BC Ministry of Advanced Education Carbon Neutral Capital Program – Project Close Out Report Note: 1.0 Completion is defined as the date at which the infrastructure has been acquired or developed and is operational and all expenditures have been incurred. TOMBSTONE INFORMATION Project ID (for internal use only): Name of institution: Date of Report: Campus/ Building: Project title: Project description: Original Project Scope: 2.0 Provide a brief scope description of the project and state the primary driver of the project PROJECT OUTCOMES AND MILESTONES Project Start date: Project Completion Date: Project Outcomes: Outcomes achieved as a result of the project implementation Project Close Out Report | Page 1 of 4 BC Ministry of Advanced Education Carbon Neutral Capital Program – Project Close Out Report 3.0 COST, FUNDING AND CASHFLOW SUMMARY List actual project costs and list funding sources, compared to the initially approved project budget. 4.0 HEALTH & SAFETY Waste management and health and safety improvements: 5.0 If applicable, provide a short description of improvements (e.g. lights, system upgrades, accessibility upgrades, hazardous waste removal, mould abatement) ENERGY EFFICIENCY AND GREEN HOUSE GAS EMISSIONS Provide an estimate of direct energy savings that will be achieved (Giga Joules/year): Describe the work completed to improve energy efficiency: Reduction of greenhouse gas emissions: Provide an estimate of greenhouse gas emissions reductions (in Tonnes of Equivalent carbon dioxide/year) that will be achieved, using Table 1 below Table 1 Estimate of Greenhouse Gas Emissions Reductions GHG Emission Reductions GHG Emission Categories (Tonnes CO2e/year) Direct emissions reductions from fossil fuel and/or biomass savings (e.g., from reduced natural gas consumption) Indirect emissions reductions from electricity and/or steam savings Total estimate of greenhouse gas emissions reductions Project Close Out Report | Page 2 of 4 BC Ministry of Advanced Education Carbon Neutral Capital Program – Project Close Out Report 6.0 PROCUREMENT How the consulting and construction services were procured? (e.g. posted on BC bid) Did you follow Capital Asset Management Framework (CAMF) guidelines in procurement of consulting and construction services? Which procurement method was used to procure consulting services? Which procurement method was used to procure construction services? Which procurement method was used to procure equipments? (if applicable) Name of consulting firm Name of construction firm Project Close Out Report | Page 3 of 4 BC Ministry of Advanced Education Carbon Neutral Capital Program – Project Close Out Report 7.0 OTHER Lessons Learned: Please list lessons learned from the project implementation. Other: Please provide a description of other benefits that this project may have _______________________________________ [FIRST NAME, LAST NAME] Facilities Director ___________________________________ Signature ___________________________________ Date Project Close Out Report | Page 4 of 4