Lean Six Sigma Analyze Phase Tollgate Review Lean Six Sigma DMAIC Tools and Activities Review Project Charter Validate High-Level Value Stream Map and Scope Voice of the Customer & Voice of the Business Validate Problem Statement and Goals Validate Financial Benefits Create Communication Plan Select and Launch Team Develop Project Schedule Complete Define Tollgate Validate Define Project Charter Voice of the Customer Value Stream Map Flow Identify Key Input, Process and Output Metrics Operational Definitions Develop Data Collection Plan Validate Measurement System Collect Baseline Data Determine Process Capability Complete Measure Tollgate Develop Measure and Kano Analysis SIPOC Map Project Valuation/ROIC Analysis Tools RACI and Quad Charts Stakeholder Analysis Communication Plan Effective Meeting Tools Inquiry and Advocacy Skills Time Lines, Milestones, and Gantt Charting Pareto Analysis Value Stream Mapping Process Cycle Efficiency/Little’s Law Operational Definitions Data Collection Plan Statistical Sampling Measurement System Analysis (MSA) Gage R&R Kappa Studies Control Charts Spaghetti Diagrams Histograms Normality Test Process Capability Analysis Identify Root Causes Reduce List of Potential Root Causes Confirm Root Cause to Output Relationship Estimate Impact of Root Causes on Key Outputs Prioritize Root Causes Value-Add Analysis Takt Rate Analysis Quick Wins Statistical Analysis Complete Analyze Tollgate Analyze Process Constraint ID and Takt Time Analysis Cause & Effect Analysis FMEA Hypothesis Tests/Conf. Intervals Simple & Multiple Regression ANOVA Components of Variation Conquering Product and Process Complexity Queuing Theory Develop Potential Solutions Evaluate, Select, and Optimize Best Solutions ‘To-Be’ Value Stream Map(s) Develop and Implement Pilot Solution Implement 5s Program Develop Full Scale Implementation Plan Cost/Benefit Analysis Benchmarking Complete Improve Tollgate Develop Develop SOP’s, Training Plan & Process Controls Implement Solution and Ongoing Process Measurements Confirm Attainment of Project Goals Identify Project Replication Opportunities Training Complete Control Tollgate Transition Project to Process Owner Improve Replenishment Pull/Kanban Stocking Strategy Process Flow Improvement Process Balancing Analytical Batch Sizing Total Productive Maintenance Design of Experiments (DOE) Solution Selection Matrix Piloting and Simulation Work Control System Setup reduction Pugh Matrix Pull System Control Mistake-Proofing/ Zero Defects Operating Procedures (SOP’s) Process Control Plans Visual Process Control Tools MGPP Statistical Process Controls (SPC) Solution Replication Visual Workplace Metrics Project Transition Model Team Feedback Session Standard Kaizen Events Targeted in Measure to Accelerate Results International Standards for Lean Six Sigma 2 Measure Overview Process Capability I -M R C h a r t o f D e l i v e r y T i m e 40 U C L= 3 7 . 7 0 I n d iv id u a l V a lu e CTQ: ? Unit (d) or Mean (c): ? Defect (d) or St. Dev. (c): ? PCE%: ? DPMO (d): ? Sigma (Short Term): ? Sigma (Long Term):? MSA Results: show the percentage result of the GR&R, AR&R or other MSA carried out in the project 35 _ X= 2 9 .1 3 30 25 LC L= 2 0 . 5 6 20 1 28 55 82 109 136 163 190 217 244 O b s e r v a tio n U C L= 1 0 . 5 3 10.0 M o v in g R a n g e Graphical Analysis 7.5 5.0 __ M R = 3.22 2.5 0.0 LC L= 0 1 28 55 82 109 136 163 190 217 244 O b s e r v a tio n Root Cause / Quick Win Root cause: Quick Win #1 Root cause: Quick Win #2 Root cause: Quick Win #3 Tools Used Detailed process mapping MSA Value Stream Mapping Data Collection Planning Basic Statistics Process Capability Histograms Time Series Plot Probability Plot Pareto Analysis Operational Def. 5s Pull Control Charts Enter Key Slide Take Away (Key Point) Here International Standards for Lean Six Sigma 3 Graphical Analysis Summary Data is Continuous: ?? Data Points Collected Between XX/XX/XX and XX/XX/XX Normality Central Tendency Normal Variation Average Non-Normal Std. Dev (long term) Median or Q1 or Q3 Investigation Statistical / Graphical Analysis What is the shape of the Project Y data? Is the Y data normally distributed? What is the normality test p-value? What is the central tendency of the Project Y data? Span (1/99) or Stability Factor (Q1/Q3) Observations/Conclusion Histogram Normality Test Mean, Median, or Quartile Values What is the spread of the Project Y Standard Deviation, Span, or data? Stability Factor Is the data stable over time? Run Chart Describe any other observations about the Project Y data Include any other