Mr. Surinder Kumar, Additional Director (S), Govt. of India, MOEF, Northern Regional Office, Bays No. 24-25, Sector-31, Chandigarh.160030. Subject: Ref: Construction of Housing/commercial project namely “Royal Business Centre” in the revenue estate of Singhpura, Tehsil Dera Bassi, District SAS Nagar. Your File No.5-435/2013-RO (NZ)/114 dated 29-01-2015 Dear Sir, Reference of your File No. 5-435/2013-RO (NZ) /114 dated 19-01-2015 regarding the above said subjects. In this regard, we are here by submitting compliance of your letter as under: Sr. No OBSERVATIONS 1. Component wise construction status till date along with %age of work done with photographs and remaining construction work. 2. The design details of Sewage Treatment Plant and the construction status. 3. Submit the details of infrastructure and medical facilities provided to the workers along with expenditure till date. 4. 5. 6. 7. COMPLIANCE About 45% construction has been done till date. Feasibility report attached as Annexure-I. Temporary house has been provided to the workers for staying. All workers are contractual. The quantity of muck excavated so far from The quantity of muck excavated has the construction sites and the sites of disposal. been used at site for leveling and It may be confirmed whether the sites have filling. been restored or not simultaneously. Submit the schedule for completing rain water The completion of RWH measures harvesting measures and number of recharge will completed along with other pits completed so far. works. Submit the details about the area covered, no. About 35% area has been marked for of plants planted, species of the plants planted green belt and 200 plants of different and the expenditure incurred on the varieties have already been planted. plantation. Expenditure incurred till date is about Rs 2, 45,000/- (Rs. Two Lacs Forty Five Thousand Only) Submit forest approval letter from NRO, The project proponent has been Ministry of Environment, Forests & Climate applied to NRO, Ministry of Change for the forest land involved in the Environment, Forests & Climate project. Change for NOC of forest land involved in the project. This is for your kind information please, Thanking you. Yours truly, Motia Developers (P) Ltd (Authorized Signatory) Annexure-II FEASIBILITY REPORT The Residential complex will be having provision for 880 No. flats of 2 & 3 Bed rooms and 100 Nos. flats of EWS and in commercial complex will have shops, multiplex and food court. Considering, 5 members in 2&3 bed rooms per flats, 3 members for EWS flats and commercial complex, and the population is expected to be about 5820. The details of water requirement are as under: a) The estimated water requirement for the residential complex is as follows: S. No. Description a. b. Apartment Blocks No. of Dwelling Units = 880 Population @ 5 persons/DU EWS No. of Dwelling Units = 100 Population @ 3 persons/DU No. of Units Population 880 Daily Total Water Water Req. Req. LPD per unit No. of Dwelling Units = 836 = 4400 836 135 5,94,000 100 = 836 300 135 40,500 c. Maintenance and Security Staff L.S 20 45 900 d. L. S 100 15 1500 f. Visitors Drivers, Delivery men, Courier persons, casual labor etc. Club Adhoc Provision Commercial Block g. Food Court/Restaurant e. Total Water Requirement for Complex 2,000 1000 40 40,000 5,000 6,83,900 Say 684 KLD b) CAPACITY OF SEWAGE TREATMENT Quantum of waste water generated = 684KLD x 0.80 = 547KLD or Say = 550 KLD It is proposed to provide a sewage treatment plant of capacity 600 KLD in three models. CHARACTERISTIC OF UNTREATED SEWAGE Inflow Conditions Flow m3/day 600 BOD 5, 20oC mg/l 300 COD mg/l 450-550 TSS mg/l 250 Oil/Grease mg/l 20-50 pH 6.5-7.5 CHARACTERISTIC OF TREATED SEWAGE pH : 6-9 TSS < 100mg/l TDS < 2100mg/l BOD COD < < 30mg/l 250mg/l TREATMENT PROCESS DESCRIPTION: The sewage is collected in a tank, called sewage sump or Sewage Collection tank. The sewage from sump will then be constantly pumped into the Sewage Treatment Plant (STP) by employing sewage lift pumps at a constant flow rate. Piping arrangement is also made to re-circulate the effluent to enable the contents of the sewerage collection tank be in a mixing state. The STP comprises of Bar Screen, Collection Tank, SAFF Reactor with aeration system, Secondary Clarifier (Tube Settler), Chlorine contact chamber and Treated Sewage Holding Chamber, SDB and Dual media filter. As it is a biological system it has to be operated continuously all 24 hours and there by constant feed of sewage is required. The equalized effluent is passed through the screen to enable trap the floating debris if any and then passed on to the aeration tank to oxidize the organics to CO2 & H2O by the aeration. SAFF Reactor is