11.23. NYSDOT CONSTRUCTION/ENVIRONMENTAL TRAINING SCHEDULE
Table 1: NYSDOT Construction Environmental Sample Training Schedule
Region
Topic(s)
Environmental and Landscape Permits, Issues
and Practices - SEQR, Wetlands, SPDES,
ECOPAC, Tree Preservation, Landscaping
Enhancements
Presenter(s)
D. Hitt, D.
Goetke, M.
Manosh, R.
Ambuske, D.
Graves, C.
Schleede
Audience (#)
EICs
Date(s)
1/28/03
2a.
General Environmental Awareness, West
Nile, SPDES, Waste Areas
E. Warner, E.
Frantz, DEC
Winter Construction
Meeting (80)
3/12/03
3a.
Erosion and Sediment Control, Tank
Removal, Haz Waste, Asbestos, ECOPAC,
SPDES, Waste Areas, Lead Paint (7.5 hrs)
R. Steele, C.
Anderson, H.
Koslowsky
Construction Staff
and Contractors(25)
2/10/03
3/10/03
4/10/03
4/25/03
3b.
Erosion and Sediment Control, SPDES, Waste
Areas (1 hr)
R. Steele
Contractors (50)
3/14/03
3c.
Haz Waste (1 hr)
R. Steele, M.
Brophy
Bainbridge
Residency (20)
3/18/03
Hazcom for NYSDOT (1 hr)
R. Steele
Disposal of Surplus Material-BMPs (1 hr)
T. Martin
AGC/DOT
Conference (50)
12/11/02
Disposal of Surplus Material-BMPs (1 hr)
T. Martin
MEC/CEC Statewide
Meeting (60)
1/17/03
4c.
Disposal of Surplus Material-BMPs (1 hr)
T. Martin
New EIC Training
(40)
2/7/03
4d.
SPDES, Section 209 (1 hr)
T. Martin
EIC/Field Staff
Winter Training
(100)
2/26/03
4e.
Solid and Haz Waste Regs (30 min)
T. Martin
1a.
March
3d.
4a.
4b.
3/6/03
LAB/EAB
Conference(25
4f.
Haz Waste Manifests (45 min)
T. Martin
EIC/Field Staff
Winter Training (55)
3/13/03
5a.
Environmental Ethic, Wetlands, Streams,
Water Quality, MBTA, Erosion and Sediment
Shepherd,
NYSDEC,
Construction
Inspectors School
2/10/03
2/18/03
Control, Cultural resources, Asbestos, Noise,
Air Quality, Trees & Planting, Curb, Ramps,
Pedestrians
Wheeler,
Jones, Kluck,
Christner,
Tackley
(75)
2/28/03
5b.
Same as above with emphasis on E&SC and
Contractor Responsibilities
J. Shepherd
Contractor (20)
2/27/03
5c.
Same
J. Shepherd
EIC Annual Training
(55)
3/13/03
6
SPDES Phase 2 Construction Permit (At So.
Tier Reg Planning Board Conference)
T. Markel,
NYSDEC
Town Highway
Superintendent
4/10/03
8a-c
Erosion and Sediment Control, SPDES, 209
Revisions (2 hr)
J. Ayers, J.
Fogietta
EICs and
Inspectors(100
1/28, 29 &
30/03
8d-g
Erosion and Sediment Control (1 hr)
J. Ayers, S.
Davis
Residency
Maintenance Staff
(110)
2/24-27
10
Environmental Awareness, SPDES, Erosion
and Sediment Control, etc
L. Star
EIC Annual Mtg (45)