PRINT BINDER COVER PRINT BINDER SPINE THIS PAGE INTENTIONALLY LEFT BLANK Contractor’s Guide to LEED Contents Description SUBMITTAL REQUIREMENTS per LEED LEED-Related Documentation Required with each Submittal Division 1 LEED-RELATED SPECIFICATIONS Section Contents Section 01351: ENVIRONMENTAL PROCEDURES Section 01575: Construction Waste Management Section 01600: Recycled Content Certification Section 01810: Commissioning Requirements (see 01810 – 01819 in Spec. Book) LEED SPECIFIC CONTRACTOR DEVELOPED PLANS Erosion and Sedimentation Control Plan (in addition to SWPPP) Partial Section 01351: 3.03C: Construction Erosion and Sedimentation Control Plan Referenced Document: COUNTY OF LOS ANGELES STORMWATER BMPS FOR CONSTRUCTION ACTIVITIES: BEST MANAGEMENT PRACTICES HANDBOOK – PART A, CONSTRUCTION ACTIVITIES Construction Waste Management Plan Partial Section 01351, 3.03D: Construction Waste Management Plan Referenced Document: CITY OF LOS ANGELES SOLID RESOURCES MANAGEMENT SPECIFICATIONS Partial List of Facilities that Accept C&D Materials for Recycling Construction IAQ Management Plan Partial Section 01351: 3.03E: Construction IAQ Management Plan Checklist of referenced SMACNA Guidelines LEED SPECIFIC BUILDING MATERIAL SUBMITTALS Specifications list of Recycled Content Materials Specifications list of Local/Regional Material Manufacturers and Distributors Specifications list of materials that contain Volatile Organic Compound (VOC) limits for adhesives/sealants VOC limits for Adhesives & Sealants Regulation 8, Rule 51 VOC limits for adhesives and sealants per Rule 1168 Specifications list of materials that contain VOC limits for Paints & Coatings VOC limits for Paints and Coatings per Green Seal Specifications list of materials that contain VOC limits for Carpets VOC limits for Carpet per Green Label VOC limits for Cushion per Green Label VOC limits for Carpet Adhesive per Green Label Construction Documents that contain GPM/GPF requirements for plumbing fixtures Sample Specification Pages with required GPM/GPF limits for plumbing fixtures THIS PAGE INTENTIONALLY LEFT BLANK INSERT DIVIDER HERE TAB Title “SUBMITTAL REQUIREMENTS per LEED” THIS PAGE INTENTIONALLY LEFT BLANK THIS DOCUMENT IS TO BE USED AS A TOOL ONLY! IT IS NOT PROJECT SPECIFIC AND DOES NOT SUPERSEDE THE CONSTRUCTION DOCUMENTS LEED-Related Documentation Required with each Submittal Submittal Number Section DIVISION 1 01298 01321 01571 01572 01770 Submittal LEED-Related Information to Look for in the Submittals… Schedule of values Contractor's construction schedule Storm Water pollution Prevention Plan (SWPPP) Solid Resources Management Plan Project close out Includes a two-week flushout per Section 01355 Identifies the specific strategies to be used and why Highlights a goal of a minimum of 75% diversion of construction waste from the landfill, including earthwork O & M manual Training plan 01811 Mechanical commissioning Commissioning package 01812 Electrical Commissioning Commissioning package Building Demolition Building Demolition Plan DIVISION 2 02050 02220 Earthwork 02513 Asphalt Concrete Paving 02720 Storm Drain System 02751 Cement Concrete Paving Highlights a goal of a minimum of 75% diversion of construction waste from the landfill Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials, including Crushed Miscellaneous Base (CMB), within a 500 mile radius Includes the recycled content of the CMB as 100% postconsumer Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials, including Crushed Miscellaneous Base (CMB), within a 500 mile radius Highlights a treatment system that removes a minimum of 80%Total Suspended Solids (TSS) & 40%Total Phosphorous (TP) Highlights at least 20% fly ash Highlights a white or gray color concrete Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials, including Crushed Miscellaneous Base (CMB), within a 500 mile radius D:\687293046.doc THIS DOCUMENT IS TO BE USED AS A TOOL ONLY! IT IS NOT PROJECT SPECIFIC AND DOES NOT SUPERSEDE THE CONSTRUCTION DOCUMENTS 02810 Irrigation System 02830 Swing and Sliding gates 02950 Trees, Plants and Ground Cover DIVISION 3 03100 Concrete Formwork 03200 Concrete reinforcement 03300 Cast In Place Concrete 03315 Lightweight Structural Concrete 03345 Concrete Finishing 03365 Stain treatment of concrete floors DIVISION 4 04210 04220 Brick Veneer Concrete Block Masonry Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights "Trex" composite lumber for landscape structures Highlights Forest Stewardship Council Chain of Custody Certificate Number Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights a minimum of 20% fly ash in mix design Highlights a white or gray color concrete for site work (i.e. not necessary for vertical surfaces) Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights a minimum of 20% fly ash in mix design Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights VOC limit of 250 g/L for any interior stains, coloring products and sealants to be used in the work of this section Highlights VOC limit of 250 g/L for any interior stains, coloring products and sealants to be used in the work of this section Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights a minimum of 20% fly ash in mix design Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius D:\687293046.doc THIS DOCUMENT IS TO BE USED AS A TOOL ONLY! IT IS NOT PROJECT SPECIFIC AND DOES NOT SUPERSEDE THE CONSTRUCTION DOCUMENTS DIVISION 5 05120 Structural Steel 05300 Metal Decking 05400 Cold-Formed Metal Framing 05500 Metal Fabrications. 05510 Metal Stairs 05515 Metal Ladders DIVISION 6 06100 Rough Carpentry 06171 Pre-fabricated Plywood web joists 06181 Glue-laminated structural units D:\687293046.doc Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights Forest Stewardship Council Chain of Custody Certificate Number Highlights "no-added urea formaldehyde" statement on composite wood materials used in the work of this section Highlights the TOTAL VOC limit of 10 mg/m2/hr on all adhesives and 250 g/L on all sealants and sealant primers used in the work of this section Highlights Forest Stewardship Council Chain of Custody Certificate Number Highlights "no-added urea formaldehyde" statement on composite wood materials used in the work of this section Highlights the TOTAL VOC limit of 10 mg/m2/hr on all adhesives and 250 g/L on all sealants and sealant primers used in the work of this section Highlights Forest Stewardship Council Chain of Custody Certificate Number Highlights "no-added urea formaldehyde" statement on composite wood materials used in the work of this section THIS DOCUMENT IS TO BE USED AS A TOOL ONLY! IT IS NOT PROJECT SPECIFIC AND DOES NOT SUPERSEDE THE CONSTRUCTION DOCUMENTS 06200 Finish Carpentry and Architectural Woodwork 06400 Custom casework. DIVISION 7 07211 Building Insulation 07412 Metal Wall Panels 07421 Cap Sheet Roofing Highlights the TOTAL VOC limit of 10 mg/m2/hr on all adhesives and 250 g/L on all sealants and sealant primers used in the work of this section Highlights Forest Stewardship Council Chain of Custody Certificate Number Highlights "no-added urea formaldehyde" statement on composite wood materials used in the work of this section Highlights the TOTAL VOC limit of 10 mg/m2/hr on all adhesives and 250 g/L on all sealants and sealant primers used in the work of this section Highlights Forest Stewardship Council Chain of Custody Certificate Number Highlights "no-added urea formaldehyde" statement on composite wood materials used in the work of this section Highlights the TOTAL VOC limit of 10 mg/m2/hr on all adhesives and 250 g/L on all sealants and sealant primers used in the work of this section Highlights at least 20% P/C and 10% P/I recycled content Highlights the TOTAL VOC limit of 10 mg/m2/hr on all adhesives and 250 g/L on all sealants and sealant primers used in the work of this section Highlights "no-added urea formaldehyde" statement on insulation materials used in the work of this section Highlights the TOTAL VOC limit of 10 mg/m2/hr on all adhesives and 250 g/L on all sealants and sealant primers used in the work of this section Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights the Energy Star logo Highlights an emissivity rating of 0.9 07540 PVC Thermoplastic Membrane Roofing Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights the Energy Star logo Highlights an emissivity rating of 0.9 07551 Single Ply Roofing D:\687293046.doc Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights the Energy Star logo THIS DOCUMENT IS TO BE USED AS A TOOL ONLY! IT IS NOT PROJECT SPECIFIC AND DOES NOT SUPERSEDE THE CONSTRUCTION DOCUMENTS Highlights an emissivity rating of 0.9 07552 Built up Roofing Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights the Energy Star logo Highlights an emissivity rating of 0.9 07310 Asphalt Shingles Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights the Energy Star logo Highlights an emissivity rating of 0.9 07610 Standing seam metal roof Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights the Energy Star logo Highlights an emissivity rating of 0.9 07600 Flashing and Sheet Metal 07720 Roof Accessories 07920 Caulking and Sealants DIVISION 8 08110 Metal Doors and Frames D:\687293046.doc Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights the TOTAL VOC limit of 10 mg/m2/hr on all adhesives and 250 g/L on all sealants and sealant primers used in the work of this section Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius THIS DOCUMENT IS TO BE USED AS A TOOL ONLY! IT IS NOT PROJECT SPECIFIC AND DOES NOT SUPERSEDE THE CONSTRUCTION DOCUMENTS 08210 Wood Doors 08305 Access Panels 08330 Overhead Coiling Doors - Shop drawings 08346 Sound Control Doors and Frames 08416 Aluminum Entrances and Storefronts D:\687293046.doc Highlights the TOTAL VOC limit of 10 mg/m2/hr on all adhesives and 250 g/L on all sealants and sealant primers used in the work of this section Highlights the VOC limit (minus water and tinting color added) of 150 g/L (non-flat) and 50 g/L (flat) of all paints and coatings used in the work of this section Highlights Forest Stewardship Council Chain of Custody Certificate Number Highlights "no-added urea formaldehyde" statement on composite wood materials used in the work of this section Highlights the TOTAL VOC limit of 10 mg/m2/hr on all adhesives and 250 g/L on all sealants and sealant primers used in the work of this section Highlights the VOC limit (minus water and tinting color added) of 150 g/L (non-flat) and 50 g/L (flat) of all paints and coatings used in the work of this section Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights Forest Stewardship Council Chain of Custody Certificate Number Highlights "no-added urea formaldehyde" statement on composite wood materials used in the work of this section Highlights the TOTAL VOC limit of 10 mg/m2/hr on all adhesives and 250 g/L on all sealants and sealant primers used in the work of this section Highlights the VOC limit (minus water and tinting color added) of 150 g/L (non-flat) and 50 g/L (flat) of all paints and coatings used in the work of this section Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius THIS DOCUMENT IS TO BE USED AS A TOOL ONLY! IT IS NOT PROJECT SPECIFIC AND DOES NOT SUPERSEDE THE CONSTRUCTION DOCUMENTS 08460 Automatic Sliding Doors 08520 Aluminum Windows 08620 Unit Skylights 08800 Glass and Glazing DIVISION 9 09200 09260 Lath and Plaster Gypsum Board System D:\687293046.doc Highlights the TOTAL VOC limit of 10 mg/m2/hr on all adhesives and 250 g/L on all sealants and sealant primers used in the work of this section Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights the TOTAL VOC limit of 10 mg/m2/hr on all adhesives and 250 g/L on all sealants and sealant primers used in the work of this section Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights the TOTAL VOC limit of 10 mg/m2/hr on all adhesives and 250 g/L on all sealants and sealant primers used in the work of this section Highlights the VOC limit (minus water and tinting color added) of 150 g/L (non-flat) and 50 g/L (flat) of all paints and coatings used in the work of this section Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights the TOTAL VOC limit of 10 mg/m2/hr on all adhesives and 250 g/L on all sealants and sealant primers used in the work of this section Highlights the VOC limit (minus water and tinting color added) of 150 g/L (non-flat) and 50 g/L (flat) of all paints and coatings used in the work of this section Highlights a Tvis (visual transmittance %) of 0.4 or greater Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights 100% P/C or P/I recycled content in facing paper AND a minimum 10% P/I recycled content in the gypsum core Highlights the TOTAL VOC limit of 10 mg/m2/hr on all adhesives and 250 g/L on all sealants and sealant primers used in the work of this section Highlights the VOC limit (minus water and tinting color added) of 150 g/L (non-flat) and 50 g/L (flat) of all paints and coatings used in the work of this section THIS DOCUMENT IS TO BE USED AS A TOOL ONLY! IT IS NOT PROJECT SPECIFIC AND DOES NOT SUPERSEDE THE CONSTRUCTION DOCUMENTS 09300 Ceramic Tile Highlights Forest Stewardship Council Chain of Custody Certificate Number Highlights "no-added urea formaldehyde" statement on composite wood materials used in the work of this section Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights a minimum of 35% P/I recycled content 09510 Acoustical Ceilings 09650 Resilient Flooring Highlights the TOTAL VOC limit of 10 mg/m2/hr on all adhesives and 250 g/L on all sealants and sealant primers used in the work of this section Highlights a minimum of 65% P/I and 35% P/I recycled content Highlights the TOTAL VOC limit of 10 mg/m2/hr on all adhesives and 250 g/L on all sealants and sealant primers used in the work of this section Highlights "no-added urea formaldehyde" statement on materials used in the work of this section Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights a minimum of 50% P/I recycled content Carpet Tile Highlights the TOTAL VOC limit of 10 mg/m2/hr on all adhesives and 250 g/L on all sealants and sealant primers used in the work of this section Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights a minimum of 40% P/C recycled content 09680 09900 Painting D:\687293046.doc Highlights the TOTAL VOC limit of 10 mg/m2/hr on all adhesives and 250 g/L on all sealants and sealant primers used in the work of this section Highlights the TOTAL VOC limit of 0.5 mg/m2/hr on all carpets and 1mg/m2/hr on all carpet cushions used in the work of this section. The materials should have a CRI Green Label Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights the VOC limit (minus water and tinting color added) of 150 g/L (non-flat) and 50 g/L (flat) of all paints and coatings used in the work of this section THIS DOCUMENT IS TO BE USED AS A TOOL ONLY! IT IS NOT PROJECT SPECIFIC AND DOES NOT SUPERSEDE THE CONSTRUCTION DOCUMENTS 09951 09960 DIVISION 10 10100 Vinyl Wall Coverings Epoxy Coatings Chalkboards and Tack boards 10160 Metal Partitions 10171 Solid Phenolic Toilet Compartments 10200 Metal Louvers 10350 Flagpoles 10400 Bicycle Rack 10700 Metal Lockers and Benches 10710 Wood Lockers D:\687293046.doc Highlights a minimum of 100% P/C recycled content Highlights the TOTAL VOC limit of 10 mg/m2/hr on all adhesives and 250 g/L on all sealants and sealant primers used in the work of this section Highlights the VOC limit (minus water and tinting color added) of 150 g/L (non-flat) and 50 g/L (flat) of all paints and coatings used in the work of this section Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights a minimum of 15% P/I recycled content Highlights the TOTAL VOC limit of 10 mg/m2/hr on all adhesives and 250 g/L on all sealants and sealant primers used in the work of this section Highlights Forest Stewardship Council Chain of Custody Certificate Number Highlights "no-added urea formaldehyde" statement on composite wood materials used in the work of this section Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights Forest Stewardship Council Chain of Custody Certificate Number Highlights the TOTAL VOC limit of 10 mg/m2/hr on all adhesives and 250 g/L on all sealants and sealant primers used in the work of this section THIS DOCUMENT IS TO BE USED AS A TOOL ONLY! IT IS NOT PROJECT SPECIFIC AND DOES NOT SUPERSEDE THE CONSTRUCTION DOCUMENTS Highlights "no-added urea formaldehyde" statement on composite wood materials used in the work of this section DIVISION 12 12480 Entrance Mat Highlights a minimum of 50% P/I and 50% P/C recycled content Highlights the TOTAL VOC limit of 10 mg/m2/hr on all adhesives and 250 g/L on all sealants and sealant primers used in the work of this section Highlights the TOTAL VOC limit of 0.5 mg/m2/hr on all carpets and 1mg/m2/hr on all carpet cushions used in the work of this section. The materials should have a CRI Green Label Highlights the TOTAL VOC limit of 0.5 mg/m2/hr on all carpets and 1mg/m2/hr on all carpet cushions used in the work of this section. The materials should have a CRI Green Label Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius DIVISION 13 13032 Handball courts Highlights the TOTAL VOC limit of 10 mg/m2/hr on all adhesives and 250 g/L on all sealants and sealant primers used in the work of this section Highlights "no-added urea formaldehyde" statement on composite wood materials used in the work of this section Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius Highlights the manufacturer's name and location within a 500 mile radius of the project site for all materials used in the work of this section Highlights the name and location of the sources of all raw materials within a 500 mile radius 13125 DIVISION 15 15400 Metal building system Plumbing Highlights a maximum GPF of 1.6 for water closets Highlights a maximum GPF of 1.0 for urinals Highlights a maximum GPM of 2.5 for service sinks water supply Highlights a maximum GPM of 0.5 for lavatory water supply (NO aerators or flow restrictors) Highlights a maximum GPM of 2.5 for shower head water supply (NO aerators or flow restrictors) Highlights a maximum GPM of 2.0 for kitchen sink water supply (NO aerators or flow restrictors) D:\687293046.doc THIS DOCUMENT IS TO BE USED AS A TOOL ONLY! IT IS NOT PROJECT SPECIFIC AND DOES NOT SUPERSEDE THE CONSTRUCTION DOCUMENTS 15600 Heating, Ventilating & Air Conditioning IAQ Management Plan HVAC Duct Insulation CO2 sensor Filters DIVISION 16 16010 16520 General Electrical Requirements Site Lighting Site photometric drawing D:\687293046.doc Highlights HVAC protection, Source Control, Pathway Interruption, Housekeeping and Scheduling strategies to meet or exceed the requirements of SMACNA IAQ Guideline for Occupied Buildings Under Construction Highlights a minimum of 20% P/C and 10% P/I recycled content Highlights the TOTAL VOC limit of 10 mg/m2/hr on all adhesives and 250 g/L on all sealants and sealant primers used in the work of this section Highlights "no-added urea formaldehyde" statement on insulation materials used in the work of this section Highlights a CO2 sensor system that mechanically adjusts indoor air quality Highlights MERV values of 13 for filtration material during construction and immediately prior to occupancy Highlights shields or other devices required to keep light on site Highlights a max of .6fc at all project property lines THIS PAGE INTENTIONALLY LEFT BLANK INSERT DIVIDER HERE TAB Title “Division 1 LEED-RELATED SPECIFICATIONS” THIS PAGE INTENTIONALLY LEFT BLANK CONTENTS Division 1 LEED-RELATED SPECIFICATIONS Section 01351: ENVIRONMENTAL PROCEDURES Section 01575: Construction Waste Management Section 01600: Recycled Content Certification Section 01810: Commissioning Requirements NOTE: Become very familiar with these LEEDRelated Sections THIS PAGE INTENTIONALLY LEFT BLANK INSERT DESCRIPTION OF WORK specification per project SECTION 01112 DESCRIPTION OF WORK PART 1 - GENERAL SUMMARY The work to be done under this Contract includes the furnishing of project management, labor, materials, tools and equipment for the construction of the FIRE STATION NO. 77 for the City of Los Angeles, all in accordance with the Contract Documents, including the GENERAL CONDITIONS, DIVISION 1 - GENERAL REQUIREMENTS and other Sections of the Project Manual. 