ANNUAL PERFORMANCE EVALUATION REPORT

IBIKA BULK WATER SUPPLY SCHEME

EASTERN CAPE

CHIEF DIRECTORATE: BULK INFRASTRUCTURE PROGRAMME

PERIOD: 1 APRIL 2013 TO 31 MARCH 2014

2

P

ROGRAMME

M

ANAGEMENT

: R

EGIONAL

B

ULK

I

NFRASTRUCTURE

APRIL 2014

TABLE OF CONTENTS

1.

INTRODUCTION ........................................................................................................................... 3

2.

BACKGROUND ............................................................................................................................ 3

2.1.

Description of Project .............................................................................................. 3

2.2.

Project History ......................................................................................................... 4

2.3.

Project concept, design and plan ............................................................................. 5

2.4.

Funds previously allocated to project ....................................................................... 9

2.5.

Start date – duration of the programme ................................................................. 10

3.

PROGRESS TO DATE ................................................................................................................ 11

3.1.

Implementation of the approved business plan ...................................................... 11

3.2.

Risks taken and management thereof ................................................................... 12

3.3.

Capacities dedicated to the programme ................................................................ 12

3.4.

Key challenges within the project .......................................................................... 13

4.

PROJECT RESULTS AND BENEFICIARIES ............................................................................ 13

4.1

Outcomes and outputs .......................................................................................... 13

4.2

Beneficiaries and project results ............................................................................ 13

4.3

Jobs Created ......................................................................................................... 14

5.

CONCLUSION ............................................................................................................................. 14

5.1

Main successes and failures of the project to date ................................................ 14

5.2

Outcomes, outputs, successes and failures versus the costs ................................ 14

6.

7.

5.3

Ownership and sustainability of infrastructure works ............................................. 14

LESSONS LEARNED ................................................................................................................. 14

RECOMMENDATIONS ............................................................................................................... 14

3

P

ROGRAMME

M

ANAGEMENT

: R

EGIONAL

B

ULK

I

NFRASTRUCTURE

APRIL 2014

1. INTRODUCTION

In terms of Section 10(7) (b) of the Division of Revenue Act No 2 of 2013 (DORA) as promulgated in Government Gazette No 36555 dated 10 June 2013, the transferring national officer must submit an annual performance report for Schedule 6 within four months in respect of a province and six months in respect of a municipality after the end of the financial year to the National Treasury.

The Regional Bulk Infrastructure Grant (RBIG) is a Schedule 6 indirect conditional grant for the benefit in kind of municipalities.

The objective of this Report is to provide an annual performance evaluation report covering the 4 th quarter of RBIG funded projects, in compliance with the DORA. The objective of this evaluation was to determine whether the progress on the project is commensurate with the expenditure to date as well as to determine whether the project is still on course in terms of the original planning.

This performance evaluation report, covering quarter 4 and annual report of the

2013/14 fiscal year is for the Ibika-Centane Water Supply Project which is one of the

Regional Bulk Infrastructure Grant projects currently being implemented by the

Amatole District Municipality (ADM) in the Eastern Cape Province, with Department of

Water Affairs (DWA) as funder.

2. BACKGROUND

2.1. Description of Project

The primary focus of this project is to make potable water services available to the residents of the project area by means of providing bulk services. The project is the design and construction of a water supply scheme covering the villages located on the right-hand-side of N2 national route bounded by the Xhobani River on the west and

Gosaxi River on the east all the way down to the Indian Ocean and also to Centane town and its surrounding rural settlements. The scope of the works includes among others, the following:

Concrete Reservoirs:

Phase 1 and 2 o 1 x 1 M ℓ (Contract B) o 1 x 500 K ℓ (Contract 1A) o 1 x 360 Kℓ (Contract 2A) o 1 x 270 Kℓ (Contract 2B) o 1 x 200 Kℓ (Contract 2C) o 1 x 150 Kℓ (Contract B) o 3 x 100 Kℓ (Contract A x 1, Contract 1C x 2)

Phase 3 o 1 x 500 Kℓ

4

P

ROGRAMME

M

ANAGEMENT

: R

EGIONAL

B

ULK

I

NFRASTRUCTURE

APRIL 2014

Pipelines:

Phase 1 and 2 o 110 mm Dia mPVC x 41 426 m o 160 mm Dia mPVC x 49 084 m o 200 mm Dia mPVC x 47 956 m o 250 mm Dia mPVC x 17 349 m o 315 mm Dia mPVC x 1 858 m

Phase 3 o 110 mm Dia mPVC x 4 328 m o 160 mm Dia mPVC x 421 m

The project will be implemented in phases over a period of three years, subject to availability of sufficient funding. In view of this, the pipeline to Centane is considered to be critical since it serves an urban centre with facilities that crucially depend on a reliable water supply. The proposed phases comprise of phases 1, 2 and 3 bulk structures including distribution mains. All reticulation will be funded from the MIG programme. Out of Phase 1 there will be three sub-phases on the bulk component depending on the aspect of benefiting SMMEs and approval of fund allocations. The same will be done for Phases 2 and 3. Phase 2 has been sub divided into Phases 2A,

2B, 2C and Phase 3 into a Bulk Phase, and Phases 3A, 3B, 3C, 3D and 3E respectively.

2.2. Project History

Amatole District Municipality seeks to implement a rural water supply scheme for the area stretching from N2 route in the north, Xholani on the west and Gosaxi in the east down to the coastal area of Mazepa within the Mnquma Local Municipality. The area is home to a total of 32,574 people dwelling in 6,515 households (the latest figures indicate 33,530 people dwelling in 8,529 households) made of mainly low income earners. The project will also extend to Centane which has both urban and rural dwellers. The estimated population for Centane, projected from the 2002 population is around 13,260 which converts to about 2,652 households (latest figures indicate

10,533 people in 2,835 households) at an average of 5 people per household.

