The Wandle Lettable Standard The Wandle Standard - General Wandle will only let homes that meet the Wandle lettable standard as set out in this document. We will only let homes once we have carried out any required repairs which are our responsibility as a landlord, and once we have checked the weather-tightness of windows, doors outside walls and roofs. There will be no sign of infestation, damp or damage to the building structure (roofs, walls, windows and doors). All fixtures and fittings must be fit for purpose, safe and in good working order. All of the previous tenant’s belongings will be removed with the exception of hard floor coverings and other built-in items if considered serviceable and worthy of ’gifting’ to the incoming tenant. The property will be clean and clear of all rubbish, including the garden and loft space. We will conduct safety checks of all electrical and gas installations and obtain appropriate certificates showing that these installations are safe prior to letting the home. How we decide what works to do When a Wandle home becomes void, it will be surveyed within 24 hours of the keys being returned. The survey will be carried out using the survey form which will detail all repairs required to the property in order to achieve the lettable standard set out in this document. Gas & Electrical Supplies VPP – April 2015 V5 – review due April 2017 Most properties will have both gas and electricity, meter readings of both will be taken at handover. The incoming tenant will need to set up an account with the suppliers of their choice. If electricity or gas meters (where a gas supply is required for heating or cooking) have been removed or are damaged, Wandle will arrange to have these replaced prior to letting. Electrical Installations Electrical work will be carried out to Institute of Electrical Engineers Regulations and a NICEIC safety certificate or similar approved document, will be issued. The installation must be deemed ‘satisfactory’ and a 10 year certificate issued, with C1 and C2 recommendations. Electrical socket outlets Should the any of the socket outlets be cracked or damaged by smoke staining, all will be replaced with white high impact plastic faceplates (MK or similar approved). VPP – April 2015 V5 – review due April 2017 Kitchen to include: Double switched socket outlets (4 No DSSO) above worktop Cooker control unit with neon indicator in kitchen Fused Spur Units up to 5 No Switched single socket outlets (SSO) below worktop Lounge - minimum of four double switched sockets, two where the TV is likely to be placed. Main/only bedroom - minimum of four switched double sockets. Other bedrooms - minimum of two switched double socket. Halls/landings - minimum of one single socket per floor level. Bathroom/WC – none Gas Installations & Central Heating Where a property has gas appliances, registered Gas Safe engineers will test gas installations and a LGSR safety certificate will be issued. If there is no ‘live’ gas supply, we will test the installation, cap off at the meter, and conduct the LGSR once the incoming tenant has established an account for the supply of gas. A source of heating will be provided; this will be a hot water radiator, electric storage heater or a solid fuel fire or underfloor heating (where existing). All cold water supply pipes not within the occupied area of the premises, e.g. roof space, external stores, will be lagged to prevent freezing. All properties will have a carbon monoxide detector fitted where applicable i.e. AICO EI225EN Lighting: All rooms will have a minimum of one overhead light. Ceiling mounted lights will generally be pendants with shade lock rings. In the bathroom/shower room/separate WC, all lights will be water resistant and operated by a pull cord or a switch located outside the room. All light fixtures will be fitted with appropriate low energy light bulbs. VPP – April 2015 V5 – review due April 2017 Should the any of the light fittings be cracked or damaged by smoke staining, all will be replaced with white high impact plastic faceplates (MK or similar approved). Plumbing The mains stop cock is to be checked and if faulty be replaced with new. Direct mains cold water supply must be supplied as a minimum to kitchen sink and if possible to the bathroom wash hand basin. A cold water supply will be provided to the bath/shower/WC. A single means of heating water and supplying hot water to sink, wash hand basin, bath or shower will be provided. VPP – April 2015 V5 – review due April 2017 An appropriate cover and insulation will be fitted to the Cold Water storage tank. Floors and stairs Floors will be safe and level with no trip hazards, and worn or damaged floor tiles or vinyl flooring in kitchens and baths will be replaced. The bathroom, WC and kitchen will have a water resistant floor covering. Stairs and banisters must be safe, secure and meet present day building regulations (100mm sphere must not be able to pass through tang gaps). Walls and ceilings Wall and ceiling finishes will be left fit for easy decoration. All missing/defective sections of skirting board will be replaced and ready for gloss paint. All polystyrene tile/sheets must be removed and made good ready for decoration. Kitchens Ventilation of kitchen areas will be by opening of windows or extractor fans. Should an extractor fan be required, a Greenwood Airvac CV2 GIP fan to be fitted including core drilling hole where required. Install a hard wire heat alarm - AICO EI144RC HEAT ALARM. All kitchen units and worktop areas will be serviceable and clean. We will replace all damaged worktops and units as part of void works. There will be a minimum of 450mm of tiling above worktops, behind sinks and cooker space. Existing washing machine plumbing will be plugged/capped and left for the incoming tenant. Where there is no existing provision for washing machine and space permits, this will be installed and we will provide a hole/access for washing machine plumbing. Flooring will either be sheet vinyl covering or vinyl floor tiles. VPP – April 2015 V5 – review due April 2017 Note: Should a full kitchen replacement be required immediately due to significant damage or wear to base or wall unit carcasses, this will be carried out as part of void works to a specification equivalent to that which is used in our