning pursuant to Cl. 12.4.1 of C.A.
4) Letter No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/071, dated 23-11-2013 addressed
to I.E. for E.O.T. of 7 Month – Delay in Tree felling.
5) Letter No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/075, dated 26-11-2013 addressed
to I.E. for E.O.T. of 7 Months.– Delay for shifting of RWSS & PH Pipe lines
6) Letter No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/076, dated 26-11-2013 addressed
to I.E. for E.O.T. of 7 Months. – Delay in Tree felling.
7) Letter No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/182, dated 10-03-2014 addressed
to I.E. for E.O.T. – Review of Design & Drawings by Independent Engineer pursuant to
Cl. 12.3 of C.A. – Abnormal delay in review of about 10 months from Appointed Date
after submission of Design & Drawings – Determination of Extension of Time for Project
Milestones & Scheduled Four Laning Date pursuant to Cl. 12.4.2 of C.A. and Cl. 3.1 (vii)
& Cl. 8.2 Schedule-Q of C.A. – Requested.
8) Letter No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/183, dated 10-03-2014 addressed
to I.E. for E.O.T. – Determination of extension of Time for all Milestones or the
Scheduled Four Laning Date and amendment for them as stipulated in Cl. 6 of
Schedule-G and Cl. 12.4.2 of Concession Agreement for the reasons of delay in
obligations attributable to Authority / Independent Engineer – Requested.
9) Lr. No. SAI/IC/03/241/2014, dated 27-03-2014 – I.E. has stated that the extension of
time is not justified and untenable without calling for verifying relevant documents,
records of evidence from either NHAI / Concessionaire. Thus the action of IE is arbitrary
& indiscreet.
10) Lr. No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/309, dated 21-06-2014addressed to
I.E. substantiating its claim for occurrence of Milestone-I with a detailed substance.
11.
Disputes
a) Letter No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/182, dated 10-03-2014 addressed
to I.E. for E.O.T. – Review of Design & Drawings by Independent Engineer pursuant to Cl.
12.3 of C.A. – Abnormal delay in review of about 10 months from Appointed Date after
submission of Design & Drawings – Determination of Extension of Time for Project
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 59
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
[
Milestones & Scheduled Four Laning Date pursuant to Cl. 12.4.2 of C.A. and Cl. 3.1 (vii) &
Cl. 8.2 Schedule-Q of C.A. – Requested.
b) Letter No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/183, dated 10-03-2014 addressed
to I.E. for E.O.T. – Determination of extension of Time for all Milestones or the Scheduled
Four Laning Date and amendment for them as stipulated in Cl. 6 of Schedule-G and Cl.
12.4.2 of Concession Agreement for the reasons of delay in obligations attributable to
Authority / Independent Engineer – Requested.
c) Lr. No. SAI/IC/03/241/2014, dated 27-03-2014 – I.E. has stated that the extension of time
is not justified and untenable.
Claim of Concessionaire for EOT for 10 Monthsvide letter 182 dated 10-3-2014 and
rejection of I.E. vide their Lr. No. 241 dated 27-03-2014 stating the EOT as unjustified
constitutes a clear case of“Dispute”.
d) In Lr. No. SAI/IC/03/247/2014, dated 01-04-2014 I.E. has rejected the plea of
Concessionaire for EOT for 10 months.
e) In Lr. No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/211, dated 01-04-2014
Concessionaire has informed I.E. that it would go for “Dispute Resolution” vide Cl. 44 of
C.A.
f) Concessionaire vide its Lr. No. SMTL/P-R/NH-215/TSN-CGM/NHAI/2014-15/309, dated
18-04-2014 addressed to P.D. requesting him to restrain from imposing damages for
Non-occurrence of Milestone-1 as recommended by IE. vide their letter No. 1399 dated
04-04-2014, the contents of which are not agreed to by Concessionaire who requested to
maintain status quo until EOT case under dispute settled
g) Concessionaire vides its Lr. No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/238, dated 2104-2014 notified I.E. with a request to mediate and assist the parties to dispute for
arriving at an amicable settlement pursuant to Cl. 44.2 (conciliation) of C.A.
h) I.E. vide their Lr. No. SAI/IC/02/110/2014, dated 29-04-2014 informed P.D. on the
intention of Concessionaire for dispute resolution and narrated the provisions in Cl. 44.2
of C.A. with a copy to Concessionaire.
i) Concessionairevide its Lr. No. SMTL/P-R/NH-215/TSN-CGM/I.E./2014-15/254, dated 0605-2014 requested IE to take up dispute resolution in consonance with Cl. 44.2 of C.A.
through conciliation.
j) Concessionaire vide its Lr. No. REF: SMTL/P-R/NH-215/TSN-CGM/NHAI/2013-14/325,
dated 09-05-2014addressed to PD for EOT for 10 months
k) Concessionaire vodeitsLr. No. SMTL/P-R/NH-215/TSN-CGM/NHAI/2013-14/326, dated
11-05-2014 addressed to PD for EOT for 10 months.
l) Concessionairevide its Lr. No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/274, dated 1705-2014 addressed to I.E. requested for EOT of 365 days for project milestones under
various reasons.
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 60
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
[
m) IE vide their Lr. No. SAI/IC/02/120/2014, dated 26-05-2014 addressed to P.D. asked to
provide details and documents related to action taken by PIU under Cl. 10.3 of C.A.
n) As a reply to PDsLr. No. NHAI/11011/1/PKR(SMTPL)/2012/PIU/KJR/6162, dated 29-052014, Concessionaire vide its Lr. No. SMTL/P-R/NH-215/TSN-CGM/NHAI/2013-14/342,
dated 31-05-2014 has replied with its legitimate demand of EOT for 365 days as on 3105-2014.
The dispute in regard to Extension of Time for Project completion is under stalemate because
of PIU not providing relevant data to I.E. as asked by it vide point no (m) above.
12. Non Conforming Product Notifications (NCPNs).
NCPN
No
I.E.'s
Lr.No.
1
SAI/IC/03
/100/201
3 Dt.0712-2014
2
SAI/IC/03
/178/201
3 Dt.0802-2014
3
SAI/IC/03
/179/201
4 Dt.1002-2014
4
SAI/IC/03
/188/201
4 Dt.1402-2014
Description
Embankment Material 16+380 - 16+550 LHS NCW
Embankment Material dumped from unidentified,
un reviewed source of borrow area and it appears
to be highly plastic, expensive soil which are not
suitable for embankment works. Hence the
material dumped at side is not acceptable
Major Bridge at Km 56+800 (A2).
Since the
Design related issues (Founding Level) has not
resolved/settled for Major Bridge at Km 56+800,
the Concessionaire has constructed the Raft (A2)
without submission of compliance report, as IE
designer's commented on submitted design and
drawings of aforementioned structure.
Fly Over at Km 125+284.5 (A2&P3). Since the
Design related issues (Overlapped pressure bulbs
of Abutment & adjacent pier is not considered in
the design) has not resolved/settled for Fly Over at
Km 125+284.5, the Concessionaire has constructed
the Raft (A2&P3) without submission of
compliance report, as IE designer commented on
submitted design and drawings of aforementioned
structure.
PMC Lr. No.
& Date
SMTL Lr. No. &
Date
Sheladia/PM
C/NH215/201314/25
Dt.
21-12-2013
SMTL/P-R/NH215/TSNCGM/IE/201314/090
dt.26-12-2013
Km 146 (Batching Plant). Without Calibration of
Admixture at Km 146 Batching Plant, Production of
Concrete started.
Sheladia/PM
C/NH215/201314/97
Dt.
18-02-2014
SMTL/P-R/NH215/TSNCGM/I.E./201314/152
dt.19-02-2014
5
SAI/IC/03
/196/201
4 Dt.1702-2014
Major Bridge at Ch. 56+800.
1st lift of
Abutment/Return Wall: A2
1. Haunch not
provided as shown in the Drgs 2. Dowels for lap is
very less (500mm to 1500mm instead of two layers
as shown in the drawings). 3. Vertical bars in
Abutment wall are fixed in one layer instead of
two layer as shown in the drawings. 4. RFIs are
not submitted but the Concessionaire for casting
footing and 1st lift of wall. 5. 1st lift of wall
(Abutment & Return) is casted after all NCR has
been issued to Concessionaire.
Sheladia/PM
C/NH215/201314/122
Dt. 19-032014
SMTL/P-R/NH215/TSNCGM/I.E./201314/197
Dt.19-03-2014
6
SAI/IC/03
/200/201
4 Dt.2402-2014
Box Culvert at Km 141+764 (LHS) A lot of cracks
were found on the top of Raft and also looking
very porous. Structurally it is not acceptable.
Sheladia/PM
C/NH215/201314/151
Dt. 15-042014
SMTL/P-R/NH215/TSNCGM/I.E./201314/230
Dt.16-04-2014
M/s. SAI MAATARINI TOLLWAYS LIMITED
Compliance
The material collected from site
and tested, the test results are
found suitable as per Technical
Specification hence NCPN-1 has
been closed.
Repairing work has been done
as per methodology submitted
on 11-03-2014 adopting MORTH
specification.
Page 61
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
[
NCPN
No
I.E.'s
Lr.No.
Description
7
SAI/IC/03
/201/201
4 Dt.2402-2014
VUP at Km 131+412 : A lot of honey comb surface
found in 2nd lift wall in whole length (inside face)
and also embedded reinforcement were exposed.
Structurally it is not acceptable.
8
SAI/IC/03
/203/201
4 Dt.2502-2014
At Km 151+200 (Batching Plant) : Without
Calibration of Admixture component at Km
151+200 batching plant, Production of Concrete
Started.
9
SAI/IC/03
/219/201
4 Dt.0603-2014
At Km 140+600 to 140+750: Dumped
embankment material found lots of boulder (Over
size material)
10
SAI/IC/03
/220/201
4 Dt.0603-2014
11
SAI/IC/03
/223/201
4 Dt.0803-2014
12
SAI/IC/03
/225/201
4 dt.0803-2014
13
SAI/IC/03
/271/201
4 dt.2104-2014.
14
SAI/IC/03
/283/201
4 dt.0105-2014.
At Km 135+060 to 135+250: Subgrade material
used over unjustified material of embankment top
which is not verified. FDD & levels of embankment
top has not been concurred by IE. GSB material has
been dumped over un concurred layer of
Subgarde.
AT Km 56+800 Major Bridge: As per IE designer
comments, concessionaire has to furnish the data
of RQD, UCS and core recovery for all abutments
and piers for conformity of hard rock, but without
submission of aforesaid data PCC for P4 has been
done and further reinforcement has been placed
for concrete (Raft) works. Hence it is considered as
non-conformity of work till submission of required
of necessary data.
At Km 23+100 to 23+380 (LHS): The embankment
1st layer has been done at above chainage from
unconcurred / untested source of barrow area. In
this connection WIR No.4 (Material) dated
26.02.14 has been issued but no necessary action
has been taken, instead further layers are in
progress. Hence the executed beneath layer has
not considered as acceptance in accordance to the
TS as set in Schedule D of CA.
At Km 22+380 to Km 22+540 (LHS): Embankment
2nd layer work is in progress over bulged /
uncompacted 1st layer at above mentioned
chainage. The same has been communicated vide
our WIR No.07 for your necessary action. Despite
repeated instructions further layers (3rd Layer) is in
progress without attending any rectification
measures and approval of beneath layers. Since
the embankment layers are not being constructed
as per the MORTH Specifications the aforesaid
works are treated as not approved.
PMC Lr. No.
& Date
Sheladia/PM
C/NH215/201314/135
Dt. 26-032014
Sheladia/PM
C/NH215/201314/127
Dt. 22-032014
Sheladia/PM
C/NH215/201314/130
Dt. 23-032014
Sheladia/PM
C/NH215/201314/159
Dt. 25-042014
Sheladia/PM
C/NH215/201314/143
Dt. 05-042014
SMTL Lr. No. &
Date
Compliance
SMTL/P-R/NH215/TSNCGM/I.E./201314/206
Dt.28-03-2014
The repairing work is done as
per methodology submitted on
dt.11-03-2014. The ongoing
work was satisfactory.
SMTL/P-R/NH215/TSNCGM/I.E./201314/200
Dt.22-03-2014
Calibration
of
Admixture
component
completed
at
Km.151+200 Batching plant.
SMTL/P-R/NH215/TSNCGM/I.E./201314/202
Dt.24-03-2014
Over Size material has been
removed on above said location
and also the Borrow Area
material which was used on that
location is extended.