findings regarding the data here Enter Key Slide Take Away (Key Point) Here International Standards for Lean Six Sigma 4 Sources of Waste Overproduction Defect Area 1 Sources of Waste Area 1 Area 1 Sub area 1 Transportation Sub area 1 Sub area 1 NVA Area 1 Area 1 Sub area 1 Processing Sub area 1 5% 10% ? ? ? ? Waiting 5% 5% 5% 30% ? Sub area 1 Inventory Motion < Insert your waste percentage as shown in pie chart > Area 1 40% Defect Overproduction Transportation Waiting Inventory Motion Processing Enter Key Slide Take Away (Key Point) Here International Standards for Lean Six Sigma 5 Cause and Effect Matrix C&E Matrix (Optional) Cause and Effect Matrix Process Step y1 y2 y3 y4 y5 5 1 4 2 3 ----- Process input ----- Correlation of Input to Output Step #1 Input #1 3 1 9 1 1 Step #2 Input #2 3 0 9 0 0 Step #3 Input #3 3 9 0 0 0 Step #4 Input #4 1 3 3 1 0 Step #5 Input #5 3 0 0 0 0 Step #6 Input #6 1 9 0 0 0 Step #7 Input #7 0 0 0 0 3 Step #8 Input #8 0 0 0 0 3 Step #9 Input #9 0 0 0 0 3 <<< CCR Process Outputs <<<Importance Rating ( 5 = high, 1 = low) Process Step Totals 57 51 24 22 15 14 9 9 9 ? ? Enter Key Slide Take Away (Key Point) Here International Standards for Lean Six Sigma 6 Pareto Plot P a r e to C h a r t 1 00 150 Perce nt 80 100 60 40 50 20 0 D efec t C o unt P erc e nt C um % 0 So ut h No r th s Ea t he Ot rs 100 50 15 6 5 8 .5 2 9 .2 8 .8 3 .5 5 8 .5 8 7 .7 9 6 .5 1 00 .0 Enter Key Slide Take Away (Key Point) Here International Standards for Lean Six Sigma 7 Hypothesis Test Summary Hypothesis Test (ANOVA, 1 or 2 sample t - test, Chi Squared, Regression, Test of Equal Variance, etc) Example: ANOVA Example: ANOVA Example: Chi Squared Example: Pareto Factor (x) Tested p Value Observations/Conclusion 0.030 Significant factor - 1 hour driving time from DC to Baltimore office causes ticket cycle time to generally be longer for the Baltimore site 0.004 Significant factor - on average, calls requiring parts have double the cycle time (22 vs 43 hours) 0.000 Significant factor - Department 4 has digitized addition of customer info to ticket and less human intervention, resulting in fewer errors n/a South region accounted for 59% of the defects due to their manual process and distance from the parts warehouse Location Part vs. No Part Department Region Describe any other observations about the root cause (x) data Enter Key Slide Take Away (Key Point) Here International Standards for Lean Six Sigma 8 Control / Impact Analysis Does the X have a high, medium, or low impact on the project Y? Does the X in he teams control, influence, or out of their control? High Impact In Our Control In Our Influence Out of Our Control Medium Impact Low Impact ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? Enter Key Slide Take Away (Key Point) Here International Standards for Lean Six Sigma 9 Quick Win Documentation Template Process Name: __________________ Process Lead: ___________________ Process Owner: ______________________ Start Date: ______________ Process Area: ________________________ Stop Date: ______________ 1. 2. 3. 4. 5. 6. Root Cause: _________________________________________________ Obvious Solution: __________________________________________ Low or No Cost: __________________________________________ 5s 4-Step Setup Reduction Low Risk: ________________________________________________ Inventory Reduction Implementation Plan: ______________________________________________ MSA Improvements Stakeholder (s) Approval: ___________________________________________ Price reductions Reduced DOWNTIME Benefits: (NVA steps or work) __________________________________________________________ Pull System __________________________________________________________ Kaizen events Other __________________________________________________________ Enter Key Slide Take Away (Key Point) Here International Standards for Lean Six Sigma 10 Business Impact State financial impact of future project leverage opportunities Separate “hard or Type 1” from “soft Type 2 or 3” dollars Annual Estimate Type 1: ? Type 2: ? Type 3: ? Replicated Estimate • • • Type 1: ? Type 2: ? Type 3: ? 1: ? 2: ? 