CALIFORNIA ENVIRONMENTAL PROTECTION AGENCY CDQAP – WDR General Order Reference Binder TAB 6.10, Version March 2011 SAMPLING AND ANALYSIS PLAN FOR EXISTING MILK COW DAIRIES UNDER WASTE DISCHARGE REQUIREMENTS GENERAL ORDER NO. R5-2007-0035 PART I. DAIRY FACILITY INFORMATION Name of Dairy or Business Operating the Dairy: _________________________________ Physical address of Dairy: __________________________________________________________________________________________ Number and Street City County Zip Code PART II. DOCUMENTATION OF QUALIFICATIONS AND PLAN DEVELOPMENT I certify that I meet the requirements as a certified specialist in developing nutrient management plans as described in Attachment C of Waste Discharge Requirements General Order No. R5-2007-0035 and that I prepared the Sampling and Analysis plan. ____________________________________________________________________________________ QUALIFICATIONS OF CERTIFIED NUTRIENT MANAGEMENT SPECIALIST ___________________________________________________________________________ SIGNATURE OF TRAINED PROFESSIONAL DATE ____________________________________________________________________________________ PRINT OR TYPE NAME ____________________________________________________________________________________ MAILING ADDRESS ____________________________________________________________________________________ PHONE NUMBER EMAIL ADDRESS PART III. OWNER AND/OR OPERATOR CERTIFICATION I certify under penalty of law that I have personally examined and am familiar with the information submitted in this document and all attachments and that, based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the information is true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment. _____________________________________________________________________________ SIGNATURE OF OWNER SIGNATURE OF OPERATOR _____________________________________________________________________________ PRINT OR TYPE NAME PRINT OR TYPE NAME _____________________________________________________________________________ DATE DATE Version 2-29-08; page 1 SAMPLING AND ANALYSIS PLAN This plan needs to be certified by a certified nutrient management specialist, maintained as part of the NMP, and included in the list of items completed in the July 1, 2008 Statement of Completion. The plan must be made available to Central Valley Water Board staff during their inspections of the dairy and submitted to the Executive Officer when requested by the Executive Officer. SOLID MANURE SAMPLING AND ANALYSIS PLAN Minimum Sampling Frequency Each application to each land application area Sampling Method Source Description (pond, corral, separator, or settling basin solids, or other) Minimum Analyses Field Total weight (tons) applied and percent moisture Twice per year Annually Percent Moisture General minerals, including: calcium, magnesium, sodium, sulfur, chloride, and fixed solids Total nitrogen, total phosphorus, total potassium, and percent moisture Once every two years Each offsite export of manure Laboratory Total weight (tons) exported Total dry weight (tons) manure applied annually to each land application area, and total dry weight (tons) manure exported offsite annually Percent moisture Page 2 of 4 PROCESS WASTEWATER (LIQUID MANURE) SAMPLING AND ANALYSIS PLAN Minimum Sampling Frequency Sampling Method Source Description (pond identification) Minimum Analyses Laboratory Field Date applied and volume (gallons or acre-inches) applied None Quarterly during one application event Electrical conductivity Nitrate-nitrogen (only when pond is aerated), ammonium-nitrogen, total Kjeldahl nitrogen, total phosphorus, total potassium and total dissolved solids Once every two years None General minerals, including: calcium, magnesium, sodium, bicarbonate, carbonate, sulfate, and chloride Each application SOIL SAMPLING AND ANALYSIS PLAN Minimum Sampling Frequency Once every five years from each land application area (can sample 20% per year) Sampling Method Source Description (soil sampling locations) Field None Recommended: Spring pre-plant for each crop Recommended: Fall pre-plant for each crop None Minimum Analyses Laboratory Soluble phosphorus (Olsen) 0 to 1 foot: Nitrate-nitrogen and organic matter 1 to 2 foot: Nitrate-nitrogen 0 to 1 foot: Electrical conductivity, nitrate-nitrogen, soluble phosphorus, potassium, organic matter 1 to 2: Nitrate- nitrogen Page 3 of 4 PLANT TISSUE SAMPLING AND ANALYSIS PLAN Minimum Sampling Frequency Sampling Method Source Description (land application area) Field Minimum Analyses Laboratory Percent wet weight Total weight (tons) of harvested material removed from each land application area At each harvest from each land application area Mid-season, if necessary to assess need for additional nitrogen during the growing season (only if Discharger wants to add fertilizer in excess of 1.4 times the nitrogen expected to be removed by the harvested portion of the crop) Total nitrogen, total phosphorus, and total potassium, fixed solids (ash) expressed on a dry weight basis Total nitrogen, expressed on a dry weight basis IRRIGATION WATER SAMPLING AND ANALYSIS PLAN1 Minimum Sampling Frequency Each irrigation event for each land application area One irrigation event during each irrigation season during actual irrigation events – for each irrigation water source (well and canal) Sampling Method Source Description (well or canal identification) Field Minimum Analyses Laboratory Volume (gallons or acre-inches)2 applied and date applied Electrical conductivity, total dissolved solids, and total nitrogen3 Data collected to satisfy the groundwater monitoring requirements will satisfy this requirement for irrigation wells 1 Irrigation water from each well source and canal that is used on all land application areas are to be monitored. Initial volume measurements may be the total volume for all land application areas. Actual volume measurements for each irrigation source for each land application area are to be recorded no later than July 1, 2011. 3 In lieu of sampling the irrigation water, the Discharger may provide equivalent data from the local irrigation district. 2 Page 4 of 4