1.1 GENERAL SCOPE OF WORK Work In This Contract: Work in this Contract includes all labor, materials and equipment necessary for construction of Fire Station No. 77 as noted on the Contract Drawings and in the Project Manual and all other Contract Documents including the GENERAL CONDITIONS and GENERAL REQUIREMENTS. Work Not In This Contract: “Work not in this Contract,” “Work by others” and “Work by others but arranged and paid for by CONTRACTOR” are listed as follows: All work or equipment indicated on the Contract Drawings or in this Project Manual as “Not in Contract” or “N.I.C.” or anything which implied exclusion from the Contract in any manner. All work or equipment indicated on the Contract Drawings or in this project as “work by others,” but arranged and paid for by “CONTRACTOR.” The CONTRACTOR shall provide all necessary coordination, arrangement, and scheduling in accordance with General Conditions and other Sections of this Project Manual. CONTRACTOR shall appropriately pay for all charges, fees and costs specified to be paid for by the CONTRACTOR. Department of Water and Power shall furnish and install electric service conductors from street utility line to new transformers and switchboard, CONTRACTOR shall make all necessary arrangements and pay for all fees and charges. Telephone equipment (except terminal cabinets) for telephones system shall be installed by the CITY. Permanent Water Meter and Service Line: CONTRACTOR shall arrange for installation of permanent meter and water service line by the Department of Water and Power at their convenience, and CONTRACTOR shall pay all fees and charges. Construction light, power and water to be provided and paid for by the CONTRACTOR in accordance with the GENERAL REQUIREMENTS. Permanent Gas Meter and Service line: CONTRACTOR shall arrange for installation of permanent meter and gas line by the Southern California Gas Company and shall pay for all fees and charges. 7. Fire Station No. 77 03/14/03 Active electronics (head end equipment) for communications systems such as security, voice / paging, data, radio, etc. Systems equipment to be installed, connected, and tested by the City and/or their vendors. Description of Work 01112-1 Related Work: Documents affecting work of this Contract include, but are not limited to, the GENERAL CONDITIONS, DIVISION 1 - GENERAL REQUIREMENTS, and other Sections of the Project Manual. The work of other Contracts is described in the various Contract Documents. Lists of these documents are in the possession of the CITY and where they are available for inspection by interested parties. 3. 1.3 Refer to Section 01313 - Work by City or Others BUILDING COMMISSIONING A. Commissioning Coordination: This project will have selected building systems commissioned. The equipment and systems to be commissioned are specified in Section 01810. The commissioning process, which the Contractor is responsible to help execute, is defined in Sections 01810, 01811, 01812, 01813, 01814, 01820, and 01830. B. A Commissioning Authority, whose services will be provided by the City, will direct and coordinate the commissioning process and approve commissioning work. The Commissioning Authority will work with the Contractor according to protocols established in the Commissioning Plan. PROJECT IDENTIFICATION General: The Project Name is Fire Station No. 77, located at 9224 North Sunland Boulevard in Sun Valley, California. Contract Documents have been prepared by RRM Design Group, 3765 South Higuera Street, Suite 201, San Luis Obispo, CA 93401. Project Manual and Contract Drawings are dated March 14, 2003. The extent of Contracted Work is indicated on the Contract Drawings and in the following Sections of the Project Manual. Division 1 – General Requirements Division 2 - Sitework Division 3 – Concrete Division 4 – Masonry Division 5 – Metals Division 6 – Wood and Plastics Division 7 – Thermal and Moisture Protection Division 8 – Standard Steel Doors and Frames, etc. Division 9 – Finishes Division 10 – Specialties Division 11 – Equipment Division 12 – Furnishings Division 13 – Special Construction – NOT USED Division 14 – Conveying Systems – NOT USED Division 15 – Mechanical Division 16 – Electrical Fire Station No. 77 03/14/03 Description of Work 01112-2 Division 17 – Communication - Data In addition to provisions noted in Section 01112 - DESCRIPTION OF WORK in Division 1 GENERAL REQUIREMENTS, the following listed drawings of Work Order No. E170074F are, but not limited to, a part of the Contract Documents: Drawing Index (Part 1 of 2) General/Architectural: T-1.0 Title Sheet (Part 1 of 2) T-1.1 Accessibility Details T-1.2 Accessibility Details T-1.3 Accessibility Conditions C-1 Notes and Legend C-1.1 Notes C-2 Grading Plan C-3 Site Utility Plan C-4 Site Details C-4.1 Site Details C-5 Horizontal Control Plan 1 of 12 Street Improvements – Title Sheet 2 of 12 Street Improvements – Typical Sections 3 of 12 Street Improvements – Sunland Boulevard 4 of 12 Street Improvements – Tuxford Street 5 of 12 Street Improvements – Tuxford Street 6 of 12 Street Improvements – Tuxford Street / Tuxford Place 7 of 12 Street Improvements – Tuxford Place 8 of 12 Street Improvements – Street Lighting 9 of 12 Street Improvements – Street Lighting 10 of 12 Street Improvements – Traffic Signals 11 of 12 Street Improvements – Traffic Signals 12 of 12 Street Improvements – Traffic Striping A-1.0 Architectural Site Plan A-1.1 Hose Tower and Details A-1.2 Architectural Site Details A-1.3 Original Topographical Survey A-1.4 Original Boundary Survey A-2.0 First Floor Dimension Plan A-2.1 Second Floor Dimension Plan A-2.2 First Floor Plan A-2.3 Second Floor Plan A-2.4 Enlarged First Floor Plans A-2.5 Enlarged Second Floor Plans A-3.0 First Floor Reflected Ceiling A-3.1 Second Floor Reflected Ceiling A-4.0 Roof Plan A-5.0 Exterior Elevations A-5.1 Exterior Elevations A-6.0 Building Sections A-7.0 Door Schedule and Door Types A-7.1 Door Details A-7.2 Window Schedule, Types, and Details A-8.0 Interior Elevations A-8.1 Interior Elevations A-8.2 Interior Elevations A-8.3 Interior Elevations Fire Station No. 77 03/14/03 Description of Work 01112-3 A-8.4 A-9.0 A-9.1 A-9.2 A-9.3 L-1.1 L-1.2 L-1.3 L-1.4 L-2.1 L-2.2 L-2.3 L-2.4 Finish Schedule Exterior Details Exterior Details Interior Details Interior Details Irrigation Plan Irrigation Plan Irrigation Plan Irrigation Details Planting Plan Planting Plan Planting Plan Planting Details Drawing Index (Part 2 of 2) T-2.0 T24-1 T24-2 T24-3 Title Sheet (Part 2 of 2) Energy Compliance – Title 24 Energy Compliance – Title 24 Energy Compliance – Title 24 Structural: S0.1 General Notes S0.2 General Notes S1.1 Typical Details S1.2 Typical Details S1.3 Typical Details S1.4 Typical Details S1.5 Typical Details S1.6 Typical Details S1.7 Typical Details S1.8 Typical Details S2.1 First Floor Foundation Plan S2.2 Second Floor / Roof Framing Plan S2.3 Roof Framing Plan S2.4 Diaphragm Nailing Plans S3.1 Sections S3.2 Sections S4.1 Details S4.2 Details S4.3 Details Mechanical: M-1.0 Mechanical Schedules, Notes, Legend and Abbreviations M-2.0 Mechanical Details M-2.1 Mechanical Details M-3.0 Mechanical Roof Plan M-4.0 Mechanical Second Floor Plan M-5.0 Mechanical First Floor Plan Plumbing: P-1.0 Plumbing Schedules, Notes, Legend and Abbreviations P-2.0 Plumbing Details P-2.1 Plumbing Details P-3.0 Plumbing Site Plan Fire Station No. 77 03/14/03 Description of Work 01112-4 P-4.0 P-5.0 P-6.0 P-7.0 P-7.1 P-8.0 P-8.1 P-9.0 P-10.0 P-11.0 P-12.0 Plumbing First Floor Plan Plumbing Second Floor Plan Plumbing Roof Plan Plumbing Partial First Floor Plan Plumbing Partial First Floor Plan Plumbing Partial Second Floor Plan Plumbing Partial Second Floor Plan Drainage, Waste and Vent Riser Diagram Natural Gas Isometric Hot and Cold Water Isometric Hot and Cold Water Isometric Electrical: E-1.0 Legend, Abbreviations, and General Notes E-1.1 Single Line Diagram and Calculations E-2.0 Electrical Site Plan E-2.1 LADWP Sub –Structure Site Plan E-3.0 First Floor Lighting Plan E-3.1 Second Floor Lighting Plan E-4.0 First Floor Power Plan E-4.1 Second Floor Power Plan E-4.2 Roof Power Plan E-5.0 First Floor Communications / Signal Plan E-5.1 Second Floor Communications / Signal Plan E-6.0 Fixture Schedule E-6.1 Panel Schedule E-7.0 Electrical Details E-7.1 Electrical Details E-7.2 Electrical Details E-7.3 Electrical Details 1.2 SUMMARY OF REFERENCES Contracted Work can be summarized by references to the Contract General Conditions, Sections in the Project Manual, Contract Drawings, Addenda, Notice to Bidders and Modifications to the Contract Documents. It is recognized that the Contracted Work may also be unavoidably affected or influenced by other governing codes and Regulations, natural phenomenon, including weather conditions and other forces outside the Contract Documents. 1.3 SUPPLEMENTAL INFORMATION The following supplemental information is provided for use by the CONTRACTOR: Soil Investigation: Soils Engineering Investigation prepared by the City of Los Angeles Geotechnical Engineering Division (GED) Geotechnical Engineering Report, GED File #02007, dated February 21, 2002. (Attachment No. 1). Structural Calculations prepared by Englekirk & Sabol, Inc., dated December 16, 2002 (Attachment No. 2). Title 24 Report prepared by Brummel, Myrick & Associates, dated December 13, 2002 (Attachment No. 3). Fire Station No. 77 03/14/03 Description of Work 01112-5 Project Color and Sample Material Boards. The Color Sample Material Boards will be stored and be available for review at INSPECTOR’S job office. Utility Fee Information as described in Subsection 1.9 (Attachment No. 4). Site Survey (Attachment No. 5). Water Service (Attachment No. 6). Power Service (Attachment No. 7). Gas Service (Attachment No. 8). Telephone Service (Attachment No. 9). L. 1.4 Commissioning Plan (Attachment No. 10) Internet based contract administration and management The CONTRACTOR will be required to use the City's internet based collaborative project management website, managed by e2020, at no cost, to conduct all day to day communication with other members of the project team. This use shall include all submissions to the ENGINEER and the INSPECTOR including but not limited to, shop drawing submittals, RFI's, change order requests, change orders, progress payment requests, etc. The CONTRACTOR shall equip the site office with a computer, internet service provider and DSL or cable modem connection suitable for accessing the e2020 website. 1.5 GROUND BREAKING CEREMONY The Ground Breaking Ceremony for this project may be requested and may occur before the Notice-to-Proceed is issued. The CONTRACTOR shall include in the contract cost and verify with the ENGINEER the ceremony schedule after the award of the contract. The CONTRACTOR shall prepare, after the award of the contract, all submittals for the construction sign and secure all necessary approvals. The CONTRACTOR shall provide necessary coordination for the Ground Breaking Ceremony, occurring before or during the construction at no additional cost to the CITY. 1.9 LEADERSHIP IN ENERGY AND ENVIRONMENTAL DESIGN – LEED™ A. The City of Los Angeles is seeking LEED™ Certification from the US Green Building Council for this project. B. The USGBC LEED™ green building rating system evaluates the project in the following major areas: Site, Water, Energy, Materials and Indoor Environmental Quality. Using a point based system, the project must achieve all 7 Prerequisites and at least 26 of the 69 points available in order to qualify for LEED™ Certification. C. The contractor shall carefully review all the specifications for requirements related to obtaining LEED™ Certification. Especially close attention shall be paid to the following items: 1. Erosion & Sedimentation Control 2. Reduced Site Disturbance Fire Station No. 77 03/14/03 Description of Work 01112-6 3. 4. 5. 6. 7. 8. Building Commissioning Construction Waste Management Local/Regional Materials Certified Wood Construction Indoor Air Quality Management Plan Low-Emitting Materials D. Documents affecting works of this contract include but are not necessarily limited to the following sections of the Project Manual: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. Section 01322 Section 01563 Section 01571 Section 01572 Section 01770 Section 01810 Section 01811 Section 01812 Section 01813 Section 02050 Section 06100 Section 06400 Section 07500 Section 09900 Section 10400 Section 15400 Section 15600 Section 16500 Construction progress photography Pollution control Stormwater pollution control Solid resources management Project closeout General commissioning requirements Mechanical commissioning requirements Electrical commissioning requirements Prefunctional check lists Building demolition Rough carpentry Custom casework Membrane roofing Painting Bicycle racks Plumbing HVAC Lighting fixtures PART 2 - PRODUCTS (NOT APPLICABLE) PART 3 – EXECUTION (NOT APPLICABLE) (END OF SECTION) Fire Station No. 77 03/14/03 Description of Work 01112-7 THIS PAGE INTENTIONALLY LEFT BLANK INSERT SPECIAL ENVIRONMENTAL REQUIREMENTS specification per project SECTION 01355 SPECIAL ENVIRONMENTAL REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes Special Environmental Requirements: Work includes special environmental, sustainable, and “green” building practices related to energy conservation and efficiency, indoor air quality, and resource efficiency, including the following: 1. 2. B. Special Requirements: a. Require construction practices to ensure healthy indoor air quality in final Project. b. Maximize the use of durable products. c. Maximize the use of products easy to maintain, repair, and that can be cleaned using non-toxic substances. d. Maximize recycled content in materials, products, and systems. e. Maximize use of reusable and recyclable packaging. f. Maximize use of products with low embodied energy (production, manufacturing, and transportation). Construction team is required to comply with sustainable building practices during construction and when considering materials for substitutions. Refer to Article 1.2 – Design Requirements. Related Requirements: Refer to Specification sections for special environmental requirements for specific products. 1. Solid Resources Management in Section 01572 2. Guaranty / Warranty in Section 01611 3. Substitutions and “Or Equal” Submittal in Section 01630 4. General Commissioning Process in Section 01810 5. Mechanical Commissioning Requirements in Section 01811. 6. Electrical Commissioning Requirements in Section 01812. 7. Prefunctional Checklists in Section 01813. 8. Operations and Maintenance Training in Section 01820 Fire Station No. 77 03/14/03 Special Environmental Requirements 01355-1 1.2 9. Building Commissioning in Section 01830. 10. Site Work in Division 2 11. Concrete in Division 3 12. Masonry in Division 4 13. Metal in Division 5 14. Wood and Plastics in Division 6 15. Thermal and Moisture Protection in Division 7 16. Doors and Windows in Division 8 17. Finishes in Division 9 18. Mechanical in Division 15 19. Electrical in Division 16 DESIGN REQUIREMENTS A. B. General: The City has established with design team general environmental goals for design and for construction of Project; Contractor, subcontractors, suppliers, and manufacturers are required to participate where possible to realize the City’s environmental goals. 1. Intent is for environmental goals to be achieved in manner that ultimately provides safe and healthy environment for building occupants with minimal impact on local, regional and global environment. 2. Contract Documents are not intended to limit alternative means of achieving environmental goals. a. Suggestions from construction team for implementing goals are encouraged. b. Team approach is encouraged. Environmental Goals: 1. Fire Station No. 77 03/14/03 Refer to specific Specifications sections for more detailed construction requirements related to specific materials and systems. a. Energy Efficiency (Operations Throughout Project Life): Materials and systems are intended to maximize energy efficiency for operation of Project throughout service life (substantial completion to ultimate disposition – reuse, recycling, or demolition). b. Indoor Environmental and Air Quality: Materials are selected and processes specified, such as preconditioning and temporary ventilation, to maximize healthy indoor air quality. Cleaning, surface coating, and renewal or replacement of interior materials should be feasible with lowest practical use of toxic, irritating, or odorous compounds. Ventilation Special Environmental Requirements 01355-2 system design, construction, and commissioning ensure adequate outside air supply under all anticipated conditions of use. Documentation of system design assumptions is included in Project Manuals to enable building operators and management to use and modify the system as required to provide continued assurance of indoor air quality. Additionally, materials are selected to provide appropriate indoor environmental qualities such as good acoustics and lighting. c. C. D. E. Resource Efficiency (Project Construction): Materials and systems are to maximize environmentally-benign construction techniques, including construction waste recycling, reusable delivery packaging, and reusability of selected materials. Energy Conservation Goals: Strategies used by the Architect to maximize energy conservation strategies in order to reduce life-cycle energy requirements. 1. Reduce undesirable heat gain and heat loss through exterior envelope. 2. Use daylight as the primary lighting source and supplement with integrated and energy-efficient electrical lighting systems. 3. Choose equipment with high-end energy performance characteristics, including lighting, HVAC systems, appliances, and office equipment. 4. Where appropriate, use thermal storage strategies such as thermal mass of building or ground to minimize total energy consumption. 