PUERTO RICO 2032 TRANSPORTATION PLANNING REGIONS-UZA LONG RANGE TRANSPORTATION PLAN UPDATE (PR 2032 TPR-UZA LRTPU) APPENDICES APPENDIX A: EIGHT (8) PLANNING FACTORS Among the goals of the present plan are the provisions of an efficient, safe, fiscally constrained, and sustainable transportation system. Metropolitan Planning Organizations (MPOs) are required to consider the elements now commonly known as the eight (8) SAFETEA-LU planning factors within their multi-modal long-range transportation plans and programs. These eight (8) planning factors, which are consistent with our goals, are addressed below. 1. SUPPORT THE ECONOMIC VITALITY OF THE METROPOLITAN AREA, ESPECIALLY BY ENABLING GLOBAL COMPETITIVENESS, PRODUCTIVITY AND EFFICIENCY. In the Transportation Planning Regions UZA (TPR-UZA), the MPO, the Puerto Rico Department of Transportation and Public Works (PRDTPW or its Spanish acronym DTOP), the Puerto Rico Highway and Transportation Authority (PRHTA), other local and federal agencies, and municipal governments have worked in coordination for many years on a variety of transportation projects to support the economic vitality of these regions. The PRDTPW and the PRHTA, as the operating arm of the MPO, continues to develop an integrated transportation system to help the future economic development of the Transportation Planning Regions. An efficient transportation infrastructure makes places attractive for people and businesses to locate, and provides stability to the area. It also aids in the movement of people and goods, and promotes economic vitality. For each of the TPRUZAs, this plan contains transportation projects that consider this planning factor related to the support of the economic vitality. NORTH TPR - An important project in the NTPR is the Northwest Corridor of PR-2/22, from Hatillo to Aguadilla. The completion of this Toll road will provide a direct, safe and fast connection throughout the northwest half of the Island. This Corridor is the essential link for trucking freight between San Juan and much of the western half of the Island. An improved PR2/22 corridor is also essential to the revitalization and growth of Rafael Hernández Airport (Aguadilla TMA) and its planned related economic development, as well as to the success of the Porta Del Sol tourism plan for the west coast. The area will benefit from the highway with increased tourism and enhanced transportation for people and goods. Other important transportation projects are the completion of the PR-10 Corridor (Adjuntas-Utuado section) and the proposed “Tren del Norte” (Northern Train or BRT). The first of these, will improve safety and access across the mountains between Arecibo and Ponce. The other one will address the transportation and cargo needs by providing island wide or enlarged regional mobility of people and freight to the SJTMA and other urbanized areas. The type of development expected in part [A2] as a result of the proposed improvements in the transportation system within the NTPR will add to its global competitiveness in the movement of people mainly tourists, and goods. EAST TPR - For the ETPR an important transportation project is the PR-66, East Corridor (Río Piedras - Río Grande) and the PR-53 corridor in Yabucoa-Guayama section. The completion of this Toll road will link San Juan TMA’s residents, airports, and port with the communities, businesses, and recreational/tourism activities of the northeast coast and with the islands of Culebra and Vieques, via ferry connections at Fajardo. . This highway will increase economic activities in the Region by increasing tourism and enhancing transportation for people and goods. Other transportation projects are improvements to PR-3 (corridor between San Juan and Fajardo), airports, seaports and ferry system between Fajardo, Vieques and Culebra. The first of these, will improve safety and access to the East Region. The other two will improve the movement of people and goods to the East Region and other urbanized areas. The type of development expected in part as a result of the proposed improvements in the transportation system within the ETPR will add to its global competitiveness in the movement of people, mainly tourists and residents of Vieques and Culebra, goods and access to basic services like medical services. SOUTH EAST TPR – In the Southern Regions important freight is expected to increase as a result of the cargo activities from the Port of America, in Ponce, and the future location of value added industrial parks. Highway infrastructure is crucial in the economic development and competitiveness of the Region, for the attraction of investment related to the value added industry which represents the creation of new jobs for the South and Southeastern Regions. In that matter, it is crucial that to invest in projects like the PR-52 (Juana Díaz- Salinas) highway improvement, and PR-3 bridge replacement, as well as the completion of the PR-53 expressway at the long term. These projects will improve the mobility and security of people and goods, which will promote economic vitality and efficiency for the region. Also, the improvements in the transportation system will have a positive impact on the tourism industry for the Southeast Region, specially eco-tourism, by facilitating the access to the region’s ecological diversity, pristine coastline beaches and mangroves (Bahia de Jobos, e.g.), the historic town centers, and the Central Aguirre (old sugar mill complex), which is an important point of reference in the Southeast. SOUTH TPR – For the South TPR are important projects related to the access to a regional airport in Ponce (Mercedita Airport), as well as the Puerto de Las Américas (Port of The Americas) at Ponce-Guayanilla, Port of Guánica, and the Southern Train (Tren del Sur). This kind of projects, helps the future economic development of the South TPR, makes it attractive for people and businesses to locate, and provides stability to the area. [A3] The development of PR-10 expressway across the mountains between Arecibo and Ponce is important to the STPR. This development will create new connectivity possibilities between the mountainous center and both the north and south coasts. This highway will increase economic activities in the Region by increasing tourism and enhancing transportation for people and goods. Other transportation project proposed for the region is the reconstruction of the 74-kilometer section of PR-2 between Ponce and Mayagüez. The upgrading of this corridor is important to the long-term development of the recreational and tourism opportunities in the STPR. It is also an important truck freight link between the south and west coasts, and together with the PR-52 Highway, its role in the Island wide freight system will grow with the development of the Mercedita Airport as an important passenger and air cargo center and the Puerto de Las Américas in Ponce as a major transshipment port. SOUTH WEST TPR – As same for the STPS, in the South West Region important freight is expected to increase as a result of the cargo activities from the Port of America, in Ponce, and the future location of value added industrial parks. Highway infrastructure is crucial in the economic development and competitiveness of the Region, for the attraction of investment related to the value added industry, which represents the creation of new jobs for the South and Southwestern Regions. For that matter, it is crucial to invest in projects like the PR-52 (Juana Díaz- Salinas) highway improvement, and PR-3 bridge replacement, as well as the completion of the PR-53 expressway in the long term. These projects will improve the mobility and security of people and goods, which will promote economic vitality and efficiency for the region. Also, the improvements in the transportation system will have a positive impact in the tourism industry for the Southeast Region, specially eco-tourism, by facilitating the access to the regions ecological diversity, pristine coastline beaches and mangroves (in Cabo Rojo and Guánica, for example), and the historic town centers. 