Division 7 Guide Specification for
3M™ Air and Vapor Barrier 3015
PRODUCT DESCRIPTION: 3M™ Air and Vapor Barrier 3015 is a high performance,
vapor impermeable, self-adhered membrane possessing good adhesion, elongation and self-sealing
properties that make it ideal for use as a secondary barrier behind exterior cladding systems. The membrane
material is a proprietary film developed by 3M that is unlike any other existing weather/secondary barrier
product. The adhesive contains no asphalt or butyl. Only one membrane material is needed for both the field
barrier and for penetration flashing; its unique elastic and adhesive qualities make it an ideal self-adhered
flexible flashing material at penetrations as well as for sealing around openings for doors and windows.
NOTE TO DESIGNER – VAPOR BARRIER: 3M™ Air and Vapor Barrier 3015 is a Class II vapor retarder
with a water vapor permeance of less than 1 perm (per ASTM E-96). In order to allow the use of the generic
term “barrier” to be applied to the various functions of this product (air/water/vapor barrier) it is referred to
throughout this specification as a “vapor barrier”. Proper placement of a vapor barrier within any assembly
requires an understanding of vapor diffusion and condensation dynamics; it is recommended that a
hygrothermal analysis of the assembly be performed by the designer based on the climate conditions found
at the building location so as to avoid moisture problems within the assembly due to condensation and/or
trapped moisture.
NOTE TO SPECIFIER: 3M™ Air and Vapor Barrier 3015 can be specified as a CSI 2004 MasterFormat
Specifications Group titled Section 07 25 00 - Weather Barriers, or as a CSI 2004 MasterFormat General
Requirements Subgroup titled Section 07 27 00 – Air Barriers. This guide specification must be edited to
conform to the specific barrier function(s) and requirements required by the assembly design and the
language coordinated to match the barrier callouts included on the Drawings. Select the appropriate section
number and title from the bracketed options below:
SECTION 07 27 13
SHEET AIR BARRIER
PART 1 - GENERAL
1.01
SUMMARY
NOTE TO SPECIFIER: Coordinate the following suggested barrier names with the callouts on the Drawings
Delete the following barrier names/functions in [brackets] that do not apply to the project.
A.
Section Includes:
1.
Air Barrier membrane and accessories
2.
[Air/Water/Vapor Barrier membrane and accessories]
07 27 13-1
Rev. 12/10/2013
Division 7 Guide Specification for 3M™ Air and Vapor Barrier 3015
1.02
1.03
1.04
RELATED SECTIONS
A.
Concrete:
Section 03 XX XX
B.
Masonry:
Section 04 XX XX
C.
Gypsum Sheathing:
Section 06 XX XX
D.
Plywood Sheathing:
Section 06 XX XX
E.
Insulation:
Section 07 XX XX
F.
Roofing:
Section 07 XX XX
G.
Wall Panels:
Section 07 XX XX
H.
Flashing:
Section 07 XX XX
I.
Sealants:
Section 07 XX XX
J.
Door Frames:
Section 08 XX XX
K.
Window Frames:
Section 08 XX XX
REFERENCE STANDARDS
A.
AAMA 711-07 – Voluntary Specification for Self-Adhering Flashing Used for Installation of
Exterior Wall Fenestration Products
B.
AATCC Test Method 127 – Water Resistance: Hydrostatic Pressure Test
C.
ASTM D882 - Standard Test Methods for Vulcanized Rubber and Thermoplastic
Elastomers— Tension
D.
ASTM D1970 – Standard Specification for Self-Adhering Polymer Modified Bituminous Sheet
Materials Used as Steep Roofing Underlayment for Ice Dam Protection
E.
ASTM D3330 - Standard Test Method for Peel Adhesion of Pressure-Sensitive Tape
F.
ASTM D3652 – Standard Test Method for Thickness of Pressure-Sensitive Tapes
G.
ASTM E84 – Standard Test Method for Surface Burning Characteristics of Building Materials
H.
