MINOR PROJECTS GUIDE
MPG-Exhibit B
EDITION: NOVEMBER 5, 2015
PREPARATION OF GUARANTEED MAXIMUM PROPOSAL
GUIDELINES FOR CONSTRUCTION MANAGERS FOR THE PREPARATION OF MINOR PROJECTS
GUARANTEED MAXIMUM PRICE PROPOSALS
MINOR PROJECTS GUARANTEE MAXIMUM PRICE PROPOSAL
Project Name:
Project Name
Date:
USF Building Name:
USF Proj No
Architect/Engineer:
Constructor Manager: CM Firm Name
A/E Project Manager
CM Project Manager: CM PM Name
USF Project Manager:
I.
Click here to enter a date.
A/E Firm Name
A/E PM Name
USF PM Name
COST OF WORK
A. General Conditions
Supervision at __________ Hrs/Week
$ 000,000.00
Subtotal A – General Conditions
$ 000,000.00
B. Self-Performed Work (requires Project Manager’s Approval)
$ 000,000.00
Subtotal B – Self-Performed Work
Self-Performed Work
Approved By University Project Manager:
$ 000,000.00
(Signature /Date)
C. Trade/Sub-Contract Work
Name: Trade Contractor Name
Name:
Name:
Name:
Name:
Name:
Name:
Name:
Name:
Name:
Subtotal C – Trade/Sub-Contract Work
Cost of Work Subtotal (A+B+C)
II.
III.
IV.
V.
VI.
Trade:
Trade:
Trade:
Trade:
Trade:
Trade:
Trade:
Trade:
Trade:
Trade:
Trade Scope
$ 000,000.00
$ 000,000.00
$ 000,000.00
CM FEE (0.0 %) X (A+B+C)
BONDS & INSURANCE (Bonds are required for all projects over $100,000.00)
CM CONTINGENCY (Negotiated % of Cost of Work Subtotal A+B+C)
USF PERMIT FEE
$ 000,000.00
$ 000,000.00
$ 000,000.00
$ 000,000.00
TOTAL GMP (I + II + III + IV + V)
$ 000,000.00
CONTRACT TIME:
Number of Days from Notice to Proceed to Substantial Completion
Calendar Days
000
PAGE 1 OF 2
MINOR PROJECTS GUIDE
MPG-EXHIBIT B
VII. CLARIFICATIONS:
1.
2.
3.
4.
5.
VIII. DRAWINGS AND SPECIFICATIONS:
(our price is as per the following drawing sheets and specifications)
1.
2.
3.
4.
5.
IX. ATTACHMENTS:
1.
2.
3.
4.
5.
X.
CM CERTIFICATION:
CM Project Manager:
(Signature/Date)
XI.
The undersigned have reviewed this proposal and recommend an award of a purchase order and
Notice to Proceed for the described work.
Architect/Engineer:
(Signature/Date)
University Project Manager:
(Signature/Date)
FILE:
MPG-Exhibit B-Preparation of GMP Proposal.docx
PAGE 2 OF 2