2. INCREASE THE SAFETY OF THE TRANSPORTATION SYSTEM FOR MOTORIZED AND NONMOTORIZED USERS. The PR Government is committed to improving the safety of the transportation system for motorized and non-motorized users. In the TPR-UZAs, through the PRDTPW/PRHTA are programmed a large number of safety projects such as those related to ITS, intersection improvement, and others. A comprehensive Studies bicycle and pedestrian plan is being developed by the DTPW/HTA, which will address many safety concerns of non-motorized users and find appropriate solutions to their needs. The PRHTA also conducts similar safety [A4] improvement studies on streets and intersections in the area. transportation system will help to reduce congestion. Improved safety of the The PR Government also supports the implementation of a number of projects to ensure the safety of its users including: the construction of median guardrails on highways in the area, rehabilitation and replacement of bridges and structures needing such, a safe and convenient multi-modal transportation modes, and the construction and improvement of sidewalks, pedestrian bridges, recreational trails and other facilities for the safe movement of bicyclists and pedestrians. 3. INCREASE THE SECURITY OF THE TRANSPORTATION SYSTEM FOR MOTORIZED AND NONMOTORIZED USERS. With regard to security, the PRDTPW/PRHTA has designated what is called the Strategic Road Network (STRAHNET), including all roads in Puerto Rico classified as Interstate. For the NTPR are the roads PR-2, PR-22 and PR-10; for ETPR, SETPR and SWTPR are the roads PR-3, PR-53 and PR-66; and for the STPR are the roads PR-2 and PR-52. All these are highways which are completely or partially within the NTPR and provide access for defense, continuity and capacity in cases of emergency for the movement of personnel and equipment, whether in time of peace or of war. It includes routes (for long distance trips) and connectors (to connect military installations and ports to the Strategic Network). The completion of the STRAHNET is one of the main priorities in the TPR-UZAs. The PRDTPW/PRHTA has also coordinated with the Puerto Rico Police Department in planning and operating traffic facilities as necessary, including the development of the ITS in the area. The 511 assistance line is being developed to provide timely information on different matters including security. Also, as mentioned above (factor number 2), the comprehensive Studies bicycle and pedestrian plan is being developed by the DTPW/PRHTA, which will address many safety, but also security concerns of non-motorized user. 4. INCREASE THE ACCESSIBILITY AND MOBILITY OPTIONS AVAILABLE TO PEOPLE AND FOR FREIGHT This implementation of this plan will increase the accessibility and mobility options available to people and for freight in the TPR-UZAs and beyond by considerably improving and increasing the transportation options available for users. The transportation planning efforts will provide the necessary resources to enhance the existing transportation system in an efficient way. [A5] Transportation planning will have an effect on land use policies and development. This results in pressures to address the needs to increase the accessibility and mobility options for people and freight, while providing safe and efficient people and freight distribution routes. This should consider the relationship between urban goods movement and land use planning when planning for new highway facilities and improvements, replacing and improving deficient bridges, improving intersections, while avoiding or at least minimizing impacts in residential neighborhoods. The private vehicle is still the major means of transportation in the area, but financial resources are increasingly becoming available for increasing the availability of adequate public transportation including publicos, trolleys, buses, para-transit, and rail (or BRT as proposed) will be critical for travel within the area, to school, employment centers, medical facilities and other services and activities, while assisting in the reduction of congestion in the transportation network. The municipal governments in the TPR-UZAs are also interested in the development of regional transportation systems. As mentioned before for NTPR is a proposed to implement the “Tren del Norte” (Northern Train or BRT). This project will address the transportation and cargo needs by providing island wide or enlarged regional mobility of people and freight to the SJTMA and other urbanized areas. For the ETPR is a priority project improve the ferry services between Fajardo, Culebra and Vieques that will improve the movement of people and goods to the East Region and other urbanized areas. For the South portion of the Island there is a proposal to increase in the público service, the introduction of express public transportation service as part of an Island wide interurban transit network, and the extension and improvement of the “Tren del Sur”. Though the Plan recognizes the financial constraints for the development of some of these public transportation projects, it urges the Commonwealth and municipalities, in order to preserve and strengthen público service, to take definite actions: (1) revise regulations governing público operations to encourage entrepreneurship, (2) provide for subsidies to support the recommended increase in público service, (3) allow público vehicles and operators to serve as taxis to off-route destinations, during off hours, or when demand is low, (4) encourage público service between major communities in the region, and (5) continue to support the development of público terminal facilities. Those public transportation proposals will result in increasing the accessibility and in mobility options to the people, especially for older persons and the ones that doesn’t have a vehicle. While the projects mention in factor number one (PR-52 highway improvement, PR-3 bridge replacement, and the completion of the PR-53 expressway) will provide a better mobility for freight. [A6] 5. PROTECT AND ENHANCE THE ENVIRONMENT, PROMOTE ENERGY CONSERVATION, IMPROVE THE QUALITY OF LIFE AND PROMOTE CONSISTENCY BETWEEN TRANSPORTATION IMPROVEMENTS AND STATE AND LOCAL PLANNED GROWTH AND ECONOMIC DEVELOPMENT PATTERNS. The PR Government has proven for years its commitment to protect and enhance the environment, promote energy conservation, and improve the quality of life of its residents, while promoting consistency between transportation improvements and state and local planned growth and economic development patterns. The Puerto Rico Government Program (2009-12) includes several strategies related to transportation, energy and environment. It proposes therefore the adoption of plans that aim for energy conservation, protection and conservation of natural resources as well as for the reduction of its impact on the infrastructure and the