The present source of water supply in Ibika rural is mainly harvested rainwater, springs, streams, small dams and the Upper Kobonqaba - and the Qora River. In

Centane Town there is a water supply scheme relying on groundwater sources. The proposed Ibika - Centane Scheme will use the existing concrete storage reservoirs at

Ibika which are favourably located to supply the areas under gravity flow. The source of water for the Ibika reservoirs is treated surface water from Gcuwa Treatment Works in Butterworth.

The average annual water demand in the project area (Ibika - Centane) for the year

2017 is 730,712 cubic meters including 10% losses while the summer peak flow is

2,402 cubic meters per day. The yield from existing boreholes in the project area does satisfy the required demand. Water infrastructure at Gcuwa Water Treatment Works and the Ibika reservoirs have adequate capacity to allow the incorporation of the Ibika -

Centane Scheme into the Gcuwa system.

5

P

ROGRAMME

M

ANAGEMENT

: R

EGIONAL

B

ULK

I

NFRASTRUCTURE

APRIL 2014

The reservoirs at Ibika have a combined capacity of 15,000 cubic meters. Current daily draw-off from these reservoirs is estimated at 900 cubic meters.

Collective draw-off from the reservoirs would, upon completion of the Ibika-Centane scheme, be 3,302 cubic meters. This quantity represents 22% of the total reservoirs’ capacity.

The reservoirs therefore have sufficient capacity to support the development of the

Ibika-Centane scheme.

The Gcuwa - Xilinxa surface water system on which the project will depend has 98% assurance system yield of 9.2 million m 3 per annum.

The system will be able to sustain the demand until 2020 provided no more demand is exerted on the resources other than that presented herein.

The Gcuwa Water Treatment Works has a capacity of 6.57 million m 3 per annum, which will be sufficient to meet the demand until 2017, operating at 90% capacity until

2012 and 100% thereafter. The capacity of the works will therefore need to be upgraded before 2017 to sustain the demand.

2.3. Project concept, design and plan

The project covered design and construction of a potable water supply scheme to RDP standards for the greater Ibika rural area as well as the Centane rural and urban areas.

The following activities formed the major scope of the works during the phases of the project. Preliminary and detailed project design, tender specification and documentation following CIDB guidelines, tendering and tender evaluation.

The design complied with the following standards and guidelines: o o

DWA - RDP Water Supply Design Criteria.

Technical Guidelines for Planning and Design in the Development of Water and

Sanitation Services – DWA. o o

The Red Book - Guidelines for Human Settlement Planning and Design.

SANS 1200 – Standard Specification for Civil Engineering Construction.

The demand is based on 25 ℓ/c/d for the rural component while for the urban area it is

60 ℓ/c/d. The growth rate is limited to 1% for the next 20 years, especially for the design of pipes. In the 2003 feasibility study report, a population growth rate of -0.1% was estimated for Butterworth and the surrounding areas. A 48 hour emergency storage has been provided for all the service reservoirs.

The Ibika – Centane Water Supply Project was divided into the following schemes with the scope as indicated:

Scheme A: Ibika – Centane Water Supply (Regional Bulk)

Scheme A of the project was completed on 8 June 2010 by Mamlambo Construction cc and was reviewed in the last performance evaluation in May 2010. The works comprised of the following:

6

P

ROGRAMME

M

ANAGEMENT

: R

EGIONAL

B

ULK

I

NFRASTRUCTURE

APRIL 2014

Ties into the e xisting 1.5 Mℓ reservoir,

Clear and grub for pipe laying;

Excavate 8 814 m for 110 mm – 250 mm diameter mPVC pipe,

Laying 54 m of 110 mm diameter mPVC pipe,

Laying 1 710 m of 200 mm diameter mPVC pipe,

Laying 7 050 m of 250 mm diameter mPVC pipe,

Construction of manhole chambers for air valves, scour valves, gate valve, and

Construction of a 100 K ℓ reservoir.

A pipeline across a railway line which was initially planned for the Scheme A was deferred and included in Scheme B due to delay in way leave approval.

Scheme B – Ibika – Centane Water Supply (Regional Bulk)

Scheme B of the project was awarded to EC Khula Nathi Construction cc and was under construction since 24 June 2010. This phase ties in with Scheme A and supplies water to Centane. The completion payment certificate was dated 25 August 2012. The

 work that was incorporated in this phase comprises of the following works:

Ties in to Scheme A

Clear and grub for pipe laying

Excavate for 22,362 m for various diameters of pipeline

Laying 22,362 m of 110 mm – 250 mm diameter mPVC pipe

Construction of manhole chambers for air valves, scour valves and gate valves,

Construction of 150 K ℓ reservoir

Construction of 1000 K ℓ reservoir

Additional work included a pipeline to connect a steel tank located about 4.3 km from the 1,000 K ℓ reservoir towards Centane. The reason for the inclusion of the latter is that a pumping main which was initially considered to transport water to an existing steel tank in Centane was inadequate. Thus a new pipeline was designed and priced for its approval and inclusion in the project. This additional work was approved by

ADM and the work has been implemented. This resulted in the contract being completed later than the estimated completion date of 14 July 2011.

Phase 1: Ibika – Centane Water Supply (Reticulation & Bulk)

Phase 1A: Ibika – Centane Water Supply (Reticulation & Bulk)

Phase 1A covering some portion of the reticulation component of the project as well as bulk pipelines, linked to the regional bulk component has been awarded to Town

& Around Construction cc. Work began on 4 April 2011. The completion payment certificate was dated 20 April 2013. The works include:

500 K ℓ storage reservoir,

 pumping station,

200 mm dia pumping main 5,114 meters long,

 gravity bulk pipelines 200 mm dia mPVC; and

7

P

ROGRAMME

M

ANAGEMENT

: R

EGIONAL

B

ULK

I

NFRASTRUCTURE

APRIL 2014

29,042 m 110 mm – 250 mm diameter gravity supply pipelines feeding village reticulation, comprising of communal standpipes.