ASTM E96 – Standard Test Methods for Water Vapor Transmission of Materials
I.
ASTM E331 – Standard Test Method for Water Penetration of Exterior Windows, Skylights,
Doors, and Curtain Walls by Uniform Static Air Pressure Difference
J.
ASTM E2178 - Standard Test Method for Air Permeance of Building Materials
K.
ASTM E2357 - Standard Test Method for Determining Air Leakage of Air Barrier Assemblies
L.
LEED NC, Version 2.2, Environmental Quality Credit 4.1 – USGBC’s Rating System for New
Construction and Major Renovations
M.
LEED CS, Version 2.0, Environmental Quality Credit 4.1 – USGBC’s Rating System for Core
and Shell
N.
LEED CI, Version 2.1, Environmental Quality Credit 4.1 - USGBC’s Rating System for
Commercial Interiors
PERFORMANCE REQUIREMENTS
A.
Material Performance
1.
Air permeance of membrane: ASTM E2178, less than 0.004 cfm/ft2 at 1.57 psf (0.02
L/s/m2 at 75 Pa)
2.
Water vapor permeance of membrane: ASTM E96, Desiccant method, not to exceed
01 13 14--72
Rev. 1/13/2014
Division 7 Guide Specification for 3M™ Air and Vapor Barrier 3015
1 US Perm (57 ng/Pa s m2)
3.
Water resistance of membrane: AATCC Test Method 127, deviated, 2.16 inches (55
cm) of water for 5 hours; no leakage
4.
Flammability
a.
Surface burning characteristic of membrane: ASTM E 84, flame spread index
less than 25, smoke developed value less than 450
b.
5.
B.
1.05
Membrane in an assembly meets the performance requirements of NFPA 285
Self Sealability (Head of Water Test): ASTM D1970, Section 7.9, pass.
Assembly Performance
1.
Air Leakage: ASTM E2357, less than 0.04 cfm/ft2 at 1.57 psf (0.2 L/s/m 2 at 75 Pa)
2.
Loads from imposed pressures: Withstands design wind, fan, and stack pressures,
both positive and negative, without damage or displacement of the air barrier
assembly or adjacent materials. Allows transfer of these loads to the structure.
3.
Movement: Allows for thermal, creep, and anticipated seismic and building
movement within the air barrier assembly, each air barrier detail, and transitions to
adjacent systems without breaching the air barrier system or negating specified air
leakage performance.
4.
Continuity: Joins air barrier materials and adjacent compatible materials and
systems preventing air leakage and maintaining specified air leakage performance
at the following locations and as shown on the Drawings:
a.
Transitions from roof air barrier to wall
b.
Transitions from window, curtain wall, storefront, louvers, and doors to wall
c.
Transitions from foundation waterproofing to wall
d.
Transitions from one type of exterior cladding to another
e.
Across construction, control, expansion, and seismic joints
f.
Penetrations of utilities, pipes, conduit, and ducts
g.
Penetrations of ties, anchors, and channels for exterior finishes
h.
Pathways for potential air leakage into the building envelope
ADMINISTRATIVE REQUIREMENTS
A.
Coordination:
1.
Work of this Section with the work of other Sections that have work or materials
connected to or passing through the air barrier assembly.
2.
Sequence of construction to ensure continuity of the barrier assembly at openings,
transitions, and penetrations.
3.
Coordinate with installation of materials which cover the air barrier assemblies, to
ensure exposure period does not exceed 6 months.
4.
Coordinate field observations and testing by specified parties.
01 13 14--73
Rev. 1/13/2014
Division 7 Guide Specification for 3M™ Air and Vapor Barrier 3015
NOTE TO SPECIFIER: The pre-installation meeting may be deleted if the size and complexity of the project
does not require prior coordination and review of the barrier system installation. A pre-installation meeting is
recommended when an air barrier function is required for the building to allow coordination with other
trades; review of the mock-up and project substrates and conditions; and to review proper installation
details.
B.