SMTL/P-R/NH215/TSNCGM/I.E./201314/218
Dt.05-04-2014
Sheladia/P
MC/NH215/201314/194
Dt. 09-062014
Safety during Construction:
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 62
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
[
NCPN
No
15
I.E.'s
Lr.No.
Description
PMC Lr. No.
& Date
SAI/IC/03
/299/201
4 dt.1305-2014.
At Km 10+000 to 10+320 (RHS): The embankment
4th layer is under progress on loose, uncompacted and without approval of beneath layer
because of it was containing Marshy type material
which is not suitable for embankment works in
accordance to MORTH specification. In this respect
WIR no. 8 & 9 had been issued for removal of the
unsuitable material (Copy enclosed for ready
reference). But without attending rectification
works the next layer is in process this is also
contaminated with Marshy type material.
Sheladia/P
MC/NH215/201314/194
Dt. 09-062014
SMTL Lr. No. &
Date
Compliance
13. Correspondence
INCOMING CORRESPONDENCE
Sl No
Ref No.
Date
Subject
Encl:
Address To
CC:
1
SAI/IC/03/319/2014
13-Jun-14
Closure of NCPN.
Nil
CGM, SMTL
PD, NHAI,Keonjhar,
2
SAI/IC/03/320/2014
14-Jun-14
Nil
CGM, SMTL
PD, NHAI,Keonjhar,
3
SAI/IC/03/321/2014
14-Jun-14
Nil
CGM, SMTL
PD, NHAI,Keonjhar,
4
SAI/IC/03/322/2014
17-Jun-14
Nil
CGM, SMTL
PD, NHAI,Keonjhar,
5
SAI/IC/03/323/2014
21-Jun-14
Nil
CGM, SMTL
PD, NHAI,Keonjhar,
6
SAI/IC/03/324/2014
21-Jun-14
Nil
CGM, SMTL
PD, NHAI,Keonjhar,
7
SAI/IC/03/325/2014
21-Jun-14
Comments on Compliance for RCC
Superstructures.
Use of Fly Ash.
Comments
on
Design
and
Drawings of Median wall for 4 nos.
of Major Bridges and 24 nos. of
Minor Bridges dated 17-06-2014.
Review of Borrow Area No.86, 86A,
91, 95, 97, 99, 105 & 109.
Review of 3rd Party Test Report of
SIKAMENT-122
for
Source
approval.
Review of Borrow Area No.12
Nil
CGM, SMTL
PD, NHAI,Keonjhar,
8
SAI/IC/03/326/2014
21-Jun-14
Review of Sanfield Source approval
for POT/POT cum PTFE Bearings.
Nil
CGM, SMTL
PD, NHAI,Keonjhar,
9
SAI/IC/03/327/2014
21-Jun-14
Review of
Material.
GSB
Nil
CGM, SMTL
PD, NHAI,Keonjhar,
10
SAI/IC/03/328/2014
21-Jun-14
Review of Borrow Area No.13 &
15.
Nil
CGM, SMTL
PD, NHAI,Keonjhar,
11
SAI/IC/03/329/2014
21-Jun-14
Nil
CGM, SMTL
PD, NHAI,Keonjhar,
Nil
CGM, SMTL
PD, NHAI,Keonjhar,
Nil
CGM, SMTL
PD, NHAI,Keonjhar,
Nil
CGM, SMTL
PD, NHAI,Keonjhar,
Nil
CGM, SMTL
PD, NHAI,Keonjhar,
Dhenkikote
Review of Filter Media Mix Design.
12
SAI/IC/03/330/2014
21-Jun-14
13
SAI/IC/03/331/2014
21-Jun-14
14
SAI/IC/03/332/2014
21-Jun-14
15
SAI/IC/03/333/2014
28-Jun-14
Review of Procurement of GSB
Material.
Review of Concrete Mix Design M15, M-20, M-25, M-30 & M-35.
Lack of Safety arrangements in the
project highway.
Compliance for extension of GSB
Single layer underneath Earthen
Shoulder and Median-Compliance
furnished-Review and Acceptance
in conformance with C.A.
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 63
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
[
OUTGOING CORRESPONDENCE
Sl
N
o
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Ref No.
SMTL/P-R/NH215/TSNCGM/NHAI/201
3-14/344
SMTL/P-R/NH215/TSNCGM/I.E./201415/292
SMTL/P-R/NH215/TSNCGM/I.E./201415/296
SMTL/P-R/NH215/TSNCGM/NHAI/201
3-14/345
SMTL/P-R/NH215/TSNCGM/NHAI/201
3-14/346
SMTL/P-R/NH215/TSNCGM/NHAI/201
3-14/347
SMTL/P-R/NH215/TSNCGM/NHAI/201
3-14/348
SMTL/P-R/NH215/TSNCGM/NHAI/201
3-14/349
SMTL/P-R/NH215/TSNCGM/NHAI/201
3-14/350
SMTL/P-R/NH215/TSNCGM/NHAI/201
3-14/351
SMTL/P-R/NH215/TSNCGM/I.E./201314/299
SMTL/P-R/NH215/TSNCGM/I.E./201314/300
SMTL/P-R/NH215/TSNCGM/I.E./201314/301
SMTL/P-R/NH215/TSNCGM/NHAI/201
3-14/354
SMTL/P-R/NH215/TSNCGM/NHAI/201
Date
04-Jun-14
06-Jun-14
07-Jun-14
07-Jun-14
07-Jun-14
08-Jun-14
08-Jun-14
08-Jun-14
08-Jun-14
09-Jun-14
10-Jun-14
11-Jun-14
11-Jun-14
11-Jun-14
20-Jun-14
Subject
Evection of Encroachments on the Project stretch in Sec-1 of
Gayatri Projects Ltd.- Programme-Reg.
Conduct Lateral Traffic Volume Count from 09-06-2014 to 11-062014 at Km.45+448 to verify the need of VUP-Deputation of IE's
representative to witness count-Requested- Reg.
Submission of Modified Plan & Profile Drawings duly justification
for certain areas(10 locations)-Review of Independent EngineerRequested-Reg.
Acquisition of left out plots in the stretch between Km.24+000 to
Km.58+000 by direct purchase under NHAI provisions-List of land
plots attached-Action-Requested-Reg.
Vedio recording as on 31-05-2014 for the stretch from
Km.113+000 to Km.166+173 projecting the status of progress of
construction works purusant to CL.13.6 of C.A.- Furnished-Reg.
Increasing the Electrical Towers height of 132 KV HT line at
Km.7+010 & 220 KV HT Line at 7+670 in Jajpur Bypass because of
shortage in vertical clearance from FRL to the live wires Additional cost estimate from line department - Requested - Reg.
Non-accomplishment of Joint Inspection of Project Highway from
4th to 6th June 2014 as decided in Monthly Review Meeting held
on 29-05-2014-Revised Programme-Requested-Reg.
Non Payment of Copmpensation in between Km.113+000 to
Km.166+173-(A) Plots for immediate payment and (B) Plots for
balance Tahasils / villagers - Immediate action for expeditious
payment by CALA-Requested - Reg.
Additional Land requirementfor diverging Junction at Km.113+502
Keonjhar Bypass and Toll Plaza at Km.134 - Certain inherent
difficulties - Communicated for resolution - Requested - Reg.
Construction of ROBs at Km.9+180 (Jajpur Bypass) and
Km.115+636 (Keonjhar Bypass) supervision by Officers of East
Coast Railway - Requested - Reg.
, P1, P2 & P3 - Review and acceptance in comformance with C.A.Requested-Reg.
Shifting of location of PUP from Ch.149+580 to Ch.149+502 Requested - Reg.
Occurrence of Milestone-1 consistent with Cl.2.2 of Schedule of
C.A. - Documents in proof of occurrence of Milestone-1 Furnished - Reg.
Resistance of Land Owners of about 517 Missing pits in Jajpur
District despite issuance of 3D Notification in local newspapers
dated 01-06-2014 - Initiation and extension of sustained support
to Concessionaire to proceed with the work - Requested - Reg.
Forest Land Diversion proposal and lease of Govt. Land for
Junction at Km.113+502 at keonjhar bypass & establishing Toll
Plaza at Km.134+000- Processing the proposals - Requested -Reg.
M/s. SAI MAATARINI TOLLWAYS LIMITED
Encl
:
Address
To
Nil
PD, NHAI,
Keonjhar
The Team
Leader,
Keonjhar
Nil
The Team
Leader,
Keonjhar
The PD,
NHAI,
Keonjhar
Yes
The Team
Leader,
Keonjhar
The PD,
NHAI,
Keonjhar
Nil
PD, NHAI,
Keonjhar
GM, Sec-I,
GPL
Yes
PD, NHAI,
Keonjhar
The Team
Leader,
Keonjhar
Nil
PD, NHAI,
Keonjhar
The Team
Leader,
Keonjhar ,
GM, Sec-I,
GPL.
Nil
PD, NHAI,
Keonjhar
The Team
Leader,
Keonjhar
Yes
PD, NHAI,
Keonjhar
The Team
Leader,
Keonjhar
Yes
PD, NHAI,
Keonjhar
The Team
Leader,
Keonjhar
Nil
PD, NHAI,
Keonjhar
The Team
Leader,
Keonjhar
Yes
The Team
Leader,
Keonjhar
The PD,
NHAI,
Keonjhar
Nil
The Team
Leader,
Keonjhar
PD, NHAI,
Keonjhar
Yes
The Team
Leader,
Keonjhar
PD, NHAI,
Keonjhar
Yes
PD, NHAI,
Keonjhar
The Team
Leader,
Keonjhar
Nil
PD, NHAI,
Keonjhar
The Team
Leader,
Keonjhar
CC:
Page 64
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
[
16
17
18
19
20
21
22
23
24
25
3-14/357
SMTL/P-R/NH215/TSNCGM/NHAI/201
3-14/358
SMTL/P-R/NH215/TSNCGM/I.E./201314/309
SMTL/P-R/NH215/TSNCGM/I.E./201314/315
SMTL/P-R/NH215/TSNCGM/I.E./201314/316
SMTL/P-R/NH215/TSNCGM/I.E./201314/318
SMTL/P-R/NH215/TSNCGM/NHAI/201
3-14/359
SMTL/P-R/NH215/TSNCGM/I.E./201314/319
SMTL/P-R/NH215/TSNCGM/NHAI/201
3-14/360
SMTL/P-R/NH215/TSNCGM/NHAI/201
3-14/361
SMTL/P-R/NH215/TSNCGM/NHAI/201
3-14/362
20-Jun-14
21-Jun-14
25-Jun-14
25-Jun-14
27-Jun-14
28-Jun-14
28-Jun-14
29-Jun-14
29-Jun-14
Construction of double cell VUP at Km.115+118 of
2x10.00mx5.50m in lieu of existing provision of VUP of size
1x12mx5.5m - Issuance of change of scope of Notice pursuant to
Cl.16.2.1 of C.A. - Requested - Reg.
Occurrence of Project Milestone-1 pursuant to Cl.2.1 & Cl.2.2 of
Schedule of -G, within a period of 90 days in consonace with
Cl.12.4.2 of C.A. from the date set forth in Cl.2.1 of Schedule-G for
Milestone-1 - Accomplishment of Milestone -1 - Notified afresh for
consideration and acceptance - Reg.
Monthly Review Meeting held on 29-05-2014 - Communication of
minutes of review meeting - Requested -Reg.
Monthly Return on MIS, Form-I, Form-II and ROB/RUB status Furnished for the month of June'14 - Reg.
Design and GA & R/F Drawings for canal Minor Bridge at
Km.146+697 in Jhumpura Bypass - Review of Independent
Engineer - Requested -Reg.
Status of Procurement(for private land) for the Concessionaire the
Right-of-Way to the site in accordance with provision of Cl.10.3.1
by the end of June 2014 - Notified - Expeditious support pursuant
to Cl.6.1.2(h) and (g) for completion of L.A. -Requested - Reg.
Installation and functioning of laboratory at Bandho camp located
at Km.56+000 w.e.f. from 21-06-2014 - Intimation -Reg.
2 missing plots in Jajpur District - Direct purchase by PIU Requested - Reg.
Obstruction of execution between Km.15+550 to Km.16+100 Resolution of tussel - Requested - Reg.