environment. It also proposes for an efficient transportation system that reduces the need for the private car and therefore the congestion and pollution by promoting the use of public transportation and other non motorized modes of transportation, in order to enhance the mobility and access in our communities. NORTH TPR - In the NTPR, in consideration of sensitive ecosystems, the proposed transportation projects focus upon improvements to existing roadways, rather than the recommendation of new corridors. For example, an extension of PR-22 to Aguadilla would likely run mainly south of PR-2, passing through environmentally sensitive limestone karst areas, as well as agriculturally important and otherwise legally or policy protected lands. These concerns have therefore led the PRDTPW/PRHTA to look closely again at the potential for rebuilding the existing PR-2 alignment to expressway standards, to increase capacity and improve operational safety while minimizing potential environmental impacts. The PRDTPW/PRHTA will continue its assessment of these alternatives and possibly new ones as well to minimize potential environmental impacts. In addition, the bicycle pedestrian network proposed for the NTPR would connect different recreational areas, parks and open spaces, natural reserves adjacent to waterways, and along the Atlantic Ocean urban waterfront promoting the protection and conservation of the environment. This can be developed as a tourist destination that will help the future economic development for the Region. EAST TPR – The proposed transportation projects in the ETPR, will promote the protection and conservation of a few important ecological sites in the Region such as: the Cay system from Fajardo to Vieques Island, as part of La Sierra de Luquillo is El Yunque National Rain Forest, Cabezas the San Juan bioluminescent lagoon, at Fajardo, the Culebra´s Fish and Wildlife bird [A7] sanctuary, the Culebra´s coral reef, the Mosquito Bay Natural Reserve on Vieques (famous for its bioluminescence), the Ceiba Forest Reserve, and other important ecological areas. Ecotourism concept can be an option to be considered as part of the economic development for the Region. SOUTH EAST TPR – As mentioned before, for the SETPR, there is a proposal of an efficient transportation system that reduces the need for the private car and therefore the congestion and pollution by promoting the use of public transportation and other non motorized modes of transportation, in order to enhance the mobility and access in our communities. This will promote the protection and conservation of a few important ecological sites in the SETPR such as: The National Reserve of Bahía de Jobos, in Salinas, the Carite State Forest and Aguirre State Forrest. These natural attractions make Eco-tourism an option to be considered as part of the economic development for the Region. In addition, to reduce potential environmental impacts in the sensitive easternmost segment of the PR-53 expressway project, where the Pandura mountain range meets the Caribbean Sea, costly tunneling techniques have been implemented, for which additional funding might be necessary. SOUTH TPR - The proposed transportation projects in the STPR will promote the protection and conservation of a few important ecological sites such as Bosque Estatal de Guánica (Bosque Seco). Eco-tourism concept can be an option to be considered as part of the economic development for the Region. SOUTH WEST TPR - As mentioned before, for the SWTPR, there is a proposal of an efficient transportation system that reduces the need for the private car and therefore the congestion and pollution by promoting the use of public transportation and other non motorized modes of transportation, in order to enhance the mobility and access in our communities. This will promote the protection and conservation of a few important ecological sites in the SWTPR such as: The National Reserve of Bahía de Jobos, in Salinas, the Carite State Forest and Aguirre State Forrest. These natural attractions make Eco-tourism an option to be considered as part of the economic development for the Region. 6. ENHANCE THE INTEGRATION AND CONNECTIVITY OF THE TRANSPORTATION SYSTEM, ACROSS AND BETWEEN MODES, FOR PEOPLE AND FREIGHT. For the TPR-UZAs the PR Government is developing projects and programs to enhance the integration and connectivity of the transportation system, across and between modes, for both people and freight. [A8] NORTH TPR - For NTPR, an expanded and enhanced público system could be one means of providing this service. Another would involve the reestablishment of an Islandwide interurban bus system, which could serve express runs between San Juan and Arecibo through PR-22 and PR-2 and other major destinations. Well-furnished motor coaches with frequent and reliable schedules could make this an attractive option to traveling long distances and discourage the use of private vehicles. EAST TPR - For ETPR, an expanded and enhanced público system, the reestablishment of an Islandwide interurban bus system, which could serve express runs between San Juan and Fajardo through PR-3 and PR-66 (with a first phase completed and a second phase already designed) and other major destinations, such as Ceiba through PR-53. SOUTH EAST TPR - For SETPR some projects that promotes integration and connectivity are the the proposed expansion and enhancement of the público system, the reestablishment of an Island wide interurban bus system, as well as the completion of PR-53 expressway. SOUTH TPR - For STPR, one of project proposed is the reestablishment of an Island wide interurban bus system, which could serve express runs between San Juan and Ponce through PR-52, and other major destinations, such as Mayagüez and Aguadilla. As mentioned, municipal leaders from South portion of the Island proposed the extension of “Tren del Sur” to Mercedita Airport (PSE) at Ponce. This 50 kilometers (31.07 miles) railroad extension proposal includes the acquisition and construction of old right-of-way that runs in private property, interconnection with many tourist and historic zones, signaling, railroad security, and purchase of new machinery to expands its carrying capacity. With the adequate vision, funding, and management, “Tren del Sur” could be an effective tool, not only for tourism development, but also for the entire economic growth of the region. In this sense, the feasibility of the operation and development of Tren del Sur as a versatile system that handles freight as well as passengers should be carefully analyzed by both municipalities, and private sector. SOUTH WEST TPR - For SWTPR it is a proposed projects that promotes integration and connectivity like the proposed expansion and enhancement of the público system, the reestablishment of an Island Wide interurban bus system, as well as the completion of PR-53 expressway. 