TERMS OF REFERENCE Project title DIPECHO VIII: Scaling up resilience to seismic hazards of urban and rural communities in South-East Kazakhstan 00091813 Type of the contract Individual contract (IC) Duty station: Permanent place of living (including outside trips on project’s territory to Talgar, Issyk and alongside territories Position: Expert on mini-projects in DRR Duration: July – December, 2015 Introduction: Despite of the fact that Kazakhstan is the most developed country in Central Asia the disaster preparedness system still needs improvements, especially when it comes to the communities preparedness. The city of Almaty is the former capital of the country and remains the largest cultural and commercial center of the country and the region. It is threatened by a risk of high-intensity earthquakes as located in a tectonic-active area. This creates a real threat to the safety of population, infrastructure and national and regional economics as a whole. The primary focus of the proposed project is to support and develop innovative approaches to disaster preparedness at the local and national level and to assist the government of Kazakhstan to strengthen the seismic-risk preparedness system, as well as develop practical methods of involving the public and private sector in seismic-risk management and disaster risk reduction (DRR) mechanism for further replication by the state authorities. This will be achieved through the following activities: 1) strengthening the rural and urban communities; preparedness to earthquakes and their involvement in the country DRR mechanisms; 2) engagement of private sector into the problems of Disaster Risk Management and earthquake preparedness and linking their initiatives with national disaster management authorities; 3) further replication and integration of achieved results nationally and regionally within the government programmes and strategies and in cooperation with other DRR actors. Specifically the project will work in Almaty and it's surroundings to increase awareness on safety behavior of the urban and rural population before, during, and after an earthquake, to engage the large-scale representatives of private sector in DRR, and to establish a learning platform between the national and regional partners to share the best practices and lessons learnt. Disaster risk reduction is a priority for UNDP Kazakhstan for the period of 2010-2015. Specific focus is on national risk assessment methodologies, climate risk management and disaster preparedness, specifically from community perspective. The project will link to ongoing initiatives on disaster preparedness and seismic risk management. It will work with regional and national authorities (MoES, Ministry of Environmental Protection, National Institute of Seismology) and others in the frameworks of their respective initiatives to scale up the Project activities and vice versa. Rationale: According to integrated analysis of the situation and existing measures relating to seismic risk management, a unified preparedness system is lacking. To date, attempts to raise public awareness have been undertaken by the ESC MIA RK and through some other partner project initiatives - such as through the Kazakh Society of the Red Crescent (KSRC). Schools are an effective instrument of raising awareness and remain one of the main information sharing structures - not only among schoolchildren but for parents and other family members. In cities, other channels are available, with the wide network of condominiums (KSK) available for communicating public messages. Structural DRR measures (relating to maintenance of such environmental sites as dams, riverbanks and canals) and non-structural (such as information campaigns and training) can help reduce public risk in the event of seismic activity – especially relating to cascading disaster. Based on internal assessment of the situation, including the vulnerability and capacity of local communities (regarding structural and non-structural measures) four sites are to be selected for piloting the Project. The aim is to mitigate risk in cases of earthquake (by strengthening landslideprone slopes, stabilizing river banks, and restoring dams and other mudslide protection constructions). Selection will be carried out jointly with local communities, involving representatives of state bodies, in accordance with criteria developed during co-ordination and planning meetings - with the participation of all interested parties. In this regard there is a nedd to attract an expert on mini-project in the sphere who would provide an development and inspection for implementation of small-scale mitigation events. Objective: The purpose of the project expert work aimed to mitigate the effects of potential disaster in 2015, is the development and implementation of 4-mitigation projects in cooperation with local communities and government officials in the Almaty region. Scope of the work: Within the frames of this Terms of Reference Project expert is responsible (but not limited to) the following tasks: 1. Implementation of the measures to mitigate the consequences of emergency situations related to seismic risk within the target communities, with further involvement of the population, executive bodies and other stakeholders. 2. Participation in the plan development on increasing the social awareness on seismic hazards. 3. Development and control on implementation of mitigation project in Talgar and Issyk cites together with local communities and state body representatives. 4. Participating in organization of national research and practice workshop on current issues of seismic risk management with participation of local stakeholders. 5. Cooperation during final report submission of project realization based on analysis and aggregation of national experts’ materials for the 2013-2015YY. Expected results and payments: Outcome Time limits Payments July 2015 30 % from amount of the contract on the Component 1: -Criterias for selecting venues for mini projects implementations are developed Form of accomplishment - report on the Component 1: - Risk assessment on factors on earthquakes Form of accomplishment - report secondary October 2015 40 % from amount of the contract on the Components 1-3: -Methodological assistance for national experts in preparing interim reports on Terms of References within the expert's competences is provided On the Component 1: -4 (four) mitigation projects On the Component 3: -National research and practice October 2015 workshop on current issues on seismic risk management on the Components 1-3: -Within the expert competence a methodological assistance to national experts in preparing final reports on terms of references is provided On the component 2: November 2015 -Final report on project realization based on analysis and national experts' materials aggregation for the 2015 is provided -Final report on execution of Terms of References is fully provided 30% from amount of the contract 30 % from amount of the contract Responsibility: Expert on mini projects in DRR system coordinates its activity with Project manager and reports to PM Tasks should be executed in accordance with technical requirements, which are indicated in this technical scope in a timely manner and on high level. All the requirements indicated in individual contract should be carried out unconditionally. Materials prepared during the job execution should be delivered to Project manager for further agreement and approval. Working conditions: This work will be performed by the Expert on mitigation projects who will be selected in accordance with UNDP procedures and with whom contract will be signed. Payments will be made in tranches, which will be discussed at a time of signing the contract. The final payment will be made after the completion of all work that needs to be validated by the project manager. Any other costs associated with the implementation of work reflected in the terms of reference should be included in the financial proposal. Skills and knowledge: High Technical degree or high degree in Natural sciences Previous experience in the implementation of the projects on Public Administration in the field of emergency response, risk assessment and natural disaster management is not less than 5 years Knowledge of state and English languages will be considered as an advantage. COA Project ID Activity Account 00091813 Activity 1 71300 Amount Fund Dept ID 30079 55205 Total: Job Descri[tion certification: Rassul Rakhimov, OIC of Energy and Environment Unit UNDP Signature Date Maxim Kadyrbayev, Project Manager Signature Date Impl Agency 004492 Donor 11724