Doppler Spectro Imager PI: F.X. Schmider (Observatoire Côte d’Azur, F) PM: Fréderic Rouesnel (Institut d’Astrophysique Spatiale, F) DSI-ECHOES team Cosmic Vision 2015-2025 Assessment Definition Implementation Phase 0/A Phase A/B1 Phase B2/C/D TRL ≥5 Euclid M-class missions DOI: Declaration of Interest AO: Announcement of Opportunity LOE: Letter of Endorsement MLA: Multi-Lateral Agreement Plato M1 launch Spica M2 launch Marco-Polo Cross-Scale Solar Orbiter Instruments AO LOE L-class missions DOI MLA TRL ≥5 EJSM/Laplace TSSM/Tandem L1 launch Lisa IXO Instruments DOI 2008 2009 AO LOE 2010 2011 MLA 2012 2013 2014 2015 2016 2017 2018 2019 2020 2 Doppler Spectro Imager • Science goal : Formation and evolution of the Solar System • 2 objectives: Internal structure (M1) • Atmosphere study (L1 to L4) 3 Jovian seismology Main goal Solar system formation scenarii: accretion, gravitational instability ? Key question Does Jupiter have a core ? If any, what size/mass ? What happens at the transition metalic/molecular hydrogen ? The tool Seismology : most performant way to investigate planetary and stellar internal structures (e.g. SOHO for the Sun, CoRoT for the stars) Measurement of mode frequencies up to degrees l=100 Complementarity with JUNO gravitational moments from Guillot et al. 2004 Study of the upper troposphere Main goals Origin of the global circulation of Jupiter, Structure of the troposphere: interaction between the envelope and the upper atmosphere Structure of the band system: its relation to differential rotation Key measurements - Travelling waves detection and characterisation (cross-correlation): dynamics and composition - Velocity field: thermodynamics quantities and the “potential vorticity” This latter quantity can be deduced from observations of the wind field, together with temperature profiles of the atmosphere. The tool Doppler measurements 3D velocity maps wave propagation 5 DSI – ECHOES Probing internal structure Theoretical works: Vorontsov 76, Bercovici & Schubert 87, Gudkova & Zarkhov 99, Lognonné 2007 obs - theoretical Inversion method obs - theoretical 6 DSI – ECHOES Detection of acoustic modes Best detection level: 1 bar Velocity measurement 2D images and velocity maps at 1 frame/mn Mode frequencies = [0.5 - 3.5] mHz Mode amplitudes = [10 - 50] cm/s (Bercovici and Schubert, 1987) 7 Instrument Study Team organisation LESIA (France) B. Mosser JPL (USA) Neil Murphy 8 Instrument Study Study Team OCA IAS J-B Daban Local Manager Frederic Rouesnel Project Manager Yves Bresson Optique Gilles Morinaud Mecanique Carole Gouvret Optique Véronique Hervier Electronique Cathy Blanc Gestion Boubacar Bah Electronique Anne Philippon Optique JC Clec’h Thermique Didier Campistron Qualité Chloe Gallar Assistante Projet 9 Instrument Study Team members Sylvie Robbe OCA France 10 DSI – ECHOES SYMPA results • First instrument dedicated to Jovian seismology • Fourier transform tachometer: velocity measurement with spatial resolution • Ground based network: 2 (3) instrument on 1.5 m telescopes • Presence of a periodicity of 156 µHz in the density power spectrum ℓ= 0 and ℓ =1 • First clear evidence for Jovian acoustic mode (Gaulme et al 2010, to be submitted) 11 DSI – ECHOES Instrument principle Fourier tachometer Fixed OPD Mach Zehnder interferometer Four output images in phase quadrature OPD modulation for calibration Solar reference for absolute velocity 12 DSI – ECHOES Velocity measurement Measurement of combined vertical and horizontal velocities: sum of Doppler shifts in direction of the Sun + in direction of the S/C Seismology: search for velocity variations Global noise level < 1 cm²/s²/µHz up to l=100 Atmosphere: following of structure with jovian rotation separates vertical and horizontal components Precision: 20 m/s/px/hr (400x400 pxs @ 150 km ) DSI – ECHOES Mission scenario Atmosphere Seismology 14 DSI – ECHOES Block diagram 15 DSI-ECHOES Optical study Mach-Zehnder Equivalent pupil diameter: 3.2 cm Equivalent focal lengh: Full field: 2.72 degrees Pixel size: 18 µm 16 DSI - ECHOES Mechanical design Fine pointing mirror Filter Pupil Door Triplet Large pointing mirror Baffles Doublet Interferometer unit 17 DSI - ECHOES Mechanical design Mach-Zehnder support: Titanium