Border Data Warehouse The Cascade Gateway Variable Message Signs Southbound Northbound CascadeGatewayData.com Volume Departure rate Delay Queue length (meters) Vehicles in queue Project product BWT border wide interface • Nationally summarized wait time data • Portal to regional archives Cascade Gateway data warehouse • Standard format wait time data • Other, regionally available border data Existing Niagara region data warehouse Border region data warehouse 3 Border region data warehouse 4, etc. • Standard format wait time data • Other, regionally available border data • Standard format wait time data • Other, regionally available border data • Standard format wait time data • Other, regionally available border data Project product Future Future Simplified comparison of Cascade Gateway ATIS and Niagara BWT schema Cascade Gateway • • • • • • • • • • • • • • • • • • • • Organization (WSDOT or BC MoT) Data collection period Organizational identifier Detector report Crossing (crossing & traffic type) • Crossing ID • Status (open, closed) • Lanes (fixed number of lanes) • Link direction • Delay • Open lanes • Queue length • Vehicles in queue • Service rate (vehicles per hour) Date Lane data (actually loop data?) Detector lane number Detector ID Detector vehicle speed Detector vehicle count Detector occupancy Detector average-vehicle length Detector start time Detector end-time Link measurement duration VDS identifier (actually loop IDs) VDS name (loop names) Link direction ATC error code Niagara • Network status • Lane (Traveler, NEXUS, Commercial, FAST) • Port of Entry code • System status (operational, down) • Time/date of last update • Delay • Wait time event • System readiness Border-wide BWT system data elements for highlevel schema • Location (port name) • Direction (to U.S., to Canada) • Traffic type (Passenger, NEXUS, Commercial, FAST) • Time unit associated with records • System status (operational, down) • CURRENT delay of cars now arriving at port • ACTUAL delay of cars now departing port Task category 1. Establish project advisory committee 2. Identify system component owners 3. Document BWT systems data 4. User needs survey, & BIFA integration 5. Site visit, systems requirements, agreements 6. Scope for developer 7. Consultant engagement and project management 8. System maintenance strategy and plan 9. Project report & developer documetation 2012 2013 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Sample of System Requirements • The custom query shall result in multiple output types including data table, chart, and downloadable file. • The custom query tool shall allow users to select date ranges and days of the week. • The custom query tool shall allow users to group by month, day of week, day, am/pm, hourly, or by five minute increment. • The custom query tool shall allow users to query multiple detectors or crossings at a time. Over 100 requirements were identified for Cascade Gateway Border Data Warehouse