Doc-9.1, Appendix I, v0.2, 12.02.2015 Table WIGOS Pre-operational Phase Activities Depending on the implementation scale, planned activities are specified as follows: G = Global activity, R = Regional activity and N = National activity No. I. 1.1.1 G 1.3.1 N 3.1.4 G 3.2.3 R 4.1.1 G 6.1.1 G 7.3.1 Estimated Costs Target Potential Risks Date for Responsibility (2012-2015) K CHF Completion Dependencies RQ RB Shortfall Activities listed in the WIP (Version 3.0, Table 2) not completed during the Implementation Phase, and proposed to be included in the Pre-Operational Phase Develop WIGOS Functional ICG-WIGOS WIGOS FA 2018 Architecture (or successor) Develop National WIGOS N-WIPs developed 2019 Members Implementation Plans (N-WIPs) Develop a concept of Regional Description of RBON 2016 ICG-WIGOS, Basic Observing Network concept applied by Regions onwards RAs (RBON) to be applied by RAs Migrate from the existing 2017 RBONs adopted by RAs RAs, Members RBSN/RBCN into an integrated onwards RBON Develop guidance, mechanisms 1) Guidance included in the 1) 2019 ICG-WIGOS and procedures for improved WIGOS Guide 2) 2015 integration of observational data 2) Work is underway for onwards and products some specific product integration activities 1) Develop guidance for WIGOS 1) Guidance to WIGOS 1) 2015 Relevant TCs standards standardization developed TT-WRM 2) Implemented standard 2) 2015 WIGOS PO and recommended practices 2) Document the implemented onwards and procedures are standard and recommended documented and available at practices and procedures on the Portal as appropriate instruments, methods of 3) 2015 3) Newly developed standard observation, data products, etc. onwards and recommended practices documented in the WIGOS regulatory material Provide information required by Required information 2015 Members Activity Deliverables Doc-9.1, Appendix I, v0.2, 12.02.2015, p. 2 N WIR available in WIR and onwards maintained II. New activities (by WIGOS Key Activity Area) 1. WIGOS Regulatory Material, supplemented with necessary guidance material, focusing on providing Members with those technical details that are required for the implementation (KAA 1, 2, 5, 6, 9) 1.1.G Develop Guide to WIGOS, Guide to WIGOS Cg-18 including guidelines on: 1) WIGOS Metadata 2) Station Identifiers 3) OSCAR/Surface 4) WIGOS Data Quality Monitoring 5) Lifecycle management of data (acquisition, data policy, sharing, quality management, dissemination, archiving, reprocessing, etc.) 6) Incorporation of observations 2016 (WMO and partners) across onwards all WIGOS component observing systems (access, sharing and integration of WIGOS data) 1.2.G Develop Guideline on National WIGOS Development and Partnerships 1.3.G Develop standards and recommendations supported by best practices and procedures for surface-based remote sensing (mainly weather radars and wind profilers) 1.4.G Develop standards and recommendations supported by 2016 2017 2017 Doc-9.1, Appendix I, v0.2, 12.02.2015, p. 3 best practices and procedures for improving observational data and products quality 1.5.G Update the Manual on WIGOS New editions of Manual on WIGOS EC-68, EC69, EC-70, Cg-18 2. WIGOS Information Resource (WIR), including the OSCAR and SORT databases (KAA 7, 8) Web-based portal 2.1.G 2016 preliminary operation OSCAR/Capabilities 2.2.G 2016 migration 2.3.G OSCAR/Space migration 2017 2.4.G SORT initial capability 2017 OSCAR/Surface fully 2.5.G 2018 populated 3. WIGOS Data Quality Monitoring System (WDQMS) (KAA 5, 9) Initial WIGOS (GOS surface3.1.G based components) monitoring capability at ECMWF, NCEP and/or other NWP centres Full WIGOS (GOS surface3.2.G based components) operational monitoring and reporting functionality Monitoring Workshop(s) for 3.3.G GAW, GCOS, GCW and hydrology components of WIGOS Initial monitoring capability 3.4.G for all WIGOS components Mechanisms for routine 3.5.G reporting of monitoring Mid 2016 2018 2016 Mid 2017 Mid 2016 Doc-9.1, Appendix I, v0.2, 12.02.2015, p. 4 3.6.G results to EC, Regional Associations and Members Mechanisms and regional structures in place to handle incident management actions and support Members in improving the data availability and quality 4. WIGOS Regional Centres (KAA 1, 3, 4, 5, 8, 9) Initial establishment of 4.1.G WIGOS Regional Centres in pre-operational mode in some regions/sub-regions Establishment of WIGOS 4.2.G Regional Centres covering all WMO Regions Operational phase of initial 4.3.G WIGOS Regional Centres, after successful completion of two-year pre-operational phase 2017 Mid 2016 2018 Mid 2018 onwards 5. Regional and national coordination and governance mechanisms (KAA 1, 2, 6, 9) Develop Guidance on 5.1.G Develop Guidance on 2017 governance mechanisms and governance mechanisms partnership arrangements to and partnership support the incorporation of arrangements to support the observations (WMO and incorporation of observations partners) across all WIGOS (WMO and partners) across component observing systems all WIGOS component (see also 1.1.G – 6)) observing systems (see also 1.1.G – 6)) Tools and guidance for 5.2.G Develop tools and guidance for 2018 Members to plan, deliver, Members to plan, deliver, expand and evolve their national expand and evolve their Doc-9.1, Appendix I, v0.2, 12.02.2015, p. 5 WIGOS implementation national WIGOS implementation __________