plate Modulation PZT support Fine guiding mirror with PZT 18 DSI - ECHOES Thermal and mechanical studies 19 DSI - ECHOES Focal Plane Assembly Hydra Startracker Sodern 20 DSI - ECHOES Calibration concept The in-flight calibration should follow 3 steps: sun Optical fibers Diffuser Door Baffle 1st lens - Distortion calibration: A star is pointed by the S/C and acquired in the DSI field and its position measured on the four sub images. Differential positions on the sub-images provide the algorithm of distortion correction. - Flat field calibration: Uniform illumination of the field is performed, with an internal source. - Fringe calibration: with solar light uniform illumination, the MZ OPD is modulated at 0, p/2, p, 3p/2, allowing the determination of the OPD dependence in the field, i.e. the fringe contrast and phase (OPD) at any point in each sub-image. 21 DSI – ECHOES Interface and resources Instrument type Mass Power consumption Operating temperature Operating temperature stability Data volume Data products Wavelengths FOV Spatial Resolution Filter bandwidth Noise Velocity Level Exposure times Detection Absolute calibration Pointing stability Mass Power consumption Volume Mass Volume Power consumption Compact interferometer 16.4 Kg 23.2 Watts with 25% margins -10°C to 40°C 0.5 °C/h 70 Gbits Velocity/intensity/ polarization maps DSI-ECHOES – I unit [519-520] nm 2.72 deg. 25 arcsec / pixel 1 nm 1 cm²/s²/µHz in [0.5 - 4] mHz range 5s APS - 1k× 1k - 18 µm pix. (rad-hard qualified) 10 m/s 0.54 arcsec rms (1 s) over 5 s 13.0 Kg 6.37 Watts (640 x 270 x 175) mm3 DSI-ECHOES – E/F unit 3.4 Kg (290 x 220 x 95) mm3 16.88 Watts 22 DSI – ECHOES Descope options 23 DSI – ECHOES Follow- up Before the AO [..] will complete the study of each sub-system and will examine the technical descope options in order to reduce the S/C resources requirement. It will be focussed on the full data acquisition and treatment simulation, in order to eliminate possible redundancies in the calibration system and reduce the data rate. […] also pay attention to the consolidation of the consortium for the AO answer. Two TDAs are also being carried: complete MZ breadboarding R&T on going, radiation mitigation. “Other subsystems require a special attention to reach the TRL 5 before 2012. Although these subsystems are not technological development, these activities are listed in the planning.” Calibration sub-system Detector Unit (PRNU stability) R&T submitted for 2011 DSI – ECHOES Global budget • Global Budget for DSI-Echoes (overall PFM program) : DSI - Echoes ROM cost Budget Allocations (k€) ≤ 2010 0/A 2011 A 2012 A/B1 2013 B1 2014 B2 2015 C/D 2016 C/D 2017 C/D 2018 C/D 2019 C/D 2020 C/D > 2020 E Total Total Equipment (HW / SW) and Eng. Studies 4 82 87 103 122 160 407 792 1019 500 40 20 3336 AIT / AIV, GSE and Harness 0 48 23 27 38 162 219 232 232 232 87 10 1310 Calibration and Facilities 0 25 10 25 39 65 65 65 127 85 114 90 710 Operation & Data Processing Center 0 0 0 0 0 0 0 0 50 50 197 400 697 Missions & Colloquium 20 15 26 26 35 51 51 51 51 51 51 462 893 PA / QA sub-contractors 0 65 131 131 131 131 131 131 131 131 131 720 1963 Technical Assistance sub-contractors (CDD) 8 48 88 88 88 88 88 88 88 88 88 605 1453 Outpblic Relation 0 2 2 2 2 5 5 5 10 10 10 84 137 CNES funding (k€) - total per year 32 286 367 402 455 662 966 1364 1708 1147 718 2391 10499 French manpower cost (INSU ressources) 291,60 442,80 702,00 928,80 1000,80 1022,40 1051,20 1144,80 1177,20 1292,40 1018,80 622,80 10073 Other funding contribution (HW/SW phase E excl.) 0,00 46,00 87,00 248,00 265,00 348,00 427,00 796,00 592,00 256,00 38,00 0,00 3103 Other funding contribution (Man power) 55,08 136,00 311,10 484,50 484,50 421,60 421,60 421,60 421,60 421,60 421,60 0,00 4001 Total non CNES (k€) 346,68 624,80 1100,10 1661,30 1750,30 1792,00 1899,80 2362,40 2190,80 1970,00 1478,40 622,80 17799 DSI – ECHOES WBS General duties and/or responsabilities Payload - DSI-Echoes (DSI - I / E / F) Project management System engineering PA management (including PP activities) AIT/AIV activities Local management (technical and product assurance) Science working group Public Outreach Post-delivery support Optics(design, tolerancies budget and manufacturing) Optical