Core MPO Processes Materials in advance of on-site portion of the Certification Review Please provide, as is practical, web links or electronic copies of documentation for the most recent items listed below: Financially Constrained Long Range Transportation Plan (CLRTP) 2034 LRTP webpage: http://www.hrtpo.org/page/2034-long-range-transportation-plan/ 2034 LRTP Full Document (adopted January 2012): http://www.hrtpo.org/uploads/docs/Reports/Final_2034LRTP.pdf 2034 LRTP Amendments: http://www.hrtpo.org/uploads/docs/2034LRTP_Amendment_June2015.pdf 2040 LRTP (under development) webpage: http://www.hrtpo.org/page/2040-long-rangetransportation-plan/ 2040 LRTP reports produced to date: 1. 2040 LRTP Visioning Survey Report (Sept 2013): http://www.hrtpo.org/uploads/docs/Reports/2040%20Long-Range%20Trans%20PlanVisioning%20Survey%20Report.pdf 2. 2040 Socioeconomic Forecast and TAX Allocations Report (Oct 2013): http://www.hrtpo.org/uploads/docs/HR_2040_SocioeconomicForecast_TAZAllocation_F inalReport.pdf 3. HRTPO Prioritization Tool Scoring Criteria (Oct 2013): http://www.hrtpo.org/uploads/docs/HRTPO%20Prioritization%20Tool%20Scoring%20C riteria-%20Oct%202013.pdf 4. 2040 LRTP Committed and Candidate Transportation Projects Report (Sept 2014): http://www.hrtpo.org/uploads/docs/2040LRTP_Committed_and_Candidate_Transportati on_Projects.pdf 5. 2040 LRTP Prioritization of Transportation Projects, Project Evaluation and Scoring (Apr 2014): http://www.hrtpo.org/uploads/docs/HRTPO_2040LRTP_ProjectPrioritization_FinalRepo rt.pdf 6. 2040 LRTP: Transportation Challenges and Strategies Report (June 2015): http://www.hrtpo.org/uploads/docs/Challenges%20and%20Strategies%20FINAL%20Rep ort.pdf 7. 2040 LRTP: Candidate Project Evaluation Title VI/Environmental Justice Methodology (Oct 2015): http://www.hrtpo.org/uploads/docs/101515TPO-Enclosure%2012Hampton%20Roads%202040%20LRTPCandidate%20Project%20Evaluation%20Title%20VIEnvironmental%20Justice%20Methodology.pdf Metropolitan Transportation Improvement Program (MTIP) TIP Website: http://www.hrtpotip.org/ Unified Planning Work Program (UPWP) UPWP Webpage: http://www.hrtpo.org/page/unified-planning-work-program/ Public Involvement Process http://www.hrtpo.org/uploads/docs/draftPPP2015nov.pdf Title VI, ADA Environmental Justice documents/procedures http://www.hrtpo.org/page/title-vi-and-lep-guide/ http://www.hrtpo.org/page/ada-statement-and-accessibility-policy/ http://www.hrtpo.org/page/environmental-justice-(ej)/ http://hrtpo.org/page/senior-voices/ http://www.hrtpo.org/page/ej-methodology-tool/ http://www.hrtpo.org/page/title-vi-and-non-discrimination/ Congestion Management Process 2014 Hampton Roads Congestion Management Process – System Performance and Mitigation report: http://hrtpo.org/uploads/docs/CMP%20Report%20Final%20Version.pdf Appendices http://hrtpo.org/uploads/docs/CMP%20Report%20Appendices%20Updated%20Final%2 0Version.pdf Traffic Volumes, Speeds, and Congestion on Major Roadways in Hampton Roads – 2014: http://hrtpo.org/uploads/docs/CMP%20Volumes%20and%20Speeds%202014%20%20Final%20Report.pdf List of Obligated Projects Annual Obligation Report Webpage: http://www.hrtpo.org/page/annual-obligation-report/ Travel Demand Forecasting documentation Travel Demand Modeling and Forecasts webpage: http://www.hrtpo.org/page/travel-modelsand-forecasts/ 2009 Hampton Roads Model User’s Guide: http://www.hrtpo.org/uploads/docs/Hampton%20Roads%20Model%20Users%20Guide%20v1.0. pdf 2009 Hampton Roads Model Methodology Report: http://www.hrtpo.org/uploads/docs/HR_Methodology_Report_v1.0.pdf 2009 Hampton Roads Model Revision 1.1 Release Notes: http://www.hrtpo.org/uploads/docs/HR_Model_Revision_1.1_ReleaseNotes.pdf Agreements and Contracts o Metropolitan Planning Agreement (3-C Agreement): [File 1] o Memoranda of Understanding HRTPO & HRPDC – Staff: [File 2] HRTPO & HRPDC – Finance: [File 3] HRTPO & HRPDC – Personnel & Budget Committee: [File 4] o PL Agreement PL Agreement: [File 5] FY 2016 PL Letter of Authorization: [File 6] FY 2016 SPR Letter of Authorization: [File 7] o Section 5303 Agreement Master Agreement for Use of Commonwealth Transportation Funds: [File 8] FY 2016 Agreement for Use of Commonwealth Funds: [File 9] FY 2016 Agreement for Use of Federal Funds: [File 10] FY 2016 Pass-Through Agreement – HRT: [File 11] FY 2016 Pass-Through Agreement – WATA: [File 12] Self-Certification/Procurement Procedures o HRTPO Self-Certification Procedural Guide: [File 13] o HRTPO Self-Certification – July 2014: http://www.hrtpotip.org/uploads/docs/HRTPO%20Board%20Resolution% 202014-04%20&%20Self-Certification.pdf Performance Measures documentation Annual State of Transportation in Hampton Roads Report: http://hrtpo.org/uploads/docs/State%20of%20Transportation%202015%20Final%20Rep ort.pdf Annual HRTPO Regional Performance Measures (RPMs) Report: http://hrtpo.org/uploads/docs/HRTPO%20RPMs%20Final%20Report%20%28w%20ne w%20inside%20cover%29.pdf Additional Performance Measures documentation – including how HRTPO is transitioning to MAP-21’s Performance Based Planning requirement – is available on the TPO’s Performance Management website at http://hrtpo.org/page/performancemanagement/. Financial Planning/Fiscal Constraint documentation o For TIP – Financial Plan excerpt from FY 2015-2018 TIP: [File 14] o For 2034 LRTP: Section 6 – The Regional Transportation Plan (pages 16-1 to 18-12): http://www.hrtpo.org/uploads/docs/Section_6_The_Regional_Transportatio n_Plan.pdf Organizational Structure, Board Membership and Planning Boundaries Hampton Roads Metropolitan Planning Area boundary: http://hrtpo.org/uploads/docs/tpomap.pdf Consultation and Coordination with Federal, State and local agencies (i.e., formal memoranda or agreements)