7. PROMOTE EFFICIENT SYSTEM MANAGEMENT AND OPERATION. For the TPR-UZAs the PR Government promotes the efficient system management and operation transportation network, with for example, the development of a computerized traffic [A9] signal system. Changeable message signs are increasingly used to alert drivers of congestion, accidents, or other traffic problems on the highway system and to direct drivers away from the problem areas. Traffic surveillance camera systems are being developed, as well as traffic signals to assure that traffic is managed seamlessly for the users. Due to limited financial resources, this plan seeks to ensure that all modes of the transportation system are operated and maintained in an efficient and effective way. 8. EMPHASIZE THE PRESERVATION OF THE EXISTING TRANSPORTATION SYSTEM. The preservation of the existing transportation system in the TPR-UZAs is increasingly a concern and considering the need oftentimes expressed by the public to safely and efficiently move people and goods within the area, particularly with the effect that considerably rainy conditions experienced many times during the year, and its effect on the system, proper maintenance of the existing system is being given primary importance, and more emphasis is being given to the rehabilitation and replacement of deteriorated bridges, in some cases even by immediate installation of temporary, but safer, structures. For the reason mention above, there has been an increase in highway maintenance and preservation budget, including pavement rehabilitation/resurfacing and rehabilitation of highways throughout the system, improving intersections, replacing substandard bridges and upgrading traffic signal systems. [A10] APPENDIX B PUBLIC INVOLVEMENT PROCESS The Department of Transportation and Public Works (DTPW) and the Puerto Rico Highway and Transportation Authority (PRHTA) in concord with the MPO members developed in consultation with all interested parties a Participation Plan. This Plan defines the process for citizens, affected public agencies, representatives of public transportation employees, freight shippers, providers of freight transportation services, private providers of transportation, representatives of users of public transportation, among others, the reasonable opportunity to be involved in the metropolitan transportation planning process. This Plan promotes the continued emphasis on the public participation throughout the planning process in the implementation of plans and projects. Specifically requires a proactive and open approach and consultation process for project selection and implementation, and recognizes the importance of cooperation, coordination and joint support of transportation projects. Also gives emphasis in the develop of early public involvement in the planning and programming process to protect the environment, promote the conservation of energy and improve the quality of life. The Plan present and describe procedures and strategies to provide the opportunity for the interested parties to achieve early and continuing public input and involvement as follow; 1. Early and continued public participation throughout the process of transportation planning and project programming; 2. Timely information about transportation planning issues and processes to citizens, affected public agencies, representatives of transportation agency employees, private providers of transportation, other interested parties and segments of the community affected by transportation plans, programs, and projects; 3. Reasonable public access to technical information and public policy used in the development of the STIP and, in urbanized or metropolitan areas, the local TIP; 4. To the maximum extent practicable; a. ensure that public meetings are held at convenient and accessible locations and time, b. use visualization techniques to describe the proposed long-range statewide transportation plan and supporting studies, c. makes public information available in electronically accessible format and means. [A11] 5. Adequate public notice of public involvement activities and time for public review and comment at key decision points, including but not limited to, action on the TPs and STIP; 6. Process for demonstrating explicitly consideration and response to public input during the planning and program development process; 7. Process for seeking out and considering the needs of those traditionally underserved by existing transportation systems; 8. Periodic review of the effectiveness of the public involvement process to ensure that the process provides full and open access to all and revision of the process as necessary. Public involvement is not limited to special events or high profile projects or just to those projects utilizing Federal funds. It is also an essential part of the planning process used by the PRHTA in the development of its highway program. There are numerous techniques used to disseminate information about projects, identify issues and concerns and involve the public at an early stage. These techniques are geared to the scope of work being undertaken. [A12] APPENDIX C Tables C1 – C2: Puerto Rico Revenues and Expenditures Tables C1-A; C2-B: TPR-UZA Proportion of Total Revenues and Expenditures in Puerto Rico Table C-3: Federal Transit Administration (FTA) Program Allocation for Puerto Rico Tables C3; C3A: Federal Transit Administration (FTA) Program Allocation 2011-2015; 2016-2032 Table C4: Total Revenue and Expenditure Projections Per Region [A13] Version 2032 - Updated on January 26, 2012 Table C-1 - Revenues Projections (Island Wide) FY Ending June 30, 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Existing Sources Pledged Revenues Gas Tax Diesel Tax License Fees 1968 Tolls Eastern Corridor Tolls Petroleum Products Tax DSRF Income 173,290,000 11,000,000 33,250,000 194,900,000 19,790,000 98,780,000 21,958,000 174,100,000 10,500,000 33,500,000 200,420,000 19,980,000 99,240,000 24,030,000 175,600,000 10,000,000 33,750,000 206,040,000 20,180,000 100,090,000 24,732,000 176,880,000 10,000,000 34,000,000 211,180,000 20,380,000 100,830,000 26,039,000 178,400,000 10,000,000 34,250,000 216,500,000 20,590,000 101,690,000 26,860,000 175,800,000 9,850,000 34,540,000 218,130,660 23,699,340 100,210,000 27,397,200 174,510,000 9,780,000 34,830,000 222,279,860 24,150,140 99,470,000 27,945,144 173,200,000 9,710,000 35,130,000 226,275,720 24,584,280 98,720,000 28,504,047 172,110,000 9,650,000 35,430,000 230,127,260 25,002,740 98,100,000 29,074,128 171,230,000 9,600,000 35,730,000 233,807,420 25,402,580 97,600,000 29,655,610 Total Pledged Revenues FHWA Funds FTA Funds (1) ARRA Funds - FHWA ARRA Funds - FTA Remaining GARVEE Funds Local Appropriations Interest, Toll Fines & Other Impact Fees and Other Total Existing 552,968,000 139,419,089 12,000,000 41,550,368 6,000,000 2,994,519 26,483,364 38,000,000 2,000,000 821,415,341 561,770,000 168,484,196 12,120,000 16,610,217 880,000 22,692,544 24,362,400 2,030,200 808,949,557 570,392,000 162,055,751 12,241,200 7,049,436 6,954,780 24,732,708 2,061,059 785,486,935 579,309,000 149,034,405 12,363,612 1,700,000 25,140,798 2,095,067 769,642,881 588,290,000 126,139,592 12,487,248 25,583,276 2,131,940 754,632,056 589,627,200 126,265,732 12,612,121 34,829,393 2,168,822 765,503,267 592,965,144 126,391,997 12,738,242 37,272,987 2,206,777 771,575,146 596,124,047 126,518,389 12,865,624 39,922,405 2,246,057 777,676,523 599,494,128 126,644,908 12,994,280 42,764,599 2,285,812 784,183,727 603,025,610 126,771,553 13,124,223 45,684,370 2,322,614 790,928,370 - - - - - - - - - - 302,998,366 328,422,325 328,370,113 351,610,863 377,913,380 373,907,511 408,288,104 442,025,122 475,765,650 514,423,452 Total Existing + New Sources + GDB Financing 1,124,413,706 1,137,371,882 (1) Amount of FTA Funds is the same amount showed in Table C-3 under PRHTA line. 1,113,857,048 1,121,253,745 1,132,545,436 1,139,410,779 1,179,863,251 1,219,701,645 1,259,949,377 1,305,351,822 2013 2014 2015 2016 2017 2018 2019 2020 New Sources N/A Total Additional GDB Financing Version 2032 - Updated on January 26, 2012 Table