Preinstallation Meeting: Prior to starting installation of the barrier system,
conduct a preinstallation meeting at the job site to review the Project conditions
and installation requirements.
1.
2.
1.06
Attendance is required by:
a.
Installing contractor of the air barrier assembly
b.
Representatives of related trades including exterior cladding, air barrier
substrate, penetrating work and systems, and adjacent materials
c.
General Contractor
d.
Architect/Engineer
e.
Air barrier system manufacturer’s field representative
f.
Owner’s representative
g.
Third-party observer
h.
Field testing agency
Agenda shall include:
a.
Construction of the mock-up
b.
Sequence of construction and protection of installed air barrier assembly
c.
Substrate condition and preparation
d.
Materials approved for use
e.
Compatibility of materials
f.
Transition details between the various different types of barrier systems
specified
g.
Coordination with installation of adjacent and cladding materials
h.
Project-specific details of construction
i.
Field observation and testing
j.
Repair of test and damaged areas
SUBMITTALS
A.
Refer to Section 01 33 00 for submittal procedures.
B.
Prior to Installation:
1.
Qualifications:
a.
Submit manufacturer’s letter verifying installing contractor’s experience with
the specified self-adhered sheet membrane air barrier.
01 13 14--74
Rev. 1/13/2014
Division 7 Guide Specification for 3M™ Air and Vapor Barrier 3015
b.
2.
Product Data: Provide the manufacturer’s technical data sheet on the barrier
assembly materials stating that each material meets the specified performance
requirements.
3.
MSDS: Provide the manufacturer’s MSDS on the air barrier assembly materials.
4.
Installation Instructions: Submit manufacturer’s installation instructions along with
manufacturer’s standard details applicable to the project.
5.
Manufacturer’s compatibility letter: Submit signed letter stating project name, list of
the specific air barrier materials, and adjacent system materials; that are compatible,
both chemically and adhesively.
6.
Shop drawings: Project specific details with actual product names on details of:
7.
C.
1.07
Submit 5 project references within the last 5 years of similar-sized projects
with self-adhered sheet membrane air barrier assembly installation by the
proposed installing contractor.
a.
Typical conditions
b.
Transitions to adjacent systems
c.
Mock-up, including plans and elevations
Warranty: Submit manufacturer’s sample warranty.
During mock-up construction, air barrier installation, and within 7 days of site visit:
1.
Field observation reports by manufacturer’s field representative and third-party
observer, including observation of field testing.
2.
Field test reports of the air and water infiltration testing of the mock-up and the Work
by the field testing agency.
QUALITY ASSURANCE
A.
Source Limitations: Barrier system components shall be produced by and obtained from a
single manufacturer of the specified self-adhered sheet air barrier assembly.
B.
Installing contractor:
1.
Minimum of 5 years' experience with installation of self-adhered sheet membrane air
barrier assembly.
2.
Show evidence of adequate equipment and trained installers to successfully
complete the Work.
C.
Accredited laboratory testing for materials: Accredited by International Accreditation
Service, Inc. (IAS) or American Association for Laboratory Accreditation (A2LA).
D.
Field Quality Assurance:
1.
Schedule field tests for air and water infiltration, and membrane adhesion of the
mock-up and the Work as described in Field Quality Control of this Section.
Coordinate observations of the tests by the third-party observer.
NOTE TO SPECIFIER: The mock-up may be deleted if the size and complexity of the project does not
require it. A mock-up is recommended when an air barrier function is required to allow coordination with
the work of other trades and installation materials/sequence between different substrates or different air
barrier systems.
01 13 14--75
Rev. 1/13/2014
Division 7 Guide Specification for 3M™ Air and Vapor Barrier 3015
E.
Mock-Up
1.
Demonstrate the proper installation sequence and workmanship required for the air
barrier assembly installation at typical conditions, transitions, openings, and
penetrations through the exterior building envelope.
2.