The pump station was upgraded and a bi-pass to the 500 K l reservoir was constructed to pump directly into the bulk pumping main. These works have been completed and the project is ready for handover to the client.

Phase 1B: Ibika – Centane Water Supply (Reticulation & Bulk)

Phases 1B covering some portion of the reticulation component of the project as well as bulk pipelines, linked to the regional bulk component was awarded to Ashoda JV.

Work began on 4 April 2011 and the completion pay certificate was dated

11 September 2012. The works include:

Gravity bulk pipelines 200 mm dia mPVC, and

A total of 72,394 m 110 mm – 200 mm diameter gravity supply pipelines feeding village reticulation, comprising of communal standpipes;

Phase 1C: Ibika - Centane Water Supply (Reticulation & Bulk)

Phase 1C of project was planned for construction in the 2011/12 fiscal year. This phase ties in with Scheme A from the 100 K ℓ reservoir. The contract was awarded to

Kwalo’s Construction JV Hagaa Consulting on 26 October 2012. Practical completion was given on 28 June 2013.

The client approved an extension of the contract under MIG in order to supplement the already existing supply of water from a borehole. The borehole pump station has not been completed due to the Eskom line installation being delayed. The works incorporated in this scheme comprise of the following:

2 X 100 K ℓ storage reservoirs,

3,479 m 110 mm – 200 mm diameter gravity mPVC bulk pipelines; and gravity supply pipelines feeding village reticulation

Phase 1D: Ibika - Centane Water Supply (Reticulation)

Phase 1D was awarded and has been completed but was not funded by RBIG.

Phase 2: Ibika - Centane Water Supply (Reticulation and Bulk)

Phase 2 of the project fell under the 2012/13 fiscal year. This phase will tie into the

500 K ℓ reservoir and feed the north eastern side of the scheme. This phase has been divided as follows:

Phase 2A: Ibika - Centane Water Supply (Reticulation and Bulk)

The works comprises the construction of bulk and water reticulation pipelines, concrete reservoir (360 K ℓ) including 200 public standpipes, gate valves and scour valves.

Bulk and reticulation pipelines consist of a total length of approximately 22 km and

8

P

ROGRAMME

M

ANAGEMENT

: R

EGIONAL

B

ULK

I

NFRASTRUCTURE

APRIL 2014

59 km respectively of mPVC and HDPE pipeline of diameter ranging from 50 mm to

315 mm. The project has been awarded to Umso Construction CC for the duration of

14 months. Work started 2 November 2012.

Changes to the initial design was required meaning that the water will be pumped from the 1.5 M ℓ Command Reservoir to the 500 Kℓ reservoir and also directly to

Reservoir 2A.

The client also approved the extension of the contract to include additional standpipes and reticulation to Emahlaweni village that was not previously included.

The works include:

1 x 360 K ℓ reservoir

Valves and valve chambers

21,607 m of 160 mm – 315 mm diameter bulk gravity mains

Reticulation to villages including

Standpipes and valves.

The works have been completed and are ready for handover to the client.

Phase 2B: Ibika - Centane Water Supply (Reticulation and Bulk)

The works consists of the construction of bulk and water reticulation pipelines, concrete reservoir (270 K ℓ) including 108 public standpipes, gate valves and scour valves.

Bulk and Reticulation pipelines consist of a total length of approximately

5.5 km and 45 km respectively, of PVC and HDPe pipelines of diameters ranging from 50 mm to 315 mm.

The project has been awarded to Mamlambo Construction CC for the duration of 12 months. Works started on 6 November 2012.

The works include:

1 x 270 K ℓ reservoir

Valves and valve chambers

18,770 m of 110 mm – 250 mm diameter bulk gravity mains

Reticulation to villages including standpipes and valves

The works have been completed and are ready for handover to the client.

Additional to the original scope, the client approved that the remainder of the funds, the savings, be used to complete Emahlaweni village under Phase 2A.

Phase 2C: Ibika - Centane Water Supply (Reticulation and Bulk)

The work consists of the construction of bulk and water reticulation pipelines, concrete reservoir (200 K ℓ) including 105 public standpipes, gate valves and scour valves. Bulk and reticulation pipelines consist of a total length of approximately 11 km and 43 km respectively, of PVC and HDPE pipelines of diameters ranging from 50 mm to 315 mm .

9

P

ROGRAMME

M

ANAGEMENT

: R

EGIONAL

B

ULK

I

NFRASTRUCTURE

APRIL 2014

The project was awarded to Mamlambo Construction CC for the duration of 12 months. Work started on 6 November 2012. The works include:

1 x 200 K ℓ reservoir

Valves and valve chambers

18 823 m of 110 mm – 250 mm diameter bulk gravity mains

Reticulation to villages including standpipes and valves.

The works have been completed and are ready for handover to the client.

Additional to the original scope, a variation order was approved for:

the inclusion of an additional village, Matole village, funded through a MWIG grant

the emergency upgrading of 800m of pipe work, and

Upgrading of a borehole from a hand pump to a diesel motor and pump in

Mhlahlane village through a refurbishment grant. The village will be reticulated and serviced by Eskom under phase three.

The variation work will be completed by the end of April 2014.