30-Jun-14
PD, NHAI,
Keonjhar
The Team
Leader,
Keonjhar
Nil
The Team
Leader,
Keonjhar
The CGM,
RO, NHAI,
Bhubanesw
ar,
PD, NHAI,
Keonjhar
Nil
The Team
Leader,
Keonjhar
PD, NHAI,
Keonjhar
Yes
The Team
Leader,
Keonjhar
PD, NHAI,
Keonjhar
Yes
The Team
Leader,
Keonjhar
PD, NHAI,
Keonjhar
Yes
PD, NHAI,
Keonjhar
The Team
Leader,
Keonjhar
Nil
The Team
Leader,
Keonjhar
PD, NHAI,
Keonjhar
Yes
PD, NHAI,
Keonjhar
The Team
Leader,
Keonjhar
Yes
PD, NHAI,
Keonjhar
The Team
Leader,
Keonjhar
PD, NHAI,
Keonjhar
The G. M.,
Sec I & II,
Gayatri
Projects
Ltd., Jajpur
& Keonjhar.
Yes
Nil
Relocation of Government Structures between Km.0+000 to
Km.166+000 - Requested - Reg.
14. Environmental Regulations& Clearances:
APPLICABLE PERMITS (Cl. 4.1.3 (d) and Schedule-E of C.A.
SEC-II (Km.0 – Km.113)
Sl
No.
Description of
Permission /
License
Manjuri
Km. 18+500
Manjuri
(Km.
19+000)
Hasanpur
Km.
33+000
M/s. SAI MAATARINI TOLLWAYS LIMITED
Ostapura
(Km.
42+000)
Bandha / Arjun
Bania (Km.
58+000)
Langalakanthi
(92+000)
Khajirijiani
(Km.
94+000)
Page 65
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
[
WMM Plant
a
b
c
d
e
f
g
Permission of
the
state
Government
for extraction
of
boulders
from quarry
Permission of
Village
Panchayata
and Pollution
Control Board
for installation
of crushers
License for use
of explosives
Permission of
the
state
Government
for
drawing
water
from
river
/
reservoir
License from
Inspector of
factories
or
other
competent
Authority for
setting
up
Batching Plant
Clearance of
Pollution
Control Board
for setting of
Batching Plant
Clearance of
Village
Panchayats
and Pollution
Control Board
for
Asphalt
Plant
NA
NA
NA
Batching
Plant
NA
NA
NA
Stone Quarry
Crusher
Batching Plant
HM Plant
WMM Plant
HSD Pump
Stone Quarry
Crusher
Stone
Quarry
Crusher
WMM Plant
HM Plant
Batching
Plant
HSD Pump
Approved
(25% Part
payment
deposited
for renewal)
Hot Mix
Plant
HSD
Pump
Stone
Quarry
Crusher
NA
Approved
(Part
payment
deposited
for
renewal)
FDP under
Process
To be applied
for
Permission
NA
Approved
(Valid up
to 31-12015)
Approved (Valid
up to 31-12-015)
To be applied
for
Permission
Approved
(Valid up to
31-12-015)
NA
Approved
(Renewed
up to 3112-014)
Approved
(Renewed up to
31-12-014)
Approved
Approved
(Renewed
up to 31-032015)
NA
Under Process
(Plan Approved
but not applied
for licence)
NA
Not Applied
NA
Approved
(Renewed
up to 31-032015)
NA
Approved for total stretch (Km. 00+000 to 163+000)
NA
In Process
NA
In Process
Approved
NA
NA
Approved
(Renewed up to
31-03-2015)
In Process
NA
Approved
NA
Approved
h
Permission of Village Panchayat and State Government for borrow earth
In Process
i
Permission of State Government for cutting of trees
In Process
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 66
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
[
Manjuri
Km. 18+500
Description of
Permission /
License
Sl
No.
j
WMM Plant
Manjuri
(Km.
19+000)
Hasanpur
Km.
33+000
Batching
Plant
Hot Mix
Plant
HSD
Pump
Ostapura
(Km.
42+000)
Bandha / Arjun
Bania (Km.
58+000)
Langalakanthi
(92+000)
Stone
Quarry
Crusher
Stone Quarry
Crusher
Batching Plant
HM Plant
WMM Plant
HSD Pump
Stone Quarry
Crusher
Khajirijiani
(Km.
94+000)
Stone
Quarry
Crusher
WMM Plant
HM Plant
Batching
Plant
HSD Pump
Labour License - Done
Any other permits or clearance required under Applicable Laws
SEC-II (Km.113 – Km.163)
SL.NO:
A
B
C
D
E
F
G
H
I
DESCRIPTION
Permission of the State
Government for extraction
of boulders from quarry
Permission
of
Village
Panchayat
State Pollution Control
Board for installation of
Crushers
State Pollution Control
Board for Crushing of
Granite Stone Chips
License for use of
explosives
Permission of the State
Government for drawing
water from river/reservoir
License from Inspector of
factories
or
other
competent authority for
setting up Batching Plant
Clearance of Pollution
Control Board for setting
up Batching Plant
Clearance
of
Village
Panchayats and Pollution
Control Board for Asphalt
Plant
Permission
of
Village
Panchayat
and
State
Government for borrow
earth
Permission
of
State
Government for cutting of
trees.
GPL
@ 115 (Ramachandrapur)
1.Permission for quarry obtained
through
auction
at
Km.
115
Tulasichoura
Stone
Quarry
-3,
Tulasichoura Village of 12 Aces for long
term Memo NO. 8028 dated 21.12.2013
for 3 years. Environmental Clearance is
pending with /SEIAA.office
Completed Order No GP/2012-13/1209
& 07-83-2013
Completed Order No
NOC/242 & 15-05-2012
943/IND-I-
@ 135 (Raisuan)
1.Permission for quarry obtained through
auction at Km. 135 Tikarpada Stone Quarry
No-1,Tikarpada Village of 12 Aces on dated
01.04.2014. To be renew by 31-03-2015
Environmental Clearance is pending with
/SEIAA.office
-NA-NA-
Completed order no 220/APC & 05-042014
-NA-
Completed (Tulasichoura) Order No
5/2013 & 01-01-2014
Completed (Tikarpada) Order No 14/2012 &
01-01-2014
-NA-
-NA-
Completed
(Order
595/210061200110 & 06-03-2012)
No
-NA-
Completed ( Order No 347/IND-INOC/240 & 19-03-2012)
-NA-
Completed, Village Panchayat Order No
87 & 19-12-2012, Pollution Control
Board Order No 347-IND-NOC/240 &
19-03-2012
-NA-
Completed
-NA-
Completed Order No 3196/Lease on
dated, Keonjhar the 24-04.2013 for DL39, & Order No 8478/Lease on dated,
Keonjhar the 20-11.2013 for DL-35 (Only
for Non forest & Govt land)
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 67
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
[
GPL
SL.NO:
DESCRIPTION
J
Any other permits or
clearances required under
Applicable Laws.
@ 115 (Ramachandrapur)
@ 135 (Raisuan)
WMM Plant Completed
15. Statement showing Road Accident cases for the month:
MAR '14
Stretch / NH
Detail of Accident
Sl.
No.
State
PIU/CMU
NH No.
From
(Km)
To (Km)
1
Odisha
Keonjhar
215
Panikoili
Remuli
Length
No. of
Animals
Killed (If
Any)
Fatal
Grievous
Minor
Total
4
6
8
18
NA
4
6
8
18
NA
163
TOTAL
Remarks
APR '14
Stretch / NH
Sl.
No.
State
1
Odisha
PIU/CMU
NH No.
Keonjhar
215
Detail of Accident
Length
From
(Km)
To (Km)
Panikoili
Remuli
No. of
Animals
Killed (If
Any)
Fatal
Grievous
Minor
Total
4
4
2
10
NA
4
4
2
10
NA
163
TOTAL
Remarks
MAY '14
Stretch / NH
Detail of Accident
Sl.
No.
State
PIU/CMU
NH No.
From
(Km)
To (Km)
1
Odisha
Keonjhar
215
Panikoili
Remuli
Length
No. of
Animals
Killed (If
Any)
Fatal
Grievous
Minor
Total
4
8
14
26
NA
4
8
14
26
NA
163
TOTAL
Remarks
16. Eviction of Encroachments:
Private Building
Sl
N
o
Name of the
Village
Tota
l
Nos
Compensatio
n
Total no of encroachments
Dismantle
Pai
d
Balanc
e
Complet
e
Balanc
e
Tota
l
Nos
No of
Notice
s
Issued
Balanc
e to
Issue
Notice
s
Govt. Structure
Dismantle
Complete
d
Balanc
e
11
0
Tota
l
Dismantl
e
Balanc
e
Sadar Tahasil
1
Jamunalia
2
1
1
1
0
5
5
0
2
Tolankbahal
1
1
0
1
0
0
0
0
3
Sirispal
2
2
0
2
0
0
0
0
4
Nizgarh
13
13
0
10
3
11
11
0
5
Maligaon
Gopinathpur
Nuagaon
1
1
0
1
0
3
3
0
4
4
0
4
0
0
0
0
6
M/s. SAI MAATARINI TOLLWAYS LIMITED
1
1
Page 68
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
[
Private Building
Sl
N
o
Name of the
Village
7
Dhrupada
8
Raisuan
Tota
l
Nos
Compensatio
n
Total no of encroachments
Complet
e
Balanc
e
0
2
0
0
0
Balanc
e to
Issue
Notice
s
0
4
20
2
16
16
21
21
Pai
d
Balanc
e
2
2
26
22
Dismantle
Tota
l
Nos
No of
Notice
s
Issued
Govt. Structure
Dismantle
Complete
d
Balanc
e
Tota
l
0
14
2
8
8
0
18
3
1
9
Gopinathpur
22
22
0
20
2
10
Khuntapada
0
0
0
0
0
11
Silisuan
3
2
1
2
0
9
9
0
9
0
1
12
Banajodi
8
5
3
5
0
18
18
0
14
4
1
13
Padmapur
20
19
1
19
0
17
17
0
17
0
7
14
Putulia
32
30
2
20
10
2
2
0
2
0
0
15
Keshpank
3
2
1
2
0
16
Jadichatara
0
0
0
0
0
1
1
0
1
0
2
17
Bankamaruni
2
1
1
0
1
9
5
4
18
Hundula
0
0
0
0
0
5
4
1
19
Jamudiha
18
10
8
10
0
6
3
3
4
20
Palaspanga
20
18
2
18
0
27
17
10
12
21
Mursuan
2
1
1
0
1
1
1
22
Spongepatna
0
0
0
0
0
34
23
Tangarani
Sub Total Sadar
Tahasil
4
4
0
2
2
185
160
25
139
21
Dismantl
e
Balanc
e
0
1
4
3
4
14
22
0
0
9
7
2
0
0
34
0
185
133
52
1
86
9
37
Jhumpura Tahasil
1
Bhaluka
3
0
3
0
0
0
2
27
0
0
0
0
0
0
0
0
0
0
2
2
7
6
1
0
6
2
2
5
Arsala
Sundhimursu
an
Balabhadrapu
r
Katalposi
16
11
5
8
3
11
11
6
Balibandh
27
16
11
12
4
7
7
14
7
Mursuan
Sub Total
Jhumpura Tahasil
5
2
3
0
2
3
3
2
85
35
23
20
15
25
3
4
0
25
5
1
0
0
Champua Tahsil
1
Sijukala
3
2
1
2
0
9
9
0
9
0
2
Parsala
12
2
10
2
0
13
13
0
13
0
3
Rimuli
Sub Total Champua
Tahasil
4
1
3
1
0
19
5
14
5
0
22
22
0
22
0
9
7
2
Grand Total
289
200
62
164
36
232
155
77
108
9
68
11
16
0
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 69
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
[
STAFF OF SPV & Its TEAM
17. Appendix - Concessionaire Staff
S. No.
1
2
3
Name
Mr. T. Suryanarayana
Mr. U. Anil Kumar
Mr. Gopal Mandal
Designation
Chief General Manager (Tech.)
Sr. Planning Engineer / Quantity Surveyor
Office Asst.