5. Design mechanical systems for efficient operation throughout the typical operating range, from minimum to peak load. Sustainable Site Planning and Landscape Goals: Strategies used by the Architect to maximize sustainable site planning and landscaping requirements. 1. Maximize erosion and sedimentation control. 2. Minimize site disturbance. 3. Maximize planted areas. 4. Reduce heat islands. 5. Where possible, reduce or eliminate light pollution from site lighting. 6. Reduce or eliminate use of pesticides. 7. Rely on indigenous, dry or xeriscape planting. Maintain existing planting on site to reduce costs. 8. Implement seasonal plant and soil maintenance schedule to maintain healthy soil and landscaping. 9. Minimize stormwater runoff. 10. Reduce water use with water efficient irrigation systems and local vegetation. Durable Materials Goals: Strategies used by the Architect to provide durable and Fire Station No. 77 03/14/03 Special Environmental Requirements 01355-3 sustainable materials. F. 1. Select materials with longest useful service life. 2. Select materials that deteriorate minimally under installed conditions, exposures, and uses. 3. Select materials with surfaces that require minimal or no refinishing or resurfacing. 4. Select materials with protective coating requirements that do not involve frequent application of toxic or odorous components for materials that require surface renewal or protection. 5. Select materials that can be re-used after their service life in this building. 6. Select materials that can be recycled at the end of their useful lives for materials that cannot be re-used. Resource Efficient Materials Goals: Use resource efficient materials; consider energy use over life cycle of material including harvesting, mining, manufacturing, transport, installation, use, operations, recycling and disposal. 1. Where possible and allowable by the Agency and Code with jurisdiction over the project, re-use existing building materials to extent feasible within design concept expressed in Contract Documents. 2. Select materials that efficiently use resources such as energy, water, and component materials. 3. Use construction practices such as material reduction and dimensional planning that maximize efficient use of resources and materials. 4. Provide materials that utilize recycled content to maximum degree possible without being detrimental to product performance or indoor air quality. 5. Where possible and feasible, provide for non-destructive removal and re-use of materials after their service life in this building. 6. Select materials that use less embodied energy to manufacture. a. G. Exceptions might include materials that result in net energy conservation during their useful life in building and building’s life cycle. 7. Select materials that conserve energy during building operations. 8. Where possible, select materials harvested and manufactured regionally, within a 500-mile radius of the project site. Scarce, Irreplaceable, and Endangered Resources Goals: 1. Select materials from abundant resources. a. Fire Station No. 77 03/14/03 For natural resources, determine abundance based on ratio of removal rate from existing stocks to natural replacement/renewal rate, where this information is available. Special Environmental Requirements 01355-4 b. H. I. J. For mineral resources, determine abundance based on ratio of removal rate from terrestrial storage minus amount re-entering commerce through recycling or resource recovery compared to total in terrestrial storage, where this information is available. 2. Select renewable materials, and materials which can be replenished. 3. Select materials that create minimal or no damage to natural habitats and natural environment. 4. Select materials that can be easily refinished, repaired or refurbished to extend their useful life. Pollution Reduction Goals: Selection of materials that generate least amount of pollution during mining, manufacturing, transport, installation, use, and disposal. 1. Avoid materials that emit greenhouse gases 2. Avoid materials that require energy intensive extraction, manufacturing, processing, transport, installation, maintenance, or removal. 3. Avoid materials that contain ozone-depleting chemicals (e.g. CFCs or HCFCs). 4. Avoid materials that emit potentially harmful volatile organic chemicals (VOCs), as described in Article 2.1. 5. Employ construction practices that minimize dust production and combustion byproducts. 6. Avoid materials that can leach harmful chemicals into ground water; do not allow potentially harmful chemicals to enter sewers or storm drains. 7. Protect soil against erosion and topsoil depletion. 8. Minimize noise generation during construction; screen mechanical equipment to block noise. 9. Select materials that can be reused or recycled and materials with significant percentage of recycled content; conform with or exceed specified Project recycled content percentages for individual materials; avoid materials difficult to recycle. 10. Protect natural habitats; restore natural habitats where feasible within scope of Project. Sustainable Wood Product Goals: 1. Use woods from Forest Stewardship Council (FSC) accredited certified sustainably harvested sources are encouraged 2. Composite wood products with high-recycled content, which meet the indoor air quality data requirements,. Water Efficiency Goals: Fire Station No. 77 03/14/03 Special Environmental Requirements 01355-5 1.3 1. Reduce the use of municipally supplied potable water. 2. Reduce dependence on municipal storm water system for plumbing fixtures and irrigation. Reduce irrigation or use micro-irrigation. 3. Maintain natural aquifer conditions. 4. Consider roofwater or groundwater collection system. 5. Consider graywater collection system for irrigation systems. 6. Commission irrigation, graywater, roofwater collection systems. Provide measurement and verification for these systems. Train maintenance staff on performance of all water collection and distribution systems. SUBMITTALS A. Resource Efficient Product Data: 1. Environmental Issues Data: Submit following information, including manufacturer’s certifications, verifying information, and test data, where Specifications sections require data relating to environmental issues including but not limited to: a. Project Recyclability: Submit information to assist City, Architect, and Contractor in recycling materials involved in shipping, handling, and delivery, and for temporary materials necessary for installation of products. b. Recycled Content: Submit information regarding product post industrial recycled and post consumer recycled content. i. Use the “Recycled Content Certification Form”, attached as Appendix A to this Section, signed by a corporate office holder (i.e. Chairman of the Board, President, Vice President, Secretary, or similar position of authority). c. Product Recyclability: Submit information regarding product and product’s component’s recyclability including potential sources accepting recyclable materials. d. Provide certification for all wood products provided by a Forest Stewardship Council (FSC) accredited certifier when FSC certified products are used in the project. e. Provide final certification of well-managed* forest of origin to provide final documentation of certified sustainably harvested status when FSC certified products are used in the project: Acceptable wood “certified sustainably harvested” certifications shall include: Wood suppliers’ certificate issued by one of the Forest Stewardship Council-accredited certifying agencies, such as Smart wood (800-434-5491) or Forest Conservation Program (510-8321415); Suppliers’ invoice detailing the quantities of certified wood products for project; Fire Station No. 77 03/14/03 Special Environmental Requirements 01355-6 Letter from one of a certifying agency corroborating that the products on the wood supplier’s invoice originate from certified well-managed forests. (Note 6) B. Indoor Air Quality (IAQ) Data: 1. Environmental Issues: Submit emission test data produced by acceptable testing laboratory listed in Quality Assurance Article for materials as required in each specific Specification section. a. Laboratory reports shall contain emissions test data on VOCs including total VOCs (TVOC), specific individual VOCs, formaldehyde and other aldehydes as described in this Specification Section. b. In special cases it may be necessary to identify other specific chemicals for listing based on known quantity present or on known odor, irritation or toxicity. c. Identify all VOCs emitted by each material as required in these Specifications. d. Specific test conditions and requirements are set forth in this Section. For required tests, submit documentation of sample acquisition, handling, and test specimen preparation, as well as test conditions, methods, and procedures. The tests consist of a ten-day conditioning period followed by a 96-h test period. Samples collected during the test period at 24, 48, and 96 hours shall be analyzed for TVOC and formaldehyde. VOC samples collected at 96 hours shall be identified and quantified for all compounds that are Chemicals of Concern on lists in Article 2. 2. Fire Station No. 77 03/14/03 Cleaning and Maintenance Products: Provide data on manufacturers’ recommended maintenance, cleaning, refinishing and disposal procedures for materials and products. These procedures are for final Contractor cleaning of the project prior to substantial completion and for provided materials and products as required by the specific specification sections. a. Where chemical products are recommended for these procedures, provide documentation to indicate that no component present in the cleaning product at more than 1% of the total mass of the cleaning product is a carcinogen or reproductive toxicant as defined in the lists in this specification section. b. For purposes of reporting, identification of product VOC contents shall not be limited to those regulated under Clean Air Act (CAA) but shall also include compounds exempted from the CAA definition and listing of VOCs. c. California EPA and local air district definitions of VOCs based on CAA are not sufficient as they exempt compounds based on non-reactivity for outdoor air pollution control but still important for indoor air quality. Special Environmental Requirements 01355-7 d. C. No alpha-pinene, d-limonene or other unsaturated carbon double bond alkalines are permitted in cleaning agents. Certificates: 1. Environmental Issues Certifications: a. Submit documentation certifying accuracy of post-industrial and postconsumer recycled content, and recyclability. b. Prior to Final Completion, submit certificate signed by corporate office holder (i.e. Chairman of the Board, President, Vice President, Secretary, or similar position of authority) of contractor, subcontractor, supplier, vendor, installer or manufacturer, provided they are primarily responsible for manufacture of product, indicating: Post-industrial and post-consumer recycled content of materials installed are same as those required by Project requirements. Product recyclability of materials installed are same as those required by Project requirements. Indoor air quality requirements. Certification shall state products and materials provided are essentially same, and contain essentially same components as products and materials tested. c. D. Closeout Submittals: Submit data relating to environmental issues. 1. 1.4 Comply with requirements specified in Section 01770 – Project Closeout. Submit environmental product certifications, in two forms: a. Two CD-ROMs organized by CSI 16 Division Format. b. Four three-ring binders organized by CSI 16 Division Format with Table of Contents and with dividers for each division. QUALITY ASSURANCE A. Environmental Project Management and Coordination: Contractor to identify one person on Contractor’s staff to be responsible for environmental issues compliance and coordination. 1. Experience: Environmental project manager to have experience relating to sustainable building construction. 2. Responsibilities: Carefully review Contract Documents for environmental issues, coordinate work of trades, subcontractors, and suppliers; instruct workers relating to environmental issues; and oversee Project Environmental Goals. 3. Meetings: Discuss Environmental Goals at following meetings. Fire Station No. 77 03/14/03 a. Pre-construction meeting. b. Pre-installation meetings. Special Environmental Requirements 01355-8 1.5 c. Regularly scheduled job-site meetings. d. Special sustainability issues meetings. B. Environmental Issues Criteria: Comply with requirements listed in various Specification sections. C. The maximum concentration for any chemical emitted at 96 hours in emissions tests shall not result in a modeled indoor air concentration greater than ½ the chronic inhalation REL concentration of California Office of Environmental Health Hazard Assessment (OEHHA) Chronic Reference Exposure Limit (REL), with the exception of formaldehyde, which is discussed separately below. D. Formaldehyde: No single product shall contribute more than one half (½) the OEHHA staff recommended indoor air limit of 33 μg/m 3 (27 ppb) for formaldehyde. The calculated concentration of formaldehyde shall not exceed 16.5 μg/m 3. Same modeling procedure as described above shall be used for formaldehyde. This concentration limit shall apply to all building and occupancy types. (Note 12) E. Construction adhesives used in Work shall comply with following requirement: no component present in adhesive at more than 1% of total mass of adhesive shall be a carcinogen or reproductive toxicant as defined in the lists in this specification section. F. State Agency Buy Recycled Campaign (SABRC) Recycled Content: Implement the SABRC recycled-content goals for specific building products, including but not limited to: 1. Paper products; 2. Glass products (windows, glazing, fiberglass, tile, construction blocks, loosegrain abrasives); 3. Plastic products (carpet, plastic lumber, furniture made from plastic, fencing, parking bumpers, toilet partitions, entry mats, signage, sheet plastic and other plastic-containing building products); 4. Solvents; 5. Tire-derived products (entry-mats, resilient flooring, wheelchair and other ramps, playground surfacing, parking bumpers, speed bumps, tree ties, road surfacing); 6. Steel products (structural steel, steel framing, architectural metal, reinforcing bars, sheet metal, metal siding, metal roofing, lockers, toilet partitions, office furniture for filing and storage); 7. Paint (allowed only in exterior installations). 8. Compost DELIVERY, STORAGE, AND HANDLING A. Packaging: Deliver materials in recyclable or in reusable packaging such as cardboard, wood, paper, or reusable blankets, which will be reclaimed by supplier or manufacturer for recycling. B. General: Minimize packaging materials to maximum extent possible while still ensuring protection of materials during delivery, storage, and handling. Fire Station No. 77 03/14/03 Special Environmental Requirements 01355-9 1. 1.6 Unacceptable Packaging Materials: Polyurethane, polyisocyanate, polystyrene, polyethylene, and similar plastic materials such as “foam” plastics and “shrink-fit” plastics. C. Reusable Blankets: Deliver and store materials in reusable blankets and mats reclaimed by manufacturers or suppliers for reuse where program exists or where program can be developed for such reuse. D. Pallets: Where pallets are used, suppliers shall be responsible to ensure pallets are removed from site for reuse or for recycling. E. Corrugated Cardboard and Paper: Where paper products are used, recycle as part of construction waste management recycling program, or return to material’s manufacturer for use by manufacturer or supplier. F. Sealants, Paint, Primers, Adhesives, and Coating Containers: Return to supplier or manufacturer for reuse where such program is available. PROJECT CONDITIONS A. No smoking will be permitted in indoor Project site locations, as per California Labor Code (Section 400-6413.5). B. Certifications: 1. C. Environmental Product Certification: a. Include manufacturer certification indicating product contains maximum recycled content possible without being detrimental to product performance b. Include certification indicating cleaning requirements of these Specifications. materials comply with Construction Ventilation and Preconditioning: 1. Temporary Construction Ventilation: Maintain sufficient temporary ventilation of areas where materials are being used that emit VOCs. Maintain ventilation continuously during installation, and until emissions dissipate after installation. If continuous ventilation is not possible via building’s HVAC system(s) then ventilation shall be supplied via open windows and temporary fans, sufficient to provide no less than three air changes per hour. a. Period after installation shall be sufficient to dissipate odors and elevated concentrations of VOCs. Where no specific period is stated in these Specifications, a time period of 72 hours shall be used. b. Ventilate areas directly to outside; ventilation to other enclosed areas is not acceptable. 2. During dust producing activities (e.g. drywall installation and finishing) turn ventilation system off, and openings in supply and return HVAC system shall be protected from dust infiltration. Provide temporary ventilation as required. 3. Preconditioning: Prior to installation, allow products which have odors and Fire Station No. 77 03/14/03 Special Environmental Requirements 01355-10 significant VOC emissions to off-gas in dry, well-ventilated space for 14 calendar days to allow for reasonable dissipation of odors and emissions prior to delivery to Project site. D. a. Condition products without containers and packaging to maximize offgassing of VOCs b. Condition products in ventilated warehouse or other building. Comply with substitution requirements for consideration of other locations. Protection: 1. Moisture Stains: Materials with evidence of moisture damage, including stains, are not acceptable, including both stored and installed materials; immediately remove from site and properly dispose. Take special care to prevent accumulation of moisture on installed materials and within packaging during delivery, storage, and handling to prevent development of molds and mildew on packaging and on products. a. b. 2. 1.7 Immediately remove from site and properly dispose of materials showing signs of mold and signs of mildew, including materials with moisture stains. Replace moldy materials with new, undamaged materials. Ducts: Seal ducts during transportation, delivery, and construction to prevent accumulation of construction dust and construction debris inside ducts. SEQUENCING A. Environmental Issues: 1. On-Site Application: Where odorous and/or high VOC emitting products are applied on-site, apply prior to installation of porous and fibrous materials. Where this is not possible, protect porous materials with polyethylene vapor retarders. 