Phase 3 : Ibika - Centane Water Supply (Reticulation and Bulk)

Phase 3 is the last phase of the Ibika - Centane Water Supply Project. Due to the recent appointment of Bosch Stemele (Pty) Ltd after the termination of the previous professional service provider’s contract, Bosch Stemele has undertaken to reevaluate the overall design of this project.

A preliminary design is currently being undertaken for Phase 3 making provision for 6 schemes and the scope work for Phase 3 can be summarised as follows:

Bulk Gravity Mains

1 x 500 K ℓ Bulk and Village Reservoir

Also, funded by MIG:

2 x 100 K ℓ Village Reservoirs

2 x 50 K ℓ Village Reservoirs

5 x 0.5 K ℓ Break Pressure Tanks

Reticulation Pipelines

955 Standpipes

Associated Pipe work, Fittings and Valves

2.4. Funds previously allocated to project

Table 1 below indicates the DWA funding that was made available to the project up to date.

10

P

ROGRAMME

M

ANAGEMENT

: R

EGIONAL

B

ULK

I

NFRASTRUCTURE

APRIL 2014

Table 1: Funding for the past 6 financial years

Funding 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14

RBIG

(DWA)

Co-

Funding

MIG

*R600,000

(FS)

R36,401,562

- -

R12,587,765 R4,207,023

R625,599.86 R10,811,259.44 R25,700,892.66 R35,383,650.52 R14,596,667.33

*Note that 2007/08 allocation of R600, 000 was for the feasibility study.

2.5. Start date – duration of the programme

Depending on the availability of funding the project should be completed in 2015.

The envisaged dates for executing the phases of this project are summarised below.

Scheme A

Contract completion

Scheme B

Contract start date

: 8 June 2010

Contract completion

Phase 1A

Contract start date

: 24 June 2010

: 8 June 2010

Contract completion

Phase 1B

Contract start date

: 4 April 2011

: 20 April 2013

Contract completion

Phase 1C

Contract start date

: 4 April 2011

: 11 Sept 2012

Contract completion

: 24 June 2010

: 8 June 2010

Phase 2A

Contract start date

Contract completion

: 2 Nov 2012

: 31 Dec 2013

Actual expected completion : 15 April 2014

Phase 2B

Contract start date

Contract completion

: 6 Nov 2012

: 31 Oct 2013

Actual expected completion : 15 April 2014

Phase 2C

Contract start date

Contract completion

: 6 Nov 2012

: 31 Oct 2013

Actual expected completion : 30 April 2014

11

P

ROGRAMME

M

ANAGEMENT

: R

EGIONAL

B

ULK

I

NFRASTRUCTURE

APRIL 2014

3. PROGRESS TO DATE

The performance evaluation was conducted on 11 April 2014 by a team consisting out of the following people:

C. Ndzungu

T. Kente

S. Mgaju

L. Wilhelm

A. Coetzer

-

-

-

-

-

DWA

ADM

ADM

– EC

Bosch Stemele

Bosch Stemele

3.1. Implementation of the approved business plan

Following is a table reflecting the milestones for the project:

Table 2: Milestones

Product

Name of Organization compiling/ developing

Feasibility Study Camdekon feasibility)

(broad

Sigodi Marah Martin (for project area)

Implementation

Readiness Study

Sigodi Marah Martin

Preliminary Design Sigodi Marah Martin

Planned date for completion

FS/IRS/Design/EIA

2003

2008

July 2009

July 2009

Date

FS/IRS/Design/EIA approved

2003

2008

July 2009

July 2009

EIA Sigodi Marah Martin Ongoing since

August 2009 in phased approach

Not applicable

Ongoing since

August 2009 in phased approach

Not applicable WUL Not applicable

Operation and

Maintenance Plan

Financial Funding

Plan

Design

Bosch Stemele

DWA / ADM

April 2014

July 2009 January 2010

Sigodi Marah Martin Ongoing since

August 2009 in phased approach

Ongoing since

August 2009 in phased approach

The table above reflects the original implementation milestones with the original service provider whose contract was terminated. Bosch Stemele was appointed as the new service provider in September 2013.

Scheme A: Ibika Centane Water Supply Scheme

The works have been completed and the site has been handed over to ADM. Work and material complies with standards and quality.

Scheme B – Ibika Centane Water Supply Scheme

The works has been completed and the project has been handed over to the Client.

Work and material complies with standards and specifications. Challenges included

12

P

ROGRAMME

M

ANAGEMENT

: R

EGIONAL

B

ULK

I

NFRASTRUCTURE

APRIL 2014 connecting a steel tank that turned out to be a precast concrete reservoir, covered with steel on the outside, and a crossing a bridge.

Phase 1A: Ibika – Centane Water Supply

The works are complete and is ready for hand over to the client.

Phase 1B: Ibika – Centane Water Supply

The work has been completed and handed over to the Client. Work and material complies with standards and quality.

Phase 1C: Ibika – Centane Water Supply

Additional work comprising equipping a borehole and a bulk line pumping main was included in the Phase 1C contract. Practical Completion was awarded to the contractor. An Eskom connection to the borehole is outstanding and following that the installation of the pump. The borehole and pumping main supplement the existing supply on site.

Phase 2A: Ibika

– Centane Water Supply

Site was handed over to the contractor on 2 November 2012. An additional village was added to the scope of works and the estimated completion date is 15 April 2014

Phase 2B: Ibika – Centane Water Supply

Site was handed over to contractor on 6 November 2012. Expected completion date is 15 April 2014. The savings from this phase was re-allocated to Phase 2A to complete the additional village.

Phase 2C: Ibika - Centane Water Supply Scheme

Site was handed over to contractor on 6 November 2012. The scope of works was increased to include an additional village, the emergency upgrade of 800m of pipe work, and the upgrade of a borehole. The expected completion date is 30 April 2014.