3: ? • • • Type 1: ? Type 2: ? Type 3: ? Type 1: ? • Type 2: ? • Type 3: ? • • • • Type 1: ? Type 2: ? Type 3: ? • • • Type 1: ? Type 2: ? Type 3: ? • • • Type 1: ? Type 2: ? Type 3: ? • • • Type 1: ? Type 2: ? Type 3: ? Revenue Enhancement • • • Expenses Reduction • Type • Type • Type Loss Reduction • Cost Avoidance Total Savings Type 1: ? • Type 2: ? • Type 3: ? Enter Key Slide Take Away (Key Point) Here International Standards for Lean Six Sigma 11 Business Impact Details Type 1: Describe the chain of causality that shows how you determined the Type 1 savings. (tell the story with cause–effect relationships, on how the proposed change should create the desired financial result (savings) in your project ) Show the financial calculation savings and assumptions used. Type 2: Describe the chain of causality that shows how you determined the Type 2 savings. (tell the story with cause–effect relationships, on how the proposed change should create the desired financial result (savings) in your project ) Show the financial calculation savings and assumptions used. Assumption #1 (i.e. source of data, clear Operational Definitions?) Assumption #2 (i.e. hourly rate + incremental benefit cost + travel) Assumption #1 (i.e. Labor rate used, period of time, etc…) Assumption #2 (i.e. contractor hrs or FTE, source of data, etc…) Describe the Type 3 Business Impact(s) areas and how these were measured Assumption #1 (i.e. project is driven by the Business strategy?) Assumption #2 (i.e. Customer service rating, employee moral, etc…) Other Questions Stakeholders agree on the project’s impact and how it will be measured in financial terms? What steps were taken to ensure the integrity & accuracy of the data? Has the project tracking worksheet been updated? Enter Key Slide Take Away (Key Point) Here International Standards for Lean Six Sigma 12 Current Status Key actions completed Issues Lessons learned Communication, team building, organizational activities Lean Six Sigma Project Status and Planning Deliverables/Tasks Completed last week Upcoming Deliverables/Tasks - 2 weeks out Comment Due Revised Due For deliverables due thru: Actions Scheduled for next 2 Weeks Deliverable/Action Who Due Revised Due Commen Current Issues and Risks Who Due Revised Due Recomm Issue/Risk Enter Key Slide Take Away (Key Point) Here International Standards for Lean Six Sigma 13 Next Steps Key actions Planned Lean Six Sigma Tool use Questions to answer Barrier/risk mitigation activities Lean Six Sigma Project Issue Log No. Description/Recommendation Status Open/Closed/Hold Last Revised: Revised Due Due Date Resp Comments / Resolution Date 1 2 3 4 5 6 7 8 9 10 Enter Key Slide Take Away (Key Point) Here International Standards for Lean Six Sigma 14 Sign Off I concur that the Analyze phase was successfully completed on MM/DD/YYYY I concur the project is ready to proceed to next phase: Analyze Enter Name Here Green Belt/Black Belt Enter Name Here Enter Name Here Sponsor / Process Owner Financial Representative Enter Name Here Deployment Champion Enter Name Here Master Black Belt Enter Key Slide Take Away (Key Point) Here International Standards for Lean Six Sigma 15 Tollgate Reviews Backup Slides D M A I C Project Charter Financial Impact Problem/Goal Statement Problem: Describe problem in non-technical terms Statement should explain why project is important; why working on it is a priority Goal: Goals communicate “before” and “after” conditions Shift mean, variance, or both? Should impact cost, time, quality dimensions Express goals using SMART criteria Specific, Measurable, Attainable, Resource Requirements, Time Boundaries Explain leverage and strategic implications (if any) Team State financial impact of project Expenses Investments (inventory, capital, A/R) Revenues Separate “hard” from “soft” dollars State financial impact of leverage opportunities (future projects) Tollgate Review Schedule PES Name Project Executive Sponsor (if different from PS) PS Name Project Sponsor/Process Owner DC Name Deployment Champion GB/BB Name Green Belt/Black Belt MBB Name Master Black Belt Core Team Role % Contrib. LSS Training Team Member 1 SME XX YB Team Member 2 TM XX GB Team Member 3 SME XX PS Extended Team Team Member 1 BFM XX Not Trained Team Member 2 IT XX Not Trained Tollgate Scheduled Revised Define: XX/XX/XX Measure: XX/XX/XX XX/XX/XX Analyze: XX/XX/XX XX/XX/XX Improve: XX/XX/XX XX/XX/XX Control: XX/XX/XX XX/XX/XX Review high-level schedule milestones here: Phase Completions Tollgate Reviews Complete XX/XX/XX XX/XX/XX XX/XX/XX XX/XX/XX XX/XX/XX Enter Key Slide Take Away (Key Point) Here International Standards for Lean Six Sigma 17 Measure Tollgate Checklist Has a more detailed Value Stream Map been completed to better understand the process and problem, and where in the process the root causes might reside? Has the team conducted a value-added and cycle time analysis, identifying areas where time and resources are devoted to tasks not critical to the customer? Has the team identified