2. Complete interior finish material installation no less than fourteen (14) days prior to Substantial Completion to allow for building flush out PART 2 - PRODUCTS 2.1 CHEMICALS OF CONCERN A. Chemicals of Concern are those chemicals listed below as toxic air contaminants, carcinogens, teratogens, reproductive toxins, and chemicals with established Chronic Reference Exposure Levels (REL): B. Carcinogens: Chemicals listed as probable or known human carcinogens in the latest published edition of the following two lists: 1. California Environmental Protection Agency, Air Resources Board (ARB), list of Toxic Air Contaminants (California Air Toxics).http://www.arb.ca.gov/toxics/summary/summary.htm 2. California Environmental Protection Agency, Office of Environmental Health Hazard Assessment (OEHHA), Safe Drinking Water and Toxic Enforcement Act of 1986 (Proposition 65). Fire Station No. 77 03/14/03 Special Environmental Requirements 01355-11 http://www.oehha.ca.gov/prop65/prop65_list/Newlist.html. C. Reproductive Toxicants: Chemicals known to cause reproductive toxicity including birth defects or other reproductive harm in the latest published edition of the following list: California Environmental Protection Agency, Office of Environmental Health Hazard Assessment (OEHHA), Safe Drinking Water and Toxic Enforcement Act of 1986 (Proposition 65). http://www.oehha.ca.gov/prop65/prop65_list/Newlist.htm. D. Chemicals with established Chronic Reference Exposure Levels (REL): Chronic RELs have been developed for 65 hazardous airborne substances as of January 2001. A chronic REL is an airborne concentration level that would pose no significant health risk to individuals indefinitely exposed to that level. RELs are based solely on health considerations, and are developed from the best available data in the scientific literature. The California Environmental Protection Agency, Office of Environmental Health Hazard Assessment (OEHHA) establishes and publishes RELs. Table 1. Chronic Reference Exposure Levels for organic chemicals with possible indoor sources. Based on California OEHHA list as of January 2001: Chronic Inhalation REL Hazard Index Target(s) (µg/m3) Substance (CAS #) Acetaldehyde* 75-07-0 9 Acrolein 107-02-8 0.06 Respiratory system; eyes Ammonia 7664-41-7 200 Respiratory system Arsenic & arsenic compounds 7440-38-2 0.03 Development; Cardiovascular system; Nervous system Benzene 71-43-2 60 Hematopoietic system; development; nervous system Butadiene 106-99-0 20 Reproductive system Cadmium & cadmium compounds 7440-43-9 0.02 Carbon tetrachloride 56-23-5 40 Alimentary system; development; nervous system Chlorinated dioxins 1746-01-6 0.00004 & dibenzofurans 5120-73-19 Alimentary system (liver); reproductive system; development; endocrine system; respiratory system; hematopoietic system Chlorine 7782-50-5 0.2 Respiratory system Chlorine dioxide 10049-04-4 0.6 Respiratory system Chlorobenzene 108-90-7 1000 Alimentary system; reproductive system kidney; Chloroform 67-66-3 300 Alimentary development kidney; Fire Station No. 77 03/14/03 Respiratory system Kidney; respiratory system system; Special Environmental Requirements 01355-12 Substance (CAS #) Chromium hexavalent: soluble except chromic trioxide Chromic trioxide (as chromic acid mist) Chronic Inhalation REL Hazard Index Target(s) (µg/m3) 0.2 Respiratory system 0.002 Respiratory system Cresol mixtures 1319-77-3 600 Nervous system Dichlorobenzene (1,4-) 106-46-7 800 Nervous system; respiratory system; alimentary system; kidney Dichloroethylene (1,1) 75-35-4 70 Alimentary system 5 Respiratory system Alimentary system Diesel Exhaust* Dimethylformamide (N,N-) 68-12-2 80 Dioxane (1,4-) 123-91-1 3,000 Epichlorohydrin 106-89-8 3 Respiratory system; eyes Epoxybutane (1,2-) 106-88-7 20 Respiratory system; cardiovascular system Ethylbenzene 100-41-4 2,000 Development; alimentary system (liver); kidney; endocrine system Ethyl chloride 75-00-3 30,000 Development; alimentary system Ethylene dichloride 107-06-2 400 Alimentary system (liver) Ethylene glycol 107-21-1 400 Respiratory development Ethylene glycol monoethyl ether 110-80-5 70 Reproductive hematopoietic system Ethylene glycol monoethyl ether acetate 111-15-9 300 Development Ethylene monomethyl ether glycol 109-86-4 60 Reproductive system Ethylene glycol monomethyl ether acetate 110-49-6 90 Reproductive system Ethylene oxide 75-21-8 30 Nervous system Fire Station No. 77 03/14/03 system ; respiratory Alimentary system; cardiovascular system kidney; system; Special Environmental Requirements 01355-13 kidney; system; Chronic Inhalation REL Hazard Index Target(s) (µg/m3) Substance (CAS #) Formaldehyde 50-00-0 3 Glutaraldehyde 111-30-8 0.08 Respiratory system Hexane (n-) 110-54-3 7000 Nervous system Hydrazine 302-01-2 0.2 Hydrogen chloride 7647-01-0 9 Respiratory system Hydrogen cyanide 74-90-8 9 Nervous system; endocrine system; cardiovascular system Hydrogen sulfide 7783-06-4 10 Respiratory system 67-63-0 7,000 Isopropanol Respiratory system; eyes Alimentary system system; endocrine Kidney; development Manganese & manganese compounds 0.2 Nervous system Mercury & mercury compounds (inorganic) 0.09 Nervous system Development Methanol 67-56-1 4,000 Methyl bromide 74-83-9 5 Methyl chloroform 71-55-6 1,000 Nervous system Methyl t-butyl ether 1634-04-4 8,000 Kidney; eyes; alimentary system (liver) Methylene chloride 75-09-2 400 Cardiovascular system Methylene Isocyanate 101-68-8 0.7 Respiratory system 91-20-3 9 Respiratory system Diphenyl Naphthalene Nickel & compounds (except nickel oxide Respiratory system; system; development system; nervous nervous 0.05 Respiratory system; hematopoietic system Nickel oxide 1313-99-1 0.1 Respiratory system; hematopoietic system Phenol 108-95-2 200 Alimentary system; cardiovascular system; kidney; nervous system Phosphoric acid 7664-38-2 7 Fire Station No. 77 03/14/03 Respiratory system Special Environmental Requirements 01355-14 Substance (CAS #) Phthalic anhydride ) 85-44-9 20 Respiratory system 115-07-1 3,000 Respiratory system 107-98-2 7,000 Alimentary system (liver) Propylene oxide 75-56-9 30 Respiratory system Styrene 100-42-5 900 Nervous system Tetrachloroethylene* (perchloroethylene) 127-18-4 35 Kidney; alimentary system (liver) Toluene 108-88-3 300 Nervous system; system; development 0.07 Respiratory system 600 Nervous system; eyes 700 Nervous system; respiratory system Propylene Propylene monomethyl ether glycol Toluene diisocyanates (2,4-&2,6-) Trichloroethylene Xylenes (m-, o-, p-) 2.2 Chronic Inhalation REL Hazard Index Target(s) (µg/m3) 79-01-6 respiratory SUBSTITUTIONS D. Substitutions Environmental Issues: Requests for substitutions shall comply with requirements specified in Section 01630 – Product Substitution Procedures, with following additional information required where environmental issues are specified. 1. Indicate each proposed substitution complies with requirements for VOCs. 2. Owner, in consultation with Architect reserve right to reject proposed substitutions where data for VOCs is not provided or where emissions of individual VOCs are higher than for specified materials. 3. Comply with specified recycled content and other environmental requirements. PART 3 - EXECUTION 3.1 FIELD QUALITY CONTROL A. Building Flush Out: Just prior to Substantial Completion, flush out building continuously (i.e. 24 hours per day, seven (7) days a week) using maximum tempered outside air (or maximum amount of outside air while achieving reasonable indoor temperature) for at least fourteen (14) calendar days. If interruptions of more than a few hours are required for testing and balancing purposes, extend flush out period accordingly. 1. When Contractor is required to perform touch-up work, provide temporary construction ventilation during installation and extend building flush-out by a minimum of four (4) days after touch-up installation with maximum tempered outside air for 24 hr per day. Fire Station No. 77 03/14/03 Special Environmental Requirements 01355-15 2. If construction schedule permits, extend flush-out period beyond 15 days. 3. Return ventilation system to normal operation following flush-out period to minimize energy consumption. 3.2 CLEANING A. 3.3 Final Cleaning Environmental Issues: 1. Clean interior and exterior surfaces exposed to view; remove temporary labels, stains, and foreign substances; polish transparent and glossy surfaces using cleaning and maintenance products as described in Part 1 of this Section. 2. Clean equipment and fixtures to sanitary condition using cleaning and maintenance products as described in Part 1 of this Section. 3. Vacuum carpeted and soft surfaces with high efficiency particulate arrestor (HEPA) vacuum. 4. If ducts were not sealed during construction, and contain dust or dirt, clean ducts using HEPA vacuum immediately prior to Substantial Completion and prior to using ducts to circulate air. Oil film on sheet metal shall be removed before shipment to site. However, ducts shall be inspected to confirm that no oil film is present. Remove oil. 5. Replace all air filters (i.e., pre and final filters) just prior to Substantial Completion. 6. Remove and properly dispose of recyclable materials using construction waste management program described in Section 01565 – Site Waste Management Program. PROTECTION A. Environmental Issues 1. Protect interior materials from water intrusion or penetration; where interior products not intended for wet applications are exposed to moisture, immediately remove from site and dispose of properly. 2. Protect installed products using methods that do not support growth of molds and mildews. 3. Immediately remove from site materials with mold and materials with mildew. (END OF SECTION) Fire Station No. 77 03/14/03 Special Environmental Requirements 01355-16 Project Name: RECYCLED CONTENT CERTIFICATION FORM This form is to be completed by a Corporate Officer of the Product Manufacturer for the General Contractor. The General Contractor must return the certification, completed for each product with recycled content as required by specific Specification Sections. Attach additional sheets if necessary. GENERAL CONTRACTOR SUBCONTRACTOR/INSTALLER PRODUCT MANUFACTURER Name: Name: Name: Address: Address: Address: Telephone, fax, e-mail: Telephone, fax, e-mail: Telephone, fax, e-mail: Item # Product Category1& 2 Product Description CSI section number3 (Needed for all products) Quantity Bid (Include if applicable) Unit of measur e Cost of material, (Excluding installation labor) Weight in pounds % Virgin Conten t5 % Postconsumer 6 % Postindustrial 7 Tota l %8 As a percent of total weight 100 CSI section: 100 CSI section: 100 CSI section: 100 CSI section: 100 CSI section: 100 CSI section: Printed Name: (a corporate officer) Fire Station No. 77 03/14/03 Title Date Signature Special Environmental Requirements 01355-17 THIS PAGE INTENTIONALLY LEFT BLANK INSERT COMMISSIONING REQUIREMENTS specification per project SECTION 01810 COMMISSIONING REQUIREMENTS PART 1 - GENERAL 1.1 DESCRIPTION A. This section includes administrative and procedural requirements as well as a detailed description of the commissioning process. This section supplements other Division 1 Commissioning Sections and applies to equipment installed under Divisions 15 and 16 as listed in this section. B. Basic Commissioning is intended to achieve the following objectives: C. 1.2 1. Verify that applicable equipment and systems are installed according to the manufacturer’s recommendations and to industry accepted minimum standards and that they receive adequate operational checkout by installing contractors. 2. Verify and document that performance of equipment and systems is proper for the application. 3. Verify that Operations and Maintenance (O&M) data is complete. 4. Verify that the Owner’s operating personnel are trained in accordance with the specifications. Related Work: 1. 01112 Description of Work 2. 01330 Shop Drawings / Submittals 3. 01770 Project Closeout 4. 01811 Mechanical Equipment Commissioning 5. 01812 Electrical Equipment Commissioning 6. 01813 Prefunctional Checklists 7. Division 15 8. Division 16 DEFINITIONS A. Commissioning Process: A systematic process which verifies that the building systems perform as intended. The commissioning process coordinates system documentation, equipment startup, control system calibration, testing and balancing, performance testing and training. Fire Station No. 77 03/14/03 Commissioning Requirements 01810-1 1.3 1.4 B. Commissioning Authority (CA): An entity identified by the City that plans, schedules, and coordinates the Commissioning Team to implement the Commissioning Process. C. Functional Test (FT): A documented test of the dynamic functioning and operation of equipment and systems with the goal of verifying that the Design Intent is met. Test requirements are included in these specifications. Test procedures are developed and results documented by the Commissioning Authority. Test procedures are completed by the Contractor. D. Start-up Plan: A written plan that documents checks and tests to be completed prior to the equipment’s Functional Test. Prefunctional Checklists are part of each Start-up Plan and draft checklists are included in the specifications. The Checklists are completed by the Contractor and verified by the Commissioning Authority through site visits and inspections. The Start-up Plan is prepared by the Contractor. COORDINATION A. Items listed below require COORDINATION between the Contractor, the subcontractors, INSPECTOR and the Commissioning Authority. Details regarding each item are given elsewhere in this Section and/or other commissioning sections of the specifications. B. Construction Commissioning kick-off meeting: Conducted by the CA where the commissioning process is reviewed with the commissioning team members. C. Coordination Meetings: Attend meetings throughout construction, scheduled by the ENGINEER, to plan, coordinate, schedule future activities, and resolve problems. D. Start-up Plans: Work with the CA to develop startup plans and startup documentation formats, including prefunctional checklists. E. Equipment Start-up: Utilize start-up plans to coordinate equipment start-up, manufacturers’ testing, and other required testing to minimize duplication of work. F. Testing, Adjusting, and Balancing: Coordinate testing, adjusting, and balancing with the Commissioning Authority so that the CA can witness the processes. G. Functional Testing: Coordinate functional testing with the Commissioning Authority so that they can witness testing. H. Training: Coordinate training of owner’s staff with Commissioning Authority so that the CA can verify that training is conducted per commissioning requirements. SYSTEMS TO BE COMMISSIONED NTS: EDIT THIS PARAGRAPH TO SUIT THE SPECIFIC PROJECT A. The following systems will be commissioned where applicable: Equipment Commissioning Requirements Fire Station No. 77 03/14/03 Specified In: Commissioning Requirements 01810-2 Division 15 Domestic Hot Water Heaters and distribution system 01811 Packaged Rooftop AC Units and Controls Split AC and Heat Pump Units and Controls Evaporative Cooler and Controls Gas Fired Unit Heaters and Controls General Occupancy Exhaust Fans and Controls Distribution Systems for Conditioned Air 01811 01811 01811 01811 01811 01811 Division 16 Lighting System and Controls 01812 PART 2 - PRODUCTS 2.1 TEST EQUIPMENT A. Provide all testing equipment required by the Commissioning Process except data logging equipment. Data logging equipment is provided by the CA. B. Provide any special equipment, tools, and instruments that are only available from the equipment supplier, which are specific to the equipment, and which are required for testing. PART 3 - EXECUTION 3.1 MEETINGS A. B. 3.2 Construction Commissioning kick-off meeting: A commissioning pre-construction meeting will be held in conjunction with the pre-construction meeting within sixty (60) working days after the city has issued the Notice to Proceed. Attendance is mandatory for the following team members: 1. Commissioning Authority 2. Contractor’s Site Supervisor 3. Contractor’s Project Scheduling personnel 4. Mechanical sub-contractor 5. Electrical sub-contractor 6. Air Balance sub-contractor 7. INSPECTOR Miscellaneous Meetings. The ENGINEER will schedule other meetings, generally in conjunction with regularly scheduled site meetings as construction progresses. Meetings will cover coordination, deficiency resolution, and planning issues with particular subcontractors. START-UP PLANS AND PREFUNCTIONAL CHECKLISTS Fire Station No. 77 03/14/03 Commissioning Requirements 01810-3 3.3 A. Undertake a full prefunctional checkout of each piece of equipment. The prefunctional testing must be successfully completed prior to formal functional testing. B. Equipment shall not be “temporarily” started (for heating or cooling) until it has been started up in accordance with the manufacturer’s written start up procedures as per the Start-Up plan. C. Start-up Plans: The contractor shall prepare start-up plan for each piece of equipment listed in paragraph 1.4 of this section and submit it for approval by the ENGINEER within 45 days of receiving approved equipment submittals. Start-up plans shall consist of: 1. The manufacturer’s standard written start-up procedures per the manufacturer’s installation manuals, with check boxes by each procedure and a signature block at the end. 2. Field checkout sheets normally used by the sub-contractor. 3. Forms used by the sub-contractor to document tests required in the specifications. 4. Final prefunctional checklists (drafts are included in the specifications). The checklists for mechanical systems include sensor and actuator calibration as described in Section 01811.5. Schedule of equipment installation, contractor start-up, manufacturer’s start-up, and other tests required by the specifications. 5. Equipment Manufacturer’s operating & maintenance instructions 6. Equipment Manufacturer’s installation and start-up manual D. After the Start-up plan has been approved, the subcontractors shall complete the documentation per paragraph C.1, 2 and 3 above during the start up of the equipment and submit the completed documentation to engineer prior to the scheduled functional testing. E. Relevant subcontractors shall accompany the commissioning authority on up to 3 construction site visits prior to functional testing. The CONTRACTOR shall correct deficiencies found during site visits within 7 days of receiving a Corrective Action Report from the ENGINEER. REQUIREMENTS FOR BEGINNING FUNCTIONAL TESTING 1. Complete the following prior to functional testing: 1. Arrange for the Commissioning Authority to be present during functional testing 2. Completion of the start up plan documentation and submission of this documentation to the ENGINEER. 3. Correction of deficiencies identified during start-up. Fire Station No. 77 03/14/03 Commissioning Requirements 01810-4 4. 3.4 3.5 3.6 FUNCTIONAL TESTING A. Perform functional testing under the observation of the commissioning authority who will record the results of the functional test procedures. B. Perform all specified tests according to approved testing procedures. 