Phases 3A, 3B, 3C: Ibika - Centane Water Supply Scheme

The Contract with the previous consultant was terminated and Bosch Stemele (Pty)

Ltd was appointed in September 2013 to evaluate the works. The service provider will re-evaluate the original design of phase 1 and 2 to establish if the design is adequate to accommodate the demand of the overall scheme, including Phase 3.

Contract details are summarized in Annexure C .

3.2. Risks taken and management thereof

No risks were taken in the reporting period

3.3. Capacities dedicated to the programme

The capacities dedicated to the project are as follows:

Funder:

Implementing agent:

DWA

ADM

Operation & Maintenance: ADM

Consulting Engineer:

Contractors:

Bosch Stemele (Pty) Ltd

Listed in Annexure C

13

P

ROGRAMME

M

ANAGEMENT

: R

EGIONAL

B

ULK

I

NFRASTRUCTURE

APRIL 2014

3.4. Key challenges within the project

The key challenges within the project are as follows:

There is a portion of land that was traversed during the construction of the pipe line, which resulted in the land owner seeking compensation. Although this matter is still being handled by the ADM legal department it does not have any negative effect on the functioning of the system. ADM are busy with the servitude application.

Delay in procuring the services of a sub-contractor for the pump installation at the main reservoirs. The issue has been resolved and the installation completed. The Eskom connection has been delayed since January 2013.

The addition of two villages that were not included in the original scope.

The termination of the original service provider and the appointment of Bosch

Stemele have resulted in a number of administrative challenges.

4.

Most of these challenges have been overcome and are in the process of being resolved. There however are a number of challenges related to the design and implementation of the scope of works after the original design was re-evaluated by the new service provider. The new service provider, in conjunction with

ADM, is busy resolving all technical matters.

Close to completion of several projects, the community requested additional standpipes in various villages. This resulted in extension of contracts

The emergency repair/upgrade of 800m of pipe work.

The emergency upgrade of a borehole from a hand pump to a diesel motor and pump.

The supply of treated water from the works in Butterworth has been interrupted due to the infrastructure being out-dated. This has caused major delays in commissioning the works in Phase 2. A meeting has been set with all the needed delegates to address the matter.

PROJECT RESULTS AND BENEFICIARIES

4.1 Outcomes and outputs

Currently the expected outcomes and outputs are on track for the phases in construction, as well as the planning for the next phases.

4.2 Beneficiaries and project results

The project has benefited the project team and community in the following manner;

Involvement of trainee personnel in the project whilst gaining experience in all project aspects (design, contract administration, policies).

Involvement of local people in the project whilst gaining experience and training on construction and contracting aspects (contract management and

 various construction methods).

Sourcing of materials from local suppliers and manufactures.

Skills development of local people also took place on a project level.

The villages that will benefit is contained in Annexure B

14

P

ROGRAMME

M

ANAGEMENT

: R

EGIONAL

B

ULK

I

NFRASTRUCTURE

APRIL 2014

4.3 Jobs Created

5.

Job creation details are summarized in Annexure D .

CONCLUSION

5.1 Main successes and failures of the project to date

Good planning and execution by the ADM project team has resulted in the provision of water to the communities as the project progresses by running the MIG projects in parallel with RBIG to implement potable water reticulation, making service delivery visible. With the combination of both the bulk and reticulation implemented in parallel enhances and reduce the waiting time for the communities to have access to water supply. Unlike the case where bulk lines are constructed separately without immediately connecting to reticulation, which delays the communities ’ access to water supply.

See Annexure B for the population figures.

5.2 Outcomes, outputs, successes and failures versus the costs

The different construction milestones were achieved in the specified time and within budget. However, there were adjustment in the design due to obstacles found on site such as pipelines passing through graveyards, positioning of standpipes, large boulders on the pipeline routes, steep gullies and escarpment.

5.3 Ownership and sustainability of infrastructure works

6.

7.

ADM is the Implementing Agent and will take ownership of the infrastructure, and will also be responsible for the operation and maintenance of the works. O&M plans need to be finalised as soon as possible to ensure sustained service delivery to the beneficiaries.

LESSONS LEARNED

It should be checked that the design is correct and adequate to avoid the situation whereby a system is not functioning properly and the beneficiaries cannot get water because the design failed.

A land claim by the owner arose as soon as construction started despite the fact that no information was provided about ownership during the planning phase. The necessary research and interactions with parties concerned should therefore be undertaken during the planning stages.

RECOMMENDATIONS

Phases 3 should be finalised to ensure continued progress on the project is ensured. ADM to submit to DWA the necessary motivation for the change in scope and price increases due to escalation and redesign by the new service provider.

Monthly reporting needs to be done by the 2 nd of the new month.

15

P

ROGRAMME

M

ANAGEMENT

: R

EGIONAL

B

ULK

I

NFRASTRUCTURE

APRIL 2014

O&M plans for the scheme to be finalised by ADM.

Applications for servitudes to be registered under ADM should be finalised as soon as possible.

It is recommended that the additional RBIG funding of R 11,000,000 be approved to complete Phase 3.