Build a minimum of 8 feet tall by 8 feet wide exterior wall panel incorporating the backup wall, window with sill, door frame, through-wall flashing, insulation, cladding,
foundation, roof edge, and building corner. Show all air barrier assembly materials
and seals. Coordinate with the Third-party Testing Agency for the size of testing area
required for field testing the mock-up and allow testing prior to fully installing the
insulation and cladding. Refer to Field Quality Control of this Section for test methods
and quantity of tests.
3.
Do not install any barrier materials on the building until the mock-up is reviewed and
approved by the air barrier manufacturer’s field representative, Owner,
Architect/Engineer, and Third-party Observer.
4.
Approved mock-up represents the minimum quality for the Work for the air barrier
assembly installation. Materials and installation procedures utilized in the mock-up
become the standard of quality and construction for all subsequent similar
conditions on the building.
5.
1.08
1.09
DELIVERY, STORAGE & HANDLING
A.
Deliver and store air barrier materials and components in manufacturer’s original,
unopened, undamaged containers with identification labels intact.
B.
Storage of air barrier materials:
1.
Warehouse: Refer to manufacturer’s product data
2.
Construction site: Within ambient temperatures during application
C.
Protect air barrier materials from damage from sunlight, weather, and construction
operations.
D.
Use air barrier materials within 24 months from date of manufacture.
PROJECT CONDITIONS
A.
1.10
Remove the mock-up only after approval by the Owner and Architect/Engineer.
Maintain ambient temperatures during application between
1.
Membrane: 0° F to 150° F (-18° C to 66° C)
2.
Sealant: 40° F to 95° F (5° C to 35° C)
B.
Install on substrates clear of snow, ice, frost, and moisture.
C.
Maximum exposure time of the air barrier assembly without cover or cladding: Six months.
D.
Provide weather protection at the top of walls and unfinished roofs at the end of each day.
WARRANTY
A.
Product Warranty: Provide manufacturer’s product warranty for a minimum of five (5) years
from date of Substantial Completion with installation completed by a certified 3M applicator.
B.
Workmanship Warranty: Provide workmanship warranty for a minimum of one (1) year from
date of Substantial Completion including all air barrier assembly materials and accessories,
against failures including loss of air tight seal, loss of watertight seal, loss of attachment, loss
of adhesion, and failure to cure properly.
01 13 14--76
Rev. 1/13/2014
Division 7 Guide Specification for 3M™ Air and Vapor Barrier 3015
PART 2 - PRODUCTS
NOTE TO SPECIFIER: Delete the type of barrier system in [brackets] that do not apply to project.
2.01
AIR BARRIER [AIR/WATER/VAPOR BARRIER] ASSEMBLY
A.
Material Performance
1.
Total thickness: ASTM D3652
a.
Membrane: 10 mils (0.25 mm)
b.
Flashing: 10 mils (0.25 mm)
2.
Air permeance of membrane: ASTM E2178, <0.00005 cfm/ft2 at 1.57 psf (<0.0002
L/s/m2 at 75 Pa)
3.
Air leakage of assembly: ASTM E2357
4.
5.
6.
a.
Opaque wall: <0.002 cfm/ft2 at 1.57 psf (<0.01 L/s/m 2 at 75 Pa)
b.
Penetrated wall: <0.006 cfm/ft2 at 1.57 psf (<0.03 L/s/m2 at 75 Pa
Elongation at break: ASTM D882
a.
Membrane: 700%
b.
Sealant: > 600%
c.
Flashing: 700%
Tensile strength: ASTM D882
a.
Membrane: 1740 psi (12 MPa)
b.
Sealant (540): 300 psi (2.1 MPa)
c.
Sealant (525): 400 psi (2.6 MPa)
d.
Flashing: 1740 psi (12 MPa)
Lap adhesion: ASTM D3330
a.
Membrane: 40 oz./inch (0.44 N/mm)
b.
Flashing: 40 oz./inch (0.44 N/mm)
7.
Low temperature flexibility of membrane: ASTM D1970, Section 7.6, at -22° F (-30°
C); passes bend test and no leakage during water head test
8.
Nail sealability of membrane:
a.