1. Verify and test performance using actual conditions whenever possible. 2. Simulate conditions by imposing an artificial load when it is not practical to test under actual conditions and when written approval for simulated conditions is received from Commissioning Authority. Before simulating conditions, calibrate testing instruments. Set and document simulated conditions and methods of simulation. After test, return settings to normal operating conditions. 3. Alter set points when simulating conditions is not practical and when written approval to do so is received from Commissioning Authority. 4. Overwrite sensor values with a signal generator when actual or simulated conditions and altering set points are not practical. Do not use the sensor to act as the signal generator to simulate conditions or overwrite values. C. The Commissioning Authority will review and approve functional testing results. Deficiencies found during testing shall be corrected by the Contractor within 7 days of receiving a Corrective Action Report from the ENGINEER. Deficiencies shall be retested until accepted by the Commissioning Authority. Where there is a dispute over a deficiency, the ENGINEER will be the final authority. D. Problem Solving: The CA will recommend solutions to problems found, however the burden of responsibility to solve, correct and retest problems is with the contractor. E. All testing, retesting, and acceptance of functional testing shall be completed prior to substantial completion. COST OF RETESTING A. Costs for retesting beyond one retest shall be the responsibility of the Contractor, if the ENGINEER determines that the contractor is responsible for the deficiency B. Retesting will not be considered a reason for a claim of delay or for a time extension by the contractor. DEFERRED TESTING A. 3.07 Recording of pretest set points. Unforeseen Deferred Tests: Checks or tests not completed due to the required occupancy condition, or other condition may be delayed upon approval of the ENGINEER. WRITTEN WORK PRODUCTS Fire Station No. 77 03/14/03 Commissioning Requirements 01810-5 A. The commissioning process generates a number of written work products described in the Specifications. A summary of the written products follows. Where the product is developed by the subcontractors, the contractor shall be responsible for their production. Product 1. Commissioning schedules 2. Equipment & commissioning submittals 3. Draft prefunctional checklists 4. Startup Plan 5. Completed Startup Plan 6 O&M manuals 7 Overall training plan 8 Specific training agendas 9 Commissioning meeting minutes Developed By CA and Subcontractors Subcontractors CA with specifications Subcontractors Subcontractors Subcontractors CA and Subcontractors Subcontractors CA or A/E consultants (END OF SECTION) Fire Station No. 77 03/14/03 Commissioning Requirements 01810-6 Approximate scheduling from construction start (CS) 1 per schedule @ City PM Approved submittals for each piece of equipment listed in Section 01810, 1.4(A) Commissioning Construction A Domesticin Hot Water Heaters and distribution system Task Flow Chart B Packaged Rooftop AC Units and Controls 2 3 C Split AC and Heat Pump Units and Controls D Evaporative Cooler and Controls E Gas Fired Unit Heaters and Controls F General Occupancy Exhaust Fans and Controls G Distribution Systems for Conditioned Air H Lighting System and Controls Within 3 weeks of approval for all commissioned equipment During rough-in or at least two weeks befoire start-up Commissioning Agent attends construction meeting to explain process A MEP subs to develop a prefunctional checklist & Start-Up Plan for each piece of equipment listed above, using draft prefunctional checklists in Section 01813. Each plan to include all 6 items listed below: Domestic Hot Water Heaters and distribution system 1) Manufacturers standard written start-up procedures 2) Field checkout sheets 3) Forms used by the sub-contractor to document tests 4) Final prefunctional checklists 5) Equipment Manufacturer’s operating & maintenance instructions 6) Equipment Manufacturer’s installation and start-up manual B Packaged Rooftop AC Units and Controls 1) Manufacturers standard written start-up procedures 2) Field checkout sheets 3) Forms used by the sub-contractor to document tests 4) Final prefunctional checklists 5) Equipment Manufacturer’s operating & maintenance instructions 6) C 1) Manufacturers standard written start-up procedures 2) Field checkout sheets 3) Forms used by the sub-contractor to document tests 4) Final prefunctional checklists 5) Equipment Manufacturer’s operating & maintenance instructions 6) Equipment Manufacturer’s installation and start-up manual D Evaporative Cooler and Controls 1) Manufacturers standard written start-up procedures 2) Field checkout sheets 3) Forms used by the sub-contractor to document tests 4) Final prefunctional checklists 5) Equipment Manufacturer’s operating & maintenance instructions 6) Equipment Manufacturer’s installation and start-up manual E D:\687293046.doc Equipment Manufacturer’s installation and start-up manual Split AC and Heat Pump Units and Controls Gas Fired Unit Heaters and Controls 1) Manufacturers standard written start-up procedures 2) Field checkout sheets 3) Forms used by the sub-contractor to document tests 4) Final prefunctional checklists 5) Equipment Manufacturer’s operating & maintenance instructions Commissioning in Construction Task Flow Chart D:\687293046.doc INSERT DIVIDER HERE Divider Title “LEED - SPECIFIC CONTRACTOR DEVELOPED PLANS” “And Referenced Documents” Tab Title “Erosion & Sedimentation Control Plan (SWPPP)” THIS PAGE INTENTIONALLY LEFT BLANK CONTENTS “Erosion & Sedimentation Control Plan” 1. LEED prerequisite SSp1: Erosion and Sedimentation Control Partial Section 01351, 3.03C: CONSTRUCTION AND SEDIMENTATION CONTROL PLAN Partial Section 01351, 3.04: EROSION AND SEDIMENTATION CONTROL Referenced Document: DEVELOPMENT BEST MANAGEMENT PRACTICES HANDBOOK – PART A, CONSTRUCTION ACTIVITIES THIS PAGE INTENTIONALLY LEFT BLANK INSERT Partial STORMWATER POLLUTION CONTROL MEASURES FOR CONSTRUCTION ACTIVITIES project specification SECTION 01571 STORMWATER POLLUTION CONTROL MEASURES FOR CONSTRUCTION ACTIVITIES PART 1 - GENERAL 1.1 THE REQUIREMENT Minimum Water Quality Protection Requirements The CONTRACTOR is required to meet the following minimum standards of good housekeeping: Eroded sediments and other pollutants must be retained on site and may not be transported from the site via sheetflow, swales, area drains, natural drainage, or wind. Stockpiles of earth and other construction-related materials must be protected from being transported from the site by wind or water. Fuels, oils, solvents, and other toxic materials must be stored in accordance with their listing and are not to contaminate the soil nor the surface waters. All approved toxic storage containers are to be protected from the weather. Spills must be cleaned up immediately and disposed of in a proper manner. Spills may not be washed into the drainage system. Excess or waste concrete may not be washed into the public way or any drainage system. Provisions shall be made to retain concrete wastes on-site until they can be appropriately disposed of or recycled. Trash and construction-related solid wastes must be deposited into a covered receptacle to prevent contamination of rainwater and dispersal by wind. Sediments and other materials may not be tracked from the site by vehicle traffic. The construction entrance roadways must be stabilized so as to inhibit sediments from being deposited into the public ways. Accidental depositions must be swept up immediately and may not be washed down by rain or by any other means. Wet Weather Erosion Control Plan (WWECP) Pursuant to Section 61.02 of the LAMC, whenever it appears that the construction site will have grading between October 1 and April 15, the CONTRACTOR shall submit a WWECP to the ENGINEER for approval within thirty (30) calendar days after award of contract or thirty (30) calendar days prior to the beginning of the rainy season. Fire Station No. 77 03/14/03 Stormwater Pollution Control Measures for Construction Activities 01571-1 Guidance on preparing the WWECP can be found in the Development Best Management Practices Handbook – Part A, Construction Activities adopted by the Board of Public Works, as authorized by Section 64.72 of the Los Angeles Municipal Code. This handbook can be obtained at cost at the public/permit counters of the Bureau of Engineering. Stormwater Pollution Prevention Plan The CONTRACTOR shall prepare a Stormwater Pollution Prevention Plan (SWPPP) and implement Best Management Practices (BMPs) necessary to control stormwater pollution from sediments, erosion, and construction materials leaving the construction site. Guidance on preparing the SWPPP can be found in the Development Best Management Practices Handbook – Part A, Construction Activities The BMPs contained in the Development Best Management Practices Handbook – Part A, Construction Activities cover the following categories of construction activities: site preparation/earth removal NOTE: Requires PHOTO DOCUMENTATION of the Strategies Used underground structures aboveground structures roadways, walkways and parking lots waterways planting and landscaping The SWPPP document shall include the following information: The name, location, period of construction, and a brief description of the Project. Contact information for the CONTRACTOR, including name, address, and telephone number. Name, location, and description of any environmentally sensitive areas located on or adjoining the Project. A list of major construction materials, waste, and activities. A list of BMPs to be used to control pollutant discharges from major construction materials, wastes, and activities. A site plan (a construction plan may be used) indicating the location of BMPs where appropriate. A developer’s certification statement that all required and selected BMPs will be effectively implemented. Whenever the CONTRACTOR is required to get any type of permit from the Department of Building and Safety (DBAS), the CONTRACTOR shall submit the SWPPP document to the DBAS for review and approval before obtaining the permit as prescribed by LAMC Section 91.106. If the CONTRACTOR does not need any type of permit from the DBAS, the CONTRACTOR shall submit the SWPPP document to the Project Fire Station No. 77 03/14/03 Stormwater Pollution Control Measures for Construction Activities 01571-2 Manager for review and approval. At least one copy of the approved SWPPP shall be kept at the construction site and accessible to City INSPECTORS. A Project in a designated hillside area with less than two acres of disturbed soil and is not in or adjacent to an ESA will be exempted from the SWPPP requirement if a Grading PreInspection is not required. PART 2 - PRODUCTS (NOT APPLICABLE) PART 3 - EXECUTION (NOT APPLICABLE) (END OF SECTION) Fire Station No. 77 03/14/03 Stormwater Pollution Control Measures for Construction Activities 01571-3 THIS PAGE INTENTIONALLY LEFT BLANK INSERT .pdf HERE Document Referenced in Section 01571, 1.1C(1), (2): DEVELOPMENT BEST MANAGEMENT PRACTICES HANDBOOK – PART A, CONSTRUCTION ACTIVITIES THIS PAGE INTENTIONALLY LEFT BLANK INSERT DIVIDER HERE TAB Title “Construction Waste Management Plan” THIS PAGE INTENTIONALLY LEFT BLANK CONTENTS “Construction Waste Management Plan” 1. LEED point MRc2.1, 2.2: Construction Waste Management Partial Section 01351, 3.03D: CONSTRUCTION WASTE MANAGEMENT PLAN Partial Section 01351, 3.05: CONSTRUCTION WASTE MANAGEMENT Referenced Document: CONSTRUCTION AND DEMOLITION WASTE RECYCLING GUIDE Partial List of Facilities that Accept C&D Materials for Recycling THIS PAGE INTENTIONALLY LEFT BLANK INSERT Partial SOLID RESOURCES MANAGEMENT project specification SECTION 01572 SOLID RESOURCES MANAGEMENT PART 1 - GENERAL 1.2 DESCRIPTION This Section Includes: Procedures for ensuring optimal diversion of solid resources generated by the Work within the limits of the Construction Schedule, Contract Sum, and available materials, equipment, and products. CONTRACTOR shall participate in promoting efforts of CITY to create a resource-efficient and environmentally sensitive structure and to effect optimum control of solid waste and recoverable resources generated in the Work. Pursuant to the CITY’S Recycled Product Procurement Ordinance and Amendments (CF 93-2092) and President Clinton’s Executive Order (Federal Acquisition, Recycling, and Waste Prevention), CONTRACTOR shall use products with post-consumer recycled content to the greatest extent feasible. Refer to the most recent issue of "A Resource Guide to Recycled-Content Construction Products," published by the Solid Resources City Wide Recycling Division of the Bureau of Sanitation (call 213 / 473-8228 to obtain a copy). Waste Management Goals: A minimum 75% of total Project waste shall be diverted from landfill. The CONTRACTOR is to recycle and/or salvage at least 75% (by weight) all construction, demolition, and land clearing waste. The Construction Waste Management Plan is to meet the Materials and Resources, Construction Waste Management points 2.1 and 2.2 per the USGBC LEED Green Building Rating Systems, Version 2.0. 5. Participation in rebate programs. Related Sections: Documents affecting works of this Section include, but are not necessarily limited to, the following Contract Specifications: Special Environmental Requirements in Section 01355. Removal, Cleanup and Demobilization in Section 01740. 3. General Commissioning Process in Section 01810. 4. Building Commissioning in Section 01830. 5. Site Work in Division 2 6. Concrete in Division 3 Fire Station No. 77 03/14/03 NOTE: Requires DOCUMENTATION of all disposed waste Solid Resources Management 01572-1 1.3 7. Masonry in Division 4. 8. Metal in Division 5. 9. Wood and Plastics in Division 6 10. Thermal and Moisture Protection in Division 7. 11. Doors and Windows in Division 8. 12. Finishes in Division 9. 13. Specialties in Division 10. 14. Equipment in Division 11. 15. Furnishings in Division 12. 16. Mechanical in Division 15. 17. Electrical in Division 16. DEFINITIONS Class III Landfill: A landfill that accepts non-hazardous resources such as household, commercial, and industrial waste, resulting from construction, remodeling, repair, and demolition operations. A Class III landfill must have a solid waste facilities permit from the California Integrated Waste Management Board (CIWMB) and is regulated by the Local Enforcement Agency (LEA). Construction and Demolition Waste: Includes all non-hazardous solid resources resulting from construction, and demolition operations, such as building materials, packaging, rubbish, debris, and rubble. 1. Rubbish: Includes both combustible and noncombustible wastes, such as paper, boxes, glass, crockery, metal and lumber scrap, tin cans, and bones. 2. Debris: Includes both combustible and noncombustible wastes, such as leaves and tree trimmings that result from construction or maintenance and repair work. Disposal: Acceptance of solid wastes at a legally operating facility for the purpose of landfilling. Includes Class III landfills and inert fills. Inert Backfill Site: A location, other than inert fill or other disposal facility, to which inert materials are taken for the purpose of filling an excavation, shoring, or others soils engineering operation. Inert Fill: A facility that legally accept inert waste such as asphalt and concrete exclusively for the purpose of disposal. Inert Solids/Inert Waste: Non-liquid solid resources including, but not limited to, soil and concrete, that does not contain hazardous waste or soluble pollutants at concentrations in excess of water-quality objectives established by a regional Water Board pursuant to Division 7 (Section 13000 et seq.) of the California Fire Station No. 77 03/14/03 Solid Resources Management 01572-2 Water Code and does not contain significant quantities of decomposable solid resources. Mixed Debris: Loads that include commingled recyclable and non-recyclable materials generated at the construction site. Mixed Debris Recycling Facility: A solid resources processing facility that accepts loads of commingled construction and demolition debris for the purpose of recovering re-usable and recyclable materials and disposing the non-recyclable residual materials. Permitted Waste Hauler: A company that possesses a valid and current permit from the Los Angeles County Department of Public Health, to collect and transport solid wastes from individuals or businesses for the purpose of recycling or disposal in the Los Angeles County. Recycling: The process of sorting, cleansing, treating and reconstituting materials for the purpose of using the altered form in the manufacture of a new product. Recycling does not include burning, incinerating or thermally destroying solid waste. On-site Recycling: Materials that are sorted and processed for use in an altered form in the Work, (e.g. concrete is crushed for use as base for a parking lot on the site). Off-site Recycling: Materials hauled to a location and used in an altered form in the manufacture of a new product. Recycling Facility: An operation that can legally accept materials for the purpose of processing the materials into an altered form for the manufacture of a new product. Depending on the types of materials accepted and operating procedures, a recycling facility may or may not be required to have a Solid Waste Facilities permit from the CIWMB or be regulated by the LEA. Re-use: Materials that are recovered for use in the same form. This includes materials are used on-site or off-site. Refers also to Salvage Material, in which materials recovered for re-use and sold or donated to a third party. Source-Separated Materials: Materials that are sorted at the site of generation by individual material type for the purpose of recycling, i.e., loads of concrete that are source-separated for delivery to a base course recycling facility. Solid Waste: Materials that have been designated as non-recyclable and are discarded for the purposes of disposal. Transfer Station: A facility that can legally accept solid wastes for the purpose of temporarily storing the materials for re-loading onto other trucks and transporting them to a landfill for disposal, or recovering some materials for re-use or recycling. Transfer stations must be permitted by the CIWMB and regulated by the LEA. R. Chemical Waste: Includes petroleum products, bituminous materials, salts, acids, alkalis, herbicides, pesticides, organic chemicals and inorganic wastes. S. Sanitary Wastes: Fire Station No. 77 03/14/03 Solid Resources Management 01572-3 Garbage: Refuse and scraps resulting from preparation, cooking, distribution, or consumption of food. 2. 1.4 Sewage: Domestic sanitary sewage. SUBSTITUTIONS Should the CONTRACTOR desire to use materials, equipment or products which meet the requirements of the Project Manual but are more environmentally sensitive, the CONTRACTOR shall submit these substitution in accordance with the submittal provisions for “OR EQUAL” and “SUBSTITUTION” items as indicated in Section 01630 – SUBSTITUTION AND “OR EQUAL” SUBMITTALS of the GENERAL REQUIREMENTS. 