16

P

ROGRAMME

M

ANAGEMENT

: R

EGIONAL

B

ULK

I

NFRASTRUCTURE

ANNEXURE A: PROJECT IMPLEMENTATION PHOTOS

Photo 1

Cleaning of Excavated Trench

Photo 2

Clean Trench

Photo 3 Photo 4

APRIL 2014

Backfilling and Compaction of Trench

Photo 5

Rock on Site

Inspection of Reservoir

Photo 6

Repair of a River Crossing

17

P

ROGRAMME

M

ANAGEMENT

: R

EGIONAL

B

ULK

I

NFRASTRUCTURE

APRIL 2014

ANNEXURE B: LIST OF VILLAGES EXPECTED TO BENEFIT

Water Supply for Ibika Phase 1

Local Municipality Ward Main Place Name Sub Place Name Population Scheme

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

23 Aboboti

5 Bhongolwethu

25 Bomvana

24 Cilo

23 Cingweni

24 eMahlathini

24 eMtonjeni

24 eNkelekethe

25 ePhika

23 eSixhotyeni

23 Gatyana

23 Jojweni F

25 Khwetsha

5 Mnquna NU

Aboboti

Bhongolwethu

Bomvana

Cilo

Cingweni eMahlathini SP2 eMtonjeni eNkelekethe ePhika eSixhotyeni

Gatyana

Jojweni F

Khwetsha

King Hintsa Public FET College

23 Komkhulu E

24 Komkhulu G

24 KuHolela

24 KwaGaba

25 KwaLubobo

23 KwaNumanto

24 KwaRarase

24 KwaZizane

Komkhulu E

Komkhulu G

KuHolela

KwaGaba

KwaLubobo

KwaNumanto

KwaRarase

KwaZizane

22 Magalakangqa Magalakangqa

25 Mangobomvu B Mangobomvu B

23 Mangweni B Mangweni B

24 Maqele Maqele

24 Marhotshozweni Marhotshozweni

24 Mathole B

23 Maxhegwana

Mathole B

Maxhegwana

5 Mayekiso Farm Mayekiso Farm

25 Mfeku Mfeku

5 Mkhonkotho

24 Mkhwaneni

Mkhonkotho

Mkhwaneni

24 Msintsana

23 Mtonjeni

24 Ngqokweni

25 Ngunduza

Msintsana

Mtonjeni

Ngqokweni

Ngunduza

25 Ntilini A

23 Qoboqobo B

24 Qumbulwana

24 Rarayo

23 Teko-Fihla

23 Teko-Kona

24 Teko-Springs

23 Tshoveni

Ntilini A

Qoboqobo B

Qumbulwana

Rarayo

Teko-Fihla

Teko-Kona

Teko-Springs

Tshoveni

TOTAL

1154

480

211

525

121

177

256

235

568

441

309

236

346

158

661

307

281

239

403

154

632

278

404

120

374

233

356

608

163

341

260

595

185

992

1033

929

414

18341

217

547

372

218

798

475

292

243

1A

1C

1D

1B

1C

1C

1D

1C

1D

1D

1D

1D

1B

1B

1B

1D

1B

1C

1D

1D

1D

1C

1D

1D

1A

1C

1B

1D

1C

1C

1D

1C

1D

1D

1B

1D

1D

1B

1D

1B

1C

1A

1C

1A

1D

18

P

ROGRAMME

M

ANAGEMENT

: R

EGIONAL

B

ULK

I

NFRASTRUCTURE

APRIL 2014

Water Supply for Ibika Phase 2

Local Municipality Ward Main Place Name

Mbhashe LM

Mbhashe LM

Mnquma LM

Mbhashe LM

Mbhashe LM

Mnquma LM

Mnquma LM

Mnquma LM

Mbhashe LM

Mnquma LM

Mbhashe LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mbhashe LM

Mnquma LM

Mnquma LM

Mbhashe LM

Mbhashe LM

Mnquma LM

Mbhashe LM

Mbhashe LM

Mnquma LM

Mnquma LM

Mbhashe LM

Mnquma LM

Mnquma LM

Mbhashe LM

Mnquma LM

Mbhashe LM

Mbhashe LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Sub Place Name

22 Busila

22 Cafutweni

11 eKrozweni

3 eMahliwane

22 eMbovu

11 eMndwaxa

11 eNtilini

22 eNtshingeni

Busila

Cafutweni eKrozweni eMahliwane eMbovu eMndwaxa eNtilini C eNtshingeni

22 eSirhosheni B

11 Gqunqe

22 Jama

22 Jingqi eSirhosheni B

Gqunqe

Jama

Jingqi

11 KuLombete

22 KwaDadiyane

KuLombete B

KwaDadiyane

11 KwaMandluma KwaMandluma

11 KwaMathanzima KwaMathanzima

11 KwaVelelo

11 Landlandla

22 Makhomazini

11 Maqhunqu

11 Maseti

22 Mathole A

22 Mazikhanya

22 Msele

KwaVelelo

Landlandla

Makhomazini

Maqhunqu

Maseti

Mathole A

Mazikhanya

Msele

11 Msele

22 Ntshingeni

11 Ntshundutshe

22 Ntshutshwini

Msele

Ntshingeni

Ntshundutshe

Ntshutshwini

22 Raladiya

22 Tshoma

Raladiya

Tshoma

22 Tyhila Tyhila

11 KwaMathanzima Tyholom

26 Diphini eMatipheni

31 Gobe

30 Kentani

28 KwaKantolo

31 KwaZingxala

31 Mmangonkone

26 Mnyama

30 Mpentse

31 Mrhawuzeli

31 Myoyo

31 Seku

31 Thuthurha

26 Upper Macibe

Gotyibeni

Mgobhozi

28 KwaMaciba

30 Qokolweni A

Diphini eMatipheni

Gobe

Kentani

KwaKantolo

KwaZingxala

Mmangonkone

Mnyama

Mpentse

Mrhawuzeli

Myoyo

Seku

Thuthurha

Upper Macibe

Gotyibeni

Mgobhozi

KwaMaciba

Qokolweni A

TOTAL

Population Scheme

420

149

157

179

466

692

188

149

80

299

2C

2A

421 2A, 2B

278 2C

1308

162

844

482

2A

2A

2A

2A

2A

2A

2C

2C

2C

2A

2A

2A

423

175

136

124

525

219

313

123

412

172

204

775

2A

2A

2C

2A

229 2C

91 2C, 3A

249

193

2A

2C

2A

2A

2A

2A

2A

2C

2A

2A

191 Kentani Ext

198 Kentani Ext

