INDUSTRIAL USER COMPLIANCE INSPECTION CHECKLIST Inspection Date: A. Time: BACKGROUND INFORMATION Facility Name: Address: Metro Connector: Name of Responsible Official: Title: Phone Number: Name of Contact: Title: Phone Number: Personnel Present at Inspection: Industry (Name and Title): Connector: Metro: B. FACILITY INFORMATION Industrial Category: Applicable Federal Regulations: Permit Effective/Expiration Dates: Briefly describe the processes used at this facility: ACI Page 1 of 13 Note any changes in the processes or wastestreams from those described in the BMR or previous inspections. Draw a new process diagram, including wastestreams, indicating any changes. If no change, indicate "NONE." Were these changes reported to the Connector and Metro? Yes No N/A Yes No N/A THURS FRI Do these changes affect the applicable federal regulations? (If yes, explain) C. SHIFT INFORMATION Shifts Normally Worked: SUN MON TUES WED 1st 2nd 3rd Shift Times: Average Number of Employees per shift: 1st 1st 2nd 2nd 3rd 3rd Normal Operating Months: full year ACI or JFMAMJJASOND Page 2 of 13 SAT D. FLOW DATA Regulated or process Flow Rates: Avg. Daily Flow Max. Daily Flow gpd gpd How were these flows measured? Non-Regulated or Non-Process Flow Rates: Avg. Daily Flow Max. Daily Flow gpd gpd How were these flows measured? E. SAMPLING (Explain any NO answers) Are sampling facilities in satisfactory condition? Yes No Does only regulated process flow pass through the designated sampling points? Yes No IF NO SELF MONITORING REQUIRED, SKIP TO SECTION F. Is the I.U. performing the minimum amount of sampling as required by the Permit? Yes No Are all samples taken at the designated sampling points? (Inspector should require I.U. to identify sampling points) Yes ACI Page 3 of 13 No Are sample types (composite, grab) taken as specified in the discharge permit? Yes No If the discharge is in violation of permit limits, is increased sampling being performed? Yes No N/A Are samples representative of the discharge during normal operating conditions? Yes No Are samples collected according to accepted sampling procedures? Yes No Yes No Yes No Do sample test procedures conform to 40 CFR 136? Is this documented? ACI Page 4 of 13 F. LABORATORY FACILITIES Is an onsite laboratory used? Yes No Yes No Parameters: Is an offsite laboratory used? Parameters: Name of Offsite Laboratory: Phone: Contact: G. ACCIDENTAL DISCHARGE Has the I.U. posted a notice advising whom to call in the event of an accidental discharge? Yes ACI Page 5 of 13 No H. PRETREATMENT SYSTEM Briefly describe the pretreatment system: (IF NONE, INDICATE "NONE," AND SKIP TO SECTION I) Is the pretreatment system batch or continuous? Is there a full time Waste Treatment Operator? Is he/she certified? Yes No Are all treatment units in service? Yes If not, how is the waste being treated? Yes No Certification Level: No Is there an O&M manual for the Pretreatment System? Yes No Yes No Yes No Is there a contingency plan for emergencies relating to the Pretreatment System? Can the Pretreatment System be bypassed? ACI Page 6 of 13 Are there any sludges produced from the pretreatment process? (IF NO, SKIP TO SECTION I) Yes No No N/A If the sludges produced are hazardous, are they disposed of via a RCRA manifest? (If no, explain) Yes I.U. ID Number: Hauler: Hauler ID Number: Frequency: Disposal Site: Quantities: If the sludges produced are not hazardous, how are the sludges disposed of? ACI Page 7 of 13 I. TOXIC ORGANIC MANAGEMENT PLAN IF THE INDUSTRIAL USER IS NOT REGULATED BY CATEGORICAL STANDARDS, OR IF THE CATEGORICAL STANDARD DOES NOT CONTAIN LIMITS FOR TTOs, SKIP TO SECTION J. Does the I.U. monitor for TTOs, submit the TTO certification statement contained in its permit with each PCR, or monitor alternative parameters (i.e. oil & grease)? If the I.U. has certified that TTOs are not present in the wastestream, have they submitted a Toxic Organic Management Plan? (If no, explain) Yes No Has this plan been implemented? (If no, explain) Yes No Describe any deficiencies. List any organic chemicals found onsite which should be covered by the TTO plan. ACI Page 8 of 13 J. SPILL PREVENTION PLAN Does the industry's permit require a Spill Prevention Plan? Yes No Yes No N/A Yes No N/A Has a Spill Prevention Plan been submitted? (If no, explain) Has the Spill Prevention Plan been implemented? (If no, explain) Describe any deficiencies in the Plan or its implementation. Describe any site conditions which should be covered by a Spill Prevention Plan. ACI Page 9 of 13 K. RECORDS MAINTENANCE Are records onsite and available for inspection? Yes No Are all records pertaining to monitoring kept for a minimum of three years? Yes No Compare industrial user records with connector/Metro records. discrepancies. Describe any Do the monitoring records contain the following information: (IF NO SELF-MONITORING, SKIP TO SECTION L). Sample Date? Sample Location? Sample Type? Sample Time? Sampler Name? Date analysis was performed? Lab performing analysis? Analytical methods used? Results of analysis? Yes Yes Yes Yes Yes Yes Yes Yes Yes No No No No No No No No No If the industry performs any onsite sample analysis (e.g., pH) for reporting purposes, are maintenance, calibration and equipment records kept for all sampling and measuring equipment or devices? Yes No N/A Yes No N/A If applicable, are the following records available: 1. Wastewater flow data or water meter readings? ACI Page 10 of 13 2. Production data? Yes No N/A Yes No N/A 3. Batch discharge information? 4. Chart recordings of explosion hazard, and/or discharge flow and/or power supply monitoring? Yes No N/A Yes No N/A Yes No N/A Yes No N/A 5. pH chart recordings? 6. Material waste profiles, income logs and source lists? 7. Records of visual oil and grease observations? 8. A listing of the volume and character of wastewater transported to the industrial treatment plant from spills and wrecks? Yes 9. No N/A Receipts of all perchloroethylene or "perc"-containing products purchased and disposed? Yes No N/A Yes No N/A Yes No 10. Records of removed substances? Are the records adequate? ACI Page 11 of 13 L. COMPLIANCE INSPECTION MONITORING RESULTS Was a sample collected during the inspection? (IF NO, SKIP TO SECTION M) Yes Grab Sample? No Yes No Yes No Yes No Parameters: Composite Sample? Flow Proportioned? Parameters: Describe how and where (monitoring point number) the sample was collected. Include sampling and flow monitoring equipment used, custody procedures, field preservation, etc. Sample split with IU? Yes Attach a copy of the following forms to this inspection report: Chain or Custody Form Laboratory Analysis Report ACI Page 12 of 13 No M. ENFORCEMENT Is the IU presently under an informal/formal enforcement action by the Control Authority? Yes If yes, describe status: N. OTHER FINDINGS O. INDUSTRY CONCERNS P. SLUG PLAN REVIEW Q. POLLUTION PREVENTION MEASURES INSPECTOR(S) Signature: Date: Signature: Date: ACI Page 13 of 13 No