1.5 SUBMITTALS Solid Resources Management Plan: Prior to the Bid, CONTRACTOR shall conduct a site assessment and estimate the types and quantities of materials under the Work that are anticipated to be feasible for on-site processing, source separation for recycling, or re-use, and shall note the procedures intended for a recycling, re-use, or salvage program. Refer to the most recent issue of “Construction and Demolition Waste Recycling Guide”, and the “Wood You Recycle?” guide, published by the CITY’S Solid Resources City Wide Recycling Division, for a partial list of facilities that accept these materials for recycling. After award of Contract and prior to the commencement of the Work, CONTRACTOR shall schedule and attend a meeting with a representative of the CITY’S Solid Resources City Wide Recycling Division at 213 / 473-8228, and the Bureau of Contract Administration INSPECTOR to discuss the CONTRACTOR’S proposed Solid Resources Management Plan, and to develop a mutual understanding regarding the recycling, re-use, recycled-content procurement, and rebate programs. Not more than twenty (20) working days after the meeting, CONTRACTOR shall prepare and submit to ISWMO, a written Solid Resources Management Plan including, but not limited to, the following (submit in format provided herein as Attachment A): CONTRACTOR and Project identification information. Procedures for recycling / re-use program to be used. Materials to be re-used and recycled. Estimated quantity of waste materials to be generated. Names and location of re-used and recycling facilities/sites. Estimated cost of disposing of waste material. Estimated quantity of waste materials to be diverted. Refer to Item 1.5.B.1 for a listing of waste materials to be diverted. Fire Station No. 77 03/14/03 Solid Resources Management 01572-4 Other items as directed by ENGINEER. Submit permit or license and location of waste disposal areas. i. Submit procedures for rebate programs. If applicable, revise and resubmit Solid Resources Management Plan in coordination with the representative of the CITY’S Solid Resources City Wide Recycling Division. The CITY’S review and comment on the CONTRACTOR’S Solid Resources Management Plan will not otherwise relieve the CONTRACTOR of responsibility for adequate and continuing control of pollutants and other environmental protection measures. Required Submittal of Summary of Diversion and Disposal With Each Application for Progress Payment: A summary of recyclables and solid resources generated by the construction and demolition operations. Submit on form provided herein (Attachment B). Failure to submit the form and its supporting documentation may render the application for progress payment incomplete and delay progress payments. Include manifests, weight tickets, receipts, and invoices specifically identifying the Project and materials sent to: Source Separated Recycling Facilities. NOTE: Requires DOCUMENTATION of all disposed waste b. Mixed Debris Recycling Facilities. c. Class III Landfills. d. Inert materials accepted at Class III Landfills as daily cover. e. Inert fills. f. Inert Backfill sites other than Inert Fills. With each submittal of CONTRACTOR’S application for process payment, the CONTRACTOR is required to submit to the INSPECTOR the attached, "Summary of Solid Waste Diversion and Disposal, " quantifying all materials generated in the Work, disposed in Class III Landfills, or diverted from disposal through recycling. Indicate zero (0) if there is no quantity to report for a type of material. As indicated on the form: Disposal or recycling reporting shall be made either in tons or in cubic yards. If scales are available at disposal or recycling facility, report in tons; otherwise, report in cubic yards. Indicate locations to which materials are delivered for disposal, recycling, accepted as daily cover, or taken for inert backfill. The Summary Form must be accompanied by legible copies of weigh tickets, receipts, or invoices that specifically identify the project generating the material. Said documents must be from recyclers Fire Station No. 77 03/14/03 Solid Resources Management 01572-5 and/or disposal site operators that can legally accept the materials for the purpose of re-use, recycling, or disposal. Indicate the Project title, CITY Work Order Number; progress payment number; name of the company completing the Summary Form and compiling backup documentation; the printed name, signature, and daytime phone number(s) of the person completing the form, the beginning and ending dates of the period covered on the Summary Form; and the date that the Summary Form is completed. C. Prepare 3-ring binder with rebate information and product documentation as required for Owner to qualify for rebate programs; submit binder with final closeout submittals. Fire Station No. 77 03/14/03 Solid Resources Management 01572-6 INSERT .pdf HERE Document Referenced in Section 01572, 1.5A(1): CONSTRUCTION AND DEMOLITION WASTE RECYCLING GUIDE THIS PAGE INTENTIONALLY LEFT BLANK Document Referenced in Section 01572, 1.5A(1): PARTIAL LIST OF FACILITIES THAT ACCEPT C&D MATERIALS FOR RECYCLING C&D Debris Recyclers Database Facility Name City Phone Number A-1 Metals Recycling » www.adamssteel.com Sun Valley (818) 767-4388 Alameda Street Metal Corp. Los Angeles (323) 564-5601 Amazon Environmental Inc.- Whittier Facility » www.amazonpaint.com Whittier (800) 566-2396 Another Pallet Long Beach (562) 437-6106 Arnie's Supply Service Los Angeles (323) 263-1696 BLT Enterprises L.L.C.-Central LA Transfer Station Los Angeles (213) 746-9700 Blue Diamond Materials Irwindale (800) 300-6120 Bradley Landfill And Recycling » www.wm.com Sun Valley (818) 767-6180 Cainas Pallets Compton (310) 631-9190 Calabasas Landfill Agoura (818) 889-1430 California Waste Services » www.californiawasteservices.com Gardena (800) 839-5550 Carson Transfer Station(U.S.A. Waste of CA Inc) » www.wm.com Carson (310) 217-6300 Century Pallets » www.earth911.org/master.asp Lynwood (310) 605-0788 Chandler's Landfill » http://ladpw.org/swims/general/ Rolling Estate Community Recycling/Resource Recovery Sun Valley (818) 767-7511 CRA-Recycle America-Vernon Vernon (323) 415-0170 Downtown Metal Center Los Angeles (323) 234-1883 EarthShine Los Angeles (714) 897-4311 Falcon(JWR) Transfer Center-Wilmington (BFI) » www.bfi.com Wilmington (562) 432-2268 Fs Pallets And Repair Service Gardena (310) 538-9165 Granite Construction Company Littlerock (805) 726-4447 Habitat For Humanity - Pomona Valley » www.pomvalhabitat.org La Verne (909) 596-7098 Habitat For Humanity-Pacoima » www.valleyhabitat.org Pacoima (818) 897-0940 Hanson Aggregates » www.hansonamerica.com South Gate (800) 300-6120 Hi Waste Disposal Co. Artesia (562) 865-8068 Hugo Neu-Proler Company Terminal Island (310) 831-0281 Irwindale Iron & Metal Irwindale (626) 359-5815 Hills (310) 784-2905 Kramar's Iron & Metal Inc. » www.kramarmetals.com Sun Valley (818) 767-4303 Looney Bins Inc. » www.looneybins.com Sun Valley (818) 768-7197 Master Recycling Center, Inc. El Monte (626) 442-4242 Mid City Iron & Metal, Corp. » www.adamssteel.com Los Angeles (213) 747-4281 Nu-way Live Oak Landfill-Waste Management » www.wastemanagement.com Irwindale (626) 301-9727 Ornelas Construction Clean Up Mission Hills (818) 364-1278 Pacific Industrial Metal Corporation Los Angeles (310) 538-5360 Pacific/West Recycling Services, Inc. » http://www.pacificwestrecycling.com/ Manhattan Beach (310) 545-4972 Puente Hills Landfill Whittier (562) 695-8264 RC Pallets Lynwood (310) 608-3330 Recycled Base Materials, Inc. Sun Valley (818) 767-3088 S & G Pallets Los Angeles (213) 488-9457 Scholl Canyon Landfill- LA County Sanitation Dist. » www.lacsd.org Glendale (323) 245-9865 Shamrock Base Los Angeles (323) 223-2366 South Coast Recycling Los Angeles (213) 245-2684 Southland Pallets Los Angeles (323) 231-1884 Sun Valley Rock & Asphalt » ww.vulcanmaterials.com/sunvalley Sun Valley (818) 983-0146 The Invironmentalists- Van Nuys » www.theinvironmentalists.com Van Nuys (818) 374-5200 Valley Base Materials Sun Valley (818) 767-3088 Valley Iron & Metal Company Sun Valley (323) 875-2520 Vulcan Materials-Littlerock » www.vulcanmateirals.com Littlerock (805) 672-2517 Waste Recovery And Recycling » www.wm.com South Gate (323) 560-8488 Whittier Fertilizer » www.whittierfertilizer.com Pico Rivera (562) 699-3461 INSERT DIVIDER HERE TAB Title “Indoor Air Quality Management Plan” THIS PAGE INTENTIONALLY LEFT BLANK CONTENTS “Indoor Air Quality Management Plan” 1. LEED point EQ3.1, 3.2 Partial Section 01351, 3.03E: CONSTRUCTION IAQ MANAGEMENT PLAN Partial Section 01351, 3.06: CONSTRUCTION INDOOR AIR QUALITY MANAGEMENT Checklist of SMACNA Guidelines THIS PAGE INTENTIONALLY LEFT BLANK INSERT Partial HEATING, VENTILATING & AIR CONDITIONING project specification SECTION 15600 HEATING, VENTILATING & AIR CONDITIONING PART 1 - GENERAL 1.1 DESCRIPTION A. Provide all labor materials and equipment necessary for heating, ventilating and air conditioning where shown on the contract drawings and specified herein including the following: Commissioned systems have detailed O&M manual requirements as shown in 01820 O&M MANUAL AND TRAINING. B. 1. Sheet metal ducts and plenums. 2. Counter flashing of ducts and vents through roof. 3. Duct and plenum insulation and duct lining. 4. Volume dampers and fire dampers. 5. Diffuses, registers and grilles, and other air distribution systems. 6. Air filters and holding frames. 7. Flexible air duct. 8. Refrigerant piping. 9. Pipe installation. 10. Pipe hangers and supports. 11. Pipe and equipment insulation. 12. Pipe identification. 13. Flexible pipe connections. 14. Blowers and fans. 15. Power roof exhausters. 16. Packaged air conditioner. 17. Evaporative cooler. 18. Forced air rooftop make up gas furnace. 19. Unit heater. 20. Control system. 21. Air balancing. Related Work: 1. Work of this Section shall comply with the Contract Documents including, but not necessarily limited to, General Conditions and the General Requirements. 2. Cast-In-Place Concrete in Section 03300. 3. Rough Carpentry in Section 06100. Fire Station No. 77 03/14/03 Heating, Ventilating & Air Conditioning 15600-1 4. Flashing and Sheet Metal in Section 07600. 5. Access Panels in Section 08305 6. Plumbing and Mechanical in DIVISION 15. 7. Electrical in DIVISION 16. 1.2 QUALITY ASSURANCE A. Use adequate numbers of skilled workers who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and the methods needed for proper performance of the work of this Section. B. Without additional cost to the City, provide such other labor and materials as are required to complete the work of this Section in accordance with the requirements of governmental agencies having jurisdiction, regardless of whether such materials and associated labor are called for elsewhere in these Contract Documents. C. Conform to applicable Los Angeles City Building Codes and Ordinances. D. The Contractor is to develop and implement an Indoor Air Quality (IAQ) Management Plan for the construction and preoccupancy phases of the building as follows: 1. During construction meet or exceed the minimum requirements of the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) IAQ Guideline for Occupied Buildings under Construction, 1995 and NOTE: 2. Requires PHOTO DOCUMENTATION of all measures 3. Protect stored on-site or installed absorptive materials form moisture damage, and 4. Contractor to provide a copy of the Construction IAQ Management Plan highlighting the five requirements of SMACNA IAQ Guideline for Occupied Buildings and Construction, 1995, Chapter 3. 5. Contractor to provide photographs of construction IAQ management measures such as protection of ducts and on-site stored or installed absorptive materials. 6. Contractor to provide cut sheets of filtration media used during construction and installed immediately prior to occupancy with MERV values highlighted. Replace all filtration media immediately prior to occupancy. Filtration media shall have a Minimum Efficiency Reporting Value (MERV) or 13 as determined by ASHRAE 52.2-1999. These standards are to meet the Indoor Environmental Quality, Construction IAQ Management Plan point 3.1 per the USGBC LEED Green Building Rating System, Version 2.0. E. The Contractor is to develop and implement an Indoor Air Quality (IAQ) Management Plan for the construction and preoccupancy phases of the building as follows: Fire Station No. 77 03/14/03 Heating, Ventilating & Air Conditioning 15600-2 1. Fire Station No. 77 03/14/03 Conduct a minimum two-week building flush-out with new filtration media at 100 % outside air after construction ends and prior to occupancy. Heating, Ventilating & Air Conditioning 15600-3 NOTE: Requires PHOTO DOCUMENTATION of all measures Checklist of SMACNA Guidelines for use in writing the Indoor Air Quality (IAQ) Management Plan referenced in Section 01572, 1.2D: GENERAL NOTES 1 Read each item below and incorporate into construction strategies 2 Place a check mark on each item as it is completed during construction 3 Photo document each checked item HVAC PROTECTION 1 Seal all return system openings with plastic 2 Clear the mechanical room of any stored construction or waste materials 3 Repair duct and air handler leaks immediately 4 Place ceiling tiles before removing protective plastic from HVAC returns 5 Seal diffusers with plastic 6 Seal window units with plastic Inspect and clean all ducts and diffusers before HVAC start-up 7 8 Change filters before occupancy SOURCE CONTROL 1 Use portable fans to ventilate areas during carpet installation 2 Prohibit vehicles from idling near any project openings 3 Use bottled gas and electric-powered equipment, rather than gas-powered 4 Use a portable fan to vent dust, odors, and dirt to the outdoors 5 Use an enclosed tanker rather than an open kettle for roofing Keep all containers of wet products covered as much as possible (paint, adhesives, 6 etc) 7 Cover and seal waste materials that release odors 8 Seal any surfaces with persistent odors PATHWAY INTERRUPTION 1 Do not exhaust dust, odors or dirt where it can be drawn back into the building 2 Erect a dust curtain to keep dust from migrating to the surrounding occupied buildings 3 Relocate equipment and staging areas out of site air flow 4 Locate roofing tar kettles away from air intakes 5 Seal building openings from outside dust, odors and dirt HOUSEKEEPING 1 Daily use wetting agent or sweeping compounds to keep site dust controlled 2 Clean away dust regularly 3 Use damp rag, wet mop or high efficiency vacuum on high dust area 4 Immediately clean and remove excess solvent-containing products 5 Choose low-odor cleaning agents and ventilate area 6 Remove accumulated water, keep all work areas dry 7 Daily vacuum settled dust with a HEPA filtered vacuum 8 Protect all insulation from moisture 9 Protect all ceiling tiles from moisture 10 Protect all carpeting, carpet tiles from moisture 11 Protect all other porous finish materials from moisture SCHEDULING 1 Install carpet after paint emissions have been ventilated 2 Ventilate continuously for at least 48 hours after dust or odor producing activities 3 Schedule HVAC start-up at least 48 hours after carpet installation 4 Schedule HVAC start-up at least 48 hours after dust-, or odor-producing installations INSERT DIVIDER HERE TAB Title LEED - SPECIFIC BUILDING MATERIAL SUBMITTALS THIS PAGE INTENTIONALLY LEFT BLANK CONTENTS LEED - SPECIFIC BUILDING MATERIAL SUBMITTALS 1. Recycled Content per LEED points MRc4.1, 4.2 List of Building Materials that require recycled content reporting and documentation Section 01351, 3.01E: RECYCLED CONTENT MATERIALS REPORTING 2. Local/Regional Manufacturers and Distributors per LEED points MRc5.1, 5.2 List of Building Materials that require local/regional reporting and documentation. Section 01351, 3.01F: LOCAL/REGIONAL MATERIALS REPORTING 3. (VOC) limits for adhesives/sealants per LEED point EQc4.1 Specifications List Ref. Document: Bay Area Air Quality Management District, Reg. 8, Rule 51 Ref. Document: South Coast Air Quality Management District, Rule # 1168 Section 01351, 3.02C: LOW-EMITTING MATERIALS: ADHESIVES AND SEALANTS 4. VOC limits for Paints & Coatings per LEED point EQc4.2 Specifications List Ref. Document: Green Seal Standard GS-1 Section 01351, 3.02D: LOW EMITTING MATERIALS: PAINTS AND ARCHITECTURAL COATINGS 5. VOC limits for Carpets per LEED point EQc4.3 Specifications List Ref. Doc: Carpet & Rug Inst. Green Label Indoor Air Quality Test Program Section 01351, 3.02E: LOW-EMITTING MATERIALS: CARPETS 6. GPM/GPF requirements for plumbing fixtures per LEED points WEc3.1, 3.2 Specifications List THIS PAGE INTENTIONALLY LEFT BLANK BUILDING MATERIALS WITH LEED-RELATED RECYCLED CONTENT NOTE: REQUIREMENTS CAN BE FOUND IN SPEC SECTIONS: Submit Cut Sheet Highlighting Structural Steel Recycled Content Rebar Metal Decking Metal Fabrications Metal wall panels, flashings, louvers, gates, trellis & lockers Asphalt Carpet Acoustical Ceiling Panels Metal studs (interior partitions) Fireproofing Gypboard Concrete Metal Doors and Frames Ceramic Tile Aluminum Storefront & curtain wall system INSERT SAMPLE PAGE of a specification including the recycled content requirement G. 1.4 1.5 PRODUCT HANDLING A. Delivery: Materials delivered to the job-site shall bear manufacturer's labels intact and legible. B. Storage: Store delivered materials prior to use or installation where directed by the Engineer in a safe, dry, clean and well ventilated area. C. Protection: Use all necessary means to protect glue-down carpet before, during and after installation. In the event of damage, immediately make necessary repairs and/or replacements to the full approval of the Engineer, at no added cost to the City. WARRANTY – Lifetime commercial PART 2 2.1 Materials List: Items proposed to be provided under this Section. PART TWO-PRODUCTS MATERIALS A. General: Provide all recently manufactured and best quality materials. B. Carpet: The design of the glue down carpet tile is based on the products of Shaw Contract Stile, modular carpet, as a standard of quality. All substitutions will be considered under provisions of section 01630. All substitutions shall be equal and match carpet sample available at the City of Los Angeles Fire Department, 211 Figueroa, Suite 1550, Los Angeles. 1. Carpet Tiles to contain 40% (by weight) recycled post consumer waste to meet the requirements of Materials and Resources, Recycled Content, points 4.1 and 4.2 per the USGBC LEED Green Building Rating System, Version 2.0. 2. Carpet systems must meet or exceed the Carpet and Rug Institute Green Label Indoor Air Quality Test Program. The VOC limit is to meet the Indoor Environmental Quality, Low-emitting Materials, point 4.3 per the USGBC LEED Green Building Rating System, Version 2.0. 