ASTM D1970, Section 7.9, 5 inches (127 mm) of water head after 3 days; dry
and passes
b.
ASTM E331/547, as modified per AAMA-711-07, Annex 1; passes initial and
after thermal cycling
B.
Manufacturer:
3M Industrial Adhesives and Tapes
3M Center Bldg. 225-3S-06
St. Paul, MN 55144-1000
Phone: 800-362-3550
Fax: 877-369-2923
Web: www.3M.com/industrial
01 13 14--77
Rev. 1/13/2014
Division 7 Guide Specification for 3M™ Air and Vapor Barrier 3015
C.
Materials:
1.
2.
Membrane: 3M™ Self-Adhered Air and Vapor Barrier Membrane 3015
a.
Description: Tan colored, semi-transparent proprietary film with acrylic
adhesive and silicone coated release liner
b.
Weight: 13.4 oz/yd2 (464 g/m2)
c.
Total membrane thickness: ASTM D3652,10 mils (0.25 mm)
Accessory Materials:
a.
b.
c.
Sealant: 3M™ Polyurethane Sealant 540; a one component, moisture
curing sealant
1)
ASTM C920, Type S, Grade NS, Class 25
2)
Tack free: 60-90 minutes at 73° F at 50% relative humidity
Sealant: 3M™ Polyurethane Construction Sealant 525; a one component,
moisture curing sealant
1)
ASTM C920, Type S, Grade NS, Class 25
2)
Tack free: 90-150 minutes at 73° F at 50% relative humidity
Flashing: 3M™ Self-Adhered Air and Vapor Barrier Membrane 3015 in detail
widths
1)
d.
Description: Tan colored, semi-transparent proprietary film with
acrylic adhesive and silicone coated release liner
2)
Total membrane thickness: ASTM D3652,10 mils (0.25 mm)
3)
Detail widths: 2-3/8”, 4”, 6”, 9”, and 12”
Primer for difficult substrates: Test adhesion before application. See
Preparation in this Section. Select from the following products:
1)
3M™ Hi-Strength 90 Spray Adhesive
2)
3M™ Hi-Strength 94 ET Spray Adhesive
3)
3M™ Scotch-Weld™ Holdfast 70
4)
3M™ Fastbond™ Contact Adhesive 30NF
PART 3 - EXECUTION
3.01
EXAMINATION
NOTE TO SPECIFIER: Delete the substrates listed below that are not applicable to project. For substrate
materials not listed, consult 3M for recommendations.
A.
Substrate surfaces shall be free of grease, oil, unbonded paint, corrosion or other
substances.
B.
Verify that substrate construction is complete, clean, dry, and ready to receive barrier system
with no damaged or unsupported areas; or sharp protrusions or voids. Substrate must meet
01 13 14--78
Rev. 1/13/2014
Division 7 Guide Specification for 3M™ Air and Vapor Barrier 3015
the following requirements:
C.
3.02
1.
Exterior gypsum sheathing: Moisture content below 19%; no open joints or cracks
wider than 1/4 inch
2.
Plywood: Moisture content below 16%; no open joints or cracks wider than 1/4 inch
3.
Concrete surfaces: Cured minimum 7 days, fins and extrusions ground flush and
void areas filled and cured
4.
Masonry: Mortar joints struck flush
5.
Metal: Wipe down to remove any release agents or coatings
Start of air barrier material installation indicates Installing Contractor’s acceptance of the
substrate and installation conditions.
PREPARATION
A.
Connection to Difficult Substrates and Other Systems:
1.
Test adhesion by installing a 6 inch square test patch of barrier product over the
difficult substrate or other system. Removal of the test patch should not be possible
without permanent damage to either the test patch or substrate material.
2.
Consult the manufacturer for detailing connections that fail this test.
B.
Gaps or cracks in substrate exceeding 1/4 inch width: Fill gap or crack with sealant
and tool surface flush and smooth.
C.
Penetrations of air barrier assembly: Fill gaps or cracks exceeding 1/4 inch width between
the substrate and the penetration with sealant.