Project Management Consultants Team Staff
S. No.
Name
Designation
1
2
3
Mr. B Krishna Rao
M D Rami Reddy
Mr. S K S Marar
Team Leader Cum Senior Highway Engineer
Senior Material Engineer
Senior Planner
4
T S Sundaram
Resident Highway Engineer-I
5
Marri Bala Raju
Resident Highway Engineer - II
6
Ranjit Kumar
Resident Highway Engineer - III
7
Sanjay Kumar Acharya
Bridge Engineer - I
8
A. K. Singh
Bridge Engineer - II
9
S. K. Singh
Bridge Engineer - III
10
Mangulu Charan Panda
Field Engineer (Highways) - I
11
Umesh Kumar Nayak
Field Engineer (Highways) - II
12
Govind Narayan Dubey
Field Engineer (Highways) - III
13
Laxman Rao V
Field Engineer (Bridges) - I
14
Mahaboob Subhani
Field Engineer (Bridges) - II
15
Balachandrudu
Field Engineer (Bridges) - III
16
Satya Ranjan Mohapatra
Quality Control Engineer - I
17
Shaik. Rahamatulla
Quality Control Engineer - II
18
B C Ramanjaneyulu
Quality Control Engineer - III
19
Suvendu Das
Lab Technician - I
20
Anirvan Banerjee
Lab Technician - I
21
Mrutyunjaya Mohanty
Lab Technician - II
22
Ranjan Kumar Sahoo
Lab Technician - III
23
Arjun Kumar Jha
Lab Technician - III
24
Chitaranjan Pattanaik
Surveyor - I
25
Sarvendra Kumar Singh
Surveyor - II
26
Shashikanta Sahoo
QS – I
27
M B Gangadhar Rao
QS-II
28
Sanjeev Kumar Goyal
Office Manager
29
R. K. Nayak
Computer Operator
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 70
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state
of Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
11.0 Appendixes
Appendix – 1 Concessionaire’s EPC Contractor’s Staff
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page
71
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
SEC – I STAFF LIST
SL.NO.
NAME OF EMPLOYEE
1
2
3
BVU BHASKAR
S.Venkata Reddy
D.S.R. Ratnakar
DESIGNATION
REMARKS
General Manager
Project Manager
Project Manager
PLANNING & BILLING
1
2
3
4
5
V.Sunil Kumar
S.Mahapathro
G C Senapathi
Ram Chandra Sahoo
Uma maheswa rao
Sr.PE (Planning)
Sr.PE (Billing)
Billing Asst.
Billing Asst.
Jr Engineer
ADMIN & LIAISIONING
1
2
3
4
5
6
B.Patnaik
Vijay Bhatia
Umesh Chandra Jena
N. C. Jena
Siba Prasad Mohapatra
Sk. Equebal Mohd.
CM (HR & Admin)
Dy. Project Manager
Manager (HR/Admin)
P.R.O.
Dy. Manager, HR/Admin
Liasioning Officer
Bheemudu
Amarnath Das
Pavan
Sr. Engineer
Structure Engineer
Engineer
P.Nagendra
Tapas Sen
Naidu
Madhu
AGM
Manager Accounts
Accountant
Cashier
Tirupathy Reddy
Purnachandra rao
Material Engineer
Lab Technician
Mohd. Akhtar
Sai Prasad
Pradhan
Venkatesh
DGM Structures
P.E
Site Engineer
Site Engineer
P.RAMU
Ravi kiran
Manager
Asst. Manager
Rakesh Kumar Sahoo
Tapas Kumar Behra
Sesha sai
Sr. Surveyor
Jr.Surveryor
Jr.Surveryor
4HIGHWAYS
1
2
3
ACCOUNTS
1
2
3
4
QA & AC
1
2
STRUCTURES
1
2
3
4
STORES
1
2
SURVEY
1
2
3
MECHANICAL DIVISION
1
2
3
Y. Venkataramaih
K. Vijay Kumar
K. Basava Raj
M/s. SAI MAATARINI TOLLWAYS LIMITED
DGM (P&M)
Manager, Plants
Crusher Incharge
Page
72
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state
of Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page
73
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll)
Basis.
Monthly Progress Report : June -2014
SEC – II STAFF LIST
Sl.No
Name of Employee
KV.Saikrishna Rao
1
2
B.S.N.Murthy
ADMIN & STORE
1
S.Maruthakasi
2
Asish Kumar Swain
3
M.Arunakar Reddy
4
Loknatha Mahanta
5
R K Mishra
6
M.Venkateswar Rao
7
M.K. Naidu
PLANNING & Q.S
1
Ishwari Prasad Nath
FINANCE /ACCOUNT
1
N.Tirupathi Rao
Shibu.P
2
QA & QC
Dinesh Chandra Seth
1
2
K S Akhil
Gupteswar Routray
3
4
G Chiranjeevi
Ramesh Chowhan
5
SURVEY
B.Krishana Rao
1
2
Krishna Lal
HIGHWAY
1
K.Ravi Kumar
Kanchu Simhadri
2
3
A. Klayana Raju
Om Prakash Singh
4
5
Ganesh Singha
MECHANICAL & PLANTS
1
N.Srinivasa Rao
D.N.Raju
2
3
L.Srinivasa Rao
Designation
Remarks
General Manager
Additional General Manager
Senior Manager (Stores)
Manager (Liasioning)
Manager (Liasioning)
Admin
Foreman ( Electrical)
Store Keeper
Weigh Bridge Operator
Planning Engineer
Asst. Manager (F & A)
Accounts Officer
Deputy General Manager
Asst Material Engineer
Asst. Engineer ( Materials)
QC Engineer
Lab Technician
Senior Surveyor
Surveyor
Construction Manager
Construction Manager
Sr. DGM(Structural)
DGM(Structural)
Manager (Structural)
Dy. General Manager (Mechanical)
Dy. General Manager (Plants)
Foreman
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page
74
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June -2014
18. Appendix 2 - Summary of test Results
QC Test Summary – Section-I (Km 0.000 to Km 55.000)
S.No
Name of Test
A. Borrow Area
1
Gradation
2
Plasticity Test
3
Max.Dry Density Test
4
Deleterious Content
Testing Method
5
CBR Test
6
Free Swell Index
IS 2720 Part 4
IS 2720 Part 5
IS 2720 Part 8
IS 2720 Part 27
IS 2720 Part 16 &
AASTHO : T 193-93
IS 2720 Part 40
7
Sulphate Content
BS:1377(tests9/10)
8
Field Density of Comp. Layer EMB
9
Field Density of Comp. Layer Subgrade
B. O.G.L.
1
Sand Content
2
Plasticity Test
3
Free Swell Index
4
Max.Dry Density Test
5
Field Density of Comp. Layer OGL
6
CBR Test
C. GRANULAR SUB-BASE
1
Gradation
2
Atterberg Limits
3
Moisture Content
4
Field Density of Compaction Layer
5
Deleterious Content
2 Test /3000m3
2 Test /3000m3
2 Test /3000m3
1 Test/Source
2 Test
1516500
69000
1585500
/3000m3
Number of Tests Conducted
In This Month
Previous Month
Total to Date
Passed
Failed
Total
Passed
Failed
Total
Passed
Failed
Total
1011
1011
1011
0
0
0
0
0
1011
1011
1011
0
46
46
46
0
0
0
0
0
46
46
46
0
1057
1057
1057
0
0
0
0
0
1057
1057
1057
0
145
10
155
21
0
21
166
10
176
1011
0
1011
46
0
46
1057
0
1057
As Required
Initially one, as and when
required by the Engineer
1 Set /1000 m2
1 Set /500m2
0
0
0
0
0
0
0
0
0
10040
2323
159
49
10199
2372
930
484
9
9
939
493
10970
2807
168
58
11138
2865
IS 2720 Part 4
IS 2720 Part 5
IS 2720 Part 40
IS 2720 Part 8
IS 2720 Part 28
IS 2720 Part 16 &
AASTHO : T 193-93
As Required
As Required
As Required
As Required
1 Set /1000 m2
436
431
477
436
2266
0
0
8
0
24
436
431
485
436
2290
16
16
16
16
0
0
0
0
0
0
16
16
16
16
0
452
447
493
452
2266
0
0
8
0
24
452
447
501
452
2290
As Required
17
6
23
80
0
80
97
6
103
MORTH T 400 - 2
IS 2720 Part 5
IS 2720 Part 2
IS 2720 Part 28
IS 2720 Part 27
IS 2720 Part 16 &
AASTHO : T 193-93
1 Test /200m3
1 Test /200m3
1 Test /250m2
1 Test /500m2
1 Test/Source
1 Test/Source as when
required by Engineer
1 Test/Source as when
required by Engineer
1 Test/Source as when
required by Engineer
1 Test/Source as when
required by Engineer
136
131
424
424
1
1
0
6
6
0
137
131
430
430
1
27
27
121
121
0
0
0
3
3
0
27
27
124
124
0
163
158
545
545
1
1
0
9
9
0
164
158
554
554
1
23221.6
3
0
3
0
0
0
3
0
3
2
0
2
0
0
0
2
0
2
1
0
1
0
0
0
1
0
1
2
0
2
0
0
0
2
0
2
1 Test /200m3
6749.06
50
0
50
46
0
46
96
0
96
IS 2720 Part 28
IS 2720 Part 28
6
CBR Test
7
Max.Dry Density Test
IS 2720 Part 8
8
Water Absorption
IS 2386 Part 3
9
10% Fine Value
BS 812 Part 111
D. WET MIX MACADAM
1
Aggregate Impact Value
Frequency of Test
Executed Quantity
Upto
Present
Previous
Cumm.
Month
Month
IS 2386 PART 4
M/s. SAI MAATARINI TOLLWAYS LIMITED
4844
8275
28065.6
15024.06
Page
75
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the
state of Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
[
S.No
Name of Test
Testing Method
2
3
4
5
Gradation
Flakiness & Elongation
Atterberg Limits
Field Density of Compaction Layer
MORTH T 400 - 11
IS 2386 PART 1
IS 2720 Part 5
IS 2720 Part 28
6
Max.Dry Density Test
IS 2720 Part 8
7
Los Angles Abrasion Value
IS 2386 Part 4
8
Water Absorption
IS 2386 Part 3
Frequency of Test
Number of Tests Conducted
In This Month
Previous Month
Total to Date
Passed
Failed
Total
Passed
Failed
Total
Passed
Failed
Total
1 Test /100m3
1 Test /200m3
1 Test /100m3
1 Test /500m2
1 Test/Source as when
required by Engineer
1 Test/Source as when
required by Engineer
1 Test/Source as when
required by Engineer
110
50
83
241
0
0
0
0
110
50
83
241
79
46
79
317
0
0
0
0
79
46
79
317
189
96
162
558
0
0
0
0
189
96
162
558
2
0
2
0
0
0
2
0
2
1
0
1
0
0
0
1
0
1
1
0
1
0
0
0
1
0
1
14
14
4
14
14
2
27
24
21
0
0
0
0
0
0
0
0
0
14
14
4
14
14
2
27
24
21
1
1
1
1
1
0
3
6
6
0
0
0
0
0
0
0
0
0
1
1
1
1
1
0
3
6
6
15
15
5
15
15
2
30
30
27
0
0
0
0
0
0
0
0
0
15
15
5
15
15
2
30
30
27
E. CEMENT TEST
1
Initial Setting Time
2
Final Setting Time
3
Soundness by Le-chatlier's method(%)
4
Fineness Of Cement
5
Consistency Test
6
Chemical analysis
IS 4031 Part 5
IS 4031 Part 5
IS 4031 Part 3
IS 4031 Part 3
IS 4031 Part 4
IS 8112
1 TEST /CONSIGNMENT
1 TEST /CONSIGNMENT
1 TEST /CONSIGNMENT
1 TEST /CONSIGNMENT
1 TEST /CONSIGNMENT
1 TEST /SOURCE
7
IS 4031 Part 6
1 TEST /CONSIGNMENT
Compressive Strength
Executed Quantity
Upto
Present
Previous
Cumm.