2 Style Name: “Young at Heart”, EK 124 3. Style Number: 59188 4. Collection Name: “Green with Envy” 5. Color Name: “Twine” 6. Color Number: 70761 7. Total Recycle Content: 40% Fire Station No. 77 3/14/03 Carpeting – Glue-down 09680-3 BUILDING MATERIALS WITH LEED-RELATED LOCAL / REGIONAL REQUIREMENTS CAN BE FOUND IN SPEC SECTIONS: Asphalt Concrete Rebar Landscaping Steel Studs Gypboard Base material Unit Masonry Fireproofing Signage NOTE: Submit Cut Sheet Highlighting Local/Regional Address INSERT SAMPLE PAGE of a specification including the local/regional requirement PART TWO - PRODUCTS 2.1 MATERIALS A. B. C. Reinforcing Bars: Billet Steel, ASTM A615, grades as called for on the Contract Drawings. Reinforcing bars shall have a minimum recycled content of 60% to meet the requirements set forth in the Materials and Resources, Recycled Content points 4.1 and 4.2 per the USGBC LEED Green Building Rating System, Version 2.0. 1. #3 and Larger: Grade 60. 2. ASTM A-706 for bars subject to welding. Steel Wire: 1. Comply with ASTM A82. 2. For tie wire, comply with Fed Spec QQ-W-461, annealed steel, black, 16 gage minimum. Welded Wire Fabric: 1. D. Welding Electrodes: 1. E. F. Provide welded steel, complying with ASTM A185. Comply with AWS A5.1, low hydrogen, E70 Series having a minimum yield point of 60,000 psi. Bolsters, Chairs, Spacers, and Other Devices for Spacing, Supporting, and Fastening Reinforcement in Place: 1. Use wire bar type supports complying with CRSI recommendations, unless otherwise shown on the Contract Drawings. 2. Do not use wood, brick, or other non-complying material. 3. For slabs on grade, use supports with sand plates or horizontal runners where base material will not support chair legs. 4. For exposed-to-view completed concrete surfaces, where legs of supports are in contact with forms, provide supports with either hot-dip galvanized or plastic-protected legs. Contractor's selection subject to the Engineer's approval. The contractor to provide materials that are manufactured within a 500 mile radius of the project to satisfy the requirements set forth in the Materials and Resources, Local/Regional Materials point 5.1 per the USGBC LEED Green Building Rating System, Version 2.0. Fire Station No. 77 03/14/03 Cast-In-Place Concrete 03300- FOREST STEWARDSHIP COUNCIL (FSC) CERTIFIED WOOD MATERIALS ARE FOUND IN THE FOLLOWING SPEC SECTIONS: 03100: Concrete Formwork 06100: Rough Carpentry 06171: Prefabricated Plywood Web Joists 06181: Glue Laminated Structural Units 06200: Finish Carpentry and Architectural Woodwork 06400: Custom Casework 08210: Wood doors 08213: Plastic Faced Wood Doors 09260: Gypsum Board System 10710: Wood Lockers NOTE: Submit Cut Sheet Highlighting FSC Certification INSERT SAMPLE PAGE of a specification including the FSC requirement SECTION 06100 ROUGH CARPENTRY PART ONE - GENERAL 1.1 DESCRIPTION A. Provide all labor, materials, and equipment necessary for rough carpentry where shown on the contract drawings and specified herein including the following: B. 1.2 1. Blocking and nailers and framing anchors. 2. Miscellaneous wood, nails, screws and other rough hardware indicated on the Drawings and required for complete and proper installation. Related Work: 1. Work of this Section shall comply with the Contract Documents including, but not necessarily limited to, General Conditions and the General Requirements. 2. Concrete Formwork in Section 03100. 3. Custom Casework in Section 06400. QUALITY ASSURANCE A. Use adequate numbers of skilled workers who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and the methods needed for the proper performance of the work of this Section. B. Codes and Standards: 1. In addition to complying with the pertinent codes and regulations of the Uniform Building Code with the City of Los Angeles 1999 Amendments, comply with the following: a. "Product Use Manual" of the Western Wood Products Association for selection and use of products included in that manual; b. "Plywood Specification and Grade Guide" of the American Plywood Association; c. "Standard Specifications for Grades of California Redwood Lumber" of the Redwood Inspection Bureau for Redwood, when used. C. All lumber and plywood to be obtained from certified, well managed forests as determined by standards endorsed by the Forest Stewardship Council (FSC). D. All composite wood and Agrifiber products must not contain any added ureaformaldehyde resins. 1.3 GENERAL REQUIREMENTS VALLEY RECRUIT TRAINING CENTER 03/06/03 Rough Carpentry 06100 RAPIDLY RENEWABLE BUILDING MATERIALS WITH LEED-RELATED REQUIREMENTS CAN BE FOUND IN SPEC SECTIONS: 09650: Resilient Flooring (Linoleum) 10171: Solid Phenolic Toilet Compartments (Trespa) NOTE: Submit Cut Sheet Highlighting Renewable Resource INSERT SAMPLE PAGE of a specification including the Rapidly Renewable requirement SECTION 06400 CUSTOM CASEWORK PART TWO – PRODUCTS 1.6 B. Identification: All casework units and countertops delivered to the job-site for installation shall be properly identified as to where they are to be located in the structure. C. Replacements: In the event of damage to work of this Section, immediately make all necessary repairs and replacements to the satisfaction of the Engineer at no added cost to the City. WARRANTY A. Solid composite materials to be warranted against delamination for 10 years. The factory authorized cabinet fabricator, product installer, and material manufacturer must sign the Warranty documents and submit a copy to the Contractor. B. Other materials and work quality covered in this section shall carry a one-year warranty from the date of installation and acceptance. PART 2 - PRODUCTS 2.1 MATERIALS A. The design of the custom casework is based on solid composite panels manufactured by Trespa North America, Ltd., 800-487-3772. A list of approved fabricators that provide products that comply with this specification section as judged and approved by the Architect may be required from the above. All substitutions shall be reviewed under provision of Section 01630. B. Solid composite custom casework to contain 15% (by weight) post industrial waste to meet Materials and Resources, Recycled Content, points 4.1 and 4.2 per the USGBC LEED Green Building Rating System, Version 2.0. C. Solid composite custom casework to contain 70% rapidly renewable cellulose or wood fibers to meet Materials and Resources, Rapidly Renewable Materials, point 6.1 per the USGBC LEED Green Building Rating System, Version 2.0. Fire Station No. 77 03/14/03 Custom Casework 06400- VOC REQUIREMENTS FOR ADHESIVES AND SEALANTS APPLY TO THE MATERIALS IN THE FOLLOWING SPEC SECTIONS: 04220: Concrete Block Masonry 04270: Glass Units Masonry 06171: Prefabricated Plywood Web Joists 06181: Glue Laminated Structural Units 06200: Finish Carpentry and Architectural Woodwork 06400: Custom Casework 07830: Roof Hatches 07920: Caulking and Sealants 08210: Wood doors 08213: Plastic Faced Wood Doors 08416: Aluminum Entrances and Storefronts 08510: Steel Windows 08520: Aluminum Windows 08620: Skylights 08800: Glass and Glazing 09200: Lath and Plaster 09260: Gypsum Board System 09300: Ceramic Tile 09312: Ceramic Tile Veneer 09510: Acoustical Ceilings 09650: Resilient Flooring 09680: Carpet Tiles 09951: Vinyl Wall Coverings 10710: Wood Lockers 11410: Stainless Steel Countertops & Accessories 15200: Insulation 15400: Plumbing NOTE: Submit Cut Sheet Highlighting VOC Emissions INSERT SAMPLE PAGE of a specification including the VOC requirements for Adhesives/Sealants B. Warranty shall further state that installed sealants are warranted against the following: 1.5 1.6 1. Water leakage through sealed joints. 2. Adhesive or co-adhesive failure of sealant. 3. Staining of adjacent surfaces caused by migration of sealant or primer. 4. Chalking or visible color changes of the cured sealant. DEFECTIVE WORK A. Work will be adjudged defective by the Engineer if leakage results from failure of sealant or caulking to bond to adjacent work or if it hardens, cracks, shrinks, or runs or stains adjacent work. B. Remove defective work, clean joints and install new caulking and/or sealant materials as approved by the Engineer at no added cost to the City. PRODUCT HANDLING A. Delivery and Storage: Deliver all materials of this Section to the job-site in their original unopened or unbroken containers with all labels intact and legible at time of use. Store only under conditions recommended by the manufacturer concerning shelf life, temperature humidity, ensuring the fitness of the material when installed. Do not retain on the job-site any material which has exceeded the manufacturer's recommended shelf life. B. Protection: Use all means necessary to protect the materials of this Section before, during and after installation and to protect work and materials of other trades. C. Replacements: In the event of damage, immediately make all repairs and replacements necessary to the approval of the Engineer, at no added cost to the City. PART 2 - PRODUCTS 2.1 2.2 GENERAL A. Materials shall conform to the referenced standards specified hereinafter, to the extent that they do not conflict with requirements of this Section. B. All adhesives must meet or exceed the VOC limits of South Coast Air Quality Management District Rule #1168 and all sealants used as a filler must meet or exceed Bay Area Air Quality Management District Reg. 8, Rule 51, to meet the Indoor Environmental Quality, Low Emitting Materials, point 4.1 per USGBC LEED Green Building Rating System, Version 2.0. SEALANTS Fire Station No. 77 03/14/03 Caulking and Sealants 07920- Relevant Sections of Document Referenced in Section 07920, 2.1B: Bay Area Air Quality Management District, Regulation 8, Rule 51 Relevant Sections of Document Referenced in Section 07920, 2.1B: South Coast Air Quality Management District Rule #1168 VOC LIMITS THIS PAGE INTENTIONALLY LEFT BLANK VOC REQUIREMENTS FOR PAINTS AND COATINGS, INCLUDING PRIMERS AND TOUCHUP, APPLY TO THE MATERIALS IN THE FOLLOWING SPEC SECTIONS: 03345: Concrete Finishing 05120: Structural Steel 05400: Cold-Formed Metal Framing 05500: Metal Fabrications 05510: Metal Stairs 06070: Wood Treatment 06200: Finish Carpentry and Architectural Woodwork 06400: Custom Casework 07210: Above Grade Waterproofing Sealer Treatment 08110: Metal Doors and Frames 08210: Wood doors 08213: Plastic Faced Wood Doors 08330: Overhead Coiling Doors 08520: Aluminum Windows 08620: Unit Skylights NOTE: Submit Cut Sheet Highlighting VOC Emissions 09860: Anti-Graffiti Coating 09900: Painting 10200: Metal Louvers 10710: Wood Lockers 12690: Floor Mats and Frames 13032: Handball Courts 15330: Fire Protection Sprinkler System 15600: Heating, Ventilation & Air-Conditioning 16500: Lighting Fixtures 16625: Diesel Engine Generator Set Fire Station No. 77 3/14/03 Painting 09900-16 INSERT SAMPLE PAGE of a specification including the VOC requirements for Paints and Coatings 1.2 QUALITY ASSURANCE A. Employee: Use adequate number of skilled employees who are thoroughly trained and experienced in the necessary crafts and completely familiar with the specified requirements and methods needed for proper execution of work of this Section. B. Paint Coordination: C. 1. Provide finish coats, which are compatible with the prime coats actually used. 2. Review other Specification Sections to verify prime coats to be used and assuring compatibility of the total coating system for the various substrates. 3. Upon request from the Engineer, furnish data on the characteristics of the specific finish materials to assure compatible prime coats are used. 4. Provide barrier coats over non-compatible primers or remove the primer and reprime as required. 5. Notify the Engineer in writing of anticipated problems in using the specified coating systems over prime-coatings supplied under other Specification Sections. Codes and Regulations: 1. Work, equipment and materials must conform to applicable Federal, State and local laws and regulations including Uniform Building Code with the Los Angeles City [1999] Amendments. Current manufacturer's materials safety data sheets for all materials used and/or stored on the job-site must be on the job-site at all times. 2. Regulatory Requirements: Comply with applicable codes and regulations of governmental agencies having jurisdiction including those having jurisdiction over airborne emissions and industrial waste disposal. Where those requirements conflict with this Specification, comply with the more stringent provision. 3. a. Comply with the current applicable regulations of the California Air Resources Board (CARB) and the Environmental Protection Agency (EPA). b. Regulatory changes may affect the formulation, availability, or use of specified coatings. Confirm availability of coatings to be used prior to job going out to bid and before start of painting project. All paint materials must NOT exceed the VOC limits established by Green Seal requirements. . Fire Station No. 77 3/14/03 Painting 09900-17 Relevant Sections of Document Referenced in Section 09900, 1.2C(3): Green Seal Product Standards and Certification VOC LIIMITS Paints (GS-11) 1. Scope This Standard establishes environmental requirements for paints. The standard does not include stains, clear finishes, or paints sold in aerosol cans. 2. Definitions. For the purpose of this Standard, the following definitions apply. 2.1 Paints: Liquid, liquefiable or mastic composition that is converted to a solid protective, decorative, or functional adherent film after application as a thin layer. These coatings are intended for on-site application to interior or exterior surfaces of residential, commercial, institutional or industrial buildings. 1 2.2 Volatile Organic Compounds (VOCs): Compounds as defined by U. S. Environmental Protection Agency (EPA) in 40 CFR § 51.100 (s), (s) (1). 4. Product-Specific Environmental Requirements. 4.1 Chemical Component Limitations. 4.1.1 VOCs. The VOC concentrations of the product shall not exceed those listed below as determined by U. S. Environmental Protection Agency (EPA) Reference Test Method 24 (Determination of Volatile Matter Content, Water Content, Density Volume Solids, and Weight Solids of Surface Coatings), Code of Federal Regulations Title 40, Part 60, Appendix A. The calculation of VOC shall exclude water and tinting color added at the point of sale. Interior Coatings: Coating Type VOC weight in grams/liter of product minus water Non-flat3 Flat 150 50 Exterior Coatings: Coating Type VOC weight in grams/liter of product minus water Non-flat4 Flat Green Seal Product Standards and Certification First Edition May 20, 1993, Copyright © 1993 Green Seal, Inc. 200 100 THIS PAGE INTENTIONALLY LEFT BLANK VOC REQUIREMENTS FOR CARPETS / CARPET TILE APPLY TO THE MATERIALS IN THE FOLLOWING SPEC SECTIONS: 09680: Carpet Tile 09681: Carpet- non glue-down NOTE: Submit Cut Sheet Highlighting VOC Emissions INSERT SAMPLE PAGE of a specification including the VOC requirements for Carpet and Carpet Tile, including Cushion Criteria, and Adhesive Criteria 1.4 1.5 PRODUCT HANDLING A. Delivery: Materials delivered to the job-site shall bear manufacturer's labels intact and legible. B. Storage: Store delivered materials prior to use or installation where directed by the Engineer in a safe, dry, clean and well ventilated area. C. Protection: Use all necessary means to protect glue-down carpet before, during and after installation. In the event of damage, immediately make necessary repairs and/or replacements to the full approval of the Engineer, at no added cost to the City. WARRANTY – Lifetime commercial PART TWO-PRODUCTS 2.1 MATERIALS A. General: Provide all recently manufactured and best quality materials. B. Carpet: The design of the glue down carpet tile is based on the products of Shaw Contract Stile, modular carpet, as a standard of quality. All substitutions will be considered under provisions of section 01630. All substitutions shall be equal and match carpet sample available at the City of Los Angeles Fire Department, 211 Figueroa, Suite 1550, Los Angeles. 1. Carpet Tiles to contain 40% (by weight) recycled post consumer waste to meet the requirements of Materials and Resources, Recycled Content, points 4.1 and 4.2 per the USGBC LEED Green Building Rating System, Version 2.0. 2. Carpet systems must meet or exceed the Carpet and Rug Institute Green Label Indoor Air Quality Test Program. The VOC limit is to meet the Indoor Environmental Quality, Low-emitting Materials, point 4.3 per the USGBC LEED Green Building Rating System, Version 2.0. 