planned replacement programmes (Decent Homes). Bathrooms and WCs All sanitary ware will be in good condition and clean, including wash hand basins, baths and toilets with a new toilet seat installed. Ventilation of separate or combined bathrooms and WCs will be by opening of windows or light/humidistat extractor fan combination (Greenwood Airvac CV2 GIP fan)Traps and wastes will be free flowing. VPP – April 2015 V5 – review due April 2017 Showers, if installed, will be working as per the manufacturer’s instructions and tested. Appropriate tiling or other splashback behind and alongside a fixed shower unit will be provided (or installed if none existing). Taps will operate freely and be free from leaks. Baths and wash hand basins will have tiled splash-backs a minimum of 450mm high and a sealed joint to the wall. Both will have plugs and chains. Flooring will be sheet vinyl covering or vinyl floor tiles. Note: Should a full bathroom replacement be required immediately due to significant damage or wear to sanitary ware or units, this will be carried out as part of void works to a specification equivalent to that which is used in our planned replacement programmes (Decent Homes). Hallway Install a hard wired smoke alarm - AICO EI146RC SMOKE ALARM Doors All doors and frames, external or internal, will be free of any damage, rot or decay, and hung correctly to allow easy opening and closure. Any glazing will be in good condition and, if necessary, renewed to current British Standards. Front doors will have a cylinder lock and a five-lever mortise lock with two keys for each. They will be fitted with a spy hole and security chain or, where a composite or PVCu door has been fitted, it will comply with British standard locks. Side or rear doors will be fitted with a deadlock and/or barrel bolt or, where a composite or PVCu door has been fitted, it will comply with British standard locks. Kitchens in flats and houses will have, as a minimum, half-hour fire-resistant doors. Where the property is a flat that opens out onto an internal communal corridor it will be fitted with a minimum half hour fire check door. VPP – April 2015 V5 – review due April 2017 Windows Windows will be free of rot or decay, able to be opened and closed safely and securely and will be weather and water-tight. Glazing will be in good condition and, if renewed, will meet current British Standards. Window locks will be fitted for all windows at lower ground, ground and first floor. Locks will be working and a minimum of two keys will be issued for each type of window lock. Child-proof window restrictors will be fitted to all windows at first floor and above. VPP – April 2015 V5 – review due April 2017 Decoration, furnishings and cleanliness The property will be thoroughly cleaned throughout following completion of the works. The internal decoration of the property is the responsibility of the incoming tenant unless one of the following criteria apply: a) The property is deemed hard to let by the Operations Manager. In this case, either or both the kitchen and bathroom will be redecorated. b) The property is being marketed to Shared Owners, Key Workers or for Market Rent, in which case the property will be fully redecorated to Wandle’s decoration standard. Note: these properties may include new or recently PAT-tested washing machine, fridge freezer, hob/cooker, etc which must be tested and left in situ. c) The property is part of a Sheltered/Supported Housing scheme, in which case it will be fully redecorated to the Wandle standard. Note: these properties may include new or recently PAT tested washing machine, fridge freezer, hob/cooker, etc which must be tested and left in situ. In exceptional circumstances, rooms may be decorated by us prior to letting. Alternatively, incoming tenants may be offered a decoration pack (provided through Dulux) appropriate to the size of the property. Thermal insulation Lofts will be insulated to a minimum thickness of 270mm and, where possible, cavity walls will be insulated. Hot water cylinders will be lagged to the most recent standard. Energy Performance Certificate In accordance with the law we will provide you with and energy performance certificate detailing how your property is expected to perform in respect of carbon emissions and energy efficiency. VPP – April 2015 V5 – review due April 2017 Asbestos Any asbestos identified within the property will have been made safe in accordance with our policy. Incoming tenants will be provided with specific advice and guidance regarding Asbestos Containing Materials as they relate to the individual property. Non-Standard Items Wherever possible, ‘non-standard’ items should remain in situ. Examples of non-standard items that can remain include: Coving (not polystyrene) Kitchen units Dado rails Ceiling roses Cornice (not polystyrene) Doors and door furniture Built in wardrobes Sheds if in reasonable condition Ceramic floor tiles In cases where the previous tenant has carried out satisfactory alterations, these can remain in situ on the understanding that any subsequent replacement or repair works would be to normal Wandle standards and may not include like-for-like replacement of the previous tenant’s enhancements ie sheds, green houses, carpets, built-ins, etc. External Areas The property will be weather tight with no apparent signs of defective or damaged areas or items. Existing paths, paving and steps will be safe as will existing boundary walls, fencing, railings and gates. Garden ponds will be emptied and filled in. Unsafe green houses and sheds will be removed. External meter boxes will have the proper protective doors. VPP – April 2015 V5 – review due April 2017 Rainwater goods will be checked and serviceable. Where there is a garden it will be clear of rubbish and cut to a manageable level. Welcome Pack A welcome pack will be left in the home containing small samples of essentials to assist with the first day or two of moving in. In addition, information about Wandle as an organization and the specific property will be contained within the welcome pack. Photographic Records Photographs will be taken of each property prior to void works and following handback to confirm the condition of the property before and after works, prior to the tenant moving in. VPP – April 2015 V5 – review due April 2017