Month
Month
F. COARSE AGGREGATE
1
Dust Content
IS 2386-Part 2
2
Moisture Content
IS 2386 Part 3
3
Specific Gravity
IS 2386 Part 3
4
Gradation 40,20 & 10mm
IS 383 / IS 2386 Part 1
5
Aggregate Impact Value
IS 2386 Part 4
6
Flakiness & Elongation
IS 2386 Part 1
7
Water Absorption of Aggregate
IS 2386 Part 3
Soundness ( Sodium & Magnesium
sulphate)
9
Alkali - Aggregate Reactivity
10
Petrographic Analysis
11
Chloride & Sulphate
12
Deleterious content
F. FINE AGGREGATE
1
Silt Content
8
1 Test weekly / Day of
concrete
Daily / Day of concrete
One per Source /
Once in a month
1 test / Day
One per Source /
Once in a week
One per Source /
Once in a week
One per Source /
Once in a month
Concrete Qty. in m3
9682.42
1729.4
11411.82
0
0
0
0
0
0
0
0
0
173
0
173
23
0
23
196
0
196
15
0
15
1
0
1
16
0
16
193
0
193
23
0
23
216
0
216
127
0
127
5
0
5
132
0
132
108
0
108
5
0
5
113
0
113
15
0
15
1
0
1
16
0
16
IS 2386 Part 5
One per Source
4
0
4
0
0
0
4
0
4
IS 2386 Part 7
IS 2386 Part 8
SP 23
IS:2386-Part 2
One per Source
One per Source
One per Source
One per Source
4
4
4
4
0
0
0
0
4
4
4
4
0
0
0
0
0
0
0
0
0
0
0
0
4
4
4
4
0
0
0
0
4
4
4
4
IS 2386 Part 2
1 test / Day
181
0
181
23
0
23
204
0
204
M/s. SAI MAATARINI TOLLWAYS LIMITED
Concrete Qty. in m3
Page 76
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the
state of Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
[
S.No
Name of Test
Testing Method
2
3
Moisture Content
Clay Lumps
IS 2386 Part 3
IS 2386 Part 2
4
Specific Gravity
IS 2386 Part 3
5
Gradation, Fineness of Modulus
IS 383 / IS 2386 Part 1
6
Water Absorption of Aggregate
IS 2386 Part 3
7
8
Chloride & Sulphate
Deleterious content
Soundness ( Sodium & Magnesium
9
sulphate)
G. ADMIXTURE TEST
1
Chloride Content
2
Dry Material Content
3
Ash Content
4
Relative Density
G. CONCRETE TEST
COMPRESSIVE STRENGTH (MIX DESIGN
CUBES) No. Of Cubes
1
Frequency of Test : 1/Design Mix (or)
1/Change of Source
COMPRESSIVE STRENGTH (SITE CUBES)
No. Of Cubes
2
Frequency of Test : MORTH Sec.1700
Table:1700-8
Frequency of Test
SP 23
IS:2386-Part 2
Daily / Day of concrete
Daily / Day of concrete
One per Source /
Once in a month
1 test/Day
One per Source /
Once in a month
One per Source
One per Source
IS 2386 Part 5
One per Source
IS 9103
IS 9104
IS 9105
IS 9106
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
M/s. SAI MAATARINI TOLLWAYS LIMITED
1 TEST /CONSIGNMENT
M15 7days
M15 28 days
M20 7days
M20 28 days
M25 7days
M25 28 days
M30 7days
M30 28 days
M35 7days
M35 28 days
M40 7days
M40 28 days
M15 7days
M15 28 days
M20 7days
M20 28 days
M25 7days
M25 28 days
M30 7days
M30 28 days
M35 7days
M35 28 days
M40 7days
M40 28 days
Executed Quantity
Upto
Present
Previous
Cumm.
Month
Month
9682.42
1729.4
11411.82
Number of Tests Conducted
In This Month
Previous Month
Total to Date
Passed
Failed
Total
Passed
Failed
Total
Passed
Failed
Total
173
0
0
0
173
0
23
0
0
0
23
0
196
0
0
0
196
0
39
0
39
1
0
1
40
0
40
181
0
181
23
0
23
204
0
204
39
0
39
1
0
1
40
0
40
1
1
0
0
1
1
0
0
0
0
0
0
1
1
0
0
1
1
1
0
1
0
0
0
1
0
1
3
3
3
3
0
0
0
0
3
3
3
3
0
0
0
0
0
0
0
0
0
0
0
0
3
3
3
3
0
0
0
0
3
3
3
3
36
60
30
60
18
30
39
81
18
30
18
30
423
564
204
192
39
42
519
1206
57
96
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
36
60
30
60
18
30
39
81
18
30
18
30
423
564
204
192
39
42
519
1206
57
96
0
0
0
0
0
0
0
6
0
0
0
6
0
0
60
177
0
3
0
0
108
324
9
120
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
6
0
0
0
6
0
0
60
177
0
3
0
0
108
324
9
120
0
0
36
60
30
60
18
36
39
81
18
36
18
30
483
741
204
195
39
42
627
1530
66
216
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
36
60
30
60
18
36
39
81
18
36
18
30
483
741
204
195
39
42
627
1530
66
216
0
0
Page 77
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the
state of Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
[
QC Test Summary – Section-II (Km 55.000 to Km 113.000)
Executed Quantity
S.No
Name of Test
A. Borrow Area
1
FREE SWELLING INDEX
2
GRAIN SIZE ANALYSIS
3
ATTERBERG LIMITS
4
MAX. DRY DENSITY TEST
5
CALIFORNIA BEARING RATIO TEST
6
DENSITY OF COMP. LAYER EMBANKMENT
5
DENSITY OF COMP. LAYER SUB GRADE
B. Shoulder/Cutting Material
1
FREE SWELLING INDEX
2
GRAIN SIZE ANALYSIS
3
ATTERBERG LIMITS
4
MAX. DRY DENSITY TEST
5
CALIFORNIA BEARING RATIO TEST
6
DENSITY OF COMP. LAYER EMBANKMENT
5
DENSITY OF COMP. LAYER SUB GRADE
C. O.G.L.
1
FREE SWELLING INDEX
2
GRAIN SIZE ANALYSIS
3
ATTERBERG LIMITS
4
MAX.DRY DENSITY TEST
5
DENSITY OF COMP. LAYER (No of Pits)
6
CALIFORNIA BEARING RATIO TEST
D. GRANULAR SUB-BASE
1
GRADATION
2
ATTERBERG LIMITS
3
CALIFORNIA BEARING RATIO TEST
4
DENSITY OF COMP. LAYER (No of Pits)
5
WATER ABSORPTION
6
MAX.DRY DENSITY TEST
7
10% FINEVALUE
E. WET MIX MACADAM
1
MAX.DRY DENSITY TEST
2
ATTERBERG LIMITS
3
AGGREGATE IMPACT VALUE
4
GRADATION
5
FLAKINESS & ELONGATION INDEX
6
DENSITY OF COMP. LAYER (No of Pits)
Testing
Method
Frequency of Test
IS 2720 Part 40
IS 2720 Part 4
IS 2720 Part 5
IS 2720 Part 8
IS 2720 Part 16
IS 2720 Part 28
IS 2720 Part 28
As Required
2 Test /3000M3
2 Test /3000M3
2 Test /3000M3
1 Test /3000M3
1 Test /1000 M2
1 Test /500M2
IS 2720 Part 40
IS 2720 Part 4
IS 2720 Part 5
IS 2720 Part 8
IS 2720 Part 16
IS 2720 Part 28
IS 2720 Part 28
As Required
2 Test /3000M3
2 Test /3000M3
2 Test /3000M3
1 Test /3000M3
1 Test /1000 M2
1 Test /500M2
IS 2720 Part 40
IS 2720 Part 4
IS 2720 Part 5
IS 2720 Part 8
IS 2720 Part 28
IS 2720 Part 16
As Required
As Required
As Required
As Required
1 Test /1000 M2
As Required
IS 2720 Part 9
IS 2720 Part 5
IS 2720 Part 16
IS 2720 Part 28
IS 2386 Part 3
IS 2720 Part 8
BS 812 Part 111
1 Test /200M3
1 Test /200M3
As Required
1 Test /500M2
1 Test/Source
1 Test/Source
1 Test/Source
IS 2720 Part 8
IS 2720 Part 5
IS 2386 PART 4
IS 2386 PART 1
IS 2386 PART 1
IS 2720 Part 28
1 Test/Source
1 Test /100M3
1 Test /200M3
1 Test /100M3
1 Test /200M3
1 Test /500M2
M/s. SAI MAATARINI TOLLWAYS LIMITED
Upto
Previous
Month
66,098
3,845
4,555
0
129,443
4,144
Present
Month
13,033
7,712
1,036
0
5,235
1,457
Number of Tests Conducted
Present Month
Previous Month
Total to Date
Cumm.
Passed
Failed
Total
Passed
Failed
Total
Passed
Failed
Total
79,131
11,557
253
253
253
253
54
2103
742
0
0
0
0
17
40
32
253
253
253
253
71
2143
774
94
94
94
94
33
281
306
0
0
0
0
0
18
36
94
94
94
94
33
299
342
347
347
347
347
87
2384
1048
0
0
0
0
17
58
68
347
347
347
347
104
2442
1116
5,591
0
21
20
21
21
0
142
0
0
5
0
0
2
0
0
21
25
21
21
2
142
0
0
0
0
0
0
27
0
0
0
0
0
0
0
0
0
0
0
0
0
27
0
21
20
21
21
0
169
0
0
5
0
0
2
0
0
21
25
21
21
2
169
0
232
232
232
232
108
0
0
0
0
0
4
0
232
232
232
232
112
0
18
18
18
18
21
0
0
0
0
0
0
0
18
18
18
18
21
0
250
250
250
250
129
0
0
0
0
0
4
0
250
250
250
250
133
0
31
28
2
77
2
2
2
0
0
0
0
0
0
0
31
28
2
77
2
2
2
8
7
0
37
0
0
0
0
0
0
6
0
0
0
8
7
0
43
0
0
0
39
35
2
114
2
2
2
0
0
0
6
0
0
0
39
35
2
120
2
2
2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2
2
2
28
2
0
0
0
0
0
0
0
2
2
2
28
2
0
2
2
2
28
2
0
0
0
0
0
0
0
2
2
2
28
2
0
134,678
5,601
Page 78
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the
state of Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
[
Executed Quantity
S.No
Name of Test
7
MOISTURE CONTENT
F. CEMENT TEST
1
CONSISTENCY TEST
2
SETTING TIME
3
FINENESS TEST
COMPRESSIVE STRENGTH
4
Testing
Method
COMPRESSIVE STRENGTH (MIX DESIGN
CUBES) No. Of Cubes
1
Frequency of Test : 1/Design Mix (or)
1/Change of Source
COMPRESSIVE STRENGTH (SITE CUBES)
No. Of Cubes
2
Frequency of Test : MORTH Sec.1700
Table:1700-8
Upto
Previous
Month
Present
Month
Cumm.
Total to Date
Passed
Failed
Total
Passed
Failed
Total
Passed
Failed
Total
IS 2720 Part 2
As Required
0
0
0
0
0
0
0
0
0
IS 4031 Part 4
IS 4031 Part 5
IS 4031 Part 3
IS 4031 Part 6
1 Test/Consignment
1 Test/Consignment
1 Test/Consignment
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
3 Days
7 Days
28 Days
G. COARSE & FINE AGGREGATE
1
COARSE AGG. GRADATION 40,20 & 10MM
2
FINE AGGREGATES GRADATION
3
WATER ABSORPTION
4
SPECIFIC GRAVITY TEST
5
AGGREGATE IMPACT VALUE
6
FLAKINESS TEST
H. CONCRETE TEST
Frequency of Test
Number of Tests Conducted
Present Month
Previous Month
1 Test/Consignment
IS 383
IS 2386 Part 1
IS 2386 Part 3
IS 2386 Part 3
IS 2386 PART 4
IS 2386 PART 1
1 test/Day
1 test/Day
As Required
As Required
As Required
As Required
116
108
0
0
64
64
0
0
0
0
0
0
116
108
0
0
64
64
96
43
0
0
7
7
0
0
0
0
0
0
96
43
0
0
7
7
212
151
0
0
71
71
0
0
0
0
0
0
212
151
0
0
71
71
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
M15 7days
M15 28 days
M20 7days
M20 28 days
M25 7days
M25 28 days
M30 7days
M30 28 days
M35 7days
M35 28 days
M40 7days
M40 28 days
M15 7days
M15 28 days
M20 7days
M20 28 days
M25 7days
M25 28 days
M30 7days
M30 28 days
M35 7days
M35 28 days
M40 7days
0
0
0
0
0
0
0
0
0
0
0
0
87
159
0
0
0
0
177
378
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
87
159
0
0
0
0
177
378
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
24
66
6
0
0
0
138
291
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
24
66
6
0
0
0
138
291
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
111
225
6
0
0
0
315
669
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
111
225
6
0
0
0
315
669
0
0
0
M/s. SAI MAATARINI TOLLWAYS LIMITED
350.5
454.5
805.0
0.0
12.5
12.5
2,271.5
1,015.0
3,286.5
Page 79
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the
state of Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
[
Executed Quantity
S.No
Name of Test
Testing
Method
IS 516
Frequency of Test
Upto
Previous
Month
Present
Month
Number of Tests Conducted
Present Month
Previous Month
Cumm.