3. Style Name: “Young at Heart”, EK 124 4. Style Number: 59188 5. Collection Name: “Green with Envy” 6. Color Name: “Twine” 7. Color Number: 70761 8. Total Recycle Content: 40% 9. Construction: Pattern Loop Fire Station No. 77 3/14/03 Carpeting – Glue-down 09680-21 Relevant Sections of Document Referenced in Section 09680, 2.1B(2): Green Label Testing Program VOC LIIMITS Indoor Air Quality "Green Label" Testing Program - Carpet Criteria To identify carpet products that are truly low-VOC, CRI has established a labeling program. The CRI Indoor Air Quality Carpet Testing Program green and white logo displayed on carpet samples in showrooms informs the consumer that the product type has been tested by an independent laboratory and has met the criteria for very low emissions. List of "Green Label" Approved Carpet Products The carpet sample is tested for chemical emissions by Air Quality Sciences, an Atlanta-based, independent laboratory using the latest, most up-to-date, dynamic environmental chamber technology. The test methodology was developed by consensus during an official dialogue with the EPA and has been adopted by the American Society for Testing and Materials (ASTM) as D 5116 – Guide for Small-Scale Environmental Chamber Determinations of Organic Emissions from Indoor Materials/Products. Since the inception of the program in 1992, the industry has made substantial reductions in the levels of TVOCs, as well as reductions in 4-phenylcyclohexene (4-PC), the compound most associated with "new carpet odor." The carpet manufacturer is allowed to use the CRI/IAQ Carpet Testing Program label for that specific product type if the test result does not exceed the stated emission criteria. The product type number on the label identifies the manufacturer of the carpet and tells the buyer that the manufacturer has produced a product that meets the criteria for low emissions. Products are retested quarterly to monitor continued compliance with the test program requirements. Consumers can feel confident in selecting a carpet bearing the CRI Indoor Air Quality label. The label is assurance that the product is a responsible, low-emitting carpet. The current criteria for the program are based on a maximum emission factor measured in mg/m² ∙hr as follows: Total Volatile Organic Compounds 0.5 4-PC (4-Phenylcyclohexene) 0.05 Formaldehyde (to prove that none is used) 0.05 Styrene 0.4 Carpet & Rug Institute–Indoor Air Quality–Green Label Testing Program–Carpet Criteria Indoor Air Quality "Green Label" Testing Program - Cushion Criteria CRI has established a program that tests for volatile List of organic compounds (VOCs) in cushion used under carpet. This program will help the carpet manufacturer, installer "Green Label" and end user to identify and utilize low-emission cushion. Approved Cushion products that meet the emissions criteria can Cushion Products display the program’s green and white label. Products are re-tested regularly for continued compliance. Consumers seeking a low-emitting cushion can confidently select those bearing the label. Cushion products are characterized as: prime polyurethane, bonded polyurethane, mechanically frothed polyurethane, rubber – hair, rubber – jute, synthetic fiber, resinated or coated synthetic fiber, rubber and rubberized polyurethane. Cushions are tested for total volatile organic compounds, BHT (butylated hydroxytoluene), formaldehyde and 4-phenylcyclohexine (4-PC). For additional information, contact the Carpet Cushion Council at (203) 637-1312 or at www.carpetcushion.org. Criteria are base on a maximum emission factor as follows: Total Volatile Organic Compounds 1.00 mg/m² ∙ hr BHT (butylated hydroxytoluene) 0.30 mg/m² ∙ hr Formaldehyde 0.05 mg/m² ∙ hr 4-PC (4-phenylcyclohexene) 0.05 mg/m² ∙ hr Carpet & Rug Institute–Indoor Air Quality–Green Label Testing Program–Cushion Criteria Indoor Air Quality "Green Label" Testing Program - Adhesive Criteria Adhesives are used more often in commercial settings to adhere carpet to the floor. In residential settings, adhesives are used primarily where the carpet is installed over a concrete subfloor. List of "Green Label" Approved Adhesive Products CRI has instituted a testing program to identify low-volatile organic compound (VOC) floor covering adhesives. The program tests for chemical emissions using an independent laboratory that specializes in indoor air quality testing. Adhesives that meet the emissions criteria are allowed to display the program’s green and white label. Carpet manufacturers, installers and end users seeking a low-emitting adhesive can confidently select those bearing the label. Products are re-tested regularly for continued compliance. Tested adhesives fall into a number of categories: latex multi-purpose floor adhesive, pressuresensitive floor adhesive, vinyl-backed floor adhesive, latex seam adhesive, vinyl-backed seam sealer, cove base adhesive, "tackless" cushion adhesive and contact adhesive. Criteria for the adhesive testing program are based on a maximum emission factor as follows: Total Volatile Organic Compounds 10.00 mg/m² ∙ hr Formaldehyde .05 mg/m² ∙ hr 2-Ethyl-1-Hexanol 3.00 mg/m² ∙ hr Carpet & Rug Institute–Indoor Air Quality–Green Label Testing Program–Adhesive Criteria THIS PAGE INTENTIONALLY LEFT BLANK NO ADDED UREA-FORMALDEHYDE IN ALL COMPOSITE WOOD MATERIALS REQUIREMENTS APPLY TO THE MATERIALS IN THE FOLLOWING SPEC SECTIONS: 06100: Rough Carpentry 06171: Prefabricated Plywood Web Joists 06181: Glue Laminated Structural Units 06200: Finish Carpentry and Architectural Woodwork 06400: Custom Casework 08210: Wood doors 08213: Plastic Faced Wood Doors 10710: Wood Lockers NOTE: Submit Cut Sheet Highlighting No Added UreaFormaldehyde INSERT SAMPLE PAGE of a specification including the no-added ureaformaldehyde requirements for composite wood materials 2.3 2.4 SOLID COMPOSITE WALL PANELS A. The design of the wall panels are based on Trespa Virtuon ® homogeneous wall panels manufactured by Trespa North America, Ltd. located at 12267 Crosthwaite Circle, Poway, CA, 92604, 800-487-3772, as a standard of quality. A list of approved fabricators that provide products that comply with this specification section as judged and approved by the ENGINEER may be acquired from the above. All substitutions shall be considered under provisions of specification Section 01630. B. Solid composite wall panels to contain 15% (by weight) post industrial waste to meet Materials and Resources, Recycled Content, points 4.1 and 4.2 per the USGBC LEED Green Building Rating System, Version 2.0. C. Solid composite wall panels to contain 70% rapidly renewable cellulose or wood fibers to meet Materials and Resources, Rapidly Renewable Materials, point 6.1 per the USGBC LEED Green Building Rating System, Version 2.0. D. Solid composite wall panels to be certified by the Forest Stewardship Council to meet Materials and Resources, Certified Wood, point 7.1 per the USGBC LEED Green Building Rating System, Version 2.0. E. Solid composite wall panels assembly to use no added urea-formaldehyde to meet Indoor Environmental Quality, Low Emitting Materials, point 4.4 per the USGBC LEED Green Building Rating System, Version 2.0. F. All products specified in this section shall be provided by a single manufacturer. G. Panel: Trespa Virtuon. H. Thickness: 5/8”. I. Color: Metallic Aluminum Grey, #M51.0.1/ST. J. Joint and Sealing: Type D. K. Corner: Type E. SOLID COMPOSITE SHOWER WALL AND CEILING PANELS A. The design of the panels are based on Trespa Virtuon ® homogeneous wall panels manufactured by Trespa North America, Ltd. located at 12267 Crosthwaite Circle, Poway, CA, 92604, 800-487-3772, as a standard of quality. A list of approved fabricators that provide products that comply with this specification section as judged and approved by the ENGINEER may be acquired from the above. All substitutions shall be considered under provisions of specification Section 01630. B. Solid composite shower wall and ceiling panels to contain 15% (by weight) post industrial waste to meet Materials and Resources, Recycled Content, points 4.1 and 4.2 per the USGBC LEED Green Building Rating System, Version 2.0. Fire Station No. 77 03/14/03 Finish Carpentry and Architectural Woodwork 06200-27 WATER EFFICIENT FIXTURES APPLY TO THE MATERIALS IN THE FOLLOWING SPEC SECTIONS 15400: Plumbing P-1.0: Plumbing Schedules NOTE: Submit Cut Sheet Highlighting the GPM/GPF of each fixture INSERT SAMPLE PAGE of Construction Documents specifying the required GPM/GPF of each fixture D. 2.15 2.16 Coordination With Roofing: 1. Install flashing on bottom layer of roofing and embed in built-up roofing. 2. Install flashing fitting after roofing is finished and approved by Engineer. ACCESS PANELS A. For Valves or Equipment Located Behind Ceramic Tile Walls: Provide 8-inch x 8-inch opening; stainless steel, beveled edge frame; stainless steel cover secured with flush-head screws; polished finish; vandal-proof screws where indicated or required. B. For Valves, Cleanouts or Equipment Located Behind Finish Plaster Walls or Ceilings: Provide 8-inch x 8-inch minimum opening, 16-gage steel frame; 14gage steel door with concealed hinges arranged to open 180 degrees or to be removable and with Allen head locking device; with bonderized and prime coated finish. C. Installation: Required for ready accessibility to all valves and water hammer arrestors unless installed, in pipe spaces or in readily accessible ceiling space. D. Manufacturer's Reference Data: Required as noted in 1.3 of this Section. PLUMBING FIXTURES AND TRIM A. B. General: 1. Vitreous China: Cover all exposed surfaces with opaque vitreous china. 2. Enameled: Acid-resisting porcelain enamel. 3. Trim: Polished chromium-plated finish wherever exposed. 4. Provide faucets with removable trim units and polished chromium-plated brass or die cast material handles; quick compression type to close with the pressure; with removable unit comprising all wearing parts, including noncorrosive metal seat, lower stem, washer retainer, and end nuts. 5. Manufacturer's Reference Data: Section. 6. Also see Plumbing Fixture Schedule on Drawings for specifications on any plumbing fixtures not specified herein. Required as noted in 1.3 of this Water Closets: Maximum 1.6 gallons shall be per flush. 1. WC-1: American Standard, "Madera", 3043.102, elongated vitreous china, floor-mounted, water closet. Provide complete with Olsonite open front seat no. 95 less cover. a. Fire Station No. 77 03/14/03 Flush Valve: Sloan "Royal" flushometer No. 111. Plumbing 15400 2. WC-2: American Standard, "Madera", 2234.015, elongated vitreous china, floor-mounted, water closet. Provide complete with Olsonite open front seat no. 95 less cover. a. C. D. Lavatory Assemblies: Maximum water consumption shall be 0.5 gpm. 1. L-1: American Standard "Lucerne" 0356.421, 20-inch x 18-inch, vitreous china, wall-mounted, lavatory. Provide complete with Chicago No. 22004 single lever faucet, Chicago No. 327A grid drain, Chicago No. 1006 loose key stops with rigid supplies, Amconservation Group No. AMFAL05A faucet aerator, Zurn No. Z-1251 carrier with steel plate, and L.A. pattern p-trap. 2: American Standard "Ovalyn II" 0496.011, 20-inch x 17-inch, under counter lavatory. Provide complete with Kohler No. K-14518-1 faucet, Chicago No. 327A grid drain, Chicago No. 1006 loose key stops with rigid supplies, Amconservation Group No. AMFAL05A faucet aerator, and L.A. pattern p-trap. 3. L-3: American Standard "Ovalyn II" 0496.011, 20-inch x 17-inch, under counter lavatory. Provide complete with Kohler No. K-14518-1 faucet, Chicago No. 327A grid drain, Chicago No. 1006 loose key stops with rigid supplies, Amconservation Group No. AMFAL05A faucet aerator, and L.A. pattern p-trap. General Sink Assemblies: Maximum water consumption shall be 2.2 gpm. 1. E. F. Flush Valve: Sloan "Royal" flushometer No. 111. S-1: Elkay No. DLR-2522-12, 3-hole punched, single compartment, 18gage type 302 stainless steel, 25-inch x 22-inch x 12-inch deep, selfrimming sink. Provide complete with Kohler No. K-7776-K faucet, Elkay No. LK-18 grid drain, Chicago No. 1006 loose key stops with rigid supplies, and L.A. pattern p-trap. Service Sink Assemblies: 1. SS-1: Kohler No. K-6710, Whitby service sink, 28-inch x 28-inch, cast iron, acid-resistant enamel finish, floor-mounted, corner sink. Provide complete with Kohler No. K-8940 coated wire rim guard, Kohler No. K8928 faucet, brass valve bodies, 3-inch threaded spout for hose connection, lever handles, vacuum breaker, loose key stops, rubber hose, and L.A. pattern p-trap. 2. SS-2: Kohler No. K-6652, Sudbury service sink, blank back, single compartment, vitreous china, 20-inch x 20-inch. Provide complete with Kohler No. K-8907 Kinlock service sink faucet, brass valve bodies, lever handles, vacuum breaker, pail hook, Kohler K-6673 adjustable trap, 3inch iron pipe. Urinals: Maximum water consumption shall be 0.5 gallons per flush. 1. Fire Station No. 77 03/14/03 UR-1: American Standard "Washbrook" 6501.010, vitreous china, wallmounted urinal. Provide with Zurn No. ZR-1222 wall hanger and stainless steel strainer. Mount at handicap height. Plumbing 15400 a. 2. UR-2: American Standard "Washbrook" 6501.010, vitreous china, wallmounted urinal. Provide with Zurn No. ZR-1222 wall hanger and stainless steel strainer. a. G. H. I. J. Flush Valve: Sloan "Royal" No. 186-0.5-YB-YC and provide No. B-73-A handle flush valve and support. Shower Assemblies: Maximum water consumption shall be 1.0 gpm. 1. SH-1: Symmons No. 1-100VT-E “Visu-Temp” shower assembly. Provide complete with “Visu-Temp” pressure balancing mixing valve with thermometer, internal adjusters, temperature limit stop, integral stop, and 1.0 gpm shower head (AM Conservation Group AMSH090) or equal). 2. SH-2: Symmons No. 117VT-FS-VB-X-K-30 “Visu-Temp” shower assembly. Provide complete with “Visu-Temp” pressure balancing mixing valve with thermometer, super head, handicap hand spray with 60-inch hose and slide bar, vacuum breaker, and diverter valve. Kitchen Sink Assembly with Garbage Disposer: Maximum water consumption shall be 2.2 gpm. 1. KS-1: Kohler No. K-3351, double compartment, 18-gage type 302 stainless steel, undercounter-mounted, 31-1/2-inch x 18-inch x 7-1/2-inch deep, kitchen sink. Provide complete with Kohler No. K-14502 faucet, Kohler grid drain strainer, Chicago No. 1006 loose key stops with rigid supplies, and L.A. pattern p-trap. 2. GD-1: Maytag No. DFC7000 garbage disposer with 1 hp, 120 volt, 1 phase motor. Mop Drain: Built-up at the job-site as detailed on the Architectural Drawings. Maximum water consumption for corner janitor service sinks shall be 2.5 gpm. 1. Water Supply: Same as specified for Service Sink. 2. Drain: Same as specified for Floor Drain. Electric Drinking Fountain (EDF): Maximum water consumption shall be 1.0 gpm. 1. L. Flush Valve: Sloan "Royal" No. 186-0.5-YB-YC and provide No. B-73-A handle flush valve and support. EDF-1: HAWS Model H1011.8HPS “Hi-Lo”, bi-level, wall-mounted, electric drinking fountain for regular and handicap use. Electric drinking fountain shall be 18 gauge, type 304, No. 4 satin finish, stainless steel. It shall be 120 volt, 1 phase, 5.5 amps. Waste Gap for Dishwashers: Unit; Graning Co., No. B2310, brass chromiumplated finish with 5/8-inch copper inlet; 7/8-inch copper for each mounting; Waste - L.A. pattern, all cast brass 2-inch "P" trap; installed as indicated on the drawings unless soft copper piping and fittings on "P" trap tail piece. Fire Station No. 77 03/14/03 Plumbing 15400 Fire Station No. 77 03/14/03 Plumbing Schedule P1.0 THIS PAGE INTENTIONALLY LEFT BLANK INSERT DIVIDER HERE TAB Title LEED - SPECIFIC PROJECT CONDITIONS THIS PAGE INTENTIONALLY LEFT BLANK CONTENTS LEED - SPECIFIC PROJECT CONDITIONS 1. Project Conditions per partial LEED prerequisites EQp2, SSp1 and points EQc3.1, 3.2 Specifications List Sample Specification Pages with LEED-related Project Conditions THIS PAGE INTENTIONALLY LEFT BLANK PROJECT SPECIFIC CONDITIONS MAY BE FOUND IN THE FOLLOWING SPECIFICATIONS: 01355: Environmental Conditions NOTE: Photo Documentation of Project Conditions Required INSERT SAMPLE PAGE of specification including the LEED-specific Project Conditions 2.1 PROJECT CONDITIONS A. No smoking will be permitted in indoor Project site locations, as per California Labor Code (Section 400-6413.5). B. Certifications: 1. C. Environmental Product Certification: a. Include manufacturer certification indicating product contains maximum recycled content possible without being detrimental to product performance b. Include certification indicating cleaning materials comply with requirements of these Specifications. Construction Ventilation and Preconditioning: 1. Temporary Construction Ventilation: Maintain sufficient temporary ventilation of areas where materials are being used that emit VOCs. Maintain ventilation continuously during installation, and until emissions dissipate after installation. If continuous ventilation is not possible via building’s HVAC system(s) then ventilation shall be supplied via open windows and temporary fans, sufficient to provide no less than three air changes per hour. a. Period after installation shall be sufficient to dissipate odors and elevated concentrations of VOCs. Where no specific period is stated in these Specifications, a time period of 72 hours shall be used. b. Ventilate areas directly to outside; ventilation to other enclosed areas is not acceptable. 2. During dust producing activities (e.g. drywall installation and finishing) turn ventilation system off, and openings in supply and return HVAC system shall be protected from dust infiltration. Provide temporary ventilation as required. 3. Preconditioning: Prior to installation, allow products which have odors and significant VOC emissions to off-gas in dry, well-ventilated space for 14 calendar days to allow for reasonable dissipation of odors and emissions prior to delivery to Project site. Fire Station No. 77 03/14/03 a. Condition products without containers and packaging to maximize off-gassing of VOCs b. Condition products in ventilated warehouse or other building. Comply with substitution requirements for consideration of other locations. Special Environmental Requirements 01355-39 D. Protection: 1. Moisture Stains: Materials with evidence of moisture damage, including stains, are not acceptable, including both stored and installed materials; immediately remove from site and properly dispose. Take special care to prevent accumulation of moisture on installed materials and within packaging during delivery, storage, and handling to prevent development of molds and mildew on packaging and on products. a. b. 2. 2.2 Immediately remove from site and properly dispose of materials showing signs of mold and signs of mildew, including materials with moisture stains. Replace moldy materials with new, undamaged materials. Ducts: Seal ducts during transportation, delivery, and construction to prevent accumulation of construction dust and construction debris inside ducts. SEQUENCING A. Environmental Issues: 1. On-Site Application: Where odorous and/or high VOC emitting products are applied on-site, apply prior to installation of porous and fibrous materials. Where this is not possible, protect porous materials with polyethylene vapor retarders. 2. Complete interior finish material installation no less than fourteen (14) days prior to Substantial Completion to allow for building flush out Fire Station No. 77 03/14/03 Special Environmental Requirements 01355-40 INSERT SAMPLE PAGE of specification including the Cleaning & Maintenance requirements requiring LEED documentation a. Laboratory reports shall contain emissions test data on VOCs including total VOCs (TVOC), specific individual VOCs, formaldehyde and other aldehydes as described in this Specification Section. b. In special cases it may be necessary to identify other specific chemicals for listing based on known quantity present or on known odor, irritation or toxicity. c. Identify all VOCs emitted by each material as required in these Specifications. d. Specific test conditions and requirements are set forth in this Section. For required tests, submit documentation of sample acquisition, handling, and test specimen preparation, as well as test conditions, methods, and procedures. The tests consist of a ten-day conditioning period followed by a 96-h test period. Samples collected during the test period at 24, 48, and 96 hours shall be analyzed for TVOC and formaldehyde. VOC samples collected at 96 hours shall be identified and quantified for all compounds that are Chemicals of Concern on lists in Article 2. 3. Fire Station No. 77 03/14/03 Cleaning and Maintenance Products: Provide data on manufacturers’ recommended maintenance, cleaning, refinishing and disposal procedures for materials and products. These procedures are for final Contractor cleaning of the project prior to substantial completion and for provided materials and products as required by the specific specification sections. a. Where chemical products are recommended for these procedures, provide documentation to indicate that no component present in the cleaning product at more than 1% of the total mass of the cleaning product is a carcinogen or reproductive toxicant as defined in the lists in this specification section. b. For purposes of reporting, identification of product VOC contents shall not be limited to those regulated under Clean Air Act (CAA) but shall also include compounds exempted from the CAA definition and listing of VOCs. c. California EPA and local air district definitions of VOCs based on CAA are not sufficient as they exempt compounds based on nonreactivity for outdoor air pollution control but still important for indoor air quality. d. No alpha-pinene, d-limonene or other unsaturated carbon double bond alkalines are permitted in cleaning agents. Special Environmental Requirements 01355-41