metrology(control and metrology) Optical analysis(MZH and parasite light) Mechanical design(design, tolerancy budget and manufacturing) Door design with mechanism(design, tolerancy budget and manufacturing) Detection chain (detector , focal plane and FEE) Calibation sub-system (design, tolerancies budget and manufacturing) Thermal design (design, studies and manufacturing) Main electronic unit HW (DPU and PSU - design and manufacturing) Main electronic unit SW (software algorithm, devlopment and validation) Proximity Electronics (design, manufacturing and qualification) Environmental tests (thermal, humidity and EMC/ESD) Functional and performances tests@ system level (optics, mechanisms and electronics) Visible calibration @ system level (facilities and integrated tests level) Visible calibration @ sub-system level (facilities and tests) Radiation Qualification Programme (facilities and tests) Instrument GSE (design, upgrade and delivery) Flight harness (design and manufacturing) Ground segment - activities and responsibilities Science Operation Center (operation, science planning, quick look data visualization, data pipeline and distribution) Science Data Processing (calibration and analysis software, data processing and archiving) 26 DSI ECHOES Man Power OCA 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2020 + Total Local Manager 0% 25% 30% 30% 30% 30% 30% 20% 20% 40% 40% 20% 50% 3,65 PAM / QAM Optical Engineer (design / architecture / Test) Mechanical Technician (AIT OGSE / MGSE) Testing (Func, Perfo and Calibrations) Software Engineer (data processing / archiving) Electrical Technician (AIT / harnesss) 0% 0% 10% 10% 10% 10% 10% 10% 10% 10% 20% 10% 20% 1,30 20% 75% 75% 50% 75% 75% 75% 75% 50% 50% 50% 20% 0% 6,90 0% 0% 10% 10% 0% 0% 0% 10% 10% 0% 0% 0% 0% 0,40 0% 0% 50% 75% 75% 50% 50% 50% 50% 50% 50% 25% 200% 7,25 0% 0% 50% 50% 50% 25% 50% 25% 50% 50% 50% 50% 150% 6,00 0% 0% 10% 0% 0% 0% 0% 15% 15% 0% 0% 0% 0% 0,40 TOTAL 0,2 1 2,35 2,25 2,4 1,9 2,15 2,05 2,05 2 2,1 1,25 4,2 22,25 Phase Projet 0/A 0/A A/B1 B2 B2 C/D C/D C/D C/D C/D Proto OM EM EM EQM EQM EQM FM FM C/D FS GRM E Propal A/B1 Proto A0 EJSM / DSI-Echoes Fizeau Technical Team Model - 27 DSI – ECHOES Technology Development Activity • Study Phase (TDAs) - ROM cost estimated to 587 k€ (2011 / 2012) Activités Fincancement étranger Fincancement français MZH prototype R&T (acquis : 80 k€, demandé: 90 k€) Supp. 2012 : 50 k€ - TBC - Radiation (component lev.) 55 keuros 10 keuros (IFSI) Calibration prototype 120 k€ (2 ans) 27 k€ (Luxembourg) Detector Unit 135 k€ (2 ans) – R&T submitted 20 k€ (Luxembourg) R&T MZ Objectif général Atteindre TRL 5 pour le bloc Mach Zehnder: s’assurer de la faisabilité du composant contrôler ses performances dans un environnement thermique représentatif du S/C. Plan général d’actions • Spécification du MZ • Etude du MZ (configuration géométrique et choix des verres) et du banc de test ; • Approvisionnement du prototype de MZ et autres composants pour le banc de tests ; • Intégration, réalisation des tests et rapport de qualification. Financement CNES 80 k€ 2010 90 k€ 2011-2012 (demandé) Thése Laurence Soulat Sujet de thèse « Mise en œuvre d’un interféromètre imageur de Mach-Zehnder pour la sismologie de Jupiter » 30 R&T Schéma du banc de tests Masque de champ Masque pupille Sortie 2 Sortie 1 Contrôle de la ddm Mesure de qualité de front d’onde dans les 2 sorties Contrôle de l’échantillonnage, du contraste et de la régularité des franges Mesure de stabilité thermique de la ddm Mesure de transmission dans les 2 voies, mesure de polarisation. Vide Four Appareillage de mesure : -analyseur de front d’onde -optique + caméra -polariseur + détecteur… Contrôle de la fonction de calibration, ajustement de ddm en fonction de T°, stabilité de la platine R&T Partage des responsabilités Planning R&T MZ R&T MZ Manpower OCA 2010 2011 Phase A Manpower R&T MZ DSI - 2,35 2012 Phase B (homme.an) 3,45 3,3 9,1 7,75 FIZEAU OCA 1,9 3 2,85 Management Ingénierie optique Ingénierie mécanique Ingénierie informatique Thèse 0,5 0,5 0,5 1 0,1 1 0,25 1 0,1 0 0,25 0,25 0,3 1 1 0,45 0,45 0,45 0,2 0,2 0,2 0,25 0 0,25 0 0,25 IAS - Management - Ingénierie mécanique/thermique - Qualification environnement spatial Total 1,35