M40 28 days
Total to Date
Passed
Failed
Total
Passed
Failed
Total
Passed
Failed
Total
0
0
0
0
0
0
0
0
0
QC Test Summary – Section-III (Km 113.000 to Km 166.173)
S.No
Name of Test
A. Borrow Area
1
FREE SWELLING INDEX
2
GRADATION
3
ATTERBERG LIMITS
4
MAX. DRY DENSITY TEST
5
Deleterious content
6
CBR
7
DENSITY OF COMP. LAYER EMBANKMENT
8
DENSITY OF COMP. LAYER SUB GRADE
B. O.G.L.
1
FREE SWELLING INDEX
2
GRADATION
3
ATTERBERG LIMITS
4
Deleterious content
5
MAX.DRY DENSITY TEST
6
DENSITY OF COMP. LAYER (No of Pits)
7
CBR
C. GRANULAR SUB-BASE
1
GRADATION
2
ATTERBERG LIMITS
3
CBR
4
MOISTURE CONTENT
5
Deleterious content
6
DENSITY OF COMP. LAYER (No of Pits)
7
WATER ABSORPTION
8
MAX. DRY DENSITY TEST
9
10% FINE VALUE
D. WET MIX MACADAM
1
MAX. DRY DENSITY TEST
2
ATTERBERG LIMITS
3
AGGREGATE IMPACT VALUE
4
GRADATION
5
Flakiness & Elongation
6
Abrasion Value
Testing Method
Frequency of Test
Executed
Quantity
Till Previous Month
Passed
Failed
Total
Number of Tests Conducted
In This Month
Passed
Failed
Total
Passed
Till Date
Failed
Total
IS 2720 Part 40
IS 2720 Part 4
IS 2720 Part 5
IS 2720 Part 8
IS 2720 part 27
IS 2720 Part 16
IS 2720 Part 28
IS 2720 Part 28
AS REQUIRED
2 Test /3000M3
2 Test /3000M3
2 Test /3000M3
AS REQUIRED
1 Test /3000M3
1 Test /1000 M2
1 Test /500M2
1318500
1339500
1333500
1333500
_
438000
10400000
969500
820
834
834
834
1
131
8890
1477
24
24
20
20
0
5
491
101
844
858
854
854
1
136
9381
1578
35
35
35
35
0
5
987
336
0
0
0
0
0
5
32
25
35
35
35
35
0
10
1019
361
855
869
869
869
1
136
9877
1813
24
24
20
20
0
10
523
126
879
893
889
889
1
146
10400
1939
IS 2720 Part 40
IS 2720 Part 4
IS 2720 Part 5
IS 2720 part 27
IS 2720 Part 8
IS 2720 Part 28
IS 2720 Part 16
AS REQUIRED
AS REQUIRED
AS REQUIRED
AS REQUIRED
AS REQUIRED
1 Test /1000 M2
AS REQUIRED
_
_
_
_
_
1125000
_
196
196
196
1
196
925
2
0
0
0
0
0
114
0
196
196
196
1
196
1039
2
0
0
0
0
0
78
0
0
0
0
0
0
8
0
0
0
0
0
0
86
0
196
196
196
1
196
1003
2
0
0
0
0
0
122
0
196
196
196
1
196
1125
2
IS 2720 Part 9
IS 2720 Part 5
IS 2720 Part 16
IS 2720 Part 2
IS 2720 part 27
IS 2720 Part 28
IS 2386 Part 3
IS 2720 Part 8
BS 812 Part 111
1 Test /200M3
1 Test /200M3
AS REQUIRED
1 Test /250M2
AS REQUIRED
1 Test /500M2
1 TEST PER SOURCE
1 TEST /SOURCE
1 TEST PER SOURCE
31000
30200
0
13000
_
0
0
0
0
113
113
4
52
1
162
5
4
6
4
0
0
0
0
25
0
0
0
117
113
4
52
1
187
5
4
6
38
38
0
0
0
56
0
0
0
0
0
0
0
0
8
0
0
0
38
38
0
0
0
64
0
0
0
151
151
4
52
1
218
5
4
6
4
0
0
0
0
33
0
0
0
155
151
4
52
1
251
5
4
6
IS 2720 Part 8
IS 2720 Part 5
IS 2386 PART 4
IS 2386 PART 1
IS 2386 PART 1
IS 2386 Part 3
1 TEST PER SOURCE
1 Test /100M3
1 Test /200M3
1 Test /100M3
1 Test /200M3
AS REQUIRED
0
8200
9800
8500
9800
_
2
66
39
69
39
0
0
0
0
0
0
0
2
66
39
69
39
0
0
16
10
16
10
0
0
0
0
0
0
0
0
16
10
16
10
0
2
82
49
85
49
0
0
0
0
0
0
0
2
82
49
85
49
0
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 80
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the
state of Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
[
S.No
Name of Test
Testing Method
Frequency of Test
Executed
Quantity
Till Previous Month
Passed
Failed
Total
90
11
101
16
0
16
Number of Tests Conducted
In This Month
Passed
Failed
Total
12
0
12
8
0
8
Passed
102
24
Till Date
Failed
11
0
Total
113
24
7
DENSITY OF COMP. LAYER (No of Pits)
8
MOISTURE CONTENT
E. CEMENT TEST
1
CONSISTENCY TEST
2
SETTING TIME
3
Soundness by Le-chatlier's method(%)
4
Chemical analysis
5
FINENESS TEST
IS 2720 Part 28
IS 2720 Part 2
1 Test /500M2
AS REQUIRED
0
0
IS 4031 Part 4
IS 4031 Part 5
IS 4031
IS 8112
IS 4031 Part 3
1 TEST /CONSIGNMENT
1 TEST /CONSIGNMENT
1 TEST /CONSIGNMENT
1 TEST /SOURCE
1 TEST /CONSIGNMENT
6
IS 4031 Part 6
1 TEST /CONSIGNMENT
_
_
_
_
_
_
_
_
15
15
0
5
15
20
19
18
0
0
0
0
0
0
0
0
15
15
0
0
15
20
19
18
2
2
1
0
2
2
3
2
0
0
0
0
0
0
0
0
2
2
1
0
2
2
3
2
17
17
1
5
17
22
22
20
0
0
0
0
0
0
0
0
17
17
1
0
17
22
22
20
IS 383
IS 2386 Part 1
IS 2386 Part 2
IS 2386 Part 3
IS 2386 Part 3
IS 2386 Part 7
IS 2386 Part 8
IS 2386 Part 2
IS 2386 Part 5
IS 2386 PART 4
IS 2386 PART 1
1 test/Day
1 test/Day
AS REQUIRED
AS REQUIRED
AS REQUIRED
One per Source
One per Source
One per Source
One per Source
AS REQUIRED
AS REQUIRED
0
0
0
0
0
0
0
0
0
0
0
182
182
14
2
5
3
3
3
3
40
39
0
0
0
0
0
0
0
0
0
0
0
182
182
14
2
5
3
3
3
3
40
39
42
42
4
0
0
0
0
0
0
4
4
0
0
0
0
0
0
0
0
0
0
0
42
42
4
0
0
0
0
0
0
4
4
224
224
14
2
5
3
3
3
3
44
43
0
0
0
0
0
0
0
0
0
0
0
224
224
18
2
5
3
3
3
3
44
43
1 TEST /CONSIGNMENT
0
0
0
0
4
4
4
4
0
0
0
0
4
4
4
4
0
0
0
0
0
0
0
0
0
0
0
0
4
4
4
4
0
0
0
0
4
4
4
4
17
17
12
12
0
0
14
15
7
7
7
0
0
0
0
0
0
0
0
0
0
0
17
17
12
12
0
0
14
15
7
7
7
0
4
0
0
0
0
0
6
0
6
0
0
0
0
0
0
0
0
0
0
0
0
0
4
0
0
0
0
0
6
0
6
0
17
21
12
12
0
0
14
21
7
13
7
0
0
0
0
0
0
0
0
0
0
0
17
21
12
12
0
0
14
21
7
13
7
COMPRESSIVE STRENGTH
F. COARSE & FINE AGGREGATE
1
COARSE AGG. GRADATION 40,20 & 10MM
2
FINE AGGREGATES GRADATION
3
Silt Content
4
Water Absorption of Aggregate CA/FA
5
Specific Gravity CA/FA
6
Alkali-Aggregate reactivity
7
Petrographic Analysis
8
Deleterious content
9
Soundness ( Sodium & Magnesium sulphate)
10
AGGREGATE IMPACT VALUE
11
FLAKINESS TEST
G. ADMIXTURE TEST
1
2
3
4
CHLORIDE CONTENT
DRY MATERIAL CONTENT
ASH CONTENT
RELATIVE DENSITY
H. CONCRETE TEST
1
COMPRESSIVE STRENGTH (MIX DESIGN CUBES)
No. Of Cubes
IS 9103
IS 9104
IS 9105
IS 9106
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
M/s. SAI MAATARINI TOLLWAYS LIMITED
M15 7days
M15 28 days
M20 7days
M20 28 days
M25 7days
M25 28 days
M30 7days
M30 28 days
M35 7days
M35 28 days
M40 7days
0
0
0
0
0
0
Page 81
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the
state of Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : June - 2014
[
S.No
2
Name of Test
COMPRESSIVE STRENGTH (SITE CUBES)
No. Of Cubes
Testing Method
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
M/s. SAI MAATARINI TOLLWAYS LIMITED
Frequency of Test
Executed
Quantity
M40 28 days
M15 7days
M15 28 days
M20 7days
M20 28 days
M25 7days
M25 28 days
M30 7days
M30 28 days
M35 7days
M35 28 days
M40 7days
M40 28 days
1939CUM
0
0
14229 CUM
48 CUM
0
Till Previous Month
Passed
Failed
Total
7
0
7
190
0
190
301
0
301
0
0
0
0
0
0
0
0
0
0
0
0
555
0
555
1218
0
1218
1
0
1
6
0
6
0
0
0
0
0
0
Number of Tests Conducted
In This Month
Passed
Failed
Total
6
0
6
26
0
26
97
0
97
0
0
0
0
0
0
0
0
0
0
0
0
162
0
162
381
0
381
0
0
0
0
0
0
0
0
0
0
0
0
Passed
13
216
398
0
0
0
0
717
1599
1
6
0
0
Till Date
Failed
0
0
0
0
0
0
0
0
0
0
0
0
0
Total
13
216
398
0
0
0
0
717
1599
1
6
0
0
Page 82
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll)
Basis.
Monthly Progress Report : June -2014
19. Appendix 3 - List of Plant and Equipment (0-113)
SL.NO.
PLANTS
1
2
3
4
5
6
7
8
9
DESCRIPTION OF P&M
Crusher
Crusher
Crusher
Batching Plant
Batching Plant
Batching Plant
Wet Mix Plant
Wet Mix Plant
Wet Mix Plant
10
Hot Mix Plant
MACHINERY
1
JCB
2
HIRE JCB
3
EXCAVATOR 320D
4
EXCAVATOR
5
LOADER-3036
6
HIRE LOADER (SOWBHAGYA)
7
SOIL COMPACTORS
8
GRADER CAT120K(MGD/47)
9
GRADER CAT120K(MGD/47)
DOZERS
10
DOZZER D-50 (MDZ/1)
11
HIRE DOZER KOMATSU
PAVERS
12
PAVER-DYNAPAC(MPV/44)
13
PAVER-APOLLO(MPV/47)
CRANES
14
CRANE HYDRO(MCR/15)
15
HIRE HYDRA ESCORT 3069
DUMPERS
16
DUMPER
17
HIRE HYVA
18
BT SPRAYER
19
HIRE TIPPER & DUMPERS
LIGHT VEHICLES
20
BOLERO
21
CAMPER GENIO
22
CAMPER
23
DIESEL TANKER
24
DOZER TRACTOR AP26J4393(VTR/9)
25
INNOVA OR04H 2222 (LMV/193)
26
SCORPIO
27
SUMO AP05AA 1266 (LMV/172)
28
TATA MAGIC
D G SET & COMPRESSOR
29
COMPRESSOR
30
CONCRETE MIXTURE - 1
31
CONCRETE PUMP
32
DEWATERING PUMP
33
DG 10KVA
34
DG 125KVA
35
DG 1500VOLTS
36
DG 15KVA
37
DG 160KVA
38
DG 20 KV
39
DG 250KVA
40
DG 25KVA
41
DG 30KVA
MAKE / BRAND
CAPACITY
WORKING
IDLE
OWN / HIRE
LOCATION
Metso
Metso
Puzzolana
Schwing Stetter
Schwing Stetter
Schwing Stetter
Apollo
Apollo
MAXMECH
240 TPH
240 TPH
200 TPH
30 CPH
60 CPH
30 CPH
160 TPH
250 TPH
200 TPH
1
1
1
1
1
1
1
1
1
Own
Own
Own
Own
Own
Own
Own
Own
Own
KM-42
KM-58
KM-94
KM-19
KM-58
KM-94
KM-18
KM-94
KM-58
Speco
160 TPH
1
Own
KM-58
4
3
7
18
4
1
8
9
2
Own
Hire
Own
Hire
Own
Hire
Hire
Own
Hire
1
9
Own
Hire
-
1
1
Own
Own
20 MT
35 MT
-
3
5
Own
Hire
28
6
2
80
Own
Hire
Own
Hire
NA
NA
NA
NA
NA
NA
NA
NA
NA
11
3
12
4
1
1
7
1
2
Own
Own
Own
Own
Own
Own
Own
Own
Own
(MCP/12)
1
2
2
11
2
5
1
4
1
9
1
2
4
Own
Own
Own
Own
Own
Own
Own
Own
Own
Own
Own
Own
Own
D-50
DYNAPAC
APOLLO
M/s. SAI MAATARINI TOLLWAYS LIMITED
10KVA
125KVA
1500VOLTS
15KVA
160KVA
20 KV
250KVA
25KVA
30KVA
REMARKS
Erection
in
progress
Page
83
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT
(Toll) Basis.