the specific input (x), process (x), and output (y) measures needing to be collected for both effectiveness and efficiency categories (i.e. Quality, Speed, and Cost measures)? Has the team developed clear, unambiguous operational definitions for each measurement and tested them with others to ensure clarity/consistent interpretation? Has a clear, reasonable choice been made between gathering new data or taking advantage of existing data already collected by the organization? Has an appropriate sample size and sampling frequency been established to ensure valid representation of the process we’re measuring? Has the measurement system been checked for repeatability and reproducibility, potentially including training of data collectors? Has the team developed and tested data collection forms or check sheets which are easy to use and provide consistent, complete data? Has baseline performance and process capability been established? How large is the gap between current performance and the customer (or project) requirements? Has the team been able to identify any complete ‘Quick Wins’? Have any Kaizen opportunities been identified to accelerate momentum and results? Have key learning(s) to-date required any modification of the Project Charter? If so, have these changes been approved by the Project Sponsor and the Key Stakeholders? Have any new risks to project success been identified, added to the Risk Mitigation Plan, and a mitigation strategy put in place? Key Deliverables: Detailed Value Stream Map(s) Data Collection Plan Measurement Collection Results Process Capability Results Current Baseline Process Performance Quick Wins, if applicable Identification of Kaizen Opportunities, if applicable Refined Charter, as necessary Updated Risk Mitigation Plan Deliverables Uploaded to Central Storage Location or Deployment Management System. Tollgate Review Enter Key Slide Take Away (Key Point) Here International Standards for Lean Six Sigma 18 Analyze Tollgate Checklist Has the team examined the process and identified potential bottlenecks, disconnects and redundancies that could contribute to the problem statement? Deliverables: Has the team analyzed data about the process and its performance to help stratify the problem, understand reasons for variation in the process, and generate hypothesis as to the root causes of the current process performance? Prioritized List of Validated Root Causes Has an evaluation been done to determine whether the problem can be solved without a fundamental recreation of the process? Has the decision been confirmed with the Project Sponsor? Has the team investigated and validated (or devalidated) the root cause hypotheses generated earlier, to gain confidence that the “vital few” root causes have been uncovered? Does the team understand why the problem (the Quality, Cycle Time or Cost Efficiency issue identified in the Problem Statement) is being seen? Has the team been able to identify any additional ‘Quick Wins’? Have learning’s to-date required modification of the Project Charter? If so, have these changes been approved by the Project Sponsor and the Key Stakeholders? Have any new risks to project success been identified, added to the Risk Mitigation Plan, and a mitigation strategy put in place? List of Potential Root causes Additional “Quick Wins”, if applicable Refined Charter, as necessary Updated Risk Mitigation Plan Deliverables Uploaded to Central Storage Location or Deployment Management System Tollgate Review Has the team identified the key factors (critical X’s) that have the biggest impact on process performance? Have they validated the root causes? International Standards for Lean Six Sigma 19 19 Improve Tollgate Checklist What techniques were used to generate ideas for potential solutions? What narrowing and screening techniques were used to further develop and qualify potential solutions? What evaluation criteria were used to select a recommended solution? Do proposed solutions address all the identified root causes, at least the most critical? Were the solutions verified with the Project Sponsor and Stakeholders? Has an approval been received to implement? Was a pilot run to test the solution? What was learned? What modifications made? Has the team seen evidence that the root causes of the initial problems have been addressed during the pilot? What are the expected benefits? Has the team considered potential problems and unintended consequences (FMEA) of the solution and developed preventive and contingency actions to address them? Has the proposed solution been