NOTE TO SPECIFIER: Delete or expand the installation as applicable to project.
3.03
AIR BARRIER ASSEMBLY INSTALLATION
A.
Install air barrier assembly in accordance with manufacturer’s instructions in locations shown
on the Drawings to provide a continuous air barrier [air/water/vapor barrier].
1.
Cut membrane to length and wind up into a roll. Fold the starting edge back over
itself to crease the paper release liner. Peel back the liner to expose the 2-3 inch
starting strip of the membrane. Do not contaminate the starting strip with dust or
debris before applying it to the intended surface.
2.
Stagger all vertical joints if membrane installed in “weatherboard” or “shingle
fashion”. Stagger all horizontal joints if membrane installed in vertical strips.
3.
Align and set the membrane in place, rolling the product back against the exposed
adhesive. Simultaneously unwind the roll pulling the release liner, maintaining
pressure against the substrate to tack the membrane in place. Wipe the membrane
down with a feathering motion from the middle outward to obtain a smooth surface.
4.
Lap a minimum of 2 inches on sides and ends. Roll the membrane with a rubber
roller to ensure a tight seal against the wall and between overlapped edges.
5.
Install 6 inch wide membrane at inside and outside vertical corners and construction
joints, lapping a minimum of 2 inches on either side.
6.
Carefully execute detail work to ensure a continuously sealed building
envelope.
01 13 14--79
Rev. 1/13/2014
Division 7 Guide Specification for 3M™ Air and Vapor Barrier 3015
B.
C.
7.
Through-wall flashings: Seal top edge of through-wall flashing with air barrier
sealant. Lap membrane over sealed through-wall flashing top edge minimum 2
inches.
8.
Transitions to adjacent systems: See the Drawings for project specific detailing of
transitions to the roof, foundation waterproofing, and door systems.
9.
Repair all wrinkles and fish mouths extending within 2 inches of the membrane edge
with a repair membrane piece extending 6 inches beyond the defect.
Window and Louver Openings:
1.
Wrap rough openings as detailed in the Drawings with either flashing or membrane
material in detail widths.
2.
Install sealant at each inside corner of the window sill, jamb, and head.
3.
Apply detail strips of membrane at each inside corner extending the full depth of the
sill and a minimum 2 inches onto the face.
4.
Install detail strips at the sill, jambs, and head in lengths beyond window opening
extending the full depth of the sill.
5.
Apply reinforcing piece cut into a football, bowtie, or butterfly shape at each corner.
6.
Install membrane in “weatherboard” or “shingle fashion” with a minimum 2 inch
overlap at all detail strips.
Penetrations:
1.
Seal all penetrations with sealant. Install flashing or membrane material cut to length
to allow installation around the full circumference of penetration.
2.
Masonry Ties or Anchors:
3.
a.
Post-applied: Install backplate of tie or anchor over the air barrier with selftapping screws. Apply sealant over the screw heads.
b.
Knife plate: Cut a one piece membrane to overlap minimum 2 inches in
each direction of the knife plate. Cut a slot for the knife plate and apply
the membrane over. Apply sealant at the knife plate penetration
perimeter.
Utilities, Pipes, Conduit, and Duct Penetrations:
a.
Apply sealant between the penetration and the exterior wall.
b.
Apply membrane to allow continuous 2 inch overlap onto vent/pipe
penetration and cut “fingers” to transition to the exterior wall.
c.
Install a narrow membrane collar strip around the circumference of the
penetration perimeter, lapping onto the penetration and substrate.
d.
Install one piece membrane with penetration shape cut out on to the
substrate. Apply over “fingers” on the substrate and extend a minimum of 2
inches beyond the penetration perimeter.
e.
Apply sealant at the penetration perimeter and cut edge of the one piece
membrane.
D.
Substrate transitions and building joints: See Drawings for project specific detailing with
backer rod, sealant, and membrane.
E.