Monthly Progress Report : June - 2014
[
SL.NO.
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
DESCRIPTION OF P&M
DG 40KVA
DG 45KVA
DG 500KVA
DG 5KVA
DG 62.5KVA
DG 625KVA
DG 750KVA
DG 82.5KVA
KERB CUTTER
MIXER MACHINE
ROCK BREAKER
TROLLEY AIR COMPRESSOR
WEIGH BRIDGE
WATER TANKER
WATER TANKER
WATER TANKER
TRANSIT MIXER
TRANSIT MIXER
TRAILERS
TRAILERS
MAKE / BRAND
CAPACITY
40KVA
45KVA
500KVA
5KVA
62.5KVA
625KVA
750KVA
82.5KVA
-
WORKING
4
4
5
4
2
1
1
1
1
1
1
1
3
IDLE
OWN / HIRE
Own
Own
Own
Own
Own
Own
Own
Own
Own
Own
Own
Own
Own
12 KL
12 KL
10
6
Own
Hire
6.5 Cum
12
Own
3
Own
LOCATION
REMARKS
Section II
Sr.
No.
A
1
2
3
Plant
Crusher
Crusher
Crusher
Puzzolana
Puzzolana
Taurian
4
Batching Plant
Schwing Stetter
B
1
2
3
4
5
6
7
8
9
10
11
12
13
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Machinery
Excavator
Excavator
Dumper
Tipper
Dozer (D80)
Grader
Escort Roller
JCB Roller
Water Tanker
JCB
Transit Mixer
Transit Mixer
Transit Mixer
Loader
BT Sprayer
Tractor
Broomer
Kerb Cutting Machine
Plate Earth Compacter – 1
Concrete Pump
Electrical Vibrator 3 Phase - 1
Petrol Vibrator – 1
DG Set
DG Set
DG Set Silent
DG Set Silent
DG Gen Set
Name of P&M
Make/Brand
TATA-210
L&T
Ashok Leyland
TATA
Hindustan
CAT
Escort
JCB
Ashok Leyland
CAT
Asia Motors
Ashok Leyland
Hindustan
Ashok Leyland
Ford
Appolo
Testwell
Greaves Cotton Ltd.
Killic Eng
Killic
Caterpillar
Caterpillar
Kirloskar
Kirloskar
Kirloskar
M/s. SAI MAATARINI TOLLWAYS LIMITED
Capacity
Available at
Site
200 TPH
240 TPH
150 TPH
01
01
01
30 cum/Hr
03
1 m3
1 m3
14m3
12 KL
0.3 m3
6 m3
6 m3
4 m3
1.7 m3
500 KVA
250 KVA
125 KVA
100 KVA
63 KVA
22
05
84
03
14
08
13
01
18
06
02
02
04
03
01
01
01
01
01
01
04
01
03
01
01
01
01
Remarks
@ Ch 115+000
@ Ch 116+000
@ Ch 135+800
1-@ Ch 115+400, 2- @
Ch 148+800 & 3- @ Ch
151+200
Page 84
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT
(Toll) Basis.
Monthly Progress Report : June - 2014
[
Sr.
No.
27
28
29
30
31
32
33
20 KVA
5 KVA
Available at
Site
01
02
3 PHASE
01
Shaketech
3 PHASE
01
Rama
Vishwakarma
TATA
3 PHASE
80MT
3 KL
01
03
01
Name of P&M
DG Gen Set
Trolley Based Search Light
Air Compressor with Patch
Heater
Welding Transformer 450 Amp –
1
Welding Machine – 2
Weigh Bridge 80/100
Tata 407 HSD Distributer
Make/Brand
Kirloskar
Sigma
N/A
Capacity
Remarks
20. Appendix 4 - List of Lab Equipment & Calibration Status
Lab at Km 19
S.No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
NAME OF EQUIPMENT / INSTRUMENT
300o
Thermostatic Controlled Oven ( 0 to
Capacity) Big
Thermostatic Controlled Oven ( 0 to 300o Capacity) Medium
Electronic balance (30 kg ) 2 gm accuracy
Electronic balance (30 kg ) 2 gm accuracy
Electronic balance (30 kg ) 1 gm accuracy
Electronic balance (1000 gm ) 0.1 gm accuracy
Electronic balance (15 kg) 1g accuracy
Electronic balance (15 kg) 0.5g accuracy
Electronic balance (600 gm ) 0.01 gm accuracy
Rapid Moisture Meters
Rapid Moisture Meters
Rapid Moisture Meters
100 mm
75 mm
63 mm
53 mm
50 mm
45 mm
40 mm
37.5 mm
31.5 mm
26.5 mm
25 mm
22.4 mm
20 mm
19 mm
16 mm
14 mm
13.2 mm
12.5 mm
11.2 mm
10 mm
9.5 mm
6.3 mm
5.6 mm
4.75
2.36
4.75mm
2.36mm
2.8 mm
M/s. SAI MAATARINI TOLLWAYS LIMITED
Quantity
1
1
1
1
2
1
1
2
1
1
1
1
1
1
2
1
1
1
2
1
1
2
2
1
1
1
1
2
1
1
2
1
1
1
1
3
2
2
1
1
Calibration
Status
Remarks
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Page 85
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT
(Toll) Basis.
Monthly Progress Report : June - 2014
[
S.No
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
NAME OF EQUIPMENT / INSTRUMENT
2.00mm
1.4 mm
1.18mm
1.00mm
710 mic
600 mic
500 mic
425 mic
355 mic
300 mic
180 mic
150 mic
90 mic
75 mic
Lid and pan
Casagrande Liquid limit testing device
Casagrande Liquid limit testing device
CBR Testing Machine
Cone penetrometer
Proctor mould 2250 cc with 4.9kg rammer
Proctor mould 2250 cc with 4.9kg rammer
Proctor mould 2250 cc with 4.9kg rammer
Proctor mould 1000 cc with2.6kg rammer
Proctor mould 1000 cc with2.6kg rammer
Sand Pouring Cylinders with complete set
Sand Pouring Cylinders with complete set
Sand Pouring Cylinders with complete set
Sand Pouring Cylinders with complete set
Sand Pouring Cylinders with complete set
Sand Pouring Cylinders with complete set
100 lm glass measuring jars (FSI)
CBR moulds
Surcharge weight (2.5 Kg)
Spacer disc with handle
Aluminum containers
Perforated plates
Proving Ring (50 KN)
Proving Ring (50 KN)
Vicat Needle Apparatus ( with dash pot)
Cement Mortar Cube Moulds (7.06x7.06x7.06 cm)
Aggregate Impact Value Test Apparatus
Flakiness Gauge
Flakiness Gauge
Elongation Gauge
Elongation Gauge
Concrete Cube moulds ( 150x150x150 mm)
Slump cone
Slump cone
Slump cone
Slump cone
Slump rod
Compressive Testing Machine (2000 kn) (CTM)
Cement mortar cube vibrating machine
Soundness apparatus
100 mm dia
100 mm dia
150 mm dia
150 mm dia
200 mm dia
200 mm dia
Quantity
2
1
2
4
1
6
1
6
1
2
1
3
1
6
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
24
56
112
2
151
56
1
1
1
15
1
1
1
1
1
93
1
1
1
1
5
1
1
5
Calibration
Status
Remarks
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Lab at Km 94+300
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 86
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT
(Toll) Basis.
Monthly Progress Report : June - 2014
[
S
No
Description
Instrument
Make/Brand
Modal/Instrument
Code
Nos.
Purpose
Last Date of
Calibration
Calibration
Freq.
Due Date for
next
calibration
Steco
2000 KN - 07442
1
Comp.
Cube Test
08/02/2014
12 Months
07/02/2015
25/01/2014
6 Months
25/07/2014
25/01/2014
6 Months
25/07/2014
28/02/2014
6 Months
27/08/2014
16/01/2014
18 Months
16/07/2014
26/02/2014
18 Months
26/08/2014
1
Compressive
Testing Machine
(2000KN)
2
CBR Moulds
Not Available
C-01
30
3
Proctor Moulds
Not Available
MPM-01
3
4
IS Sieves
Not Available
Not Available
24
4
Proving Ring 50 KN
Mercer India
50KN-01479
1
5
Proving Ring 30 KN
Mercer India
30KN-866
1
Shivaki
ML-5370
1
Soil
Testing
08/02/2014
12 Months
07/02/2015
Bio Tech
Not Available
1
Soil
Testing
24/01/2014
12 Months
23/01/2015
Phoenix
E-1209384
1
24/02/2014
12 Months
23/02/2015
Swtwik
Not Available
1
24/02/2014
12 Months
23/02/2015
Phoenix
209754
1
24/02/2014
12 Months
23/02/2015
Contech
Not Available
1
24/02/2014
12 Months
23/02/2015
GREEN
GP/MG/01
1
20/04/2014
3 Months
19/07/2014
GREEN
GP/MG/02
1
20/04/2014
3 Months
19/07/2014
Not Available
SPC-01
1
FDD
Testing
20/05/2014
3 Months
19/08/2014
Not Available
SPC-02
1
FDD
Testing
26/05/2014
3 Months
25/08/2014
Schwing
Stetter
M-01 (BMP-01)
1
Concrete
Mix
26/12/2013
6 Months
26/06/2014
Schwing
Stetter
T-500 (BMP-02)
1
Concrete
Mix
11/03/2014
6 Months
11/09/2014
6
7
8
9
10
11
12
13
14
15
16
17
Thermostatically
Controlled Oven-01
(0-300OC)
Thermostatically
Controlled Oven-02
(0-150OC)
Digital Weighing
Scale-01 (cap.30kg)
Digital Weighing
Scale-02 (cap.30kg)
Digital Weighing
Scale-03 (cap.60kg)
Digital Weighing
Scale-04 (cap.600
gm)
Rapid Moisture
Meter (No-01)
Rapid Moisture
Meter (No-02)
Sand Pouring
Cylinder (150 mm
Dia)
Sand Pouring
Cylinder (200 mm
Dia)
Concrete Batching
Plant-01 (60
Cum/H)
Concrete Batching
Plant-02 (30
Cum/H)
CBR
Casting
Proctor
Testing
Sieving
CBR
Testing
CBR
Testing
Lab
Testing
Lab
Testing
Lab
Testing
Lab
Testing
FDD
Testing
FDD
Testing
Lab at Km 115+500
Sr.
Sub. No.
No.
(A) General
1
2
a
b
c
d
e
Item/Specification As per MOST
Oven-Electrically Operated Thermostatically Controlled From 100o C to
200o C Sensitivity 1o C
Balance 30 Kg capacity self Indicating Type
Balance 20 Kg capacity self Indicating Type
600 gm capacity self indicating Electronic Type-Accuracy 0.01 GM
Platform Scale-300Kg capacity
Electronic Platform Scale-200Kg capacity
M/s. SAI MAATARINI TOLLWAYS LIMITED
Available
Qty.
Calibration
Status
2
Yet to be done
2
1
2
1
1
Done
Done
Done
Done
Done
Remarks
Page 87
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT
(Toll) Basis.
Monthly Progress Report : June - 2014
[
Sr.
No.
Sub. No.
Item/Specification As per MOST
3
Water Bath-Electrically Operated and thermostatically controlled with
adjustable shelves, sensitivity 1oc.
4
Thermometers:
Yet to be done
2
Yet to be done
Mercury in glass thermometer with 30 cm stem, range 100°C upto 360°C
2
Yet to be done
3
Yet to be done
a
Kerosene or Gas stove / electric hot plate
Glasswares, spatulas, wire gauzes, steel scales, measuring tape, casseroles,
karahis, enameled trays of assoted sizes, pestle-mortar, porcelain dishes,
gunny bags, plastic bags, chemicals, digging tools like pickaxes, shovels etc.
