Corporate Safety – Forms High Voltage Access Permit No: 1. Switching Sheet No.: 3. Nominated Issue (time/day): 2. Work Area Location: 4. Anticipated Surrender (time/day): 5. Issued to: 6. Access to the following equipment/High Voltage Apparatus: 7. Work Details: 8. Description of Isolation Points with DNOs attached: 9. Location of Operator Earths with DNOs attached: 10. Other Precautions taken: Taping off Work Area Signs Barriers in place Live & Dead Board Roping off Live HV Lines & Apparatus above Board Other (please specify) 11. Nearby Live HV at the work area 12. ISSUE OF ACCESS PERMIT Approval by Name of Switching Coordinator: Switching Name: Operator (please print) Signature: Time: Date: 13. RECEIPT OF ACCESS PERMIT I acknowledge that I only have access to the apparatus listed above and will have no difficulty in keeping clear of apparatus not covered by this Permit and will not alter Isolation Points, and other precautions in place. Recipient Name: Signature: Time: Date: (please print) No: Doc no. Doc owner: Version date: Trim ID: FRM-00439 24/01/2014 Doc approver: Rev no. Y Dong Manager, WH&S 2 Page 1 of 4 The controlled version of this document is registered. All other versions are uncontrolled Corporate Safety – Forms High Voltage Access Permit 14. WORK GROUP SIGNATURES I acknowledge that I only have access to the apparatus listed on page 1 and will have no difficulty in keeping clear of apparatus not covered by this Permit and will not alter Isolation Points, and other precautions in place. Name (please print) Signature Time Is a supplementary Work Group Signature page (19) in progress? I acknowledge that I no longer have access to the apparatus listed on page 1 and will regard the apparatus as being live. Date Signature Yes No Time Sheet No.: 15. TRANSFER OF ACCESS PERMIT Outgoing Name: Recipient (please print) Ingoing Name: Recipient (please print) Signature: Time: Date: Signature: Time: Date: 16. WORKING EARTH SCHEDULE # Location of each set of Working Earths ON Time OFF Date Time Date 17. ABNORMALITIES No: 18. SURRENDER OF ACCESS PERMIT Doc no. Doc owner: Version date: Trim ID: FRM-00439 24/01/2014 Doc approver: Rev no. Y Dong Manager, WH&S 2 Page 2 of 4 The controlled version of this document is registered. All other versions are uncontrolled Date Corporate Safety – Forms High Voltage Access Permit (are supplementary pages attached and signed off?) I acknowledge that I no longer have access to the apparatus listed on page 1 and will regard the apparatus as being live. Recipient Name Signature: Time: Date: (please print): No: 19. WORK GROUP SIGNATURES SUPPLIMENTARY PAGE I acknowledge that I only have access to the apparatus listed on page 1 and Doc no. Doc owner: I acknowledge that I no longer have access Version date: Trim ID: FRM-00439 24/01/2014 Doc approver: Rev no. Y Dong Manager, WH&S 2 Page 3 of 4 The controlled version of this document is registered. All other versions are uncontrolled Corporate Safety – Forms High Voltage Access Permit will have no difficulty in keeping clear of apparatus not covered by this Permit and will not alter Isolation Points, and other precautions in place. Name (please print) Doc no. Doc owner: Signature Time Date to the apparatus listed on page 1 and will regard the apparatus as being live. Signature Time Version date: Trim ID: FRM-00439 24/01/2014 Doc approver: Rev no. Y Dong Manager, WH&S 2 Page 4 of 4 The controlled version of this document is registered. All other versions are uncontrolled Date