C-2 - Expenditures Projections (Island Wide) FY Ending June 30, 2011 2012 Capital Expenditures Right of Way Design Construction Local Construction Federal (FHWA, Earmarked & GARVEE) Construction Federal ARRA Capitalized Expenditures ARRA Funds - FTA Total Capital Expenditures 52,518,400 25,529,888 51,827,730 177,268,381 41,550,368 106,352,759 6,000,000 461,047,526 30,500,000 24,309,000 59,574,114 211,485,245 16,610,217 109,038,273 451,516,849 30,000,000 20,000,000 12,387,599 202,569,689 7,049,436 111,802,611 383,809,335 30,000,000 20,000,000 186,293,006 1,700,000 114,783,827 352,776,833 30,000,000 20,000,000 157,674,490 117,972,063 325,646,553 10,269,297 9,413,522 157,832,164 121,213,109 298,728,094 10,459,459 9,587,837 157,989,997 124,567,682 302,604,975 10,656,283 9,768,259 158,147,987 128,052,837 306,625,366 10,855,744 9,951,099 158,306,135 131,622,566 310,735,543 11,041,552 10,121,423 158,464,441 135,079,106 314,706,522 Debt Service Existing Debt Service BANs Debt Service Interim Funding Debt Service New Debt Service Line of Credit Fee Other Costs Total Debt Service 426,673,974 75,174,763 12,384,272 2,331,944 1,000,000 517,564,954 447,609,062 36,011,736 49,254,740 2,331,944 1,015,100 536,222,583 447,573,102 36,003,804 88,534,323 2,331,944 1,030,530 575,473,703 448,793,398 38,199,111 118,215,065 2,331,944 1,047,533 608,587,052 448,777,632 42,329,809 146,819,278 2,331,944 1,065,970 641,324,633 447,616,074 44,768,070 173,063,883 2,331,944 1,095,255 668,875,228 447,553,494 46,192,942 201,743,958 2,331,944 1,125,566 698,947,905 443,966,114 49,063,892 231,443,290 2,331,944 1,157,058 727,962,298 438,451,586 53,147,033 261,935,649 2,331,944 1,189,313 757,055,525 435,654,975 57,358,748 295,109,593 2,144,340 1,220,545 791,488,202 Operating & Maintenance Expenditures Tren Urbano Autoexpreso Operations and Maintenance Total Operating Expenditures 75,781,071 18,932,000 51,088,155 145,801,226 78,463,872 18,271,800 52,896,778 149,632,450 81,249,654 18,549,531 54,774,825 154,574,010 84,242,079 18,855,599 56,792,182 159,889,859 87,439,234 19,187,457 58,947,559 165,574,250 90,730,971 19,909,788 61,166,699 171,807,458 94,165,139 20,663,374 63,481,858 178,310,370 97,758,104 21,451,805 65,904,072 185,113,981 101,478,190 22,268,132 68,411,985 192,158,308 105,174,229 23,079,182 70,903,687 199,157,098 1,124,413,706 1,137,371,882 1,113,857,048 1,121,253,745 1,132,545,436 1,139,410,779 1,179,863,251 1,219,701,645 1,259,949,376 1,305,351,822 - - - - 0 0 0 0 Total Expenses Cash Excess (Deficiency) [A14] (0) (0) Version 2032 - Updated on January 26, 2012 Table C-1 - Revenues Projections (Island Wide) FY Ending June 30, 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 Existing Sources Pledged Revenues Gas Tax Diesel Tax License Fees 1968 Tolls Eastern Corridor Tolls Petroleum Products Tax DSRF Income 170,820,000 9,580,000 36,030,000 237,316,200 25,783,800 97,370,000 30,248,723 170,800,000 9,570,000 36,340,000 240,635,560 26,144,440 97,360,000 30,853,697 170,740,000 9,570,000 36,650,000 243,765,500 26,484,500 97,320,000 31,470,771 170,500,000 9,560,000 36,960,000 246,687,980 26,802,020 97,190,000 32,100,186 170,170,000 9,540,000 37,280,000 249,403,000 27,097,000 97,000,000 32,742,190 169,840,000 9,520,000 37,590,000 251,901,540 27,368,460 96,810,000 33,397,034 169,520,000 9,500,000 37,910,000 254,165,560 27,614,440 96,620,000 34,064,975 169,260,000 9,490,000 38,230,000 256,195,060 27,834,940 96,480,000 34,746,274 168,850,000 9,460,000 38,560,000 257,990,040 28,029,960 96,250,000 35,441,200 168,490,000 9,440,000 38,890,000 259,541,480 28,198,520 96,040,000 36,150,024 168,130,000 9,420,000 39,220,000 261,092,920 28,367,080 95,830,000 36,858,848 167,770,000 9,400,000 39,550,000 262,644,360 28,535,640 95,620,000 37,567,672 Total Pledged Revenues FHWA Funds FTA Funds (1) ARRA Funds - FHWA ARRA Funds - FTA Remaining GARVEE Funds Local Appropriations Interest, Toll Fines & Other Impact Fees and Other Total Existing 607,148,723 126,898,324 13,255,466 48,824,917 2,360,240 798,487,670 611,703,697 127,025,222 13,388,020 52,282,612 2,400,601 806,800,152 616,000,771 127,152,248 13,521,900 55,966,680 2,440,931 815,082,530 619,800,186 127,279,400 13,657,119 59,923,737 2,481,938 823,142,381 623,232,190 127,406,679 13,793,691 59,696,830 2,523,883 826,653,273 626,427,034 127,534,086 13,931,627 68,753,299 2,566,284 839,212,331 629,394,975 127,661,620 14,070,944 73,729,535 2,610,681 847,467,754 632,236,274 127,789,282 14,211,653 79,050,612 2,655,324 855,943,145 634,581,200 127,917,071 14,353,770 84,803,140 2,701,261 864,356,441 636,750,024 128,044,988 14,497,307 91,059,384 2,749,073 873,100,776 638,918,848 128,172,905 14,642,280 97,315,627 2,796,885 881,846,545 641,087,672 128,300,822 14,788,703 104,030,405 2,844,432 891,052,034 - - - - - - - - - - - - 537,885,908 559,312,868 562,475,244 611,813,196 669,663,900 722,400,552 784,365,175 852,025,469 916,474,898 998,736,837 1,080,997,340 1,162,798,122 1,336,373,578 1,366,113,020 1,377,557,773 1,434,955,577 1,496,317,173 1,561,612,882 1,631,832,930 1,707,968,614 1,780,831,339 1,871,837,613 1,962,843,886 2,053,850,156 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 New Sources N/A Total Additional GDB Financing Total Existing + New Sources + GDB Financing (1) Amount of FTA Funds is the same amount showed in Table C-3 under PRHTA line. Version 2032 - Updated on January 26, 2012 Table C-2 - Expenditures Projections (Island Wide) FY Ending June 30, Capital Expenditures Right of Way Design Construction Local Construction Federal (FHWA, Earmarked & GARVEE) Construction Federal ARRA Capitalized Expenditures ARRA Funds - FTA Total Capital Expenditures 11,231,646 10,295,675 158,622,905 138,640,061 318,790,288 11,435,131 10,482,203 158,781,528 142,420,915 323,119,776 11,638,868 10,668,962 158,940,310 146,261,722 327,509,862 11,846,235 10,859,049 159,099,250 150,206,108 332,010,642 12,058,483 11,053,610 159,258,349 154,272,037 336,642,479 12,273,327 11,250,549 159,417,608 158,432,445 341,373,929 12,498,141 11,456,629 159,577,025 162,785,060 346,316,855 12,724,571 11,664,190 159,736,602 167,224,371 351,349,735 12,957,651 11,877,847 159,896,339 171,818,526 356,550,363 13,200,188 12,100,173 160,056,235 176,608,311 361,964,907 13,442,726 12,322,498 160,216,131 181,398,097 367,379,452 13,685,263 12,544,824 160,376,027 186,187,882 372,793,996 Debt Service Existing Debt Service BANs Debt Service Interim Funding Debt Service New Debt Service Line of Credit Fee Other Costs Total Debt Service 415,605,886 61,409,900 330,935,857 1,947,815 1,252,721 811,152,179 391,593,580 64,635,939 369,574,572 1,741,963 1,286,884 828,832,938 347,593,392 66,736,209 410,757,043 1,526,316 1,321,589 827,934,549 347,139,338 69,064,965 453,721,170 1,300,467 1,357,230 872,583,169 346,624,997 73,871,861 497,780,001 1,063,891 1,393,968 920,734,719 346,158,196 80,421,530 543,598,292 816,122 1,431,561 972,425,702 345,581,444 87,196,742 593,567,993 556,577 1,470,890 1,028,373,646 345,596,675 94,543,246 647,912,870 284,730 1,511,003 1,089,848,524 336,804,300 102,412,171 706,698,799 1,552,515 1,147,467,785 339,602,255 110,793,858 770,533,756 1,595,794 1,222,525,663 342,400,210 119,175,545 834,368,714 1,639,074 1,297,583,542 345,198,165 127,557,232 898,203,671 1,682,353 1,372,641,420 Operating & Maintenance Expenditures Tren Urbano Autoexpreso Operations and Maintenance Total Operating Expenditures 109,015,613 23,922,126 73,493,373 206,431,112 113,097,375 24,817,819 76,245,112 214,160,306 117,297,359 25,739,453 79,076,550 222,113,363 121,653,314 