11.23. NYSDOT CONSTRUCTION/ENVIRONMENTAL TRAINING SCHEDULE Table 1: NYSDOT Construction Environmental Sample Training Schedule Region Topic(s) Environmental and Landscape Permits, Issues and Practices - SEQR, Wetlands, SPDES, ECOPAC, Tree Preservation, Landscaping Enhancements Presenter(s) D. Hitt, D. Goetke, M. Manosh, R. Ambuske, D. Graves, C. Schleede Audience (#) EICs Date(s) 1/28/03 2a. General Environmental Awareness, West Nile, SPDES, Waste Areas E. Warner, E. Frantz, DEC Winter Construction Meeting (80) 3/12/03 3a. Erosion and Sediment Control, Tank Removal, Haz Waste, Asbestos, ECOPAC, SPDES, Waste Areas, Lead Paint (7.5 hrs) R. Steele, C. Anderson, H. Koslowsky Construction Staff and Contractors(25) 2/10/03 3/10/03 4/10/03 4/25/03 3b. Erosion and Sediment Control, SPDES, Waste Areas (1 hr) R. Steele Contractors (50) 3/14/03 3c. Haz Waste (1 hr) R. Steele, M. Brophy Bainbridge Residency (20) 3/18/03 Hazcom for NYSDOT (1 hr) R. Steele Disposal of Surplus Material-BMPs (1 hr) T. Martin AGC/DOT Conference (50) 12/11/02 Disposal of Surplus Material-BMPs (1 hr) T. Martin MEC/CEC Statewide Meeting (60) 1/17/03 4c. Disposal of Surplus Material-BMPs (1 hr) T. Martin New EIC Training (40) 2/7/03 4d. SPDES, Section 209 (1 hr) T. Martin EIC/Field Staff Winter Training (100) 2/26/03 4e. Solid and Haz Waste Regs (30 min) T. Martin 1a. March 3d. 4a. 4b. 3/6/03 LAB/EAB Conference(25 4f. Haz Waste Manifests (45 min) T. Martin EIC/Field Staff Winter Training (55) 3/13/03 5a. Environmental Ethic, Wetlands, Streams, Water Quality, MBTA, Erosion and Sediment Shepherd, NYSDEC, Construction Inspectors School 2/10/03 2/18/03 Control, Cultural resources, Asbestos, Noise, Air Quality, Trees & Planting, Curb, Ramps, Pedestrians Wheeler, Jones, Kluck, Christner, Tackley (75) 2/28/03 5b. Same as above with emphasis on E&SC and Contractor Responsibilities J. Shepherd Contractor (20) 2/27/03 5c. Same J. Shepherd EIC Annual Training (55) 3/13/03 6 SPDES Phase 2 Construction Permit (At So. Tier Reg Planning Board Conference) T. Markel, NYSDEC Town Highway Superintendent 4/10/03 8a-c Erosion and Sediment Control, SPDES, 209 Revisions (2 hr) J. Ayers, J. Fogietta EICs and Inspectors(100 1/28, 29 & 30/03 8d-g Erosion and Sediment Control (1 hr) J. Ayers, S. Davis Residency Maintenance Staff (110) 2/24-27 10 Environmental Awareness, SPDES, Erosion and Sediment Control, etc L. Star EIC Annual Mtg (45) 2/4/03