documented, including process participants, job descriptions and if applicable, their estimated time commitment to support the process? Has the team developed an implementation plan? What is the status? Have changes been communicated to all the appropriate people? Has the team been able to identify any additional ‘Quick Wins’? Have ‘learning's’ to-date required modification of the Project Charter? If so, have these changes been approved by the Project Sponsor and the Key Stakeholders? Have any new risks to project success been identified and added to the Risk Mitigation Plan? Deliverables: Prioritized List of Solutions “To-Be” Value Stream Map(s) Pilot Plan & Results Approved Solution and Detailed Implementation Plan Additional “Quick Wins”, if applicable Refined Charter, as necessary Updated Risk Mitigation Plan Deliverables Uploaded to Central Storage Location or Deployment Management System Tollgate Review Has the team developed improvement solutions for the critical X’s, piloted the solution and verified that the solution will solve the problem? International Standards for Lean Six Sigma 20 Lean Six Sigma DMAIC Improvement Process Define Define the opportunity from both the customer and business perspective Measure Understand the baseline process performance Analyze Identify the critical X factors and root causes impacting process performance Improve Develop solutions linked to critical x’s Control Implement solutions & control plan Enter Key Slide Take Away (Key Point) Here International Standards for Lean Six Sigma 21 Run Charts (Optional) When the points are connected with a line, a run ends when the line crosses the median A run, in this case, is one or more consecutive points on the same side of the median Median = 38 Longest Run about the median 1 Run about the Median, can you count the other 8? There is a no nonrandom influence acting upon this process. There is no trend There is a no nonrandom influence acting upon this process. There is no Oscillation There is a nonrandom influence acting upon this process that is creating clustering Enter Key Slide Take Away (Key Point) Here International Standards for Lean Six Sigma 22 Scatter Plot (Optional) Average Expenses decrease as Sales Increase Enter Key Slide Take Away (Key Point) Here International Standards for Lean Six Sigma 23 Linear Regression (Optional) 95% confident that 94.1% of the variation in “Wait Time” is from the “Qty of Deliveries” F i tte d L i n e P l o t W a it T im e = 3 2 .0 5 + 0 .5 8 2 5 De live r ie s 55 S 1 .1 1 8 8 5 R-Sq 9 4 .1 % R - S q ( a d j) 9 3 .9 % 50 W a it Time 45 40 35 10 15 20 25 30 35 De liv e r ie s Enter Key Slide Take Away (Key Point) Here International Standards for Lean Six Sigma 24 One-Sample T-Test and Dot Plot (Optional) This Dot Plot graphically displays 95% confidence intervals that the data will fall between 23.45 and 32.75 for response time (see the red brackets and red line). It also indicates that the Mean (Red X) is at 28.1. The blue Ho marks the Target Mean. Dotplot of Improve Data (with Ho and 95% t-confidence interval for the mean) [ ] _ X Ho We Are 95% Confident The Improve Mean Is Not Statistically Different 0 10 20 30 40 50 Improve Data The test statistic, T, for Ho: mean = 30 is calculated as –0.84. The P-Value of this test, or the probability of obtaining more extreme value of the test statistic by chance if the null hypothesis was true, is 0.410 (> 0.05). This is called the attained significant level, or P-Value. Therefore, Accept Ho, which means we conclude that the Improve data set mean (28.1) is NOT different than the Target mean (30). Hypothesis Test: Is the Improve data set mean different from the Target Mean mean of 30 minutes? One-Sample T: Improve Data Test of mu = 30 vs mu not = 30 Variable N Mean StDev SE Mean Improve Data 30 28.10 12.45 2.27 Variable 95.0% CI Improve Data (23.45, 32.75) T -0.84 P 0.410 Enter Key Slide Take Away (Key Point) Here International Standards for Lean Six Sigma 25 Test for Equal Variance (Optional) Test for Equal Variance Confirms Payroll Input Type Cycle Time is Significant Test for Equal Variances for Total Time 95% Confidence Intervals for Sigmas Factor Levels Antenna Payroll 0 50 100 150 F-Test Levene's Test Test Statistic: 0.108 Test Statistic: 21.054 P-Value P-Value : 0.001 : 0.000 Boxplots of Raw Data Antenna Payroll 0 10 20 30 40 50 60 70 T otal T ime The spread of the data is statistical greater for completing the payroll form than the Antenna time tracking. Enter Key Slide Take Away (Key Point) Here International Standards for Lean