26,695,313 82,013,137 230,361,765 126,183,440 27,689,393 85,067,142 238,939,976 130,869,388 28,717,667 88,226,196 247,813,251 135,796,097 29,798,772 91,547,559 257,142,429 140,880,575 30,914,498 94,975,283 266,770,355 146,184,165 32,078,305 98,550,722 276,813,192 151,747,057 33,299,013 102,300,971 287,347,041 157,309,950 34,519,721 106,051,221 297,880,891 162,872,842 35,740,429 109,801,470 308,414,740 1,336,373,578 1,366,113,019 1,377,557,773 1,434,955,576 1,496,317,174 1,561,612,882 1,631,832,930 1,707,968,614 1,780,831,339 1,871,837,612 1,962,843,885 2,053,850,156 0 0 0 0 0 0 Total Expenses Cash Excess (Deficiency) (0) [A15] (0) 0 (0) 0 (0) Version 2032 - Updated on January 26, 2012 Table C-1A - Revenues Projections (UZA Region) FY Ending June 30 Existing Sources Pledged Revenues Gas Tax Diesel Tax License Fees 1968 Tolls Eastern Corridor Tolls Petroleum Products Tax DSRF Income Total Pledged Revenues FHWA Funds FTA Funds (1) ARRA Funds - FHWA ARRA Funds - FTA Remaining GARVEE Funds Local Appropriations Interest, Toll Fines & Other Impact Fees and Other Total Existing 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 47,241,263.77 2,998,752.97 9,064,412.37 53,132,450.28 5,395,029.20 26,928,801.63 5,986,056.15 150,746,766 38,007,582.54 3,271,366.87 11,327,208.12 1,635,683.44 816,347.58 7,219,733.30 10,359,328.43 545,227.81 223,929,244 39,827,324.27 2,401,992.56 7,663,500.08 45,848,318.96 4,570,648.70 22,702,261.12 5,497,131.55 128,511,177 38,542,646.23 2,772,585.70 3,799,773.11 201,309.85 5,191,173.51 5,573,171.77 464,430.98 185,056,268 48,296,544.50 2,750,372.69 9,282,507.84 56,668,678.98 5,550,252.10 27,528,480.29 6,802,221.75 156,879,058 44,571,371.29 3,366,786.22 1,938,857.63 1,912,823.70 6,802,416.60 566,868.05 216,038,182 41,133,913.18 2,325,526.53 7,906,790.19 49,110,469.16 4,739,423.06 23,448,283.96 6,055,438.52 134,719,845 34,658,346.16 2,875,190.77 395,339.51 5,846,559.30 487,213.28 178,982,494 39,843,373.30 2,233,372.94 7,649,302.33 48,352,524.21 4,598,514.89 22,711,169.46 5,998,839.72 131,387,097 28,171,675.18 2,788,868.21 5,713,699.69 476,141.64 168,537,482 43,263,697.05 2,424,046.73 8,500,159.82 53,681,108.02 5,832,315.51 24,661,291.70 6,742,344.49 145,104,963 31,073,506.02 3,103,793.88 8,571,378.33 533,738.73 188,387,380 42,944,000.30 2,406,694.88 8,571,082.06 54,699,366.07 5,942,946.65 24,477,907.91 6,876,833.83 145,918,832 31,102,962.41 3,134,668.84 9,172,260.35 543,050.92 189,871,774 42,619,346.72 2,389,340.97 8,644,443.71 55,679,696.11 6,049,457.01 24,292,043.35 7,013,994.56 146,688,322 31,132,396.66 3,165,845.84 9,823,711.40 552,687.60 191,362,964 42,348,842.02 2,374,448.47 8,717,793.69 56,624,385.44 6,152,095.09 24,138,175.60 7,153,887.90 147,509,628 31,161,845.27 3,197,331.54 10,522,521.79 562,439.78 192,953,767 42,130,212.78 2,362,027.93 8,791,172.71 57,527,047.57 6,250,167.03 24,013,950.64 7,296,602.09 148,371,181 31,191,452.94 3,229,143.95 11,240,391.37 571,466.59 194,603,636 - - - - - - - - - - 82,601,567.99 75,130,283.88 90,314,019.27 81,768,038.94 84,402,151.69 92,017,186.00 100,472,892.48 108,769,179.89 117,065,390.43 126,571,100.29 Total Existing + New Sources + GDB Financing 306,530,812.44 260,186,552 (1) Amount of FTA Funds is the same amount showed in Table C-3 under PRHTA line. 306,352,201 260,750,533 252,939,633 280,404,566 290,344,667 300,132,144 310,019,157 321,174,736 New Sources N/A Total Additional GDB Financing Table C-2A - Expenditures Projections (UZA Region) FY Ending June 30 Capital Expenditures Right of Way Design Construction Local Construction Federal (FHWA, Earmarked & GARVEE) Construction Federal ARRA Capitalized Expenditures ARRA Funds - FTA Total Capital Expenditures Debt Service Existing Debt Service BANs Debt Service Interim Funding Debt Service New Debt Service Line of Credit Fee Other Costs Total Debt Service Operating & Maintenance Expenditures Tren Urbano Autoexpreso Operations and Maintenance Total Operating Expenditures Total Expenses Cash Excess (Deficiency) UZA Proportion 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 14,317,246.16 6,959,802.49 14,128,959.91 48,325,825.75 11,327,208.12 28,993,241.04 1,635,683.44 125,687,967 6,977,216.49 5,560,955.92 13,628,245.60 48,379,617.64 3,799,773.11 24,943,725.66 103,289,534 8,251,118.08 5,500,745.39 3,407,051.46 55,714,214.11 1,938,857.63 30,749,884.78 105,561,871 6,976,579.58 4,651,053.05 43,322,932.69 395,339.51 26,693,283.53 82,039,188 6,700,118.83 4,466,745.89 35,214,593.98 26,347,561.35 72,729,020 2,527,234.16 2,316,631.31 38,841,882.53 29,830,075.35 73,515,823 2,573,898.40 2,359,406.86 38,878,703.01 30,654,028.91 74,466,037 2,622,192.95 2,403,676.87 38,915,495.83 31,509,978.38 75,451,344 2,671,130.04 2,448,535.87 38,952,306.59 32,386,632.08 76,458,605 2,716,714.00 2,490,321.17 38,989,316.17 33,235,481.40 77,431,833 116,317,258.72 20,493,685.90 3,376,124.80 635,720.48 272,613.91 141,095,404 102,395,584.45 8,238,087.91 11,267,573.27 533,458.40 232,215.49 122,666,920 123,099,283.75 9,902,387.86 24,350,238.50 641,371.63 283,434.03 158,276,716 104,368,095.16 8,883,304.63 27,491,227.05 542,299.87 243,606.64 141,528,533 100,228,782.02 9,453,825.01 32,790,220.21 520,810.16 238,070.82 143,231,708 110,156,576.97 11,017,248.19 42,590,349.35 573,882.47 269,538.06 164,607,595 110,135,450.07 11,367,312.54 49,645,823.14 573,852.63 276,983.12 171,999,422 109,246,800.00 12,073,158.38 56,951,280.64 573,821.88 284,717.30 179,129,778 107,884,009.82 13,077,190.79 64,451,056.98 573,790.87 292,638.55 186,278,687 107,190,543.80 14,112,808.95 72,610,114.83 527,603.11 300,308.56 194,741,379 20,658,973.77 5,161,126.47 13,927,341.48 39,747,442 17,949,489.33 4,179,878.83 12,100,730.18 34,230,098 22,346,682.92 5,101,812.45 15,065,118.31 42,513,614 19,590,718.82 4,384,919.48 13,207,172.54 37,182,811 19,528,441.92 4,285,274.77 13,165,188.28 36,978,905 22,328,539.57 4,899,721.52 15,052,886.89 42,281,148 23,172,470.00 5,084,911.61 15,621,826.44 43,879,208 24,055,349.38 5,278,648.56 16,217,023.61 45,551,022 24,969,402.46 5,479,226.19 16,833,236.67 47,281,865 25,877,548.64 5,678,507.62 17,445,467.56 49,001,524 306,530,812 260,186,552 306,352,201 260,750,533 252,939,633 280,404,566 290,344,667 300,132,144 310,019,157 321,174,736 - - - - 0 0 0 0.272613906 0.228761196 0.275037269 0.232552653 0.223337294 [A16] (0) (0) 0.246096115 0.246083321 0.246070131 0.246056836 0 0.246044576 Version 2032 - Updated on January 26, 2012 Table C-1A - Revenues Projections (UZA Region) FY Ending June 30 Existing Sources Pledged Revenues Gas Tax Diesel Tax License Fees 1968 Tolls Eastern Corridor Tolls Petroleum Products Tax DSRF Income Total Pledged Revenues FHWA Funds FTA Funds (1) ARRA Funds - FHWA ARRA Funds - FTA Remaining GARVEE Funds Local Appropriations Interest, Toll Fines & Other Impact Fees and Other Total Existing 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 42,027,201.46 2,356,987.41 8,864,536.17 58,387,400.46 6,343,642.18 23,956,144.52 7,442,156.41 149,378,069 31,221,059.80 3,261,269.87 12,012,496.40 580,694.88 196,453,590 42,020,002.06 2,354,399.41 8,940,321.28 59,200,859.05 6,432,022.38 23,952,385.25 7,590,587.90 150,490,577 31,250,586.13 3,293,703.95 12,862,502.60 590,592.73 198,487,963 42,002,973.94 2,354,272.35 9,016,100.47 59,967,646.39 6,515,331.87 23,941,252.34 7,741,981.80 151,539,559 31,280,148.46 3,326,461.45 13,768,109.48 600,482.28 200,514,761 41,941,640.19 2,351,683.76 9,091,865.23 60,683,275.64 6,593,083.16 23,907,964.87 7,896,389.84 152,465,903 31,309,717.29 3,359,542.44 14,740,761.34 610,537.01 