Repairs: Apply membrane 6 inch larger than test or damage area. Seal leading cut edges of
membrane with sealant.
01 13 14--710
Rev. 1/13/2014
Division 7 Guide Specification for 3M™ Air and Vapor Barrier 3015
3.04
3.05
FIELD QUALITY CONTROL
A.
Third-party testing agency: Cooperate with the third-party testing agency. Provide access
and utilities to testing areas of work. Do not cover air barrier assembly until testing is
completed and accepted. Submit test results as specified under Submittals of this Section.
B.
Tests
1.
Qualitative air leakage: ASTM E1186. Conduct [quantity] at the mock-up and [quantity]
at select locations of the Work.
2.
Quantitative air leakage: ASTM E783, at 1.57 psf (75 Pa). Conduct [quantity] at the
mock-up and [quantity] at select locations of the Work.
3.
Water penetration: ASTM E1105). Conduct [quantity] at the mock-up and [quantity] at
select locations of the Work.
4.
Membrane adhesion: ASTM D4541, modified. Use a Type II Pull Tester. Cut through
the membrane at the perimeter of the disc.
a.
Conduct [quantity] sets at the mock-up and [quantity] sets at select locations
24 hours after installation. Each set includes three adhesion tests.
b.
Record the mode of failure and area where material failed.
c.
Record the adhesion level from the gauge at the end of the test.
5.
Repair all test areas to conform to the project specifications.
6.
Repair or take corrective action all non-conforming work to meet the project
specifications.
PROTECTION AND CLEANING
A.
Protect air barrier materials from damage during installation and the remainder of the
construction period.
B.
Clean spillage and soiling from adjacent construction using cleaning agents and procedures
recommended by manufacturer of affected construction and acceptable to the air barrier
assembly manufacturer.
END OF SECTION
01 13 14--711
Rev. 1/13/2014
Division 7 Guide Specification for 3M™ Air and Vapor Barrier 3015
Technical Information
The technical information, recommendations and other statements contained in this document are
based upon tests or experience that 3M believes are reliable, but the accuracy or completeness of such
information is not guaranteed.
Product Use
Many factors beyond 3M’s control and uniquely within user’s knowledge and control can affect the use
and performance of a 3M product in a particular application. Given the variety of factors that can affect
the use and performance of a 3M product, user is solely responsible for evaluating the 3M product and
determining whether it is fit for a particular purpose and suitable for user’s method of application.
Warranty,
Unless an additional warranty is specifically stated on the applicable 3M product packaging or product
literature, 3M warrants that each 3M product meets the applicable 3M product specification at the time
Limited Remedy,
and Disclaimer
3M ships the product. 3M MAKES NO OTHER WARRANTIES OR CONDITIONS, EXPRESS OR
IMPLIED, INCLUDING, BUT NOT LIMITED TO, ANY IMPLIED WARRANTY OR CONDITION OF
MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE OR ANY IMPLIED WARRANTY
OR CONDITION ARISING OUT OF A COURSE OF DEALING, CUSTOM OR USAGE OF TRADE.
If the 3M product does not conform to this warranty, then the sole and exclusive remedy is, at 3M’s
option, replacement of the 3M product or refund of the purchase price.
Limitation of Liability
Except where prohibited by law, 3M will not be liable for any loss or damage arising from the 3M product,
whether direct, indirect, special, incidental or consequential, regardless of the legal theory asserted,
including warranty, contract, negligence or strict liability.
ISO 9001: 2008
This Industrial Adhesives and Tapes Division product was manufactured under a 3M quality system registered to ISO 9001: 2008 standards.
Industrial Adhesives and Tapes Division
3M Center, Building 225-3S-06
St. Paul, MN 55144-1000
800-362-3550 • 877-369-2923 (Fax)
www.3M.com/industrial
Recycled Paper
40% pre-consumer
10% post-consumer
3M, Scotch-Weld and Fastbond
are trademarks of 3M Company.
Printed in U.S.A.
©3M 2013 (12/13)
Rev. 1/13/2014
Download