DELETE AS REQUIRED Weetwood Services Ltd (Leeds) t: 0113 244 1377 e: info@weetwood.net w: www.weetwood.net Weetwood Services Ltd (London) t: 203 757 5444 e: info@weetwood.net w: www.weetwood.net Weetwood Services Ltd (Mold) t: 01352 700045 e: info@weetwood.net w: www.weetwood.net Proposed Residential Development Land off ….. Survey Specification Prepared by: Name and qualifications Position: position, Weetwood Services Ltd. Contact Details: <Insert email and tel no> Date: DD/MM/YYYY INTRODUCTION 1. The following survey specification has been prepared by Weetwood Services Ltd (“Weetwood”). Site Location 2. The site is located <insert location, grid ref etc> as shown in Figure 1. Add information about the watercourses flowing through/near the site. SURVEY REQUIREMENTS 3. The following sections outline what we will require in terms of survey information. Cross Sections 4. In-bank and out-of-bank cross-section surveys are required for name of watercourse(s). The extent of the survey required is indicated within Figure 2. 5. The cross-sections should be spaced approximately every <EA recommends 20 – 25 times channel width; for a small stream, 50m spacing is typical > 6. The sections shall be prepared looking downstream, with zero chainage at the left extent of the floodplain. 7. Record / take notes of: Channel bed levels Left and right bank top levels Water level at the time of survey Any other noteworthy feature Photographs at all cross-sections ©Weetwood www.weetwood.net 1 nnnn/Survey spec v1.0/ <Date> <Site> River Channel & Floodplain Survey Requirements 8. The sections in-bank should be at right angles to the direction of flow. The sections out-of bank at the same locations should be at right angles to the overall general direction of flow of the river. 9. The extent of levelling beyond the top of bank into the floodplain shall extend until ground levels rise by more than 2 m or for 10m beyond the bank crest level, whichever is the greater (or <should be to the crest of the embankment>). Structures 10. There are approximately (insert number) identified structures within the survey reach, which require surveying (see Figure 2). Additional structures noted whilst on site should also be surveyed (if in doubt please ask your team to call <insert Weetwood contact name and number> for advice). 11. The additional information and cross-sections required at each structure is detailed in Table 1. Bank Crest Levels 12. Embankment crest levels along the right and left bank of all the surveyed watercourses (i.e. insert names of watercourses) are required. 13. If no embankment exists then the bank crest level is required. Level spacing should be approximately every 5m, unless there is a significant change in gradient in which case greater detail is required. Localised low points should be recorded. Deliverables 14. The information required is presented in Table 2. ©Weetwood www.weetwood.net 2 nnnn/Survey spec v1.0 <Date> <Site> River Channel & Floodplain Survey Requirements Table 1: Structure Requirements Structure Cross-sections Bridge Three required: Upstream (at point of maximum backwater) Upstream face Downstream (at point where normal depth reestablishes) Two required: Upstream (at point of maximum backwater) Downstream (at point where normal depth reestablishes) Culvert Information Required Weir Sluice or Gate ©Weetwood www.weetwood.net Two required: Upstream edge of weir Downstream at toe of weir Upstream & downstream cross-sections are required if the channel width changes 3 Invert & soffit elevation Number of spans; span widths and shapes Bridge deck (road) elevations, length & width Bridge skew angle Photographs (with indication of scale) Invert & soffit elevation Culvert shape, plus width & height dimensions Culvert length Headwall elevations, length & width Material of culverts Photographs (with indication of scale) Crest length Crest elevations Weir width and shape Photographs (with indication of scale) Number of gates Gate opening dimensions and levels Photographs (with indication of scale) nnnn/Survey spec v1.0 <Date> <Site> River Channel & Floodplain Survey Requirements Table 2: Deliverables Product Copies Excel spreadsheet (as per enclosed template) defining all survey points by: Elevation (mAOD) Chainage from left extent of the cross-section OSGR (eastings and northings) Description of significant points (e.g. top of bank etc.). Distance between cross-sections 1 digital Photographs (including an indication of scale, if possible) of: Upstream and downstream faces of structures. Representative channel and floodplain vegetation for each cross-section. Significant features along the survey reach that may affect flow and/or flooding patterns Any other feature that the Surveyor is unsure about. Map showing location of photographs 1 digital or hard 1:1250 plan based on OS mapping showing the line and location of the sections, chainages, crest and road levels. 1 digital Dimensioned elevations of bridges, culverts and similar structures. ©Weetwood www.weetwood.net 4 nnnn/Survey spec v1.0 <Date> <Site> River Channel & Floodplain Survey Requirements Figure 1: Site Location ©Weetwood www.weetwood.net 5 nnnn/Survey spec v1.0 <Date> <Site> River Channel & Floodplain Survey Requirements <Insert plan identifying structures to be identified> Figure 2: Survey Extent ©Weetwood www.weetwood.net 6 nnnn/Survey spec/v1.0 <Date> Delivering client focussed services Flood Risk Assessments Flood Consequences Assessments Surface Water Drainage Foul Water Drainage Environmental Impact Assessments River Realignment and Restoration Water Framework Directive Assessments Flood Defence Consent Applications Sequential, Justification and Exception Tests Utility Assessments Expert Witness and Planning Appeals Discharge of Planning Conditions www.weetwood.net