SCHOOL OF MATERIALS RISK ASSESSMENT FORM Assessors Unit : Building & Room of Task Task Title / Description of procedure: General us of Centrifuge Hazards and potential harm (Risks) involved in the task (What are the dangers and likely injuries?) 1. Electrical hazard – causing electric shock 2. Failure of rotor causing impact injuries 3. Chemicals – see COSHH assessments 4. Biological cells – causing infection by pathogenic micro organisms 5. Rotating Rotors at high velocity causing upper limb crushing injuries 6. Out-of-hours Who might be harmed Actions to prevent or control harm (control measures) Risk assessment score (see below) (including training, maintenance, servicing) User and those in close proximity User and those in close proximity 1. Ensure all electrical equipment is PAT tested, report any faults User, technician, cleaner User and those around User 3. See COSHH assessments for safety control measures 2x4=8 2. Ensure properly maintained and serviced – records must be kept, also tube balanced See COSHH 4. Use sealed buckets to prevent leakage, disinfect rotors, open buckets in class 2 microbiological cabinet, use PPE, follow bio-hazard guidelines 5. Interlocking device fitted, training 2x3=6 6. Not allowed to operate out-of-hours Does this procedure require an Out-of-Hours working permit? Reference Number: YES / NO Is this procedure authorised for Lone working? Is this procedure authorised for Out-of-Hours working? Assessor Print name : Signature & email Date Supervisor Print name : Signature Review 1 - Signature Review 2 - Signature Date Email : Seen also by 2x3=6 3x2=6 See COSHH YES / NO YES / NO Date Date : signature & date Seen by Safety Advisor Associated Safety Assessments Risk Assessment Number (signature & date) PROBABILITY 4….Probable / likely 3…..Possible 2…..Remote possibility 1…..Virtually impossible If Probability or Severity = 4 Stop work immediately, review control measures SEVERITY 4…..Fatal or injury causing long term or permanent absence from work 3…..Major injury greater than 3 days incapacity from work 2…..Minor injury causing up to 3 days incapacity from work 1…..Minor injury or illness, no absence from work Probability x Severity = Risk Assessment Score Risk Assessment Score Action 16………..Stop work immediately, review control measures, seek advice 12 or above…..Stop work review control measures to reduce risk, monitor regularly 8 or 9……...Review control measures to try to reduce risk less than 8…..Low priority, but still try to reduce risk Regulations, Standards, Codes of Practice and guidance notes can be found in the School Safety Policy and on the School web site www.materials.manchester.ac.uk ivan.easdon@manchester.ac.uk (School Senior Safety Advisor) room C15, Materials Science Building, Ext. 63596