Six Sigma 26 One Way ANOVA (Optional) Boxplots o f Ne t Hour by Part/No (means are indicated by solid circles) 150 100 Analysis of Variance for Net Hour Source DF SS MS Part/No 1 7421 7421 Error 69 59194 858 Total 70 66615 Level No Part Part N 27 44 Pooled StDev = Mean 21.99 43.05 29.29 StDev 19.95 33.70 50 0 Part/No Part F 8.65 P 0.004 Part It is also caused by the need for technicians to make a second visit to the end user to complete the part replacement. Next step will be for the team to confirm these suspected root causes. Box Plot: Part/ No Part Impact on Ticket Cycle Time No Part After further investigation, possible reasons proposed by the team are supplier backorders, lack of technician certifications and the distance from the supplier to the client site. Net Hours Call Open Individual 95% CI's For Mean --+---------+---------+---------+---(--------*---------) (------*------) --+---------+---------+---------+---12 24 36 48 Because the p-value <= 0.05, we can be confident that calls requiring parts do have an impact on the ticket cycle time. Enter Key Slide Take Away (Key Point) Here International Standards for Lean Six Sigma 27 Mood’s Median (Optional) Chi-Square = 19.14 DF = 2 P = 0.000 Month N<= N> Median 10 88 132 8.43 11 123 121 6.57 12 111 68 4.77 Overall Median 6.63 Q3-Q1 12.15 10.52 7.10 30 Dotplots of Defects by Subgroup Dot Plot: Part/ No Part Impact on Ticket Cycle Time 20 10 0 Subgroup Mood’s Median Test Individual 95.0% Confidence Interval’s ------+---------+---------+---------+ (--------+-------) (------+------) (-----+------) ------+---------+---------+---------+ 4.8 6.4 8.0 9.6 Before It is also caused by the need for technicians to make a second visit to the end user to complete the part replacement. Next step will be for the team to confirm these suspected root causes. 40 After After further investigation, possible reasons proposed by the team are supplier backorders, lack of technician certifications and the distance from the supplier to the client site. Defects Because the p-value <= 0.05, we can be confident that calls requiring parts do have an impact on the ticket cycle time. Enter Key Slide Take Away (Key Point) Here International Standards for Lean Six Sigma 28 Statistical Testing for Discrete Data (Optional) Chi-Square Test Expected counts (calculated by Minitab) are printed below observed counts Errors 33 40.46 Correct 60 52.54 Total 93 2 27 40.90 67 53.10 94 3 132 107.03 114 138.97 246 4 32 71.35 132 92.65 164 5 168 132.26 136 171.74 304 Total 392 509 901 1 Chi-Sq = 1.376 4.722 5.827 21.703 9.657 DF = 4, P-Value + 1.060 + + 3.637 + + 4.487 + + 16.714 + + 7.437 = 76.620 = 0.000 Because this p value is less than 5% (0.05), we can be confident that department does have an impact on the proportion of correct tickets processed This is due to the fact that Department 4 has fewer people who need to add information to each ticket, which reduces the chances that an error will be made. Also, in Department 4 the customer name, address and ticket number are added directly from the contracts system without human intervention, reducing the possibility that a typo or other error type could occur that will need to be corrected later (taking more time) Enter Key Slide Take Away (Key Point) Here International Standards for Lean Six Sigma 29 Process Takt Rate & Workload Balancing (Optional) Takt Rate Analysis compares the task time of each process (or process step) to: Each other to determine the time trap Customer demand to determine if the time trap is the constraint Task Time (seconds) Value Add Analysis - Current State Takt Time = 55 sec 80 70 60 50 40 30 20 10 0 Takt Time = Net Process Time Available Number of Units to Process 1 2 3 CVA Time 4 5 6 Task # BVA Time 7 8 9 10 NVA Time Enter Key Slide Take Away (Key Point) Here International Standards for Lean Six Sigma 30 In/Out of Frame (Optional) Creating a visual depiction of what elements of the project are in the scope (frame) and out of the scope Vital X #7 Vital X #2 Influence No Control Vital X #8 Vital X #1 Vital X #5 Vital X #3 Vital X #4 Control Vital X #6 Vital X #9 Enter Key Slide Take Away (Key Point) Here International Standards for Lean Six Sigma 31 Systems & Structures Assessment (Optional) System or Structure How should we use or modify to support "____" vision and objectives? 1 Staffing 2 1 Training & Development 2 Measurements & Reward 1 2 Communication 1 2 Organization Design 1 2 Information Systems 1 2 Resource Allocation 1 2 Enter Key Slide Take Away (Key Point) Here International Standards for Lean Six Sigma 32