338 Kentani Ext

1456 Kentani Ext

922 Kentani Ext

1492 Kentani Ext

172 Kentani Ext

329 Kentani Ext

451 Kentani Ext

584 Kentani Ext

689 Kentani Ext

312 Kentani Ext

77 Kentani Ext

715 Kentani Ext

572 Kentani Ext

406 Kentani Ext

594 Kentani Ext

1035 Kentani Ext

21170

19

P

ROGRAMME

M

ANAGEMENT

: R

EGIONAL

B

ULK

I

NFRASTRUCTURE

APRIL 2014

Water Supply for Ibika Phase 3

Local Municipality Ward Main Place Name

Mbhashe LM

Mnquma LM

Mnquma LM

Mnquma LM

Mbhashe LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mbhashe LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

Mnquma LM

11 eMndwaxa

25 eNgqaqeni

25

25

Kulomiza

25 Kutanyanga

11 KwaNjana

25 Mabala

25 Mamfenesi

25 Manyontolweni

25 Mente

25 Mhlahlane

25 KuLotshazi

25 Mngxokweni

25 Mgwebi

25 Mtshayelweni

25 Ngqaqini

11 Nkanga

25 Nkanga

25 Nkonkwane

25 Nqagqini

25 Ntsonyane

25 Qolweni A

Qombe

Sub Place Name eMndwaxa eNgqaqeni

Kulomiza

Kutanyanga

KwaNjana

Mabala

Mamfenesi

Manyontolweni

Mente

Mhlahlane

Mhlahlane

Mngxokweni

Mtonjeni

Mtshayelweni

Ngqaqini

Nkanga

Nkanga

Nkonkwane

Nqagqini

Ntsonyane

Qolweni A

Qombe

TOTAL

Population Scheme

90 3A,2C

190 3C

97 3E

199 3C

62 3A

281 3A, 3B

129 3E

52 3C, 3D

394 3C, 3E

192 3D

151 3E

68 3C, 3A

220 3E

275 3E

430 3A, 3C

165 3A

421 3C

189 3D

287 3E

262 3B

223 3D

175 3E

4552

Project - IBIKA

Bulk Bulk & Retic.

Scheme A

Scheme B

Phase 1A

Phase 1B

Phase 1C

Phase

(Reticulation)

Phase 2A

Phase 2B

Phase 2C

19

ANNEXURE C: DETAILS OF CONTRACTS AWARDED

1D

Contract Number

8/2/29/2010-2011

8/2/30/2010-2011

Contractor

8/2/107/2008-2009A Mamlambo

8/2/107/2008-2009B Khula Nathi

Town and Around

Ashoda JV

8/2/346/2010-2011 Kwalio/Hagga JV

8/2347/2010-2011 Town and Around

8/2/326/2011-2012 Umso Construction

Contract Amount (R) Award Date Start Date

5 244 056.00

15 925 150.00

17 394 124.00

9 999 993.00

9 836 648.00

4 916 438 .67

28 765 311.32

8/2/327/2011-2012 Mamlambo Construction 12 644 145.95

8/2/328/2011-2012 Mamlambo Construction 14 180 445.81

Planned

Date

02/09/2009 28/09/2009 08/06/2010

08/04/2010 24/06/2010 14/07/2011

04/04/2011 02/05/2011 21/05/2012

10/03/2011 28/06/2011 25/05/2012

01/03/2012 12/04/2012 12/04/2013

01/03/2012 23/04/2012 12/04/2013

11/10/2012 02/11/2012 10/01/2014

06/07/2012 06/11/2012 05/12/2013

06/07/2012 06/12/2012 05/12/2013 completion Actual

Date

08/06/2010

25/08/2012

26/03/2013

26/08/2012

26/04/2013 completion

Amount spent (Rand)

Bulk Reticulation

4 277 639.00

15 753 005.99

11 555 623.36 5 691 575.68

3 399 872.56 6 599 752.61

3 567 620.277 8 324 447.31

4 283 981.55

12 912 441.07

14 977

242.77

7 252 066.56 5 606 207.49

8 150 914.41 5 211 240.36

% Physical completion

100

100

100

100

100

100

98

100

100

20

ANNEXURE D: DETAILS OF JOB OPPORTUNITIES

Decent Job Opportunities

Project Name IBIKA CENTANE WATER SUPPLY: April 2013 - March 2014

Local People employed

Temporary job opportunities for Temporary job opportunities for the financial year 2013/14 local people at various occupational levels: Temporary

= Less than 5 months

No Person

Adult Men

Actual cost on job

Days opportunities

No

Days

Adult Women

Person Actual cost on job opportunities

Youth Men

No Person Actual cost on job

Days opportunities

Youth Women

No Person Actual cost on job

Days opportunities

No Person

Disabled

Actual cost on job

Days opportunities

No

Clerical Ongoing

Clerical New

Labourers Ongoing

Labourers New

Managerial Ongoing

Managerial New

Semi-Skilled Ongoing

Semi-Skilled New

Skilled Ongoing

Skilled New

Supervisor Ongoing

Supervisor New

TOTAL Ongoing

TOTAL New

656 14432

0

656

0

14432

R 1 731 840 444 9768

R 0 0

R 1 731 840 444

0

9768

R 1 172 160 480 10560

R 0 0

R 1 172 160 480

0

10560

R 1 267 200 96

R 0 0

R 1 267 200 96

2112

0

2112

R 253 440

R 0 0

R 253 440 0

0

0

R 0

R 0

1676

0

1676

36872

0

0

0

0

0

0

0

0

0

36872

TOTAL

Person Actual cost on job

Days opportunities

0

0

R 0

R 0

R 0

R 4 424 640

R 0

R 0

R 0

R 0

R 0

R 0

R 0

R 0

R 0

R 4 424 640

Project Name IBIKA CENTANE WATER SUPPLY: April 2013 - March 2014

Local People employed

Decent job opportunities for local people at various occupational levels: Decent =