202,486,461 41,858,132.29 2,346,633.26 9,170,072.12 61,347,733.26 6,665,274.79 23,859,897.94 8,053,869.22 153,301,613 31,339,282.13 3,392,948.96 14,684,126.59 620,820.52 203,338,791 41,774,618.09 2,341,582.46 9,245,807.19 61,958,847.32 6,731,670.77 23,811,827.47 8,214,486.21 154,078,840 31,368,863.27 3,426,686.39 16,910,873.80 631,214.93 206,416,478 41,693,473.08 2,336,526.63 9,323,971.00 62,512,063.09 6,791,776.26 23,763,705.58 8,378,286.35 154,799,802 31,398,397.37 3,460,751.03 18,133,791.77 642,097.42 208,434,840 41,627,090.83 2,333,930.59 9,402,125.03 63,007,532.99 6,845,607.80 23,727,884.46 8,545,352.17 155,489,524 31,427,957.22 3,495,154.07 19,441,374.33 653,039.09 210,507,049 41,523,768.67 2,326,413.10 9,482,715.55 63,445,180.58 6,893,157.09 23,669,900.71 8,715,736.88 156,056,873 31,457,499.95 3,529,894.07 20,854,877.03 664,296.85 212,563,440 41,432,664.58 2,321,350.55 9,563,275.72 63,822,749.63 6,934,179.01 23,616,790.94 8,889,499.68 156,580,510 31,487,002.45 3,564,971.66 22,392,028.58 676,012.93 214,700,526 41,341,588.64 2,316,289.57 9,643,829.81 64,200,297.95 6,975,198.67 23,563,697.37 9,063,244.59 157,104,147 31,516,514.13 3,600,399.31 23,928,999.02 687,727.84 216,837,787 41,250,540.85 2,311,230.16 9,724,377.96 64,577,826.19 7,016,216.15 23,510,619.99 9,236,971.87 157,627,783 31,546,035.08 3,636,180.54 25,578,532.91 699,376.37 219,087,908 - - - - - - - - - - - - 132,337,193.63 137,601,451.18 138,371,986.64 150,501,166.74 164,722,807.24 177,684,921.95 192,914,749.47 209,543,551.98 225,380,465.74 245,595,159.17 265,807,097.85 285,903,626.55 Total Existing + New Sources + GDB Financing 328,790,783 336,089,414 (1) Amount of FTA Funds is the same amount showed in Table C-3 under PRHTA line. 338,886,747 352,987,628 368,061,598 384,101,400 401,349,589 420,050,601 437,943,906 460,295,685 482,644,885 504,991,535 New Sources N/A Total Additional GDB Financing Table C-2A - Expenditures Projections (UZA Region) FY Ending June 30 Capital Expenditures Right of Way Design Construction Local Construction Federal (FHWA, Earmarked & GARVEE) Construction Federal ARRA Capitalized Expenditures ARRA Funds - FTA Total Capital Expenditures Debt Service Existing Debt Service BANs Debt Service Interim Funding Debt Service New Debt Service Line of Credit Fee Other Costs Total Debt Service Operating & Maintenance Expenditures Tren Urbano Autoexpreso Operations and Maintenance Total Operating Expenditures Total Expenses Cash Excess (Deficiency) UZA Proportion 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2,763,345.25 2,533,066.48 39,026,324.75 34,109,903.95 78,432,640 2,813,256.48 2,578,818.44 39,063,232.66 35,038,215.01 79,493,523 2,863,225.18 2,624,623.08 39,100,185.57 35,981,183.61 80,569,217 2,914,079.41 2,671,239.46 39,137,146.61 36,949,504.59 81,671,970 2,966,125.54 2,718,948.41 39,174,102.66 37,947,577.92 82,806,755 3,018,803.21 2,767,236.27 39,211,079.09 38,968,764.11 83,965,883 3,073,919.91 2,817,759.91 39,247,996.72 40,037,013.41 85,176,690 3,129,427.35 2,868,641.73 39,284,946.52 41,126,456.88 86,409,472 3,186,559.04 2,921,012.45 39,321,874.94 42,253,791.79 87,683,238 3,246,002.55 2,975,502.34 39,358,753.06 43,429,004.28 89,009,262 3,305,440.03 3,029,986.70 39,395,642.66 44,604,089.02 90,335,158 3,364,871.46 3,084,465.61 39,432,543.79 45,779,047.58 91,660,928 102,252,384.34 15,108,805.90 81,420,840.28 479,224.97 308,209.66 199,569,465 96,339,361.93 15,901,652.83 90,922,273.26 428,555.43 316,597.67 203,908,441 85,509,875.72 16,417,472.41 101,048,479.41 375,482.07 325,118.13 203,676,428 85,393,508.55 16,989,430.49 111,611,789.24 319,904.54 333,867.67 214,648,500 85,262,237.65 18,170,876.93 122,443,092.95 261,694.22 342,886.04 226,480,788 85,142,642.63 19,780,844.98 133,705,905.86 200,737.14 352,113.26 239,182,244 84,995,815.35 21,446,053.66 145,988,149.82 136,890.17 361,765.72 252,928,675 84,994,589.28 23,251,567.39 159,344,959.68 70,025.40 371,609.70 268,032,751 82,827,265.81 25,185,308.24 173,792,108.08 381,796.05 282,186,478 83,510,156.76 27,244,849.89 189,478,703.02 392,415.01 300,626,125 84,192,997.22 29,304,147.76 205,163,433.83 403,032.82 319,063,612 84,875,788.26 31,363,204.47 220,846,320.57 413,649.38 337,498,963 26,821,338.93 5,885,610.71 18,081,728.10 50,788,678 27,824,074.60 6,105,648.64 18,757,726.92 52,687,450 28,855,792.02 6,332,046.25 19,453,263.94 54,641,102 29,925,745.04 6,566,834.19 20,174,577.65 56,667,157 31,038,391.81 6,810,990.75 20,924,673.55 58,774,056 32,189,229.41 7,063,527.81 21,700,515.97 60,953,273 33,399,073.47 7,329,013.11 22,516,137.87 63,244,224 34,647,574.68 7,602,981.24 23,357,820.66 65,608,377 35,949,762.83 7,888,730.30 24,235,696.74 68,074,190 37,315,478.22 8,188,419.63 25,156,400.01 70,660,298 38,681,039.80 8,488,075.21 26,076,999.58 73,246,115 40,046,449.31 8,787,697.48 26,997,496.63 75,831,643 328,790,783 336,089,414 338,886,747 352,987,627 368,061,598 384,101,400 401,349,589 420,050,601 437,943,906 460,295,685 482,644,885 504,991,535 0 0 0 0 0 (0) 0.246032089 0.246018747 0.24600547 0.245992025 (0) 0.245978329 0 0.245964544 (0) 0.245950172 0 0.245935784 (0) 0.245921046 0.245905778 0.245890612 0 0.245875549 Note: The Financial Plan presents mostly the sources/revenues and expenditures for the whole of Puerto Rico, but a line specifying the proportion of the revenues and expenditures proposed for the Transportation Planning Regions is presented in Table C-1A and Table C-2A Note: These amounts take into consideration year of expenditure dollars (YOE) [A17] Table C-3 Federal Transit Administration (FTA) Program Allocation for Puerto Rico Allocation Agency Section 2011 2012 2013 2014 22, 893,288 $ 2015 2016 23, 122,221 $ 23,353,443 MBA 5307 $ 22,220,000 $ 22,442,200 $ 22,666,622 $ Ports Authority 5307 $ 5,050,000 $ 5,100,500 $ 5,151,505 $ 5,203,020 $ 5,255,050 $ 5,307,601 5309 $ 3,007,171 $ 3,037,243 $ 3,067,615 $ 3,098,291 $ 3,129,274 $ 3,160,567 PRHTA 5307 $ 12,000,000 $ 12,120,000 $ 12,241,200 $ 12,487,248 $ 12,612,121 Municipalities 5307 $ 7,500,000 $ 7,575,000 $ 7,650,750 $ 7,727,258 $ 7,804,530 $ 7,882,575 5310 $ 1,427,735 $ 1,442,012 $ 1,456,432 $ 1,470,997 $ 1,485,707 $ 1,500,564 5316 $ 5,000,000 $ 5,050,000 $ 5,100,500 $ 5,151,505 $ 5,203,020 $ 5,255,050 5317 $ 1,500,000 $ 1,515,000 $ 1,530,150 $ 1,545,452 $ 1,560,906 $ 1,576,515 12,363,612 $ Allocation Agency Section MBA 5307 $ 23,586,978 Ports Authority 5307 $ 5309 PRHTA Municipalities 2017 2018 2019 2020 2021 $ 23,822,848 $ 24,061,076 $ 24,301,687 $ 24,544,704 5,360,677 $ 5,414,284 $ 5,468,427 $ 5,523,111 $ 5,578,342 $ 3,192,173 $ 3,224,095 $ 3,256,335 $ 3,288,899 $ 3,321,788 5307 $ 12,738,242 $ 12,865,624 $ 12,994,280 $ 13,124,223 $ 13,255,466 5307 $ 7,961,401 $ 8,041,015 $ 8,121,425 $ 8,202,640 $ 8,284,666 5310 $ 1,515,569 $ 1,530,725 $ 1,546,032 $ 1,561,493 $ 1,577,108 5316 $ 5,307,601 $ 5,360,677 $ 5,414,284 $ 5,468,427 $ 5,523,111 5317 $ 1,592,280 $ 1,608,203 $ 1,624,285 $ 1,640,528 $ 1,656,933 [A18] Table C-3 Federal Transit Administration (FTA) Program Allocation for Puerto Rico (Cont.) Allocation Agency Section MBA 5307 $ 24,790,151 $ 25,038,052 $ 25,288,433 $ 25,541,317 $ 25,796,730 Ports Authority 5307 $ 5,634,125 $ 5,690,466 $ 5,747,371 $ 5,804,845 $ 5,862,893 5309 $ 3,355,006 $ 3,388,556 $ 3,422,441 $ 3,456,666 $ 3,491,232 PRHTA 5307 $ 13,388,020 $ 13,521,900 $ 13,657,119 $ 13,793,691 $ 13,931,627 Municipalities 5307 $ 8,367,513 $ 8,451,188 $ 8,535,700 $ 8,621,057 $ 8,707,267 5310 $ 1,592,879 S 1,608,808 $ 1,624,896 $ 1,641,145 $ 1,657,556 5316 $ 5,578,342 $ 5,634,125 $ 5,690,466 $ 5,747,371 $ 5,804,845 5317 $ 1,673,503 $ 1,690,238 $ 1,707,140 $ 1,724,211 $ 1,741,453 2022 2023 2024 2025 2026 Allocation Agency Section MBA 5307 $ 26,054,697 $ 26,315,244 $ 26,578,397 $ 26,844,181 $ 27,112,623 $ 27,383,749 Ports Authority 5307 $ 5,921,522 $ 5,980,737 $ 6,040,545 $ 6,100,950 $ 6,161,960 $ 6,223,580 5309 $ 3,526,145 $ 3,561,406 $ 3,597,020 $ 3,632,990 $ 3,669,320 $ 3,706,013 PRHTA 5307 $ 14,070,944 $ 14,211,653 $ 14,353,770 $ 14,497,307 $ 14,642,280 $ 14,788,703 Municipalities 5307 $ 8,794,340 $ 8,882,283 $ 8,971,106 $ 9,060,817 $ 9,151,425 $ 9,242,939 5310 $ 1,674,132 $ 1,690,873 $ 1,707,782 $ 1,724,859 $ 1,742,108 $ 1,759,529 5316 $ 5,862,893 $ 5,921,522 $ 5,980,737 $ 6,040,544 $ 6,100,950 $ 6,161,010 5317 $ 1,758,868 $ 1,776,457 $ 1,794,221 $ 1,812,163 $ 1,830,285 $ 1,848,588 2027 2028 2029 2030 2032 2031 Note: These amounts take into consideration year of expenditure dollars (YOE). Also, the amount shown under PRHTA is the same amount presented for FTA in Table C1 – Revenue Projections (Island Wide). [A19] TABLES C-3A: TPR-UZA FEDERAL TRANSIT ADMINISTRATION (FTA) PROGRAM ALLOCATION 2011-2032 TABLE C-3A UZA Revenues Section Year 5307 5316 5317 $ $ $ 2011 14,356,235 3,290,231 891,304 $ $ $ 2012 14,499,797 3,323,133 900,217 2013 14,644,795 3,356,365 909,219 $ $ $ 2014 14,791,243 3,389,928 918,311 $ $ $ $ $ $ 2015 14,939,156 3,423,828 927,495 UZA Expenditures Year Section 5307 Capital Improvement Preventive Maintenance Assistance Operational Total Apportionments and Allocations (5307) 2011 2012 2013 2014 2015 $ 5,024,682 $ 5,074,929 $ 5,125,678 $ 5,176,935 $ 5,228,704 $ $ 5,024,682 4,306,871 $ $ 5,074,929 4,349,939 $ $ 5,125,678 4,393,439 $ $ 5,176,935 4,437,373 $ $ 5,228,704 4,481,747 $ 14,356,235 $ 14,499,797 $ 14,644,795 $ 14,791,243 $ 14,939,156 TABLE C-3A UZA REVENUES Section 5307 5316 5317 $ $ $ 2016 15,088,547 3,458,066 936,769 $ $ $ 2017 15,239,433 3,492,647 946,137 $ $ $ 2018 15,391,827 3,527,573 955,599 $ $ $ 2019 15,545,745 3,562,849 965,155 $ $ $ 2020 15,701,203 3,598,477 974,806 UZA EXPENDITURES Year Section 5307 Capital Improvement Preventive Maintenance Assistance Operational Total Apportionments and Allocations (5307) 2016 2017 2018 2019 2020 $ 5,280,992 $ 5,333,801 $ 5,387,139 $ 5,441,011 $ 5,495,421 $ $ 5,280,992 4,526,564 $ $ 5,333,801 4,571,830 $ $ 5,387,139 4,617,548 $ $ 5,441,011 4,663,724 $ $ 5,495,421 4,710,361 $ 15,088,547 $ 15,239,433 $ 15,391,827 $ 15,545,745 $ 15,701,203 [A20] TABLE C-3A UZA REVENUES Section 5307 5316 5317 $ $ $ 2021 15,858,215 3,634,462 984,554 $ $ $ 2022 16,016,797 3,670,807 994,400 $ $ $ 2023 16,176,965 3,707,515 1,004,344 $ $ $ 2024 16,338,735 3,744,590 1,014,387 $ $ $ 2025 16,502,122 3,782,036 1,024,531 UZA EXPENDITURES Year Section 5307 Capital Improvement Preventive Maintenance Assistance Operational Total Apportionments and Allocations (5307) 2021 2022 2023 2024 2025 $ 5,550,375 $ 5,605,879 $ 5,661,938 $ 5,718,557 $ 5,775,743 $ $ 5,550,375 4,757,464 $ $ 5,605,879 4,805,039 $ $ 5,661,938 4,853,089 $ $ 5,718,557 4,901,620 $ $ 5,775,743 4,950,637 $ 15,858,215 $ 16,016,797 $ 16,176,965 $ 16,338,735 $ 16,502,122 C-3A (Cont.) UZA REVENUES Section 5307 5316 5317 $ $ $ 2026 2027 2028 2029 2030 2031 2032 16,667,143 $ 3,819,856 $ 1,034,776 $ 16,833,815 $ 3,858,055 $ 1,045,124 $ 17,002,153 $ 3,896,635 $ 1,055,575 $ 17,172,174 $ 3,935,602 $ 1,066,131 $ 17,343,896 $ 3,974,958 $ 1,076,792 $ 17,517,335 $ 4,014,707 $ 1,087,560 $ 17,692,508 4,054,854 1,098,436 2026 2027 2028 2029 2030 2031 2032 UZA EXPENDITURES Year Section 5307 Capital Improvement Preventive Maintenance Assistance Operational Apportionments and Allocations (5307) $ $ $ 5,833,500.10 $ 5,833,500.10 $ 5,000,142.95 $ 5,891,835.10 $ 5,891,835.10 $ 5,050,144.37 $ 5,950,753.45 $ 5,950,753.45 $ 5,100,645.82 $ 6,010,260.99 $ 6,010,260.99 $ 5,151,652.28 $ 6,070,363.60 $ 6,070,363.60 $ 5,203,168.80 $ 6,131,067.24 $ 6,131,067.24 $ 5,255,200.49 $ 6,192,377.91 6,192,377.91 5,307,752.49 $ 16,667,143.15 $ 16,833,814.58 $ 17,002,152.73 $ 17,172,174.26 $ 17,343,896.00 $ 17,517,334.96 $ 17,692,508.31 [A21] TABLE C-4 TOTAL REVENUE AND EXPENDITURE PROJECTIONS PER REGION 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Revenues Projections per Region: San Juan C-1A $ 704,137,792.00 $ 762,690,125.00 $ 664,911,512.00 $ 673,355,169.00 $ 724,625,824.00 $ 664,552,731.00 $ 688,273,785.00 $ 711,649,360.00 $ 735,273,810.00 $ 761,904,620.00 Aguadilla C-1A 113,745,102.00 114,495,205.00 142,593,335.00 187,148,043.00 154,979,979.00 145,874,799.00 151,038,848.00 156,122,791.00 161,257,954.00 167,053,065.00 UZA C-1A 306,530,812.00 260,186,552.00 306,352,201.00 260,750,533.00 252,939,633.00 328,983,249.00 340,550,618.00 351,929,494.00 363,417,613.00 376,394,137.00 Total for Island Wide $ 1,124,413,706.00 $ 1,137,371,882.00 $ 1,113,857,048.00 $ 1,121,253,745.00 $ 1,132,545,436.00 $ 1,139,410,779.00 $ 1,179,863,251.00 $ 1,219,701,645.00 $ 1,259,949,377.00 $ 1,305,351,822.00 Expenditures Projections per Region: San Juan C-2A $ 704,137,792.00 $ 762,690,125.00 $ 664,911,512.00 $ 673,355,169.00 $ 724,625,824.00 $ 664,552,731.00 $ 688,273,785.00 $ 711,649,360.00 $ 735,273,810.00 $ 761,904,620.00 Aguadilla C-2A 113,745,102.00 114,495,205.00 142,593,335.00 187,148,043.00 154,979,979.00 145,874,799.00 151,038,848.00 156,122,791.00 161,257,954.00 167,053,065.00 UZA C-2A 306,530,812.00 260,186,552.00 306,352,201.00 260,750,533.00 252,939,633.00 328,983,249.00 340,550,618.00 351,929,494.00 363,417,613.00 376,394,137.00 Total for Island Wide $ 1,124,413,706.00 $ 1,137,371,882.00 $ 1,113,857,048.00 $ 1,121,253,745.00 $ 1,132,545,436.00 $ 1,139,410,779.00 $ 1,179,863,251.00 $ 1,219,701,645.00 $ 1,259,949,377.00 $ 1,305,351,822.00 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 Revenues Projections per Region: San Juan C-1A Aguadilla C-1A UZA C-1A $ 780,152,220.00 $ 797,667,491.00 $ 804,504,463.00 $ 838,188,126.00 $ 874,203,765.00 $ 912,533,696.00 $ 953,765,032.00 $ 998,471,888.00 $ 1,041,288,753.00 $ 1,094,743,299.00 $ 1,148,219,607.00 $1,286,359,714.00 171,006,573.00 174,794,085.00 176,240,337.00 183,564,532.00 191,393,838.00 199,724,500.00 208,682,170.00 218,394,237.00 227,685,059.00 239,292,217.00 250,896,823.00 262,498,907.00 385,214,785.00 393,651,444.00 396,812,973.00 413,202,919.00 430,719,570.00 449,354,686.00 469,385,728.00 491,102,489.00 511,857,527.00 537,802,097.00 563,727,456.00 504,991,535.00 Total for Island Wide $ 1,336,373,578.00 $ 1,366,113,020.00 $ 1,377,557,773.00 $1,434,955,577.00 $1,496,317,173.00 $1,561,612,882.00 $1,631,832,930.00 $ 1,707,968,614.00 $ 1,780,831,339.00 $ 1,871,837,613.00 $ 1,962,843,886.00 $2,053,850,156.00 Expenditures Projections per Region: San Juan C-2A $ 780,152,220.00 $ 797,667,491.00 $ 804,504,463.00 $ 838,188,126.00 $ 874,203,765.00 $ 912,533,696.00 $ 953,765,032.00 $ 998,471,888.00 $ 1,041,288,753.00 $ 1,094,743,299.00 $ 1,148,219,607.00 $1,286,359,714.00 Aguadilla C-2A 171,006,573.00 174,794,085.00 176,240,337.00 183,564,532.00 191,393,838.00 199,724,500.00 208,682,170.00 218,394,237.00 227,685,059.00 239,292,217.00 250,896,823.00 262,498,907.00 UZA C-2A 385,214,785.00 393,651,444.00 396,812,973.00 413,202,919.00 430,719,570.00 449,354,686.00 469,385,728.00 491,102,489.00 511,857,527.00 537,802,097.00 563,727,456.00 504,991,535.00 Total for Island Wide $ 1,336,373,578.00 $ 1,366,113,020.00 $ 1,377,557,773.00 $1,434,955,577.00 $1,496,317,173.00 $1,561,612,882.00 $1,631,832,930.00 $ 1,707,968,614.00 $ 1,780,831,339.00 $ 1,871,837,613.00 $ 1,962,843,886.00 $2,053,850,156.00 [A22]