fitted with fixed filter media & no. of air diffusers to be providing necessary dissolved oxygen. As SAFF is designed based on extended aeration principle, minimum sludge is produced. The secondary clarifier/tube settler, which designed on low overflow rate, is provided after the aeration tank to enable separation of solids. A steep slope is provided in the secondary settling tank to eliminate the need of scrapper mechanism. The settled sludge being collected in the side by sludge thickener section re-circulated back to the aeration tank. The clarified effluent will be disinfected and finally passed through the Pressure sand filter which shall take care of micron suspension present in the clarified outlet. The final discharge shall meet the standard norms set by the State Pollution control Board. The treated waste water can be reused for flushing purpose, plantation / horticulture within the complex and the surplus waste water will be discharged in the public sewer. The sludge can be used as bio-fertilizer. PROCESS UNITS 1. Screen 2. Oil & Grease Trap 3. Collection-cum- Septic tank 4. SAFF Reactor 5. Diffuser System 6. Secondary Sedimentation Tank 7. Clear Water Tank 8. Dual Media Filter 9. Sludge Drying Beds 10. Chlorinator SAFF REACTOR m3/d mg/lt. % mg/lt. Kg/d Kg/M3/d M3 M M2 MxM 600 300 85 22.5 150 1.5 91 3.0 30.56 6.0X6.0 Actual Plan Area Actual media volume Air Requirement M2 M3 M3/Kg BOD Removed 36 27 50 Air Requirement M3/d CFM Nos. CFM 6875 168.703 36 4.686 Design Flow BOD Load in Desired BOD Reduction BOD Out BOD Load BOD Loading Rate Media Volume Required Media Height Plan Area Actual Plan Dim (to compartmented) No. of Diffusers CFM Per Diffuser * Munters FB 10.27 SECONDARY SEDIMENTATION TANK Type Flow rate Non Mechanized with Tube dek m /hr. 25.0 SLR Plan area Tube settler Plan dim. Actual tube plan area Overall Tank dim. Tube Height Tube Quantity Inlet Chamber Space above Tube Space below Tube Total SWD Bottom Slope ** Munters’ FS-41.50 m/hr. m2 mxm m2 mxm m m3 m m m m Deg. 3 2.5 9.167 3.028 x 3.028 3.1 x 3.0 3.5 x 3.0 (or Compartmented) 0.75 9.0** 0.40 0.40 0.60 1.75 45 be TUBE SETTLER –TECHNICAL DETAILS Tube settler media is a rigid PVC tube of hexagonal cross section and are inclined at 60. The cross section area is 52.80 sq. cm. perimeters are 35.2 cm. and the hydraulic radius is 1.50 cm. The specific surface area under 60 is 11m2/m3 i.e. the horizontal projection of the surface of 1 m3 of FS 41.50 inclined with 60 is 11m2. Tube settler media is basically used in the clarifiers/ setting tanks to separate suspended matters which high specific weight than that of the liquids. For matter with low or equal specific weight than that of the liquids they can be separated by adding flocculent, which create flocks of higher density and subsequently be settled using tube settlers. The particle size of the flocks or suspended matters in the setting basins using tube settler should not be grater than 15 cm size as this cause clogging. These tube settlers perform the same way as the mechanical devices like clarifiers and belt scrappers. DUAL MEDIA PRESURE FILTER (2 nos.) Size and specification: Working : Down-Flow Maximum Flow rate (m3/hr) : 25 Minimum Flow rate (m3/hr) : 15 Maximum Working Pressure (kg/cm2) : 3 Minimum Working Pressure (kg/cm2) : 1.5 Type : Vertical cylindrical Make : Mild Steel Testing Pressure (kg/cm2) : 3 Working Dia (mm) : 1400 Height on straight (mm) : 2500 Filtration Media Type Bed depth (mm) : : Graded sand with under bed 1750 Type Flow monitoring unit Quantity : : : Manual Butterfly valve One No. Frontal Pipe line Make Quantity : : MS One Lot Operation System EQUIPMENTS/UNITS BAR SCREEN/SCREEN CHAMBER No. of units : one Spacing of bars Screen Chamber m x m x m MOC : 10 mm c/c. :2x1x1 : RCC/RBC OIL & GREASE TRAP No. of units Screen Chamber m x m x m MOC : one : 3 x 2.0 x 1.5 : RCC/RBC COLLECTION TANK No. of units Capacity, m3 Retention period, hrs. Size m x m x m MOC : one : 100 : 4 : 6 x 5 x 3.5 : RCC SAFF SYSTEM No. of units Capacity, m3 /day HRT, hrs. Size m x m x m MOC : one : 600 : 4.0 : 6.0 x 6.0 x 4.2 compartmented as 6 x 3 x 4.2 (2 Nos.) : RCC AIR DIFFUSION SYSTEM Air requirement, cfm Type of air system No. of Diffusers Type of diffusers Capacity of diffusers, cfm : 170 : Blower/Twin lobe : 36 : Tubular/non/clog : 4.7 SECONDARY SEDIMENTATION TANK No. of units : one Type : Tubedek media filled Capacity,m3/hr : 21 Size m x m x m : 3.5x3.5x1.75 SWD with 45o hopper bottom. MOC : MS internally coated/ RCC CLEAR WATER TANK No. of units Capacity, m3 Retention period, hrs. Size m x m x m MOC : one : 45 : 2.1 : 6 x 3 x 2.5 : RCC SLUDGE DRYING BEDS No. of units Capacity, m2 each Size m x m MOC : 10 :9 : 3.0 x3.0 x1.0 : RCC/RBC