Full time for at least 5 months or more

Decent job opportunities for the financial year 2013/14

No

Adult Men

Person Days

Actual cost on job opportunities

No

Adult Women

Person

Days

Actual cost on job opportunities

Clerical Ongoing

Clerical New

Labourers Ongoing

Labourers New

Managerial Ongoing

Managerial New

Semi-Skilled Ongoing

Semi-Skilled New

Skilled Ongoing

Skilled New

Supervisor Ongoing

Supervisor New

TOTAL Ongoing

TOTAL New

12

6

18

0

2334

201

2535

0

R 280 080

R 42 210

R 322 290

R 0

0

0

0

0

R 0

R 0

Contractor People employed

Decent job opportunities for contractor employees at various occupational levels:

Decent = Full time for at least 5 months or more

Decent job opportunities for the financial year 2013/14

No

Adult Men

Person Days No

Adult Women

Person

Days

Clerical Ongoing

Clerical New

Labourers Ongoing

Labourers New

Managerial Ongoing

Managerial New

Semi-Skilled Ongoing

Semi-Skilled New

Skilled Ongoing

Skilled New

Supervisor Ongoing

Supervisor New

TOTAL Ongoing

TOTAL New

3

3

6

0

360

612

972

0

R 90 000

0

0

0

0

No

No

12

12

0

Youth Men

Person

Days

4266

4266

0

Actual cost on job opportunities

R 511 920

R 511 920

R 0

No

6

6

0

Youth Women

Person

Days

Actual cost on job opportunities

No

1104

1104

0

R 132 480

R 132 480

R 0

0

0

Disabled

Person

Days

0

0

Actual cost on job opportunities

R 0

R 0

No

0

0

30

0

0

0

0

0

0

0

6

0

36

0

TOTAL

Person

Days

Actual cost on job opportunities

0

0

7704

0

0

0

0

0

0

0

201

0

7905

0

R 0

R 0

R 924 480

R 0

R 0

R 0

R 0

R 0

R 0

R 0

R 42 210

R 0

R 966 690

R 0

0

0

Youth Men

Person

Days

0

0

No

1

Youth Women

Person

Days

52

1

0

52

0

No

0

0

Disabled

Person

Days

0

0

No

TOTAL

Person

Days

3

0

0

0

1

0

0

0

0

0

3

0

7

0

52

0

0

0

360

0

0

0

0

0

612

0

1024

0

Consulting Engineer managing the project

Decent job opportunities for

Consulting Engineer employees at various occupational levels: Decent =

Full time for at least 5 months or more

Decent job opportunities for the financial year 2013/14

No

Adult Men

Person Days No

Adult Women

Person

Days

Managerial Ongoing

Managerial New

Other Ongoing

Other New

TOTAL Ongoing

TOTAL New

1

1

2

36

252

288

*Current service provider was only appointed in September

No

Youth Men

Person

Days

1

1

30

30

No

Youth Women

Person

Days

No

Disabled

Person

Days

No

TOTAL

Person

Days

1

0

2

0

3

0

36

0

282

0

318

0

Summary of Decent Job Opportunities

Decent job opportunities for people employed at various occupational levels: Decent =

Full time for at least 5 months or more

Decent job opportunities for the financial year 2013/14

No

Adult Men

Person Days Actual cost on job opportunities

No

Adult Women

Person

Days

Actual cost on job opportunities

No

Clerical Ongoing

Clerical New

Labourers Ongoing

Labourers New

Managerial Ongoing

Managerial New

Semi-Skilled Ongoing

Semi-Skilled New

Skilled Ongoing

Skilled New

Supervisor Ongoing

Supervisor New

Other Ongoing

Other New

TOTAL Ongoing

TOTAL New

0

0

12

0

4

0

0

0

0

0

9

0

1

0

26

0

0

0

2334

0

396

0

0

0

0

0

813

0

252

0

3795

0

R 280 080

R 99 000

R 97 560

R 30 240

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

12

0

0

0

0

0

0

0

0

0

1

0

13

0

Youth Men

Person

Days

Actual cost on job opportunities

No

0

0

4 266

0

0

0

0

0

0

0

0

0

30

0

4296

0

R 511 920

0

0

0

0

1

0

6

0

0

0

0

0

0

0

7

0

Youth Women

Person

Days

Actual cost on job opportunities

No

52

0

1104

0

0

0

0

0

0

0

0

0

0

0

1156

0

R 132 480

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Disabled

Person

Days

Actual cost on job opportunities

No

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

1

0

30

0

4

0

0

0

0

0

9

0

2

0

46

0

TOTAL

Person

Days

Actual cost on job opportunities

52

0

7 704

0

396

0

0

0

0

0

813

0

282

0

9247 R 1 151 280

0

R 0

R 0

R 924 480

R 0

R 99 000

R 0

R 0

R 0

R 0

R 0

R 97 560

R 0

R 30 240

R 0

GANTT CHART ACTIVITIES

CONSULTANT : BOSCH STEMELE (Pty) Ltd.

PROJECT PROGRAMME

Task

IBIKA CENTANE WATER SUPPLY

Phase 1

Phase 2

Phase 3

1.

Pre-Tender

Design

2. MIG Application

Tenders and

3. Award

4. Construction

Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jun-16