Glass Beaker 1000ml capacity, Borosil
1
Yet to be done
b
Glass Measuring Cylinder, 100ml capacity
12
Yet to be done
c
Glass Measuring Cylinder, 250ml capacity
2
Yet to be done
d
Glass Measuring Cylinder, 500 capacity
2
Yet to be done
e
Glass Measuring Cylinder, 1000 capacity
1
Yet to be done
6
Yet to be done
Yet to be done
2
b
450mm x 300mm x 40mm
6
Yet to be done
c
300mm x 250 mm 40mm
4
Yet to be done
d
Circular Plate of 250 mm dia..
4
Yet to be done
3
Yet to be done
e
Spatula Set of 100 and 200 long
Sieves as per IS 460-1962
IS Sieves 450mm internal dia. of sieves sets as per BIS of required sieves
sizes complete with lid and pan, 80mm, 75mm, 63mm, 50mm, 45mm,
a
40mm, 37.5mm, 31.5mm, 25mm, 22.4mm, 20mm, 16mm, 12.5mm, 10mm,
8mm, 6.7mm, 4.75mm, lid and pan
IS Sieves 200mm internal dia. (brass frame and steel or brass wire cloth
mesh) consisting of sieves sets of required sieve sizes 4mm, 4.75mm,
b
2.36mm, 1.18mm, 600 microns, 300 micron, 150 micron, 75 micron
complete with lid and pan.
Optional
Test
Sieves
IS Sieves 450mm internal dia. of sieves sets as per BIS 53mm, 26.5mm,
for GSB 11.2mm,13.2mm, 9.5mm
and
WMM
Optional
Test
Sieves
IS Sieves, Brass, 200mm internal dia. of sieves sets as per BIS 180micron,
for GSB 425micron
and
WMM
Sieve Shaker Capable of Taking 200mm and 450mm dia. Sieve electrically
operated with time switch assembly (As per BIS)
Rain Gauge
Remarks
Yet to be done
Mercury in glass thermometer range 0°C to 110°C
Enamel Trays/GI Trays
a
600mm x 450mm x 50 mm
9
1
a
6
8
Calibration
Status
b
5
7
Available
Qty.
Yet to be done
1set
Yet to be done
2set
Yet to be done
1set
Yet to be done
1set
1
Yet to be done
1
Yet to be done
3
Yet to be done
B) For Soil and Aggregates
1
Atterberg limits (liquid & plastic Limits) determination apparatus
2
proctor Test App both 2.6 kg and 4.9 kg rammers (light and heavy compact
efforts)
a
a
Straight Edge for trimming Compacted soil sample in the lab
100mm dia. Sand Pouring cylinder with conical funnel and tap and
complete as per IS 2720 (Part 28) 1980 including modified equipment.
M/s. SAI MAATARINI TOLLWAYS LIMITED
2 set
Yet to be done
2
Yet to be done
3
Done
Page 88
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT
(Toll) Basis.
Monthly Progress Report : June - 2014
[
Sr.
No.
Sub. No.
b
c
3
4
5
6
7
a
b
c
d
f
g
h
i
j
8
9
Item/Specification As per MOST
150mm dia. Sand Pouring cylinder with conical funnel and tap and
complete as per IS 2720 (Part 28) 1980 including modified equipment.
200mm dia. Sand Pouring cylinder with conical funnel and tap and
complete as per IS 2720 (Part 28) 1980 including modified equipment.
Speedy Moisture meter complete with chemicals
Core cutter apparatus 10 cm dai, 10/15 cm height, complete with dolly,
rammer etc. (Soil)
Aggregate Impact Test Apparatus
Flakiness and Elongation apparatus
California Bearing Ratio test apparatus
CBR moulds 150mm dia.-175mm ht. Complete with collar base plate etc
CBR plunger with settlement dial gauge holder
Surcharge weights 147-mm dia 2.5Kg weight with central hole.
Spacer disk 148-mm dia 47.7mm height with handle
Soaking Tank for accommodating 24 CBR moulds
Proving Ring of 50 KN capacity
Proving Ring of 30 KN capacity
Dial Gauges, 25mm Travel-0.01mm/div
Moisture Boxes
ii)Big
iii)Small
Standard penetration test equipment(LL)
Hydrometer
Available
Qty.
Calibration
Status
4
Done
4
Done
Remarks
1
1
Yet to be done
1
1
1
18
1
18
1
1
1
1
6
Done
Done
Done
Yet to be done
Yet to be done
Yet to be done
Yet to be done
Done
Done
Done
140
82
1
2
Yet to be done
Yet to be done
Done
Yet to be done
1
Yet to be done
1
22
1
2
1
1
Yet to be done
Yet to be done
Yet to be done
Yet to be done
Yet to be done
Yet to be done
1
5
1
1
1
1
1
104
1
9
Yet to be done
Yet to be done
Done
Yet to be done
Yet to be done
Yet to be done
Yet to be done
Yet to be done
Yet to be done
Yet to be done
Yet to be done
2
Yet to be done
2
Yet to be done
1
Yet to be done
1
Yet to be done
1
1
6
Yet to be done
Yet to be done
Yet to be done
C ) For Bitumen and Bituminous Mixes
1
a
2
b
c
e
d
e
h
Penetrometer automatic type, adjustable weight arrangement and needles
as per IS 1203-1978
Marshall stability test apparatus, complete with all accessories
Standard Marshall Mould-100mm dia
Vacuum pump and 3 specific gravity bottles
Ring and Ball Apparatus as per 1205-1978
Apparatus to determination of Ductility test as per IS 1208-1978
Apparatus for Elastic Recovery Test for Modified Bitumen
D) For Cement, Cement Concrete and Materials
1
2
3
4
5
6
7
b
d
e
f
g
Vicat Needle Apparatus for setting time
Slump testing apparatus
Compression testing machine of 2000 tone capacity
Motor cube machine
Flexural Strength Testing Machine
Concrete mini mixer
Cube Vibrator
Moulds
150mm x150mm x 150mm cubes for compressive strength
High Frequency mortar cube vibrator for cement testing
Prism Mould 70.7mm x 70.7mm x 70.7mm for cement test
Equipment for determination of Specific Gravity for Fine and Coarse
Aggregate as per IS 2386 (Part 3) 1963(Phyconmeter)
Soundness testing apparatus for cement, Le Chatlier mould
E) Optional Requirement
1
Optional
4
Optional
Aggregate crushing value cum 10% Fines Value mould + base plate,
plunger, Tamping road complete
Tape 5mt length
Additional Equipment Received
1
2
3
Water Bath
Motorised Bitumen Extractor
GI Trays for Prime Coat and Tack Coat
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 89
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT
(Toll) Basis.
Monthly Progress Report : June - 2014
[
Sr.
No.
4
7
8
S.
No
Sub. No.
Available
Qty.
1
4
1
Item/Specification As per MOST
Saybolt Viscometer
Rapid Moisture Meter
Permeability Apparatus
NAME OF EQUIPMENT /
INSTRUMENT
Calibration
Status
Yet to be done
Yet to be done
Yet to be done
MAKE /
BRAND
NO'S
Last Date of
Calibration
Calibration
Frequency
Due Date of
Calibration
1
WMM Plant @ 17+860 LHS
Appolo 200TPH
1
14.02.14
6 Months
13.08.14
2
Concrete Batch mix Plant @ 18+500
LHS
Schwing Stetter,
CP30
1
09.12.13
6 Months
08.06.14
3
Concrete Batch mix Plant @ 55+400
LHS
Schwing Stetter,
CP60
1
26.12.13
6 Months
25.06.14
4
WMM Plant @ 55+400 LHS
Appolo 200TPH
1
To be erected
5
Concrete Batch mix Plant @ 93+600
LHS
Schwing Stetter,
CP30
1
Calibration to be done
M/s. SAI MAATARINI TOLLWAYS LIMITED
Remarks
REMARKS
Plant
Erected
Page 90
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT
(Toll) Basis.
Monthly Progress Report : June - 2014
[
21. Appendix 5 - Weather Report
Section-I (Ch. 0+000 to Ch. 55+000)
DD-MM-YY
Min Temp
(˚C)
Max
Temp (˚C)
1-Jun-14
28
35.9
2-Jun-14
28
3-Jun-14
Average
Rainfall
Section-I (Ch. 55+000 to Ch. 113+000)
Min Temp
(˚C)
Max
Temp (˚C)
-
28.9
32.7
35.8
-
29.8
28.2
36.4
-
4-Jun-14
29.8
36.1
5-Jun-14
30
6-Jun-14
Average
Rainfall
Section- II (Ch. 113+000 to Ch.
166+173)
Average
Rainfall
Min Temp
(˚C)
Max
Temp (˚C)
-
26.2
36.4
-
30
-
25.8
37.3
-
29.5
33.2
-
25
35.2
2
-
29.7
30
7
25.1
37.9
18.6
35.9
-
29.6
34.4
13
27.9
38.2
-
30
35.9
-
29.6
33.2
-
25.7
37.9
-
7-Jun-14
28.4
35.9
-
28.9
32.7
9
24.1
39.3
7
8-Jun-14
27.8
35.1
-
29.3
33.4
-
25.3
38.8
9
9-Jun-14
28.6
34.8
-
28.8
33.4
-
25.9
38
-
10-Jun-14
29.1
35.9
-
28.8
33.8
-
26.7
38.7
-
11-Jun-14
29.1
35.9
-
29.4
33.6
-
25.3
38.9
-
12-Jun-14
32.6
37.9
-
31.2
36.7
-
27.6
41.8
-
13-Jun-14
27.9
36.6
-
31.2
36.9
-
30.4
42.3
-
14-Jun-14
NA
NA
NA
31.5
4.7
-
29.7
41.9
-
15-Jun-14
NA
NA
NA
31.5
30.6
5
29.4
40.4
30
16-Jun-14
28.6
38.1
-
31.5
35.4
7
28.6
39.8
130.4
17-Jun-14
28.6
34.1
-
29.8
35.4
-
27.5
40.1
-
18-Jun-14
29
32.9
-
29.8
33.1
4
26.9
39.6
3.5
19-Jun-14
27.4
31
-
29.4
33.1
12
26.2
37.6
15
20-Jun-14
27.4
31
-
28.9
33.1
8
26
38.4
1
21-Jun-14
26.3
31
-
27.9
29.3
-
25.7
32.2
-
22-Jun-14
30
34.1
-
27.8
30.8
-
26.1
33.6
-
23-Jun-14
30
37.9
3.5
30.1
34.1
-
26.8
35.1
-
24-Jun-14
29.4
37.9
5.2
30.1
34.5
45
27.2
36.2
50.4
25-Jun-14
28.1
36
11.2
29.8
35
62
26.2
35.2
25
26-Jun-14
28.6
30.9
-
28.4
35
6
26.5
34
24
27-Jun-14
28.1
31.9
3.2
28.4
31.2
-
26.7
35.7
-
28-Jun-14
28.1
32.9
-
28.7
31.6
-
27.1
36
-
29-Jun-14
28
33
1.2
29
32.4
-
83
35.2
13
30-Jun-14
26
32.1
69.8
27.8
29
40
25.3
29.9
45
(in mm)
M/s. SAI MAATARINI TOLLWAYS LIMITED
(in mm)
(in mm)
Page 91
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT
(Toll) Basis.
Monthly Progress Report : June - 2014
[
22. Appendix 6 – Photographs
WMM Top layer in progress at Km 14+100 (LHS) & WMM 1st layer laying in progress at Km 32+000 (LHS)
Tree cutting progress at Ch 37+050 & Hard Rock excavation at Km 49+130 (LHS)
Tree cutting progress at Ch 55+000 & Temporary diversion at 51+512 (PUP)
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 92
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT
(Toll) Basis.
Monthly Progress Report : June - 2014
[
Eviction at Ch 53+382 & PCC of P-2 of MJB at Km 108+081
Rock breaking & Reinforcement in progress at Km 108+081 (MJB)
Raft concrete in progress in MJB Km : 108+081 (RHS) & Hard rock blasting at ch. 114+040
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 93
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT
(Toll) Basis.
Monthly Progress Report : June - 2014
[
WMM 1st Layer at ch. 114+360 & Embankment at ch. 118+400
WMM top at ch. 119+000 & GSB at ch. 121+600
WMM 1st layer at ch. 121+930 & GSB Top at ch. 138+120
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 94
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT
(Toll) Basis.
Monthly Progress Report : June - 2014
[
GSB Top at ch 138+120 & GSB at ch. 165+520
VUP at ch. 117+685 & Box Culvert at ch. 117+800
Box Culvert at ch. 141+900 & Box Culvert at ch. 158+590
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 95